Skip Top Navigation

I-405 Renton Widening Stage 1 - July 2008 Photos

A construction worker removes the form of a concrete retaining wall.
A construction worker removes the form of a concrete retaining wall.

Workers install a catch basin along I-405.
Workers install a catch basin along I-405.


Workers install a drainage pipe along I-405.
Workers install a drainage pipe along I-405.