10-04-04 - Crews poured a few sections of the tree patterned noise wall.

10-04-04 - Crews will use the tree pattern to imprint the noise wall.

Artist rendition of the new noise wall that will be built along southbound I-5
in Bellingham, between the Ohio Street on ramp and the Lakeway Drive exit.

This is what the finished noise wall will look like. There will be tree patterns imprinted on the noise wall.

Looking west across I-5 from the northbound I-5 Lakeway Drive on ramp
prior to construction. The noise wall will be built on the west side of south-
bound I-5 between Ohio Street and Lakeway Drive.

The noise wall is superimposed on this picture to show the location of the
noise wall.

Laying the foundation for the noise wall. 06-21-04

A close up view of the rebar for the noise wall. 06-22-04

Placing rebar in the foudation and preparing for the concrete pour.
06-22-04

The noise wall is on the west side of southbound I-5 and will help reduce
freeway noise in local neighborhoods.

Pouring concrete into the base of the noise wall. 6-24-04