2005 Construction Highlights Report

Each spring the Washington State Department of Transportation selects a handful of highway construction projects from each of our region offices for a year-end evaluation of the project's construction phase. The 2005 Construction Highlights Report provides the results of this self-assessment of our on-time and on-budget performance. This is WSDOT’s fifth annual report.

These 25 projects, selected back in April 2005, provide a snapshot of the variety, complexity, and size of our Construction program.  Nine of the projects (37.5%) had five-star ratings in each of the four evaluation categories.  Our project evaluation standards focus on design, construction administration, schedule and cost, and rates each project in these categories.

This report is just a sampling of the many projects that were built in 2005.  There were 186 active construction projects ranging in cost from $68,000 to $615 million (construction contract amount for the Tacoma Narrows Bridge).  This represents approximately $1.884 billion in ongoing work.

Below are the construction projects that were completed, or nearly completed, during the 2005 construction season (one project was not awarded due to contractor's bids coming too high). 

Project Design Construction
Management
Schedule Cost
I-5, James to Olive
Icon indicating Nickel Project US 12, SR 124 to McNary
SR 14, Cape Horn Rockfall
I-90, George Paving
I-90, Argonne Signal    
US 97, Tonasket Paving
Icon indicating Nickel Project SR 161, 204th to 176th
SR 225, Benton City Paving
SR 240, Yakima River Bridge
I-5, Ash Way
SR 9, US 2 Interchange
I-90, SR 26 Interchange
I-90, Harvard Ped/Bike Bridge
US 2, Spokane River to Euclid
SR 16, 36th to Olympic
SR 20, SR 20 Spur to SR 536
SR 161, 128th to 176th
SR 432, I-5 to Oregon Way
US 101, SR 105 Mitigation
SR 164, 158th Ave Turn Lanes
Icon indicating Nickel Project SR 527, 132nd to 112th
Icon indicating Nickel Project I-5, S 317th HOV Direct Access
Icon indicating Nickel Project I-5 Roanoake Noise Wall
I-90, I-405 Bridges - Seismic
I-5, I-205 to N. Fork Lewis River Not rated     Not rated Not rated Not rated