Skip Top Navigation

I-5 - Interstate Bridge to 39th Street Paving - Project Map

Project map

This project paves and resurfaces 2.35 miles of I-5 through downtown Vancouver. Paving work will repair cracks and potholes on both directions of mainline I-5 and several interchange ramps between the Interstate Bridge (milepost 0.0) and NE 39th Street (milepost 2.35). 


Pavement life cycle

To maximize our resources and limit interruptions to traffic, we try to repave roadways at just the right time. We try to catch roadways when they have some damage, but are not so damaged that they will require additional repairs. If we wait too long to repave, the damage to the roadway can lead to even greater costs. Learn more about WSDOT's pavement management program.