
September 18 - Looking north from the NE 124th Street bridge at the new HOV ramps and NE 128th Street bridge. They're beginning to look like the artist's drawing that was done during the design phase.

September 18 - On the east half of the new NE 128th Street Bridge, looking south toward NE 124th Street. The new HOV ramps (right) have taken shape over the summer.

September 13 - Crews pour concrete for the bridge deck on the west half of the new NE 128th Street bridge.