Project Evaluation: I-5, Ash Way Park & Ride Direct Access Bridge
Lynnwood, Snohomish County This Sound Transit-funded project provides a new bridge over southbound I-5 and direct access ramps connecting I-5 HOV lanes and the Ash Way Park-and-Ride. On workdays, more than 180 Community Transit and Sound Transit buses now travel above three lanes of traffic to enter and exit I-5 HOV lanes instead of merging through lanes of freeway traffic. This means less congestion and a faster commute for both bus riders and drivers.
This report reviews only the second phase of the project, which includes a bridge over southbound I-5 and other work not completed in the first phase. The first phase of work, which involved a different contractor, was reviewed in the 2004 Construction Highlights Report: www.wsdot.wa.gov/Projects/Highlights/2004/i5ashwayparkandridedirectaccess.htm
Construction Summary During this second phase of work on the project, contract plans and design were solid. Minor clarification was needed and none resulted in a change order. We and our contractor, Mowat, worked as a team very successfully. We tackled many problems with minimal impact. Mutual cooperation and problem-solving converted this potentially problematic project into a very successful one. This second phase of the project was completed on schedule.
Contact Information Contractor: Mowat, Woodinville
WSDOT Contact: Amir Ahmadi, Project Engineer (425) 225-8700 ahmadi@wsdot.wa.gov
For more information: www.wsdot.wa.gov/Projects/I5/AshWayPR
back to top
|