﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - September</title>
    <link>http://www.wsdot.wa.gov/News/2012/09/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Fri, 24 May 2013 22:07:47 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - September</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/News/2012/09/</link>
    </image>
    <item>
      <title>New tool opens door to transportation-related jobs for small businesses</title>
      <pubDate>Sat, 29 Sep 2012 00:06:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2012/09/SmallBusinessProgram.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2012/09/SmallBusinessProgram.htm</guid>
      <description>New tool opens door to transportation-related jobs for small businesses</description>
    </item>
    <item>
      <title>WSDOT holds contractor to fire-safety requirements at Taylor Bridge</title>
      <pubDate>Sat, 22 Sep 2012 00:18:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2012/09/NoticetoContactorTaylorBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2012/09/NoticetoContactorTaylorBridge.htm</guid>
      <description>WSDOT holds contractor to fire-safety requirements at Taylor Bridge</description>
    </item>
    <item>
      <title>Tacoma Narrows Bridges appear melted in new Web maps</title>
      <pubDate>Fri, 21 Sep 2012 05:13:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2012/09/20_bridgesappearmelted.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2012/09/20_bridgesappearmelted.htm</guid>
      <description>Even The New York Times today paid attention to a tweet from the Washington State Department of Transportation when the agency assured people the iconic Tacoma Narrows Bridges have not melted.</description>
    </item>
    <item>
      <title>Construction work closes St. Johns Blvd. at SR 500 Sept. 21-24</title>
      <pubDate>Thu, 20 Sep 2012 03:06:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2012/09/19_StJohnsClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2012/09/19_StJohnsClosed.htm</guid>
      <description>VANCOUVER – Planning to use the newly opened State Route 500 interchange at St. Johns Boulevard this weekend? One last piece of construction work may change drivers’ plans.</description>
    </item>
    <item>
      <title>Vehicle registration holds placed for some toll violators</title>
      <pubDate>Tue, 18 Sep 2012 03:15:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2012/09/17_vehicleholdsplacedforunpaidtolls.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2012/09/17_vehicleholdsplacedforunpaidtolls.htm</guid>
      <description>Vehicle registration holds placed for some toll violators</description>
    </item>
    <item>
      <title>Automated speed-enforcement cameras coming to Snoqualmie Pass</title>
      <pubDate>Tue, 11 Sep 2012 03:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2012/09/10_workzone_speed_camera_I90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2012/09/10_workzone_speed_camera_I90.htm</guid>
      <description>Automated speed-enforcement cameras coming to Snoqualmie Pass</description>
    </item>
    <item>
      <title>SR 500/St. Johns Blvd. interchange opening ahead of schedule</title>
      <pubDate>Mon, 10 Sep 2012 22:17:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2012/09/10_SR500RibbonCutting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2012/09/10_SR500RibbonCutting.htm</guid>
      <description>Construction crews are three months ahead of schedule and just days from fully opening a new interchange for smoother driving and safer travels on State Route 500 and St. Johns Boulevard.</description>
    </item>
    <item>
      <title>Brighter, tougher lane stripes coming to a highway near you</title>
      <pubDate>Sat, 08 Sep 2012 00:27:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2012/09/7_statewidedurablestriping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2012/09/7_statewidedurablestriping.htm</guid>
      <description>The worn-out stripes along some of the state’s busiest highways will soon be a thing of the past as crews get ready to restripe about 40 miles of roadway, in eight counties, along six routes.</description>
    </item>
    <item>
      <title>Getting things straight on SR 14 in western Skamania County</title>
      <pubDate>Wed, 05 Sep 2012 01:22:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2012/09/04_SR14_MarbleRoadConstructionStart.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2012/09/04_SR14_MarbleRoadConstructionStart.htm</guid>
      <description>WASHOUGAL – The curves on State Route 14 in western Skamania County can throw you for a loop, especially if you’ve never driven them before.</description>
    </item>
    <item>
      <title>State Route 6 closed for bridge paving Sept. 7-10</title>
      <pubDate>Wed, 05 Sep 2012 00:24:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2012/09/4_SR6_RiversideBridge_overlay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2012/09/4_SR6_RiversideBridge_overlay.htm</guid>
      <description>The transportation artery carrying drivers between Chehalis and Adna (and points further west) will close for three days while crews to repair and repave the State Route 6 Riverside Bridge.</description>
    </item>
  </channel>
</rss>