﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - 2011</title>
    <link>http://www.wsdot.wa.gov/News/2011/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Sat, 25 May 2013 07:50:12 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - 2011</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/News/2011/</link>
    </image>
    <item>
      <title>Tolling on 520 day 2: Good To Go! for 2012</title>
      <pubDate>Sat, 31 Dec 2011 11:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/30_520tollingday2.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/30_520tollingday2.htm</guid>
      <description>Evening rush hour was predictably light for the second day of tolling on the SR 520 floating bridge. As 2011 comes to a close, drivers prepare for changes to their commute on Tuesday.</description>
    </item>
    <item>
      <title>Smooth first day of tolling on SR 520 floating bridge</title>
      <pubDate>Fri, 30 Dec 2011 11:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/29_SR520TOLLINGFIRSTDAY.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/29_SR520TOLLINGFIRSTDAY.htm</guid>
      <description>Tolling on the State Route 520 bridge began as planned at 5 a.m. today, when the first tolled car since June 1979 crossed the bridge.</description>
    </item>
    <item>
      <title>White Christmas? Pack patience and tire chains</title>
      <pubDate>Thu, 22 Dec 2011 02:56:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/21_chirstmastravel2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/21_chirstmastravel2011.htm</guid>
      <description>A white Christmas? Could be – at least in the mountains. Travelers should plan to pack tire chains and a winter kit alongside presents before hitting the road.</description>
    </item>
    <item>
      <title>It’s official: Tolling on SR 520 bridge starts Dec. 29</title>
      <pubDate>Thu, 08 Dec 2011 00:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/7_sr520tollsstartdec29.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/7_sr520tollsstartdec29.htm</guid>
      <description>Tolling on the State Route 520 bridge starts December 29, 2011</description>
    </item>
    <item>
      <title>Comments sought on four-year program of transportation projects</title>
      <pubDate>Sat, 03 Dec 2011 06:20:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/Draft2012STIP.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/Draft2012STIP.htm</guid>
      <description>Comments sought on four-year program of transportation projects</description>
    </item>
    <item>
      <title>Public comments sought on rural and special needs mobility programs</title>
      <pubDate>Sat, 03 Dec 2011 03:20:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/02_RuralandSpecialNeedsPrograms.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/02_RuralandSpecialNeedsPrograms.htm</guid>
      <description>Public comments sought on rural and special needs mobility programs</description>
    </item>
    <item>
      <title>Photo tolling on the Tacoma Narrows Bridge starts Dec. 3</title>
      <pubDate>Fri, 02 Dec 2011 06:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/01_TNBPhotoTollingStarts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/01_TNBPhotoTollingStarts.htm</guid>
      <description>Drivers who cross the Tacoma Narrows Bridge will have additional options starting this weekend. On Saturday, Dec. 3, the Washington State Department of Transportation will activate photo tolling and introduce more ways to pay for a toll.</description>
    </item>
    <item>
      <title>SR 20 – North Cascades Highway closes for winter</title>
      <pubDate>Tue, 22 Nov 2011 08:45:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/21SR20NCHcloses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/21SR20NCHcloses.htm</guid>
      <description>Last Tuesday's temporary closure becomes permanent due to increasing avalanche danger.</description>
    </item>
    <item>
      <title>Federal rail funding advances King Street Station restoration</title>
      <pubDate>Tue, 22 Nov 2011 06:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/21_KingStreetStationfunding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/21_KingStreetStationfunding.htm</guid>
      <description>The Washington State Department of Transportation and the Federal Railroad Administration signed agreements today, Nov. 21, securing $16.7 million in federal high-speed-rail funds to support the next phase of the King Street Station restoration project. The station is the busiest in the Pacific Northwest, serving nearly half a million Amtrak Cascades passengers in 2010.</description>
    </item>
    <item>
      <title>What makes a good holiday trip? Knowing before you go</title>
      <pubDate>Sat, 19 Nov 2011 02:13:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/18_Thanksgiving2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/18_Thanksgiving2011.htm</guid>
      <description>As the holidays draw near and temperatures drop, the Washington State Department of Transportation has tips on how to be ready for winter weather driving and avoid Thanksgiving holiday weekend highway backups.</description>
    </item>
    <item>
      <title>Seattle shipyard selected to build new Eastern Washington ferry</title>
      <pubDate>Fri, 18 Nov 2011 01:11:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/17_KellerFerry.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/17_KellerFerry.htm</guid>
      <description>Foss Maritime Co. of Seattle will build a replacement 20-car state ferry to operate on Lake Roosevelt, a remote location requiring the ferry be built in sections and transported across the state.</description>
    </item>
    <item>
      <title>SR 20 North Cascades Highway temporarily closing</title>
      <pubDate>Wed, 16 Nov 2011 07:36:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/15SR20NCHwyTempClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/15SR20NCHwyTempClosure.htm</guid>
      <description>SR 20, The North Cascades Highway is closing at 8 p.m. Tuesday Nov. 15 due to forecast heavy snowstorms.  Reopening will be reassessed Monday.</description>
    </item>
    <item>
      <title>Wind, snow, avalanche danger close Chinook and Cayuse passes</title>
      <pubDate>Tue, 15 Nov 2011 05:00:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/Chinookandcayuseclosed2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/Chinookandcayuseclosed2011.htm</guid>
      <description>Several feet of snowfall over the weekend sent Chinook (State Route 410) and Cayuse (State Route 123) passes into hibernation for the season.</description>
    </item>
    <item>
      <title>New Manette bridge opens to fanfare in Bremerton</title>
      <pubDate>Fri, 11 Nov 2011 07:04:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/ManetteBridgeopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/ManetteBridgeopens.htm</guid>
      <description>BREMERTON – The middle of the Port Washington Narrows became a meeting place today as residents and visitors met halfway between Manette and Bremerton to shake hands and celebrate the bridge under their feet</description>
    </item>
    <item>
      <title>Federal transportation grants put rides a click away for veterans in Washington</title>
      <pubDate>Fri, 11 Nov 2011 00:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/10-Federal_vets_grants.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/10-Federal_vets_grants.htm</guid>
      <description>The Federal Transit Administration today announced the Washington State Department of Transportation will receive three grants totaling more than $737,000 to be distributed to selected veterans transportation projects. The grants are of the product of the Veterans Transportation and Community Living Initiative.</description>
    </item>
    <item>
      <title>New Keller Ferry closer to reality with today’s bid opening</title>
      <pubDate>Wed, 09 Nov 2011 04:55:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/08_KellerFerry.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/08_KellerFerry.htm</guid>
      <description>Foss Maritime Co. of Seattle is the apparent low bidder to build a new 20-car Keller Ferry to serve Washington’s only ferry route east of the Cascade Mountains.</description>
    </item>
    <item>
      <title>Huge gate installed at SR 520 pontoon construction site</title>
      <pubDate>Sat, 05 Nov 2011 02:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/SR520PCPgate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/SR520PCPgate.htm</guid>
      <description>Huge gate installed at SR 520 pontoon construction site</description>
    </item>
    <item>
      <title>Amtrak Cascades adds 11 more trains for busy Thanksgiving travel week</title>
      <pubDate>Sat, 05 Nov 2011 02:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/4_amtrak-cascades-thanksgiving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/4_amtrak-cascades-thanksgiving.htm</guid>
      <description>SEATTLE – Amtrak will add 11 trains along the Amtrak Cascades route between Portland and Seattle to accommodate the travel demand during the holiday week.</description>
    </item>
    <item>
      <title>Washington’s TIGER III applications focus on mobility, environment and multimodal connections</title>
      <pubDate>Fri, 04 Nov 2011 06:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/03_TIGER3.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/03_TIGER3.htm</guid>
      <description>Washington’s TIGER III applications focus on mobility, environment and multimodal connections</description>
    </item>
    <item>
      <title>Nalley Valley to get new eastbound viaduct</title>
      <pubDate>Sat, 29 Oct 2011 04:08:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/EBNVgroundbreaking.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/EBNVgroundbreaking.htm</guid>
      <description>TACOMA – Work begins next week on the second of three projects to rebuild and improve the Interstate 5/State Route 16 interchange, which carries more than 131,000 vehicles per day through one of the state’s busiest crossroads.</description>
    </item>
    <item>
      <title>New Manette ‘egg-about’ going round</title>
      <pubDate>Fri, 28 Oct 2011 23:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/Manetteroundabout.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/Manetteroundabout.htm</guid>
      <description>BREMERTON – The newly constructed, oval-shaped “egg-about” in Manette will get a makeover next week when crews modify the shape of its concrete truck apron and interior landscaping section to provide greater mobility for larger trucks and buses.</description>
    </item>
    <item>
      <title>Tires, chains, being prepared - hot accessories this winter</title>
      <pubDate>Thu, 27 Oct 2011 00:00:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/26_2011_winter_ready.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/26_2011_winter_ready.htm</guid>
      <description>As the season’s fashion changes from shorts and sandals to umbrellas and scarves, don’t forget to update that other winter wardrobe – your vehicle’s.</description>
    </item>
    <item>
      <title>Eastbound lanes open to traffic as rock blasting and construction wrap for winter on I-90 over Snoqualmie Pass</title>
      <pubDate>Fri, 21 Oct 2011 21:32:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/I-90eblanesopentotraffic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/I-90eblanesopentotraffic.htm</guid>
      <description>The delays drivers experienced this week on Interstate 90 over Snoqualmie Pass are over. The new eastbound lanes opened to traffic just after 7 a.m. today.</description>
    </item>
    <item>
      <title>I-5 congestion relief work wins national award</title>
      <pubDate>Wed, 19 Oct 2011 00:24:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/18_OperationI5WinsNationalAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/18_OperationI5WinsNationalAward.htm</guid>
      <description>I-5 congestion relief work wins national award</description>
    </item>
    <item>
      <title>Roundabout asphalt gets redo in Manette</title>
      <pubDate>Sat, 15 Oct 2011 05:20:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/14_303_manetteroundaboutrework.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/14_303_manetteroundaboutrework.htm</guid>
      <description>Manette Bridge roundabout rework takes place this weekend.</description>
    </item>
    <item>
      <title>Crews close single lane of eastbound I-90 over Snoqualmie Pass for six days</title>
      <pubDate>Sat, 15 Oct 2011 01:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/sixdayclosureonI90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/sixdayclosureonI90.htm</guid>
      <description>Drivers face delays of up to two hours or more on Snoqualmie Pass next week when crews close one lane of eastbound Interstate 90 for six days straight in preparation for opening a brand new section of highway.</description>
    </item>
    <item>
      <title>Commute Smart Awards celebrates 20 years</title>
      <pubDate>Wed, 12 Oct 2011 05:17:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/11_CSA_Awards.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/11_CSA_Awards.htm</guid>
      <description>Two decades of saving commuters money, curbing air pollution, conserving fuel and easing traffic congestion were celebrated today at the 2011 Governor’s Commute Smart Awards.</description>
    </item>
    <item>
      <title>WSDOT crane tips during bridge removal in Lewis County</title>
      <pubDate>Mon, 10 Oct 2011 05:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/CranetipsLewisCounty.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/CranetipsLewisCounty.htm</guid>
      <description>MESKILL, Lewis County – A truck-mounted crane tipped over today while crews from the Washington State Department of Transportation and Lewis County were working to remove sections from a 180-foot bridge over the Chehalis River. Three minor injuries were reported in the accident.</description>
    </item>
    <item>
      <title>New map helps drivers go with flow on Snoqualmie Pass</title>
      <pubDate>Tue, 04 Oct 2011 23:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/10_04I90flowmaps.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/10_04I90flowmaps.htm</guid>
      <description>Are you heading for recreation areas in eastern Washington or to the big cities on the west side this weekend? Regardless of which side of the state you pick, the Washington State Department of Transportation (WSDOT) is making it easier for you to plan your trip over Snoqualmie Pass</description>
    </item>
    <item>
      <title>Washington celebrates Walk to School month</title>
      <pubDate>Tue, 04 Oct 2011 04:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/10_03WalktoSchool.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/10_03WalktoSchool.htm</guid>
      <description>Washington celebrates Walk to School month</description>
    </item>
    <item>
      <title>Infraction notices to resume for tolling system</title>
      <pubDate>Tue, 27 Sep 2011 03:48:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/26_tnbinfractionnoticestoresume.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/26_tnbinfractionnoticestoresume.htm</guid>
      <description>Infraction notices to resume for tolling system
Tacoma Narrows Bridge drivers who didn’t pay will receive infractions</description>
    </item>
    <item>
      <title>Pontoons take shape for SR 520 floating bridge</title>
      <pubDate>Sat, 24 Sep 2011 04:00:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/SR520Pontoonwalls.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/SR520Pontoonwalls.htm</guid>
      <description>Pontoons take shape for SR 520 floating bridge ABERDEEN – Construction is shaping up from the inside out on new pontoons for State Route 520. Local officials today saw the first handful of precast concrete walls that soon will form the backbone of a new floating bridge across Lake Washington.</description>
    </item>
    <item>
      <title>Targeted investments reduce congestion; continued improvements needed to rebuild economy</title>
      <pubDate>Sat, 24 Sep 2011 01:15:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/23_2011CongestionReport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/23_2011CongestionReport.htm</guid>
      <description>Puget Sound drivers probably won’t be surprised to learn that the most improved commute route in 2010 was the northbound Interstate 405 morning commute between Tukwila and Bellevue.</description>
    </item>
    <item>
      <title>Eastbound SR 16 drivers to see more bridge-building through Nalley Valley soon</title>
      <pubDate>Fri, 23 Sep 2011 06:38:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/22_i5_sr16EBNVaward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/22_i5_sr16EBNVaward.htm</guid>
      <description>WSDOT awarded the I-5/SR 16 Eastbound Nalley Valley construction contract to Mowat Construction Company of Woodinville for $74.7 million.</description>
    </item>
    <item>
      <title>WSDOT saves lives, money with risk management program</title>
      <pubDate>Thu, 22 Sep 2011 23:39:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/09_23RiskMgtJLARC.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/09_23RiskMgtJLARC.htm</guid>
      <description>WSDOT saves lives, money with risk management program</description>
    </item>
    <item>
      <title>U.S. Department of Transportation Announces $31 Million to Improve Rail Service in Washington State</title>
      <pubDate>Thu, 22 Sep 2011 01:22:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/21_USDOTAnnouncesAmtrakCascadesFunding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/21_USDOTAnnouncesAmtrakCascadesFunding.htm</guid>
      <description>U.S. Transportation Secretary Ray LaHood today announced $31.1 million for the State of Washington to improve intercity passenger and freight rail service on the Amtrak Cascades line.</description>
    </item>
    <item>
      <title>Steel bridges inspected after nationwide FHWA recommendation</title>
      <pubDate>Sat, 17 Sep 2011 05:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/16_steelbridgesreviewed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/16_steelbridgesreviewed.htm</guid>
      <description>A review of state bridge-inspection records shows that 10 bridges made with AASHTO M270 steel in Washington state are in safe condition for daily travelers.</description>
    </item>
    <item>
      <title>Manette Bridge full demolition postponed</title>
      <pubDate>Sat, 17 Sep 2011 03:29:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/16_303_ManetteDemoDelayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/16_303_ManetteDemoDelayed.htm</guid>
      <description>Manette bridge full demo prolonged but new bridge still opening in November.</description>
    </item>
    <item>
      <title>Narrows Bridge toll equipment reading new Good To Go! passes</title>
      <pubDate>Fri, 16 Sep 2011 03:32:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/15_tnbequipmentreadingnewpasses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/15_tnbequipmentreadingnewpasses.htm</guid>
      <description>Narrows Bridge toll equipment reading new Good To Go! passes</description>
    </item>
    <item>
      <title>Congestion relief on I-5 earns WSDOT national kudos</title>
      <pubDate>Thu, 15 Sep 2011 01:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/14_I5_CongestionReliefEarnsWSDOTKudos.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/14_I5_CongestionReliefEarnsWSDOTKudos.htm</guid>
      <description>Congestion relief on I-5 earns WSDOT national kudos 
Solution to Lacey/DuPont morning commuter woes nets award nomination</description>
    </item>
    <item>
      <title>Contractor selected for next I-90 project east of Snoqualmie Pass</title>
      <pubDate>Sat, 10 Sep 2011 00:28:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/09_I90contractorselected.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/09_I90contractorselected.htm</guid>
      <description>For the last year, construction crews have been transforming a 50-year-old stretch of Interstate 90, east of Snoqualmie Pass, into a modern, wider and safer transportation corridor. And now, even more improvements are set to begin this month that will improve an additional two miles of I-90.</description>
    </item>
    <item>
      <title>Crews repave faulty section of I-5 in Thurston County</title>
      <pubDate>Fri, 09 Sep 2011 23:15:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/09_I5GrandMoundtoMaytownRepave.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/09_I5GrandMoundtoMaytownRepave.htm</guid>
      <description>Crews repave faulty section of I-5 in Thurston County</description>
    </item>
    <item>
      <title>Fewer shadow vehicles needed for SR 3 bicyclists</title>
      <pubDate>Fri, 09 Sep 2011 03:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/08_SR3SlopeBicycles.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/08_SR3SlopeBicycles.htm</guid>
      <description>GORST – Fewer bicyclists are using State Route 3 between Gorst and Bremerton, and that means starting Tuesday there will be fewer bicycle safety guides operating on the route as part of an ongoing rock stabilization project.</description>
    </item>
    <item>
      <title>Smoother exit ramps planned for SR 18 in Auburn</title>
      <pubDate>Fri, 02 Sep 2011 01:36:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/090111_SR18rampspaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/090111_SR18rampspaving.htm</guid>
      <description>SR18 ramp closures in Auburn begin Sept 6 for paving project</description>
    </item>
    <item>
      <title>WSDOT gearing up to catch the next TIGER</title>
      <pubDate>Fri, 02 Sep 2011 00:18:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/01_TIGER3grants.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/01_TIGER3grants.htm</guid>
      <description>OLYMPIA – Rounds one and two provided close to 1,500 jobs and now the Washington State Department of Transportation (WSDOT) is gearing up for TIGER 3.</description>
    </item>
    <item>
      <title>Local transportation projects receive Awards of Excellence</title>
      <pubDate>Fri, 02 Sep 2011 00:11:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/01_2001AwardsofExcellence.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/01_2001AwardsofExcellence.htm</guid>
      <description>Local transportation projects achieved excellence in safety enhancements, construction, innovative design, environmental sustainability and community involvement, earning 2011 Awards of Excellence.</description>
    </item>
    <item>
      <title>Updated CRC estimate cuts project cost by $100 million</title>
      <pubDate>Sat, 27 Aug 2011 02:14:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/26_CRC_CutsProjectCost.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/26_CRC_CutsProjectCost.htm</guid>
      <description>The estimated construction cost for the Columbia River Crossing project decreased by $100 million due to recent decisions and increased certainty on the construction schedule.</description>
    </item>
    <item>
      <title>Travel tools available to ease the pain of Labor Day travel</title>
      <pubDate>Fri, 26 Aug 2011 22:33:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/26_LaborDay_2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/26_LaborDay_2011.htm</guid>
      <description>Labor Day is the year’s busiest travel weekend over Snoqualmie Pass on Interstate 90, and it’s not the only location in Washington that will feel the strain of additional travelers.</description>
    </item>
    <item>
      <title>Learn about proposed Amtrak Cascades reroute at open house</title>
      <pubDate>Fri, 26 Aug 2011 05:00:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/25_RailPDBOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/25_RailPDBOpenHouse.htm</guid>
      <description>Rerouting Amtrak Cascades trains from a waterfront Point Defiance route to a lesser-used inland route will improve reliability and lead to faster, more frequent service.</description>
    </item>
    <item>
      <title>SR 520 bridge tolling to begin in December</title>
      <pubDate>Thu, 25 Aug 2011 23:54:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/25_SR520TollingStartsDecember.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/25_SR520TollingStartsDecember.htm</guid>
      <description>Tolling on State Route 520 across Lake Washington, which will help pay to replace the vulnerable, 50-year-old floating bridge, will start in December.</description>
    </item>
    <item>
      <title>WSDOT website, 511 information line unavailable Saturday night</title>
      <pubDate>Thu, 25 Aug 2011 22:56:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/25_website_outage.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/25_website_outage.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) website, which receives more than 100,000 visits per day in the summer months, will get a much-needed update Saturday night</description>
    </item>
    <item>
      <title>Federal Highway Administration approves SR 99 tunnel to replace Alaskan Way Viaduct</title>
      <pubDate>Wed, 24 Aug 2011 02:45:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/23_awv-rod.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/23_awv-rod.htm</guid>
      <description>After 10 years of environmental review and analysis, the Federal Highway Administration (FHWA) today signed a record of decision allowing the Washington State Department of Transportation (WSDOT) to begin final design and construction of the State Route 99 tunnel beneath downtown Seattle. The tunnel will replace the double-deck Alaskan Way Viaduct along Seattle’s waterfront.</description>
    </item>
    <item>
      <title>I-90 project recognized nationally for environmental partnerships</title>
      <pubDate>Fri, 19 Aug 2011 23:11:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/I90partnershipaward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/I90partnershipaward.htm</guid>
      <description>The Federal Highway Administration will award the Washington State Department of Transportation (WSDOT) the 2011 Environmental Excellence Award for the I-90 Snoqualmie Pass East Project on Monday, Aug. 22. The award recognizes transportation projects, processes and people who incorporate environmental stewardship into project planning and development.</description>
    </item>
    <item>
      <title>WSDOT advises SR 3 drivers: Avoid getting rocked by delays</title>
      <pubDate>Thu, 18 Aug 2011 05:57:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/17_3_unstableslopeworkbegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/17_3_unstableslopeworkbegins.htm</guid>
      <description>Work to improve unstable slopes on SR 3 begins next week.</description>
    </item>
    <item>
      <title>Join an autumn tradition: help count bicyclists and pedestrians in Washington state</title>
      <pubDate>Wed, 17 Aug 2011 23:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/2011BikePedCount.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/2011BikePedCount.htm</guid>
      <description>Join an autumn tradition: help count bicyclist and pedestrians in Washington state</description>
    </item>
    <item>
      <title>Bids opened for new SR 520 floating bridge</title>
      <pubDate>Thu, 11 Aug 2011 02:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/10_SR520BridgeABV.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/10_SR520BridgeABV.htm</guid>
      <description>SEATTLE – Kiewit-General-Manson, A Joint Venture, submitted the apparent best combination of bid price and technical proposal for replacing the aging and vulnerable State Route 520 floating bridge, according to tallies calculated today by the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>Take the scenic route to avoid 2-hour delays on US 12 this summer</title>
      <pubDate>Tue, 30 Aug 2011 22:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/Take_scenic_route_avoid_delays_on_US12.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/Take_scenic_route_avoid_delays_on_US12.htm</guid>
      <description>Rock blasting operations have been completed on US 12 near White Pass


The roadway is open in both directions</description>
    </item>
    <item>
      <title>WSDOT awards $1.1 million in first round of 2011-2013 Airport Aid grants</title>
      <pubDate>Tue, 02 Aug 2011 03:11:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/01_airportgrants.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/01_airportgrants.htm</guid>
      <description>ARLINGTON– Twenty-six Washington airports will receive a share of nearly $12 million in federal, state and local funds to maintain airport pavements, improve safety and enhance security. Of that amount the Washington State Department of Transportation (WSDOT) contributed $1.1 million through its Airport Aid Program, and used $433,290 in state funds to leverage more than $9 million in federal grants.</description>
    </item>
    <item>
      <title>Rail agreement expected to generate jobs and lead to improved Amtrak Cascades service</title>
      <pubDate>Fri, 29 Jul 2011 00:32:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/28_BNSFAgreement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/28_BNSFAgreement.htm</guid>
      <description>An agreement signed today by the Washington State Department of Transportation (WSDOT) and BNSF Railway clears the way for work to begin on rail improvements that ultimately will generate hundreds of jobs and improve Amtrak Cascades service between Seattle and Portland.</description>
    </item>
    <item>
      <title>Environment and transportation go hand-in-hand</title>
      <pubDate>Thu, 28 Jul 2011 23:10:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/EnvironmentalAward_28.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/EnvironmentalAward_28.htm</guid>
      <description>It’s not always just about building roads and bridges. Often, transportation projects also help rebuild communities and improve the surrounding environment. The Washington State Department of Transportation (WSDOT) was recently recognized for its successes in sustainable transportation and environmental protection.</description>
    </item>
    <item>
      <title>Amtrak Cascades ‘Cash Train’ Scratch ticket partnership with Washington’s Lottery a success</title>
      <pubDate>Wed, 27 Jul 2011 06:43:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/07262011_AmtrakCascadesLotteryresults.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/07262011_AmtrakCascadesLotteryresults.htm</guid>
      <description>Amtrak Cascades Cash Train Scratch ticket promotion with Lottery a success.</description>
    </item>
    <item>
      <title>Travelers choosing Amtrak Cascades in record numbers</title>
      <pubDate>Thu, 21 Jul 2011 03:24:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/07202011AmtrakCascadesRidership.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/07202011AmtrakCascadesRidership.htm</guid>
      <description>Amtrak Cascades second quarter ridership for 2011.</description>
    </item>
    <item>
      <title>Toll vendor identifies new, minor glitch as it completes toll backlog on Tacoma Narrows Bridge</title>
      <pubDate>Tue, 19 Jul 2011 06:24:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/18_MinorTNBTollGlitch.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/18_MinorTNBTollGlitch.htm</guid>
      <description>Toll vendor Electronic Transaction Consultants Corp. (ETCC), the Texas firm now handling the Tacoma Narrows Bridge tolling, has nearly caught up on a backlog of toll transactions but encountered a new problem involving Good To Go! customers who manually replenish their accounts and often carry low balances. Some accounts in good standing were charged an incorrect rate.</description>
    </item>
    <item>
      <title>WSDOT's innovative management on I-5 wins award</title>
      <pubDate>Tue, 19 Jul 2011 04:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/18_WSDOTsInnovativeMngtonI5wins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/18_WSDOTsInnovativeMngtonI5wins.htm</guid>
      <description>WSDOT’s innovative management on I-5 wins award</description>
    </item>
    <item>
      <title>Four-month Manette Bridge closure starts next Sunday</title>
      <pubDate>Sat, 16 Jul 2011 04:41:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/15_303_ManetteClosingSoon.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/15_303_ManetteClosingSoon.htm</guid>
      <description>Manette Bridge closes July 24.</description>
    </item>
    <item>
      <title>WSDOT seeks comments on Disadvantaged Business Enterprise contracting goals</title>
      <pubDate>Sat, 16 Jul 2011 04:37:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/15_DBEgoalsAug2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/15_DBEgoalsAug2011.htm</guid>
      <description>Contractors, trade and labor organizations, small and disadvantaged businesses, and others who are interested in doing business with the Washington State Department of Transportation (WSDOT) are invited to comment on the agency’s proposed interim Disadvantaged Business Enterprise (DBE) goals.</description>
    </item>
    <item>
      <title>Dirt from SR 520 pontoon project benefits Hoquiam</title>
      <pubDate>Sat, 16 Jul 2011 04:15:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/SR520Dirt2Hoquiam.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/SR520Dirt2Hoquiam.htm</guid>
      <description>ABERDEEN – The Washington State Department of Transportation (WSDOT) and Kiewit-General (K-G) have the dirt on the city of Hoquiam. And Hoquiam couldn’t be happier about it.</description>
    </item>
    <item>
      <title>Washington selects AeroVironment to light up nation’s first electric highway</title>
      <pubDate>Wed, 13 Jul 2011 22:04:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/13_ElectricHighways.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/13_ElectricHighways.htm</guid>
      <description>The Washington Department of Transportation (WSDOT) announces that within six months, drivers will have the ability to charge their electric cars (like the Nissan LEAF and Chevrolet Volt) at charge stations along Washington’s “electric highways” (I-5 and US 2).  Now it’s easy to plug in your electric car while you’re on the go in Washington!</description>
    </item>
    <item>
      <title>First pour complete in SR 520 pontoon casting basin</title>
      <pubDate>Sat, 09 Jul 2011 04:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/08_first_pour_520_pontoons.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/08_first_pour_520_pontoons.htm</guid>
      <description>First pour complete in SR 520 pontoon casting basin</description>
    </item>
    <item>
      <title>Last round of I-5 closures in Lakewood this weekend</title>
      <pubDate>Fri, 08 Jul 2011 00:47:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/07_I5CloverCreeknorthbound+Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/07_I5CloverCreeknorthbound+Closure.htm</guid>
      <description>Last round of I-5 closures in Lakewood this weekend
Drivers should plan for big delays during construction</description>
    </item>
    <item>
      <title>SR 3 hillside work rocks the commute near Bremerton</title>
      <pubDate>Thu, 07 Jul 2011 03:56:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/6_3_SlopeWorkBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/6_3_SlopeWorkBegins.htm</guid>
      <description>Slope stablization work begins on SR 3 this summer.</description>
    </item>
    <item>
      <title>Possible travel delays July 9 and 10 for STP bike ride</title>
      <pubDate>Wed, 06 Jul 2011 02:51:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/05_SeattletoPortland_2011ride.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/05_SeattletoPortland_2011ride.htm</guid>
      <description>Drivers should leave themselves extra time July 9 and 10 as 10,000 cyclists use Washington’s state and local roads for the 2011 Group Health Seattle to Portland Bicycle Classic (STP).</description>
    </item>
    <item>
      <title>WSDOT fleet named one of the best in North America</title>
      <pubDate>Fri, 01 Jul 2011 02:49:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/30_WSDOTtop100fleet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/30_WSDOTtop100fleet.htm</guid>
      <description>The Washington State Department of Transportation’s (WSDOT) work to make its fleet of large equipment, trucks and other work vehicles more efficient and sustainable is paying it off. It’s one of North America’s top 100 public fleets, according to Government Fleet magazine.</description>
    </item>
    <item>
      <title>Motorists urged to avoid southbound I-5 in Lakewood this weekend</title>
      <pubDate>Fri, 24 Jun 2011 06:19:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/23_I5CloverCreekClosuressb.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/23_I5CloverCreekClosuressb.htm</guid>
      <description>Motorists urged to avoid southbound I-5 in Lakewood this weekend</description>
    </item>
    <item>
      <title>Four-month Manette Bridge closure now one month away</title>
      <pubDate>Fri, 24 Jun 2011 01:41:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/ManetteBridge1monthaway.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/ManetteBridge1monthaway.htm</guid>
      <description>BREMERTON – Rusted. Deteriorated. Obsolete. These days, the 81-year-old Manette Bridge sounds more like a junkyard jalopy than a functioning gateway between communities. But the poorly aging bridge’s days are numbered.</description>
    </item>
    <item>
      <title>I-90 signs answer the question: 'Just how much longer until we get there?'</title>
      <pubDate>Thu, 23 Jun 2011 22:31:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/6_23_I90traveltimesigns.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/6_23_I90traveltimesigns.htm</guid>
      <description>Are we there yet? The days of wondering how long it’s going to take to reach Snoqualmie Pass are now over. Today, the Washington State Department of Transportation (WSDOT) officially unveiled three electronic signs on Interstate 90 for real-time travel time between North Bend and Ellensburg.</description>
    </item>
    <item>
      <title>Wetland and aquatic improvements project under way in Grays Harbor</title>
      <pubDate>Thu, 23 Jun 2011 04:55:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/22_SR520_GrassCreekProjectKickoff.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/22_SR520_GrassCreekProjectKickoff.htm</guid>
      <description>HOQUIAM – Local leaders and environmental representatives joined the Washington State Department of Transportation (WSDOT) to kick off the Grass Creek Mitigation Project, an effort to restore wetlands and improve shoreline habitat.</description>
    </item>
    <item>
      <title>WSDOT, vendor address technical errors in Tacoma Narrows Bridge tolling system</title>
      <pubDate>Wed, 22 Jun 2011 05:17:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/21_WSDOTAddressesTNBTollIssues.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/21_WSDOTAddressesTNBTollIssues.htm</guid>
      <description>Tolling contractor Electronic Transaction Consultants Corp. (ETCC) has made four updates to the Tacoma Narrows Bridge tolling system, correcting issues that caused some drivers to receive infraction notices in error and not have tolls properly charged to their accounts.</description>
    </item>
    <item>
      <title>I-5/SR 16 westbound Nalley Valley Viaduct opens in Tacoma</title>
      <pubDate>Wed, 22 Jun 2011 04:23:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/SR16WBNVopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/SR16WBNVopens.htm</guid>
      <description>TACOMA – The Interstate 5/State Route 16 bottleneck breaks this weekend as the Washington State Department of Transportation (WSDOT) opens the new Westbound Nalley Valley Viaduct.</description>
    </item>
    <item>
      <title>Girder setting closes I-5 next week in Rochester</title>
      <pubDate>Fri, 17 Jun 2011 03:24:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/16_5_MaytownGirderSetting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/16_5_MaytownGirderSetting.htm</guid>
      <description>Crews close I-5 in Rochester to set girders next week.</description>
    </item>
    <item>
      <title>Attention dads and grads: Plan ahead for I-5 lane closures in Lakewood this weekend</title>
      <pubDate>Fri, 17 Jun 2011 03:08:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/16_5_2ndCloverClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/16_5_2ndCloverClosure.htm</guid>
      <description>Southbound I-5 work in Lakewood this weekend could cause delays for Father's Day and graduation celebrations.</description>
    </item>
    <item>
      <title>More lanes coming to busy I-5 interchange in Federal Way</title>
      <pubDate>Tue, 14 Jun 2011 21:02:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/14_320thOffRamp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/14_320thOffRamp.htm</guid>
      <description>More lanes coming to busy I-5 interchange in Federal Way</description>
    </item>
    <item>
      <title>Students win top prize in statewide I-90 transportation art and essay contest</title>
      <pubDate>Mon, 13 Jun 2011 23:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/BridgingFuturesWinners.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/BridgingFuturesWinners.htm</guid>
      <description>Two Washington state students won top honors for their participation in the seventh annual Interstate 90 Bridging Futures Art and Essay Contest.</description>
    </item>
    <item>
      <title>Celebrating 10 years of transparency in transportation</title>
      <pubDate>Fri, 10 Jun 2011 04:18:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/GrayNotebook10thAnniversary.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/GrayNotebook10thAnniversary.htm</guid>
      <description>Celebrating 10 years of transparency in transportation 
Gray Notebook highlights safety, freight, and winter weather operations</description>
    </item>
    <item>
      <title>Good weather brings I-5 Clover Creek closures</title>
      <pubDate>Fri, 10 Jun 2011 00:12:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/09_I5CloverCreekClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/09_I5CloverCreekClosure.htm</guid>
      <description>Good weather brings I-5 Clover Creek closures
Northbound drivers should expect delays during weekend-long work</description>
    </item>
    <item>
      <title>WSDOT reopens SR 303 Manette Bridge</title>
      <pubDate>Thu, 09 Jun 2011 22:58:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/9_303_ManetteReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/9_303_ManetteReopens.htm</guid>
      <description>WSDOT reopens the SR 303 Manette Bridge to drivers following a precautionary closure.</description>
    </item>
    <item>
      <title>Crack closes SR 303 Manette Bridge</title>
      <pubDate>Thu, 09 Jun 2011 07:02:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/8_303_ManetteBridgeCrack.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/8_303_ManetteBridgeCrack.htm</guid>
      <description>WSDOT closes SR 303 Manette Bridge after crack develops.</description>
    </item>
    <item>
      <title>WSDOT investigating glitches in Tacoma Narrows Bridge toll-collection operations</title>
      <pubDate>Fri, 03 Jun 2011 04:10:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/2_GlitchesTNBTollCollection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/2_GlitchesTNBTollCollection.htm</guid>
      <description>WSDOT investigating glitches in Tacoma Narrows Bridge toll-collection operations</description>
    </item>
    <item>
      <title>Washington still 'most bicycle-friendly state'</title>
      <pubDate>Wed, 25 May 2011 05:40:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/05_24WABikeFriendlyState.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/05_24WABikeFriendlyState.htm</guid>
      <description>Washington still 'most bicycle-friendly state'</description>
    </item>
    <item>
      <title>I-5 wall work will reduce traffic noise in Lacey neighborhoods</title>
      <pubDate>Wed, 25 May 2011 00:26:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/I-5LaceyNoiseWalls.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/I-5LaceyNoiseWalls.htm</guid>
      <description>Residents who live near Interstate 5 in Lacey’s Thompson Place and Tanglewilde East neighborhoods will experience a storm before the quiet beginning next week when work to erect two noise barriers gets under way.</description>
    </item>
    <item>
      <title>North Cascades Highway reopens at noon Wednesday</title>
      <pubDate>Tue, 24 May 2011 06:29:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/23SR20SpringReopening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/23SR20SpringReopening.htm</guid>
      <description>SR 20, The North Cascades Highway will open to traffic at noon on Wednesday, May 25</description>
    </item>
    <item>
      <title>SR 104 Hood Canal Bridge closure schedule starts this week</title>
      <pubDate>Tue, 24 May 2011 00:08:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/SR104pilotprogram.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/SR104pilotprogram.htm</guid>
      <description>SHINE – State Route 104 Hood Canal Bridge drivers are used to sporadic closures caused by everything from marine vessel openings and construction work to violent windstorms. But this summer, they’ll have to get used to something else – predictability.</description>
    </item>
    <item>
      <title>WSDOT seeks input for overall Disadvantaged Business Enterprise goal setting</title>
      <pubDate>Fri, 20 May 2011 03:48:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/DBEGoalSetMeeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/DBEGoalSetMeeting.htm</guid>
      <description>WSDOT seeks input for overall Disadvantaged Business Enterprise goal setting</description>
    </item>
    <item>
      <title>Only chance of Memorial Day weekend sun but traffic guaranteed</title>
      <pubDate>Fri, 20 May 2011 03:04:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/19_memorialday2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/19_memorialday2011.htm</guid>
      <description>While many people still can’t decide if they need sandals or snow boots for Memorial Day weekend, it’s always the right decision to check your route before you go.</description>
    </item>
    <item>
      <title>North Cascades Highway, Cayuse Pass may open by Memorial Day weekend; no estimate for Chinook Pass opening</title>
      <pubDate>Sat, 14 May 2011 05:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/Crews_battle_snow_avalanches_in_mountains.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/Crews_battle_snow_avalanches_in_mountains.htm</guid>
      <description>North Cascades Highway, Cayuse Pass may open by Memorial Day weekend; no estimate for Chinook Pass opening</description>
    </item>
    <item>
      <title>I-90 Snoqualmie Pass project wins conservation award from Cascade Land Conservancy</title>
      <pubDate>Fri, 13 May 2011 03:13:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/12_I90conservationaward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/12_I90conservationaward.htm</guid>
      <description>The Cascade Land Conservancy presented its Innovative Conservation Project award to the Washington State Department of Transportation’s I-90 Snoqualmie Pass East Project (I-90 project) during its annual Conservation Awards Breakfast today in Seattle.</description>
    </item>
    <item>
      <title>I-5 travelers get a brighter greeting in Vancouver this weekend</title>
      <pubDate>Thu, 12 May 2011 01:12:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/11_WelcomeToWashingtonSignPlanting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/11_WelcomeToWashingtonSignPlanting.htm</guid>
      <description>VANCOUVER – Even if the weather isn’t sunny this weekend, Interstate 5 drivers headed north from Oregon will still get a bright greeting thanks to local volunteers planting the “Welcome to Washington” sign near Fourth Plain Boulevard.</description>
    </item>
    <item>
      <title>Washington commended for showing taxpayers where their transportation dollars go</title>
      <pubDate>Thu, 12 May 2011 00:38:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/11_PerformanceMeasures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/11_PerformanceMeasures.htm</guid>
      <description>Washington commended for showing taxpayers where their transportation dollars go</description>
    </item>
    <item>
      <title>Rock Blasting is back on I-90 east of Snoqualmie Pass</title>
      <pubDate>Wed, 11 May 2011 21:43:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/11_I90rockblastingisback.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/11_I90rockblastingisback.htm</guid>
      <description>Crews will get the green light to resume rock blasting operations this week after a snowy spring on Interstate 90.</description>
    </item>
    <item>
      <title>Washington state wins additional high-speed-rail funding rejected by Florida</title>
      <pubDate>Tue, 10 May 2011 02:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/06_15mFromFLtoWA.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/06_15mFromFLtoWA.htm</guid>
      <description>Washington state will receive $15 million in additional federal high-speed-rail funding for improvements resulting in more frequent and reliable Amtrak Cascades passenger rail service between Portland and Vancouver, B.C.</description>
    </item>
    <item>
      <title>Busy weekend: drivers should expect delays in Seattle and east of Snoqualmie Pass</title>
      <pubDate>Fri, 06 May 2011 23:52:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/06_BusyTravelWeekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/06_BusyTravelWeekend.htm</guid>
      <description>Drivers whose Mother’s Day plans include a trip to grandma’s house should plan for a full weekend of closures and sporting events in the Puget Sound area – as well delays crossing Snoqualmie Pass. The Washington State Department of Transportation (WSDOT) urges drivers to map out routes in advance, allow extra time and prepare for more congestion than usual.</description>
    </item>
    <item>
      <title>Plan for delays: Northbound I-5 to SR 16 shift begins Sunday in Tacoma</title>
      <pubDate>Thu, 05 May 2011 04:29:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/04_NBI5towb16shiftthissunday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/04_NBI5towb16shiftthissunday.htm</guid>
      <description>Plan for delays: Northbound I-5 to SR 16 shift begins Sunday in Tacoma</description>
    </item>
    <item>
      <title>Overheight load hits I-90 at SR 18</title>
      <pubDate>Wed, 04 May 2011 07:10:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/03_I90SR18GirdersDamaged.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/03_I90SR18GirdersDamaged.htm</guid>
      <description>Bridge crews are assessing damage to Interstate 90 after a tow truck removing a vehicle from an earlier collision on State Route 18 hit and damaged the girders that support the eastbound lanes of I-90</description>
    </item>
    <item>
      <title>Digging in: Excavation starts on SR 520 pontoon casting basin</title>
      <pubDate>Tue, 03 May 2011 01:15:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/SR520PCPCastingBasin.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/SR520PCPCastingBasin.htm</guid>
      <description>ABERDEEN – Today crews started excavating more than a quarter-million cubic yards of dirt for a casting basin here – a crucial step for building concrete pontoons to replace the aging and vulnerable State Route 520 floating bridge in the Seattle area.</description>
    </item>
    <item>
      <title>New SR 520 toll system put to the test</title>
      <pubDate>Sat, 30 Apr 2011 00:10:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/29NewSR520TollSystemPutToTest.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/29NewSR520TollSystemPutToTest.htm</guid>
      <description>Testing starts today on the all-electronic SR 520 toll system. The Washington State Department of Transportation (WSDOT) will spend at least the next six weeks confirming that the system can process tens of thousands of daily transactions and track revenue that will provide $1 billion in funding to replace the State Route 520 bridge.</description>
    </item>
    <item>
      <title>Drivers should prepare for delays over I-90 near Easton for the next five weeks</title>
      <pubDate>Sat, 23 Apr 2011 04:08:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/22_2011lakeeastondelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/22_2011lakeeastondelays.htm</guid>
      <description>For the next five weeks drivers traveling over I-90 between Easton and Cle Elum will experience delays associated with traffic restrictions.</description>
    </item>
    <item>
      <title>Reminder: Studded tire deadline April 25</title>
      <pubDate>Sat, 23 Apr 2011 00:54:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/22_studdedtiresoffApril25.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/22_studdedtiresoffApril25.htm</guid>
      <description>Drivers should remove studded tires by the end of the day Monday, April 25, or risk a fine from law enforcement.</description>
    </item>
    <item>
      <title>SR 520 tolling start date dependent on successful testing of equipment and systems</title>
      <pubDate>Tue, 12 Apr 2011 22:26:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/12_520TollingDateRequirements.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/12_520TollingDateRequirements.htm</guid>
      <description>At least six weeks of rigorous testing of equipment and systems for tolling of the SR 520 bridge are planned to begin next week, and if successful, a toll start date will be set, the Washington State Department of Transportation (WSDOT) said today.</description>
    </item>
    <item>
      <title>It's official: Ohio and Wisconsin high-speed-rail funding coming to Washington</title>
      <pubDate>Fri, 08 Apr 2011 23:50:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/8_WASecuresOHWIRailFunding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/8_WASecuresOHWIRailFunding.htm</guid>
      <description>Federal and state officials signed documents today that guarantee Washington state will get $145 million in high-speed-rail funding originally intended for Ohio and Wisconsin.</description>
    </item>
    <item>
      <title>Three months of construction remain for the SR 16 westbound Nalley Valley project</title>
      <pubDate>Wed, 06 Apr 2011 03:47:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/5_5_38thRampCloses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/5_5_38thRampCloses.htm</guid>
      <description>WBNV work closes 38th street ramp to I-6 and SR 16.</description>
    </item>
    <item>
      <title>Studded tire deadline extended another week</title>
      <pubDate>Tue, 05 Apr 2011 05:00:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/StudTireDeadlineApril14.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/StudTireDeadlineApril14.htm</guid>
      <description>Studded tire deadline extended another week</description>
    </item>
    <item>
      <title>Washington state applies for Florida's high-speed-rail funding</title>
      <pubDate>Tue, 05 Apr 2011 04:05:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/04_HSRFLApplication.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/04_HSRFLApplication.htm</guid>
      <description>Washington state applied today for approximately $120 million in federal high-speed-rail stimulus money, part of $2.4 billion returned by Florida. The Washington State Department of Transportation (WSDOT) will use the money to continue improving and expanding Amtrak Cascades service between Portland, Ore., and Vancouver, B.C.</description>
    </item>
    <item>
      <title>Closures set for SR 112 Lyre River Bridge</title>
      <pubDate>Sat, 02 Apr 2011 03:29:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/04_01_SR112LyreRiverClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/04_01_SR112LyreRiverClosures.htm</guid>
      <description>Closures set for SR 112 Lyre River Bridge</description>
    </item>
    <item>
      <title>Celebrate Work Zone Awareness week by going orange for work zone safety</title>
      <pubDate>Fri, 01 Apr 2011 00:07:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/31_workzonesafety2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/31_workzonesafety2011.htm</guid>
      <description>In recognition of the men and women who work mere feet from traffic, the Washington State Department of Transportation (WSDOT) along with state and national groups will go orange for work zone safety April 4 through 9 to celebrate National Work Zone Awareness Week.</description>
    </item>
    <item>
      <title>New report highlights Washington’s Recovery Act transportation investments</title>
      <pubDate>Thu, 31 Mar 2011 22:40:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/WSDOTReportsonRecoveryActInvestment.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/WSDOTReportsonRecoveryActInvestment.htm</guid>
      <description>New report highlights Washington’s Recovery Act transportation investments</description>
    </item>
    <item>
      <title>Clearing the North Cascades Highway starts April 11</title>
      <pubDate>Thu, 31 Mar 2011 01:02:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/30SR20ReopeningStarts411.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/30SR20ReopeningStarts411.htm</guid>
      <description>WSDOT plans to begin clearing State Route 20, The North Cascades Highway, on Monday, April 11.</description>
    </item>
    <item>
      <title>WSDOT’s bridge program scores high nationally</title>
      <pubDate>Thu, 31 Mar 2011 00:03:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/30_2010bridgereport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/30_2010bridgereport.htm</guid>
      <description>Washington state’s bridge maintenance and preservation program ranked high in a report released today by Transportation for America, a broad coalition of organizations promoting national transportation reform.</description>
    </item>
    <item>
      <title>Construction resumes on I-90 east of Snoqualmie Pass</title>
      <pubDate>Tue, 29 Mar 2011 04:05:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/28_I90constructionsnoqulmiepasseast.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/28_I90constructionsnoqulmiepasseast.htm</guid>
      <description>Major highway improvements on Interstate 90 east of Snoqualmie pass are kicking off again now that winter weather has calmed down.</description>
    </item>
    <item>
      <title>Studded tire deadline extended one week</title>
      <pubDate>Sat, 26 Mar 2011 03:02:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/25_studded_tires_extend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/25_studded_tires_extend.htm</guid>
      <description>The studded tire deadline has been extended one week. Drivers must now remove their studded tires by the end of the day Thursday, April 7.</description>
    </item>
    <item>
      <title>WSDOT names new public transportation director</title>
      <pubDate>Wed, 23 Mar 2011 05:55:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/New_PT_Director.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/New_PT_Director.htm</guid>
      <description>A veteran of bringing transportation choices to Washington, Brian Lagerberg was named director of the Public Transportation Division at WSDOT.</description>
    </item>
    <item>
      <title>WSDOT seeks comments on DBE contracting goals</title>
      <pubDate>Tue, 22 Mar 2011 05:08:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/DBEcontractingGoals.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/DBEcontractingGoals.htm</guid>
      <description>WSDOT seeks comments on DBE contracting goals</description>
    </item>
    <item>
      <title>Weekend-long I-5 lane closures coming to Lakewood</title>
      <pubDate>Fri, 18 Mar 2011 23:04:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/18_5_wkendclosurescoming.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/18_5_wkendclosurescoming.htm</guid>
      <description>Mid-April WSDOT crews begin preservation work on the I-5 Clover Creek Bridge in Lakewood.</description>
    </item>
    <item>
      <title>Report complete on US 101 widening project in Sequim</title>
      <pubDate>Wed, 16 Mar 2011 00:15:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/15_101_EAOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/15_101_EAOpenHouse.htm</guid>
      <description>WSDOT hosts open house for US 101 Kitchen-Dick project Thursday, Mar. 17.</description>
    </item>
    <item>
      <title>INRIX report: WSDOT’s Moving Washington programs keeping traffic moving</title>
      <pubDate>Wed, 09 Mar 2011 01:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/08_INRIX_report_WSDOT_traffic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/08_INRIX_report_WSDOT_traffic.htm</guid>
      <description>The 2010 National Traffic Scorecard, an annual congestion report published today by INRIX Corporation, shows Seattle as the country’s only major urban area that did not see congestion get worse last year.</description>
    </item>
    <item>
      <title>Amtrak Cascades hoping to cash in with new lottery ticket partnership</title>
      <pubDate>Tue, 08 Mar 2011 21:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/030811_AmtrakCascadesLottery.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/030811_AmtrakCascadesLottery.htm</guid>
      <description>Amtrak Cascades partners with Washington's Lottery to launch new Cash Train Scratch ticket.</description>
    </item>
    <item>
      <title>Bridge fence project narrows the gaps over I-5 in Olympia</title>
      <pubDate>Sat, 05 Mar 2011 05:45:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/03_04_I5CapitolBridgeProjectbegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/03_04_I5CapitolBridgeProjectbegins.htm</guid>
      <description>Bridge fence project narrows the gaps over I-5 in Olympia</description>
    </item>
    <item>
      <title>WSDOT and customer service vendor working to improve Good To Go! customer experience</title>
      <pubDate>Fri, 04 Mar 2011 04:50:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/3_gtgCustomerServiceImprovements.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/3_gtgCustomerServiceImprovements.htm</guid>
      <description>WSDOT is working to improve the Good To Go! customer experience.</description>
    </item>
    <item>
      <title>Pile driving for SR 520 pontoon project starts this week</title>
      <pubDate>Tue, 01 Mar 2011 06:23:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/SR+520PCP+Pile+driving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/SR+520PCP+Pile+driving.htm</guid>
      <description>The sounds of progress start echoing through the State Route 520 Pontoon Construction project site this week as crews begin to drive hundreds of support pilings to form the foundation of a pontoon casting facility.</description>
    </item>
    <item>
      <title>Agreements secure $590 million in federal passenger rail funding for Washington state</title>
      <pubDate>Sun, 27 Feb 2011 05:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/26_HighSpeedRailAgreements.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/26_HighSpeedRailAgreements.htm</guid>
      <description>Agreements have been signed that guarantee Washington state will get $590 million in federal stimulus money to improve the Amtrak Cascades rail corridor from Portland to Seattle, Gov. Chris Gregoire said today.</description>
    </item>
    <item>
      <title>Widening work at I-5 and Trosper Road makes way for Walmart</title>
      <pubDate>Fri, 25 Feb 2011 07:13:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/I-5+Trosper+Interchange.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/I-5+Trosper+Interchange.htm</guid>
      <description>I-5 Trosper interchange</description>
    </item>
    <item>
      <title>Work begins in Aberdeen on SR 520 pontoon project</title>
      <pubDate>Fri, 18 Feb 2011 08:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/17_SR520PontoonProjectConstructionBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/17_SR520PontoonProjectConstructionBegins.htm</guid>
      <description>ABERDEEN – A revival is under way at the former Aberdeen Log Yard– not in timber, but in concrete pontoons that will support the State Route 520 floating bridge for decades to come.</description>
    </item>
    <item>
      <title>WSDOT updating new Good To Go! website in response to customer feedback</title>
      <pubDate>Fri, 18 Feb 2011 03:36:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/17_GoodToGoWebsiteUpgrade.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/17_GoodToGoWebsiteUpgrade.htm</guid>
      <description>WSDOT updating and improving new Good To Go! website in response to customer feedback.</description>
    </item>
    <item>
      <title>Washington state to feds: We're ready to put Florida rail money to work</title>
      <pubDate>Thu, 17 Feb 2011 03:19:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/16_AddlHSRFunds.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/16_AddlHSRFunds.htm</guid>
      <description>Federal high-speed-rail stimulus funds rejected by Florida could be well spent in Washington on the vital Amtrak Cascades corridor stretching from Oregon to British Columbia, Washington Transportation Secretary Paula Hammond said today.</description>
    </item>
    <item>
      <title>Lane restrictions begin next week on Puyallup River Bridge</title>
      <pubDate>Wed, 16 Feb 2011 05:52:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/15_SR167lanerestrictionbegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/15_SR167lanerestrictionbegins.htm</guid>
      <description>Lane restrictions begin next week on Puyallup River Bridge</description>
    </item>
    <item>
      <title>WSDOT launches new Good To Go! passes and account sign-ups for SR 520 tolling</title>
      <pubDate>Wed, 16 Feb 2011 00:17:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/15_goodtogo520passsales.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/15_goodtogo520passsales.htm</guid>
      <description>WSDOT launches new Good To Go! passes and account sign-ups for SR 520 tolling</description>
    </item>
    <item>
      <title>Amtrak Cascades offers new promotions, amenities</title>
      <pubDate>Sat, 12 Feb 2011 03:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/021111_AmtrakCascadespromotions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/021111_AmtrakCascadespromotions.htm</guid>
      <description>OLYMPIA - Thinking about taking your valentine to Vancouver, B.C.? Heading into the spring travel season, Amtrak Cascades is offering ticket promotions, free food vouchers on some routes and upgraded amenities in a push to improve service throughout the Pacific Northwest.</description>
    </item>
    <item>
      <title>Secretary of Transportation Hammond applauds federal transportation initiatives</title>
      <pubDate>Wed, 09 Feb 2011 02:23:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/HammondApplaudsFedInitiative.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/HammondApplaudsFedInitiative.htm</guid>
      <description>Secretary of Transportation Hammond applauds federal transportation initiatives</description>
    </item>
    <item>
      <title>New Good To Go! statewide customer service center to feature enhanced website and pass options</title>
      <pubDate>Sun, 06 Feb 2011 03:18:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/5_GTGtransition.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/5_GTGtransition.htm</guid>
      <description>Beginning Tuesday, Feb. 15, customers will notice a new look and feel to the Good To Go! website. The Washington State Department of Transportation (WSDOT) is upgrading the website as part of its transition to a new statewide customer service center for tolls.</description>
    </item>
    <item>
      <title>WSDOT restricts lane – not weight – on SR 167 Puyallup River Bridge</title>
      <pubDate>Fri, 04 Feb 2011 01:43:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/03_PuyallupRiverBridgelanerestriction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/03_PuyallupRiverBridgelanerestriction.htm</guid>
      <description>WSDOT this week took a load off the minds of commercial truckers who rely on the SR 167 Puyallup River Bridge, lifting a previously announced weight limit on the northbound lanes.</description>
    </item>
    <item>
      <title>Wi-Fi service available on all Amtrak Cascades trains</title>
      <pubDate>Tue, 01 Feb 2011 01:28:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/013111_AmtrakCascadesWifi.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/013111_AmtrakCascadesWifi.htm</guid>
      <description>Amtrak Cascades free Wi-Fi launched on all trains.</description>
    </item>
    <item>
      <title>Work begins on reconfigured I-5 interchange at Grand Mound</title>
      <pubDate>Sat, 29 Jan 2011 06:27:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/28_5_GMinterchgBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/28_5_GMinterchgBegins.htm</guid>
      <description>Work is underway to improve the I-5/US 12 Grand Mound interchange south of Tumwater.</description>
    </item>
    <item>
      <title>Texas report: Seattle drivers stuck in traffic less than elsewhere in country</title>
      <pubDate>Fri, 21 Jan 2011 02:50:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/20_TTIreport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/20_TTIreport.htm</guid>
      <description>Seattle’s urban-area drivers spend less time stuck in traffic than drivers in similar-size areas around the country, according to a report today from the Texas Transportation Institute (TTI).</description>
    </item>
    <item>
      <title>Ridership on Amtrak Cascades hits all-time record in 2010</title>
      <pubDate>Thu, 20 Jan 2011 01:01:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/011911_AmtrakCascades2010ridership.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/011911_AmtrakCascades2010ridership.htm</guid>
      <description>2010 Amtrak Cascades ridership report</description>
    </item>
    <item>
      <title>WSDOT, Makah tackle SR 112 landslide from both sides</title>
      <pubDate>Wed, 19 Jan 2011 08:07:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/SR+112+Landslide.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/SR+112+Landslide.htm</guid>
      <description>SR 112 Landslide</description>
    </item>
    <item>
      <title>Washington to create nation’s first electric vehicle-friendly scenic byway along U.S. 2</title>
      <pubDate>Thu, 13 Jan 2011 08:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/firstElectricVehicleHighway.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/firstElectricVehicleHighway.htm</guid>
      <description>Washington to create nation’s first electric vehicle-friendly scenic byway along U.S. 2</description>
    </item>
    <item>
      <title>SR 520 pontoon project open house set for Jan. 19</title>
      <pubDate>Thu, 13 Jan 2011 02:57:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/SR+520+Open+House+Jan.+19.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/SR+520+Open+House+Jan.+19.htm</guid>
      <description>The countdown to construction is under way in Grays Harbor and a Jan. 19 open house gives the community a chance to learn more about upcoming work to build concrete pontoons for a replacement State Route 520 floating bridge.</description>
    </item>
    <item>
      <title>SR 410 widening project wraps up for winter</title>
      <pubDate>Tue, 11 Jan 2011 01:44:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/10_SR410projectwrapsup.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/10_SR410projectwrapsup.htm</guid>
      <description>SR 410 widening project wraps up for winter</description>
    </item>
    <item>
      <title>US 101 Simpson Avenue Bridge reopens</title>
      <pubDate>Mon, 10 Jan 2011 10:38:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/9_101_SimpsonBridgeReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/9_101_SimpsonBridgeReopens.htm</guid>
      <description>WSDOT is reopening the US 101 Simpson Ave. Bridge.</description>
    </item>
    <item>
      <title>National experts deliver final report on I-405/SR 167 express toll lanes</title>
      <pubDate>Wed, 05 Jan 2011 06:56:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/ERPReport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/ERPReport.htm</guid>
      <description>A proposed express toll lane system is a viable and appropriate strategy for improving mobility in the Interstate 405 and State Route 167 corridor, according to a report by national tolling experts sent today to the Washington State Department of Transportation (WSDOT).</description>
    </item>
  </channel>
</rss>