I-405 - Renton Widening Stage 1 - March 2008 Photos

SR 167 southbound widening

Crews insert timbers into the ground along SR 167 in order to stabalize the soil.
Crews insert timbers into the ground along SR 167 in order to stabalize the soil.

I-405 bridge over Tukwila railroad lines - demolition of edges

Exposed rebar seen over the rail lines in Tukwila.  This I-405 bridge will be widened about two feet on both sides.
Exposed rebar over the railroad tracks in Tukwila. This I-405 bridge will be widened by about two feet on both sides.

Cres use hydraulic scissors to munch away the edge of the I-405 bridge over the rail road lines in Tukwila.
Crews use hydraulic scissors to munch away the edge of the I-405 bridge over the railroad tracks in Tukwila.

The southern side of the i-405 bridge over the rail lines in Tukwila after demolition.
The southern side of the I-405 bridge over the railroad tracks in Tukwila after demolition.

Building the new I-405 bridge over Oakesdale Ave SW

Crews pour concrete into a form for a set of piers for the new I-405 bridge over Oakesdale Ave. and Springbrook Creek.
Crews pour concrete into a form for a set of piers for the new I-405 bridge over Oakesdale Avenue and Springbrook Creek.

Bridge crews form the pier caps for the new bridge over Oakesdale Ave. and Springbrook Creek.
Bridge crews form the pier caps for the new bridge.

Bridge and concrete workers build the piers that will hold the new I-405 bridge over Oakesdale Ave SW.
Bridge and concrete making progress on the new I-405 bridge over Oakesdale Ave SW.