Skip Top Navigation Skip to Content
Before - SR 155 at Elmer City. Construction - An oil and gravel application near the Loup Loup summit on SR 20 in 2008. Construction - The gravel is compacted with rollers. Construction - Crack sealing on SR 153 near Methow.Construction - A pilot car operated to guide drivers around the paving work zone. After - New pavement, striping and crosswalk markings at Elmer City. Before - SR 155 at MP 30 (about a mile south of Elmer City) After - SR 155 at MP 30 with new pavement, striping and centerline rumble strips.