|
Project Title & Location
I-5/ NE 175th St to NE 205th St - Shoreline
|
Project Description
This project will widen NB I-5 to provide an auxiliary lane between NB on ramp at NE 175th St to NB off ramp at NE 205th St. Existing 11 foot general purpose (GP) lanes will be re-striped to 12 feet. Widening the NB on ramp at NE 175th St will provide extra GP storage at this metered location. The purpose is to improve operations and safety on I-5 by adding a NB auxiliary lane for merging and exiting traffic.
|
|
Contractor/Consultant
Project was awarded to Pacific Road & Bridge Company.
|
|
Recent Progress
The new auxiliary northbound lane is opened to traffic. Contractor completed southbound retaining wall 2. Contractor is currently installing last panels of the southbound noise wall as well as striping northbound I-5. Next a detention pond will be excavated by the recently finished retaining wall 2 and southbound I-5 will be re-striped.
|
|
Design Construction Impacts
None at this time.
|
|
Environmental Impacts / Compliance
The contractor is utilizing Best Management Practices during construction to avoid impacts to the environment.
|
Impacts to Traffic
Motorists will experience daytime shoulder closures and periodic lane and ramp closures during evening hours.
|