I-405 - Renton - Slide Repair and Culvert Replacement - Pipe System

pipe system diagram

In the creek diversion system generators power the pumps that push water into three 24-inch pipes that run south along the I-405 shoulder.  The pipeline then turns onto northbound Talbot Road and into a wetland.  The first run (in green) is up and running. All three pipes were operational by Dec. 23.  

WSDOT also has a secondary, back-up pumping system that pushes water into a storm drain along the I-405 shoulder to the north of the creek.