I-405 Totem Lake Freeway Station - September 2006

looking north at the new HOV ramps and bridge from NE 124th Street
September 18 - Looking north from the NE 124th Street bridge at the new HOV ramps and NE 128th Street bridge. They're beginning to look like the artist's drawing that was done during the design phase.

looking south from the new NE 128th Street bridge
September 18 - On the east half of the new NE 128th Street Bridge, looking south toward NE 124th Street. The new HOV ramps (right) have taken shape over the summer. 

pouring concrete for the NE 128th Street bridge deck
September 13 - Crews pour concrete for the bridge deck on the west half of the new NE 128th Street bridge.