WSDOT Projects

text size: T T T

I-5 - South 317th Street HOV Direct Access - August 2005

caption below photo
We're using this machine to bore under northbound and southbound I-5 and place conduit (tubes) for lighting system wiring without digging an open ditch across the roadway. 

caption below photo
Near S. 320th crews place forms for barrier around the steel framework. 

caption below photo
Installing drainage structures in the median. Notice the S. 317th bridge at the upper right and the wall for the new HOV ramp stretching northward from the bridge. 

caption below photo
A wall for one of the new HOV ramps stretches southward from a retaining wall near the S. 317th bridge.  Buses, carpools and vanpools will pass under the S. 320th bridge (at the top of this photo) as they ascend to or descend from the S. 317th bridge. 

caption below photo
Installing a base for a new freeway light pole in the median. 

caption below photo
The widened portion of the northbound I-5 bridge over Military Road.  The HOV lane will be extended across this bridge and all the way to S. 320th Street as part of this project. 

shaft drilling
Electricians excavate a shaft for a freeway light pole. 

barrier construction in median
Workers place forms for the traffic barrier next to southbound I-5.  

close up shot of barrier construction
Crews pour concrete inside the forms of the barrier. 

roundabout construction
Crews install drainage structures at the new roundabout site at S. 317th and 28th S.