﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - May</title>
    <link>http://www.wsdot.wa.gov/News/2009/05/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Wed, 25 Nov 2009 21:01:54 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - May</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/News/2009/05/</link>
    </image>
    <item>
      <title>Crews check lists twice prior to Hood Canal Bridge draw span testing</title>
      <pubDate>Tue, 02 Jun 2009 12:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/06_1_HoodCanalChecklist.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/06_1_HoodCanalChecklist.htm</guid>
      <description>Crews check lists twice prior to Hood Canal Bridge draw span testing</description>
    </item>
    <item>
      <title>One month until next round of major closures on the I-90 floating bridge; two more weeks to save big on vanpooling</title>
      <pubDate>Tue, 02 Jun 2009 01:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/01_I90CommuteOptions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/01_I90CommuteOptions.htm</guid>
      <description>One month until next round of major closures on the I-90 floating bridge; two more weeks to save big on vanpooling</description>
    </item>
    <item>
      <title>SR 104 Hood Canal Bridge draw span testing starts Tuesday morning</title>
      <pubDate>Mon, 01 Jun 2009 09:33:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/31_SR104HCB_TestsBeginTuesday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/31_SR104HCB_TestsBeginTuesday.htm</guid>
      <description>Before the SR 104 Hood Canal Bridge can reopen to traffic, WSDOT and Kiewit-General must complete 20 perfect openings to meet operational standards for providing a safe and reliable draw span. Those tests are scheduled to start Tuesday morning. Accomplishing this will provide a clear view on when the bridge will be ready for 16,000 vehicles that cross it daily.</description>
    </item>
    <item>
      <title>Draw span holds the key to opening new SR 104 Hood Canal Bridge</title>
      <pubDate>Sun, 31 May 2009 06:34:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/30_SR104HCB_drawspan.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/30_SR104HCB_drawspan.htm</guid>
      <description>SR 104 Hood Canal Bridge crews are working hard day and night to get the draw span ready for its required testing - completing 20 perfect draw span openings.</description>
    </item>
    <item>
      <title>SR 104 Hood Canal Bridge still on track to open first week of June</title>
      <pubDate>Sat, 30 May 2009 04:20:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/29_SR104HCB+_update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/29_SR104HCB+_update.htm</guid>
      <description>Current work keeps Hood Canal Bridge on track for opening first week of June.</description>
    </item>
    <item>
      <title>WSDOT secures vision for competing for federal high speed passenger rail stimulus funds</title>
      <pubDate>Sat, 30 May 2009 03:18:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/29_RailStimulusFunding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/29_RailStimulusFunding.htm</guid>
      <description>With nearly $8 billion in federal stimulus funding set aside for high speed passenger rail projects, Washington, Oregon and British Columbia are working together to gain consensus on the best projects to submit for consideration.</description>
    </item>
    <item>
      <title>Weeklong SR 538/Riverside Drive intersection closure begins May 31 in Mount Vernon</title>
      <pubDate>Fri, 29 May 2009 23:26:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/29_538RiversideWeeklongClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/29_538RiversideWeeklongClosure.htm</guid>
      <description>Crews will completely close the SR 538/Riverside Drive intersection for one week beginning May 31.</description>
    </item>
    <item>
      <title>Avoiding travel delays: WSDOT reminds international travelers of changing border-crossing requirements</title>
      <pubDate>Fri, 29 May 2009 22:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/Border_052909.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/Border_052909.htm</guid>
      <description>Avoiding travel delays: WSDOT reminds international travelers of changing border-crossing requirements</description>
    </item>
    <item>
      <title>WSDOT plans US 2 route development plan open house next week</title>
      <pubDate>Fri, 29 May 2009 22:05:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/29_us2rdpopenhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/29_us2rdpopenhouse.htm</guid>
      <description>WSDOT plans US 2 route development plan open house next week</description>
    </item>
    <item>
      <title>WSDOT reminds pilots to 'Fly Clear of Wildfires'</title>
      <pubDate>Thu, 28 May 2009 05:05:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/WildfireSafety.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/WildfireSafety.htm</guid>
      <description></description>
    </item>
    <item>
      <title>New signs remind drivers to stay safe on US 2</title>
      <pubDate>Thu, 28 May 2009 04:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/27_US2CrashSigns.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/27_US2CrashSigns.htm</guid>
      <description>WSDOT unveiled a new electronic sign this morning on US 2 just outside of Monroe. The sign, which is part of the US 2 Traffic Safety Corridor project, will provide drivers with a real-time reminder of the importance of driving safely on the corridor.</description>
    </item>
    <item>
      <title>Gov. Gregoire, Sec. Hammond announce federal recovery awards for transportation paving projects</title>
      <pubDate>Thu, 28 May 2009 04:49:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/27_aara_pavingprojects.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/27_aara_pavingprojects.htm</guid>
      <description>Gov. Chris Gregoire and the Washington State Department of Transportation Secretary Paula Hammond today announced that Granite Northwest, Inc. was awarded two paving contracts funded by the American Recovery and Reinvestment Act (ARRA).</description>
    </item>
    <item>
      <title>SR 532 open house will prepare drivers for summer construction</title>
      <pubDate>Thu, 28 May 2009 03:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/27_SR532JuneOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/27_SR532JuneOpenHouse.htm</guid>
      <description>State Route 532 open house on June 8 in Stanwood will prepare drivers for summer construction.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division holds community meetings</title>
      <pubDate>Thu, 28 May 2009 00:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/WSDOT+Ferries+Division+holds+community+meetings.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/WSDOT+Ferries+Division+holds+community+meetings.htm</guid>
      <description>WSDOT Ferries Division holds community meetings</description>
    </item>
    <item>
      <title>WSDOT schedules SR 500, St. Johns Interchange open house, June 3</title>
      <pubDate>Wed, 27 May 2009 23:38:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/27_SR500_StJohnsBlvd_OpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/27_SR500_StJohnsBlvd_OpenHouse.htm</guid>
      <description>VANCOUVER – The Washington State Department of Transportation invites the public to an open house to learn more about the SR 500, St. Johns Interchange project. Over the course of this project, a portion of St. Johns Boulevard will be closed for one year. The public is encouraged to attend to learn more about their commute options during construction.</description>
    </item>
    <item>
      <title>Weekend work brings Hood Canal Bridge reopening closer</title>
      <pubDate>Wed, 27 May 2009 21:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/SR+104+HCB+reopening+closer.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/SR+104+HCB+reopening+closer.htm</guid>
      <description>SR 104 HCB Weekend work progress</description>
    </item>
    <item>
      <title>Washington remains the nation’s “Most Bicycling Friendly State"</title>
      <pubDate>Wed, 27 May 2009 06:13:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/26_BicyclingFriendlyState.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/26_BicyclingFriendlyState.htm</guid>
      <description>Washington has been rated by the League of American Bicyclists as the nation’s number one “Bicycle Friendly State” for the second year in a row.</description>
    </item>
    <item>
      <title>WSDOT completes I-5 widening and interchange project ahead of schedule</title>
      <pubDate>Wed, 27 May 2009 05:27:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/26_RushRdRibbonCuttingAnnouncement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/26_RushRdRibbonCuttingAnnouncement.htm</guid>
      <description>CHEHALIS – The first of five I-5 improvement projects in Lewis County is being delivered ahead of schedule as the Washington State Department of Transportation continues building projects that support drivers and the economy.</description>
    </item>
    <item>
      <title>More drivers come out for Memorial Day 2009</title>
      <pubDate>Wed, 27 May 2009 05:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/26_memorial09_recap.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/26_memorial09_recap.htm</guid>
      <description>OLYMPIA – It was tough out there for many travelers as the combination of concerts, festivals, lower gas prices and summer-like weather drew thousands to Washington’s roadways for Memorial Day Weekend 2009.</description>
    </item>
    <item>
      <title>WSDOT closes Seattle’s Fourth Avenue S. in SODO at night this week</title>
      <pubDate>Wed, 27 May 2009 04:11:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/26-4thAveClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/26-4thAveClosure.htm</guid>
      <description>Crews working for a WSDOT contractor will close Fourth Avenue S. in SODO for three nights this week.</description>
    </item>
    <item>
      <title>WSDOT awards I-82 Grandview to Granger pavement repair contract to Granite Northwest, Inc., of Yakima</title>
      <pubDate>Wed, 27 May 2009 02:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/0526I82dowelbarpaver.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/0526I82dowelbarpaver.htm</guid>
      <description>WSDOT awarded the federally funded I-82 Grandview to Granger westbound pavement repair project to Granite Northwest, Inc., of Yakima. Granite submitted the lowest bid of this preservation project; the estimated total project cost is $6.5 million, which will support approximately 65 jobs.</description>
    </item>
    <item>
      <title>I-5, SR 520 quieter pavement test sections are not so quiet; Final section on I-405 set to test in August</title>
      <pubDate>Tue, 26 May 2009 21:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/_26quieterpavement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/_26quieterpavement.htm</guid>
      <description>After several years of testing two types of modern quieter pavement on southbound I-5 through Lynnwood and on SR 520 between Medina and Bellevue, data collected by WSDOT engineers shows the new pavements are not quieter after all.</description>
    </item>
    <item>
      <title>WSDOT announces it will open the SR 104 Hood Canal Bridge early</title>
      <pubDate>Sat, 23 May 2009 05:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/05_22_HoodCanalEarlyOpening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/05_22_HoodCanalEarlyOpening.htm</guid>
      <description>WSDOT announces it will open the SR 104 Hood Canal Bridge early</description>
    </item>
    <item>
      <title>New I-5 off-ramp to open Tuesday in Burlington</title>
      <pubDate>Sat, 23 May 2009 03:49:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/22_5SR20OfframpOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/22_5SR20OfframpOpen.htm</guid>
      <description>Crews will open a new, elevated southbound off-ramp at the Interstate 5/State Route 20 interchange Tuesday, May 26.</description>
    </item>
    <item>
      <title>WSDOT responds to sink hole on state-owned property along Seattle’s waterfront</title>
      <pubDate>Fri, 22 May 2009 04:10:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/21-sinkhole.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/21-sinkhole.htm</guid>
      <description>WSDOT engineers responded to a sink hole that opened up early this morning to the south of the Washington Street Boat Landing on Seattle’s waterfront. The sink hole is approximately three feet by five feet on the surface and is located on state-owned property at Pier 48.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division adds vehicle holding spaces at Mukilteo ferry terminal</title>
      <pubDate>Fri, 22 May 2009 01:31:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/Mukilteo_052109.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/Mukilteo_052109.htm</guid>
      <description>WSDOT Ferries Division adds vehicle holding spaces at Mukilteo ferry terminal</description>
    </item>
    <item>
      <title>Chinook Pass opens on May 22 at noon</title>
      <pubDate>Fri, 22 May 2009 00:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/Chinook_Pass_opens_May_22.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/Chinook_Pass_opens_May_22.htm</guid>
      <description>WSDOT crews will open SR 410 Chinook Pass at noon May 22</description>
    </item>
    <item>
      <title>SR 16 on-ramp in Tacoma closes June 1 for two years</title>
      <pubDate>Thu, 21 May 2009 23:20:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/21_SR16Spragueclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/21_SR16Spragueclosure.htm</guid>
      <description>Sprague Avenue ramp to westbound SR 16 in Tacoma closes June 1 for two years.</description>
    </item>
    <item>
      <title>Gov. Gregoire announces federal recovery transportation contract award</title>
      <pubDate>Wed, 20 May 2009 06:24:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/19_fedRecov.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/19_fedRecov.htm</guid>
      <description>Gov. Chris Gregoire and Washington Transportation Sec. Paula Hammond this week announced a stimulus-funded contract award to Granite Northwest, Inc. of Camas to repair and replace damaged concrete panels and re-pave sections of Interstate 5 between North Kelso and Castle Rock.</description>
    </item>
    <item>
      <title>Be safe and avoid the headache with a check of WSDOT’s Memorial Day Weekend travel trends</title>
      <pubDate>Wed, 20 May 2009 02:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/19_memorialday_travel.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/19_memorialday_travel.htm</guid>
      <description>OLYMPIA – Memorial Day is the kick-off to the summer travel season, and a few minutes of planning could make your weekend travel more safe and less aggravating. 

WSDOT offers many ways to know before you go.</description>
    </item>
    <item>
      <title>WSDOT to send e-mail updates for SR 532 projects</title>
      <pubDate>Tue, 19 May 2009 23:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/19_NewSR+532e-mailUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/19_NewSR+532e-mailUpdate.htm</guid>
      <description>State Route 532 drivers can get e-mail updates during construction along the corridor this summer.</description>
    </item>
    <item>
      <title>WSDOT places last major components on SR 104 Hood Canal Bridge</title>
      <pubDate>Tue, 19 May 2009 22:24:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/HCB+SR+104+last+components.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/HCB+SR+104+last+components.htm</guid>
      <description>HCB 104 last components</description>
    </item>
    <item>
      <title>Bridge deck work on I-90 near Spokane begins May 18</title>
      <pubDate>Mon, 18 May 2009 22:00:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/15_I90bridgedeckwork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/15_I90bridgedeckwork.htm</guid>
      <description>Contractor crews will begin work to repair and resurface two bridges on Interstate 90 near Spokane on Monday, May 18.</description>
    </item>
    <item>
      <title>WSDOT weekend wrap up: I-90 express lanes open for the Monday morning commute</title>
      <pubDate>Mon, 18 May 2009 20:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/18_I-90ExpressLanesOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/18_I-90ExpressLanesOpen.htm</guid>
      <description>Morning commuters have access to the I-90 express lanes for the first time in two weeks today, after WSDOT contractor crews finished the first phase of a two phase project to replace large steel bridge joints on the I-90 floating bridge. Crews also continued work this weekend to replace cracked and broken concrete on a separate repair project on I-5 in Seattle.</description>
    </item>
    <item>
      <title>WSDOT reopens the Tukwila Parkway on-ramp to northbound I-405 one day early</title>
      <pubDate>Sun, 17 May 2009 22:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/17_I405TukwilaParkway.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/17_I405TukwilaParkway.htm</guid>
      <description>WSDOT reopens the Tukwila Parkway on-ramp to northbound I-405 one day early</description>
    </item>
    <item>
      <title>Exit from northbound I-5 to Olive Way in Seattle to close for up to one year as crews prepare the ground under I-5 for Sound Transit light rail</title>
      <pubDate>Sat, 16 May 2009 05:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/15-olivewayclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/15-olivewayclosure.htm</guid>
      <description>Drivers heading to downtown Seattle and Capitol Hill should prepare for up to a year-long closure of the off-ramp from northbound Interstate 5 to Olive Way beginning Monday, May 18 at 10 p.m.</description>
    </item>
    <item>
      <title>WSDOT begins construction on stimulus contract to preserve US 101, SR 103 on Long Beach peninsula</title>
      <pubDate>Sat, 16 May 2009 05:16:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/15_WSDOTBeginsUS101SR103Paver.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/15_WSDOTBeginsUS101SR103Paver.htm</guid>
      <description>LONG BEACH – Motorists along US 101 and SR 103 in Pacific County will start seeing construction equipment as the Washington State Department of Transportation (WSDOT) begins construction on the US 101/SR 103 – Fort Columbia Vic. to Long Beach Vic. – Paving project, funded in part by the 2009 American Recovery and Reinvestment Act.</description>
    </item>
    <item>
      <title>WSDOT reopens Cayuse Pass at noon</title>
      <pubDate>Sat, 16 May 2009 04:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/051509_cayuse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/051509_cayuse.htm</guid>
      <description>ayuse Pass, connecting Chinook Pass and White Pass at the east end of Mount Rainier National Park, will open at noon today, Friday, May 15, 2009. The pass was originally scheduled to open Tuesday, May 13. WSDOT crews postponed that opening after a last minute snowstorm and avalanche danger threatened driver safety in the area.</description>
    </item>
    <item>
      <title>WSDOT sets SR 104 Hood Canal Bridge west truss</title>
      <pubDate>Sat, 16 May 2009 03:50:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/SR+104+HCB+west+truss+set.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/SR+104+HCB+west+truss+set.htm</guid>
      <description>SR 104 HCB west truss placed</description>
    </item>
    <item>
      <title>WSDOT Ferries Division notes kick-off of busy summer season</title>
      <pubDate>Sat, 16 May 2009 02:12:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/Memorialday_051509.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/Memorialday_051509.htm</guid>
      <description>WSDOT Ferries Division notes kick-off of busy summer season</description>
    </item>
    <item>
      <title>More nighttime lane closures for I-5 in Seattle; I-90 express lanes work wraps up; downtown events mean more people will be on the road</title>
      <pubDate>Sat, 16 May 2009 00:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/_15_busyseattleweek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/_15_busyseattleweek.htm</guid>
      <description>It’s going to be a busy weekend in the Seattle area: WSDOT contractor crews will continue to work and close lanes on I-5 in Seattle and the Seattle Mariners play five games at home.</description>
    </item>
    <item>
      <title>WSDOT leverages federal stimulus funds to improve 28 miles of SR 4 in Southwest Washington</title>
      <pubDate>Fri, 15 May 2009 21:55:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/15_SR4_SkamokawatoCoalCreek_PavingGuardrail.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/15_SR4_SkamokawatoCoalCreek_PavingGuardrail.htm</guid>
      <description>SKAMOKAWA – The Washington State Department of Transportation (WSDOT) this week announced the advertisement of the SR 4 – Skamokawa to Coal Creek Road – Paving and Guardrail Upgrade construction contract.</description>
    </item>
    <item>
      <title>New roundabout set to open Saturday on SR 539 near Bellingham</title>
      <pubDate>Fri, 15 May 2009 21:29:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/15_sr539roundaboutsettoopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/15_sr539roundaboutsettoopen.htm</guid>
      <description>A major SR 539 project milestone – opening the first roundabout on a state highway in Whatcom County -- is expected to happen early Saturday morning, May 16, while many commuters are probably still asleep.</description>
    </item>
    <item>
      <title>WSDOT installs first new SR 104 Hood Canal Bridge pontoon section</title>
      <pubDate>Fri, 15 May 2009 09:45:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/14_SR104HCB_newpontoon.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/14_SR104HCB_newpontoon.htm</guid>
      <description>WSDOT installs first new bridge section on the east-half HCB replacement projecxt.</description>
    </item>
    <item>
      <title>Rainstorm washes away new lane stripes on SR 503 near Amboy</title>
      <pubDate>Fri, 15 May 2009 05:38:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/14_SR503StripingSurprise.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/14_SR503StripingSurprise.htm</guid>
      <description>AMBOY – WSDOT striping crews got a big surprise Wednesday afternoon when the fresh lane lines they sprayed on SR 503 washed away during a rainstorm.</description>
    </item>
    <item>
      <title>Gov. Gregoire announces contracts for resurfacing projects in the Columbia Basin and Okanogan</title>
      <pubDate>Fri, 15 May 2009 05:35:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/15NCRARRAChipSealAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/15NCRARRAChipSealAward.htm</guid>
      <description>Three stimulus resurfacing projects in the Okanogan and Columbia Basin will begin construction May 26.</description>
    </item>
    <item>
      <title>WSDOT’s advice to sports fans:  Have a game plan to get to Seattle stadiums on time</title>
      <pubDate>Fri, 15 May 2009 04:26:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/14_SR519closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/14_SR519closures.htm</guid>
      <description>WSDOT wants fans heading to this weekend’s Mariners games to have a plan so they can make it to the first pitch on time. That’s because major bridge construction next to Safeco Field’s left field bleachers could slow down the trip to the ballpark.</description>
    </item>
    <item>
      <title>Construction begins on SR 4, SR 401 safety enhancement project</title>
      <pubDate>Fri, 15 May 2009 02:51:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/14_SR4SR401ConstructionBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/14_SR4SR401ConstructionBegins.htm</guid>
      <description>NASELLE – Starting this week, drivers along SR 4 and SR 401 in Pacific, Wahkiakum and Cowlitz counties will start seeing orange barrels and construction equipment as the Washington State Department of Transportation (WSDOT) begins roadside safety improvements.</description>
    </item>
    <item>
      <title>Gov. Gregoire signs historic transportation budget</title>
      <pubDate>Fri, 15 May 2009 00:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/14_TransportationBudget.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/14_TransportationBudget.htm</guid>
      <description>Gov. Chris Gregoire today signed the $7.5 billion transportation budget for the 2009-2011 biennium, which includes the largest two-year construction budget ever for the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>Gov. Gregoire signs bill to fund and build SR 520 floating bridge replacement</title>
      <pubDate>Fri, 15 May 2009 00:27:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/14_520FloatingBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/14_520FloatingBridge.htm</guid>
      <description>Gov. Chris Gregoire today signed Engrossed Substitute House Bill 2211, approving construction and funding for a new SR 520 floating bridge replacement which will open to drivers in 2014.</description>
    </item>
    <item>
      <title>WSDOT begins construction on West 39th St. bridge in Vancouver this week</title>
      <pubDate>Thu, 14 May 2009 22:35:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/14_West39thStBridgeConstruction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/14_West39thStBridgeConstruction.htm</guid>
      <description>VANCOUVER – The Washington State Department of Transportation (WSDOT) began construction this week on a new West 39th St. bridge that will improve safety at a congested railroad crossing and enhance connectivity between neighborhoods in the area.</description>
    </item>
    <item>
      <title>I-90 express lanes to reopen May 16 after major construction</title>
      <pubDate>Thu, 14 May 2009 21:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/14_I90ExpressLanesReopening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/14_I90ExpressLanesReopening.htm</guid>
      <description>I-90 express lanes to reopen May 16 after major construction</description>
    </item>
    <item>
      <title>SR 504 – Spirit Lake Memorial Highway opens May 14</title>
      <pubDate>Thu, 14 May 2009 05:53:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/13_SR504Reopening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/13_SR504Reopening.htm</guid>
      <description>MOUNT ST. HELENS – WSDOT will reopen SR 504 (Spirit Lake Memorial Highway) east of Hummocks Trailhead at 7 a.m. Thursday, May 14.</description>
    </item>
    <item>
      <title>Work scheduled for I-5 in Seattle and I-90 express lanes this weekend; downtown events mean more people will be on the road</title>
      <pubDate>Thu, 14 May 2009 05:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/13_I5I90midweek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/13_I5I90midweek.htm</guid>
      <description>WSDOT contractor crews will continue to work and close lanes on key Seattle corridors and the Seattle Mariners will have a home stand.</description>
    </item>
    <item>
      <title>WSDOT closes lanes and ramp this week on I-5 and I-90 for Seattle earthquake safety project</title>
      <pubDate>Tue, 12 May 2009 23:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/12_I90Seismic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/12_I90Seismic.htm</guid>
      <description>Work to strengthen the Interstate 90 bridges over I-5 in Seattle will require overnight lane and ramp closures this week.</description>
    </item>
    <item>
      <title>Mother Nature throws Cayuse Pass a curve ball</title>
      <pubDate>Tue, 12 May 2009 23:49:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/051209_cayuse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/051209_cayuse.htm</guid>
      <description>Cayuse Pass was scheduled to open today, Tuesday May 12. However, new snow accumulation on SR 123 delayed the pass opening until further notice.</description>
    </item>
    <item>
      <title>Falling boulder closes eastbound I-90 at North Bend for five hours</title>
      <pubDate>Tue, 12 May 2009 21:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/12_I90rockfall.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/12_I90rockfall.htm</guid>
      <description>Eastbound Interstate 90 closed to all traffic at North Bend earlier today. The road is now open. WSDOT crews closed the road at 2 a.m. after a large boulder fell off the hillside, bounced over the concrete jersey barrier and came to rest in the eastbound lanes.</description>
    </item>
    <item>
      <title>Hood Canal Bridge focus shifts from removal to reassembly</title>
      <pubDate>Tue, 12 May 2009 04:50:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/SR+104+HCB+Removal-Reassembly.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/SR+104+HCB+Removal-Reassembly.htm</guid>
      <description>HCB Removal-Reassembly</description>
    </item>
    <item>
      <title>Island and Skagit county news for week of May 11</title>
      <pubDate>Sat, 09 May 2009 05:31:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/08_SkagitIslandEmailUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/08_SkagitIslandEmailUpdate.htm</guid>
      <description>Weekly report on WSDOT highway projects in Skagit and Island counties</description>
    </item>
    <item>
      <title>Whatcom County news for the week of May 11</title>
      <pubDate>Sat, 09 May 2009 05:28:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/08_WhatcomCountyNewsMay11.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/08_WhatcomCountyNewsMay11.htm</guid>
      <description>Whatcom County news for the week of May 11</description>
    </item>
    <item>
      <title>WSDOT awards stimulus-funded US 2 paving project to Lakeside Industries, Inc.</title>
      <pubDate>Sat, 09 May 2009 04:22:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/08_US2PaverAwarded.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/08_US2PaverAwarded.htm</guid>
      <description>MONROE - Governor Chris Gregoire and the Washington State Department of Transportation announced that Lakeside Industries, Inc. of Monroe this week was awarded the contract to repave US 2 between Monroe and Sultan after submitting the low bid of 1.4 million, 36 percent below WSDOT's construction estimate.</description>
    </item>
    <item>
      <title>SR 538/Riverside Drive intersection closure delayed two weeks</title>
      <pubDate>Sat, 09 May 2009 01:43:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/08_538RiversideClosureRescheduled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/08_538RiversideClosureRescheduled.htm</guid>
      <description>Crews have delayed the weeklong SR 538/Riverside Drive intersection closure for two more weeks due to a forecast of continued rainy, cool weather.</description>
    </item>
    <item>
      <title>Ferry system's customer service lines overwhelmed with calls</title>
      <pubDate>Sat, 09 May 2009 00:48:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/NR050809.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/NR050809.htm</guid>
      <description>Ferry system's customer service lines overwhelmed with calls</description>
    </item>
    <item>
      <title>Tugs move out old Hood Canal Bridge draw span assembly</title>
      <pubDate>Fri, 08 May 2009 09:02:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/07_SR104HCB+NOP+removed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/07_SR104HCB+NOP+removed.htm</guid>
      <description>Hood Canal Bridge draw span assembly removed May 7.</description>
    </item>
    <item>
      <title>WSDOT thanks drivers for their help and patience; Smooth sailing for I-90 floating bridge commute this morning</title>
      <pubDate>Fri, 08 May 2009 02:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/_07_I90thursday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/_07_I90thursday.htm</guid>
      <description>Seattle-bound drivers made a big difference in the Thursday morning commute through Issaquah and across the I-90 floating bridge. Traffic data shows drivers are flexing their schedule and commuting outside the peak 7 a.m. – 9 a.m. time period. Travel times from Issaquah to Seattle via I-90 and Bellevue to Seattle via SR 520 never exceeded 24 minutes.</description>
    </item>
    <item>
      <title>Eastside drivers traveling to Seattle on I-90 can continue to avoid backups by shifting their commute times</title>
      <pubDate>Thu, 07 May 2009 08:49:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/6_I90nightrelease.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/6_I90nightrelease.htm</guid>
      <description>Drivers commuting from Issaquah to Seattle on Interstate 90 appear to be shifting their travel times to avoid the peak 7-9 a.m. commute time, and a repeat performance Thursday morning will help traffic flow smoothly.</description>
    </item>
    <item>
      <title>Next Aviation Planning Council Meeting: May 26 in Seattle</title>
      <pubDate>Thu, 07 May 2009 06:24:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/May26APC.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/May26APC.htm</guid>
      <description>On May 26, 2009 from 10 a.m. to 3 p.m., members of the Governor-appointed Aviation Planning Council will meet to continue work on the final phase of the Long-Term Air Transportation Study (LATS). 

This is scheduled as the final meeting of the Aviation Planning Council. 

The meeting will take place at the Museum of Flight in Seattle: 

Museum of Flight 
9404 East Marginal Way S. 
Seattle, WA 98108-4097 
http://www.museumofflight.org/visit</description>
    </item>
    <item>
      <title>Hood Canal water shuttle could face storm delays again today</title>
      <pubDate>Thu, 07 May 2009 01:00:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/06SR104HCB_weather.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/06SR104HCB_weather.htm</guid>
      <description>High winds, rough seas MAY affect water shuttle service across the Hood Canal.</description>
    </item>
    <item>
      <title>I-90 paving in Spokane starts on May 18</title>
      <pubDate>Wed, 06 May 2009 22:35:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/06_i90spokanepavingstarts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/06_i90spokanepavingstarts.htm</guid>
      <description>I-90 paving in Spokane starts on May 18</description>
    </item>
    <item>
      <title>Wind, baseball delay Seattle-area commuters determined to cross I-90 bridge minus express lanes</title>
      <pubDate>Wed, 06 May 2009 09:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/05_I90pmclosureRelease.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/05_I90pmclosureRelease.htm</guid>
      <description>Tuesday began with gusty winds and ended with a rush-hour exodus of baseball fans across the I-90 bridge, where express lanes were closed for construction.</description>
    </item>
    <item>
      <title>Stormy commute, I-90 express lane closures lead to earlier commute times and better traffic flow</title>
      <pubDate>Wed, 06 May 2009 01:47:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/05_StormyCommuteTravelDelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/05_StormyCommuteTravelDelays.htm</guid>
      <description>Whether it was the predicted stormy commute or earlier departure times by eastside drivers, the Issaquah-Bellevue-Seattle commute started a little earlier, ended a little earlier and was not as difficult as Monday.</description>
    </item>
    <item>
      <title>Wind, rain and I-90 express lane closure equal tough Tuesday morning commute to Seattle</title>
      <pubDate>Tue, 05 May 2009 10:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/04_I-90PMexpresslaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/04_I-90PMexpresslaneClosures.htm</guid>
      <description>Day one of closures on the Interstate 90 bridge express lanes Monday morning brought 25-30 minute rush-hour delays between Bellevue and Seattle.</description>
    </item>
    <item>
      <title>WSDOT continues delivering jobs: Two more Eastern Region paving projects are advertised for contractor bids</title>
      <pubDate>Tue, 05 May 2009 06:08:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/04_us2sr206paver.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/04_us2sr206paver.htm</guid>
      <description>WSDOT continues delivering jobs: Two more paving projects are advertised for contractor bids</description>
    </item>
    <item>
      <title>WSDOT awards stimulus funds for paving project between Moses Lake and Ephrata</title>
      <pubDate>Tue, 05 May 2009 05:11:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/0417_282ARRAAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/0417_282ARRAAward.htm</guid>
      <description>A contract is awarded for the North Central Region's first stimulus paving project.</description>
    </item>
    <item>
      <title>I-90 express lane closures begin with Monday morning back ups</title>
      <pubDate>Tue, 05 May 2009 04:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/_04_09_Mondaymorning.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/_04_09_Mondaymorning.htm</guid>
      <description>Drivers made it through the first morning commute of the 19-day I-90 express lane closures. WSDOT contractor crews have closed the express lanes to replace cracking expansion joints. The $8.3 million project supports 80 jobs.</description>
    </item>
    <item>
      <title>WSDOT successfully removes SR 104 Hood Canal Bridge east truss</title>
      <pubDate>Tue, 05 May 2009 02:24:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/HCB+East+Truss+Removal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/HCB+East+Truss+Removal.htm</guid>
      <description>HCB East Truss Move</description>
    </item>
    <item>
      <title>Weekend single-lane closures on I-5 in Bellingham start May 8</title>
      <pubDate>Tue, 05 May 2009 00:44:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/04_5WeekendLaneClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/04_5WeekendLaneClosure.htm</guid>
      <description>Crews will close the left lane of southbound I-5 near the Northwest Avenue bridge (milepost 257) at 10 p.m. Friday, May 8, and reopen it by 5:30 a.m. Monday, May 11.</description>
    </item>
    <item>
      <title>Crews wrap up busy weekend in Seattle; I-90 express lanes closed for three weeks</title>
      <pubDate>Mon, 04 May 2009 19:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/04_Crewswrapupweekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/04_Crewswrapupweekend.htm</guid>
      <description>WSDOT contractor crews working to repair some of the worst spots on I-5 had a successful weekend repairing 46 concrete panels. Four weekends remain for concrete repair, though crews will continue to close lanes at night to grind down uneven pavement through the summer.</description>
    </item>
    <item>
      <title>WSDOT removes SR 104 Hood Canal Bridge draw span pontoon</title>
      <pubDate>Sat, 02 May 2009 04:34:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/HCB+draw+span+removal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/HCB+draw+span+removal.htm</guid>
      <description>HCB draw span removal</description>
    </item>
    <item>
      <title>Busy weekend of lane closures and events in Seattle area</title>
      <pubDate>Sat, 02 May 2009 00:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/01_BusyWeekendinSeattle.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/01_BusyWeekendinSeattle.htm</guid>
      <description>It’s a busy weekend in the Seattle area: WSDOT contractor crews close lanes on southbound I-5, the Seattle Mariners play at home, the boat parade is planned for the Montlake cut and the annual March of Dimes Walk is on the Alaskan Way Viaduct. This is a busy weekend. Know before you go is the best advice for getting around the Puget Sound.</description>
    </item>
    <item>
      <title>I-5 construction starts next week near Stanwood</title>
      <pubDate>Sat, 02 May 2009 00:31:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/05/01_5StandwoodPavingBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/05/01_5StandwoodPavingBegins.htm</guid>
      <description>Crews will begin construction Monday to repair broken concrete panels and smooth bumps along northbound Interstate 5 near Stanwood.</description>
    </item>
  </channel>
</rss>