﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - March</title>
    <link>http://www.wsdot.wa.gov/News/2009/03/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Fri, 10 Feb 2012 10:17:25 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - March</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/News/2009/03/</link>
    </image>
    <item>
      <title>WSDOT awards first I-90 Snoqualmie Pass East project contract</title>
      <pubDate>Wed, 01 Apr 2009 04:12:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/190phase1A_033109.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/190phase1A_033109.htm</guid>
      <description>WSDOT awarded KLB Construction Inc. (Mukilteo, WA) the first of three construction contracts for the I-90 Snoqualmie Pass East – Hyak to Keechelus Dam project (I-90 Project) on Monday, March 30.</description>
    </item>
    <item>
      <title>Gov. Gregoire, Sen. Patty Murray announce stimulus funding, jobs at Eastside briefing</title>
      <pubDate>Wed, 01 Apr 2009 00:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/31_StimulusFunding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/31_StimulusFunding.htm</guid>
      <description>Gov. Chris Gregoire and U.S. Sen. Patty Murray announced today that a $277 million construction project to relieve congestion on parts of I-405 in Bellevue is ready to go to bid. The project will be funded in part with $30 million the state received through the American Recovery and Reinvestment Act.</description>
    </item>
    <item>
      <title>Survey work closes I-5 lanes in Tacoma</title>
      <pubDate>Tue, 31 Mar 2009 06:33:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/30_I5TacomaClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/30_I5TacomaClosures.htm</guid>
      <description>I-5 Lane Closures in Tacoma occurring this week for bridge survey work.</description>
    </item>
    <item>
      <title>SR 21-Speed limit back to normal on State Route 21 in Ferry County</title>
      <pubDate>Tue, 31 Mar 2009 03:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/30_sr21speedlimitnormal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/30_sr21speedlimitnormal.htm</guid>
      <description>Speed limit back to normal on State Route 21 in Ferry County</description>
    </item>
    <item>
      <title>WSDOT closes ramps on US 395 and SR 240 for safety project; drivers need to use alternate routes</title>
      <pubDate>Mon, 30 Mar 2009 21:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/rampclosures_033009.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/rampclosures_033009.htm</guid>
      <description>Drivers traveling on US 395 and SR 240 need to add more time to their commute starting Thursday, April 2.</description>
    </item>
    <item>
      <title>North Central Washington's state highway construction season begins April 6</title>
      <pubDate>Sat, 28 Mar 2009 06:00:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/27NCRconstructionseason.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/27NCRconstructionseason.htm</guid>
      <description>The state highway construction season is set to begin in North Central Washington</description>
    </item>
    <item>
      <title>Reduced capacity on San Juan inter-island sailings will continue</title>
      <pubDate>Sat, 28 Mar 2009 03:41:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/Elway_032709.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/Elway_032709.htm</guid>
      <description>Reduced capacity on San Juan inter-island sailings will continue</description>
    </item>
    <item>
      <title>WSDOT starts closures next week for bridge and ramp construction near Seattle's sports stadiums</title>
      <pubDate>Sat, 28 Mar 2009 02:43:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/27_SR519RoyalBrougham.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/27_SR519RoyalBrougham.htm</guid>
      <description>WSDOT is about to embark upon construction that will change the landscape in Seattle’s SODO neighborhood and make trips safer and faster.

WSDOT contractor crews are beginning work to build a bridge over the railroad tracks on S. Royal Brougham Way, and a new westbound off-ramp from I-90 and I-5 to the existing S. Atlantic Street overpass.</description>
    </item>
    <item>
      <title>UPDATED: SR 11 Chuckanut Drive overpass to reopen March 30 in Burlington</title>
      <pubDate>Sat, 28 Mar 2009 00:52:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/27_sr11toreopenTuesday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/27_sr11toreopenTuesday.htm</guid>
      <description>Crews will reopen the rebuilt State Route 11 Chuckanut Drive overpass on schedule in Burlington on Monday, March 30.</description>
    </item>
    <item>
      <title>WSDOT cancels SR 520 weekend work; overnight I-5 work in north Seattle and SR 16 work in Tacoma still on</title>
      <pubDate>Sat, 28 Mar 2009 00:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/27_SR520Cancels.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/27_SR520Cancels.htm</guid>
      <description>A forecast of heavy weekend rain has forced contractor crews working on SR 520 in Bellevue to cancel weekend work.</description>
    </item>
    <item>
      <title>Small amount of settlement found on the Alaskan Way Viaduct; Battery Street Tunnel fire safety systems pass inspection</title>
      <pubDate>Sat, 28 Mar 2009 00:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/27-awvsettlement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/27-awvsettlement.htm</guid>
      <description>WSDOT bridge inspection crews reported a small amount of settlement of the Alaskan Way Viaduct near Seneca Street. New settlement in this area was approximately ¼ of an inch, bringing total settlement near Seneca Street to 1-5/8 inches since the Nisqually earthquake in 2001. No structural damage or new cracks were found during last weekend’s semiannual inspection and closure. Tests of the fire detection and suppression systems in the Battery Street Tunnel were successful. All sprinklers in the t</description>
    </item>
    <item>
      <title>SR 8 slope stabilization wraps up, speed limit returns to 60 mph</title>
      <pubDate>Fri, 27 Mar 2009 22:18:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/SR8SlideRepairComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/SR8SlideRepairComplete.htm</guid>
      <description>WSDOT completed a slope stabilization safety project this week on eastbound State Route 8 at Winslow Road. Crews have reopened the right lane through the project work zone and restored the 60 mph speed limit.</description>
    </item>
    <item>
      <title>Max J. Kuney of Spokane earns contract for SR 285 Sellar Bridge additional lane project</title>
      <pubDate>Fri, 27 Mar 2009 06:02:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/26SR285BridgeContractAwarded.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/26SR285BridgeContractAwarded.htm</guid>
      <description>A contract is awarded for the first of the Senator George Sellar Bridge Projects in Wenatchee</description>
    </item>
    <item>
      <title>Reopening of SR 20, the North Cascades Highway begins Monday</title>
      <pubDate>Fri, 27 Mar 2009 05:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/26SR20NCHReopeningBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/26SR20NCHReopeningBegins.htm</guid>
      <description>Crews begin reopening the North Cascades Highway Monday, March 30.</description>
    </item>
    <item>
      <title>Striping work continues on I-5 next week</title>
      <pubDate>Fri, 27 Mar 2009 04:24:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/26_StripingContinuesI5.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/26_StripingContinuesI5.htm</guid>
      <description>VANCOUVER – Motorists traveling both directions on I-5 in Clark and Cowlitz counties can expect delays next week as crews continue to replace damaged pavement markings from the December 2008 winter storms.</description>
    </item>
    <item>
      <title>Drivers take note: studded tires need to be off April 1</title>
      <pubDate>Thu, 26 Mar 2009 22:34:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/26_studded_tires_off.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/26_studded_tires_off.htm</guid>
      <description>The last day drivers can legally use studded tires this season in Washington is Tuesday, March 31.</description>
    </item>
    <item>
      <title>SR 16 restricted in Tacoma for street-light installation</title>
      <pubDate>Wed, 25 Mar 2009 22:50:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/25_SR16_lightpoles.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/25_SR16_lightpoles.htm</guid>
      <description>Light pole installation requires full closure on SR 16 in Tacoma, March 28.</description>
    </item>
    <item>
      <title>SR 14 widening and interchange project gets access hearing Apr. 15</title>
      <pubDate>Wed, 25 Mar 2009 21:53:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/25_SR14AccessHearing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/25_SR14AccessHearing.htm</guid>
      <description>VANCOUVER - The Washington State Department of Transportation (WSDOT) will host a public open house and formal access hearing on Wednesday, April 15, for a project that will increase safety and improve congestion along SR 14 in the Camas-Washougal area.</description>
    </item>
    <item>
      <title>Governor Gregoire joins WSDOT and Ports Association to announce 2009 Marine Cargo Forecast</title>
      <pubDate>Wed, 25 Mar 2009 05:14:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/3_24_09MarineCargoForecast.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/3_24_09MarineCargoForecast.htm</guid>
      <description>Governor Gregoire joins WSDOT and Ports Association to announce 2009 Marine Cargo Forecast</description>
    </item>
    <item>
      <title>Biggs Rapids-Sam Hill deck replacement project wraps up early</title>
      <pubDate>Tue, 24 Mar 2009 05:53:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/23_BiggsWrapsUpEarly.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/23_BiggsWrapsUpEarly.htm</guid>
      <description>GOLDENDALE – The Washington State Department of Transportation (WSDOT) will finish the $16 million US 97 Biggs Rapids-Sam Hill Bridge Deck Replacement project early and on budget.</description>
    </item>
    <item>
      <title>WSDOT continues delivering jobs: Moses Lake to Ephrata stimulus paving projects are advertised for contractor bids</title>
      <pubDate>Tue, 24 Mar 2009 03:05:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/_23_Ephratapaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/_23_Ephratapaving.htm</guid>
      <description>Gov. Chris Gregoire and the Washington State Department of Transportation today announced that two more Washington Jobs Now projects — both in Eastern Washington — are moving forward with funding under the American Recovery and Reinvestment Act.</description>
    </item>
    <item>
      <title>Crews wrap up busy weekend of construction in Puget Sound</title>
      <pubDate>Mon, 23 Mar 2009 19:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/23_Weekendworkdone.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/23_Weekendworkdone.htm</guid>
      <description>Crews wrap up busy weekend of construction in Puget Sound</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct and Battery Street Tunnel reopened after semiannual inspections</title>
      <pubDate>Mon, 23 Mar 2009 07:10:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/22_SR99ViaductReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/22_SR99ViaductReopens.htm</guid>
      <description>Alaskan Way Viaduct and Battery Street Tunnel reopened after semiannual inspections</description>
    </item>
    <item>
      <title>Working together to control litter in southwest Washington</title>
      <pubDate>Sat, 21 Mar 2009 06:10:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/20_SWWALitter.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/20_SWWALitter.htm</guid>
      <description>VANCOUVER – Warm weather is fast-approaching, and the Washington State Department of Transportation (WSDOT) is asking for citizens’ help to do a little spring cleaning along the highways.</description>
    </item>
    <item>
      <title>WSDOT starts work to strengthen I-90 bridges in Seattle against earthquakes</title>
      <pubDate>Sat, 21 Mar 2009 02:09:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/20_I90Seismic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/20_I90Seismic.htm</guid>
      <description>The Interstate 90 bridges over I-5 are getting a safety upgrade. 

On Sunday, March 22, WSDOT contractor crews will begin work to strengthen the columns, girders and crossbeams of the double-decked overpass that carries I-90 over I-5 to better with stand earthquakes. Crews also will strengthen the supports of the nearby 12th Avenue S. Bridge starting in May.</description>
    </item>
    <item>
      <title>It’s a go: WSDOT lane closures on I-5 in Shoreline, SR 520 in Bellevue, the Viaduct and the Battery Street Tunnel this weekend</title>
      <pubDate>Fri, 20 Mar 2009 23:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/20_WeekendWorkAWVinspection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/20_WeekendWorkAWVinspection.htm</guid>
      <description>A new forecast shows there should be no problems with WSDOT’s roadwork in Puget Sound this weekend.</description>
    </item>
    <item>
      <title>WSDOT will repair northbound I-5 near Stanwood this year</title>
      <pubDate>Fri, 20 Mar 2009 23:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/20_i5stanwoodprojectawarded.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/20_i5stanwoodprojectawarded.htm</guid>
      <description>WSDOT will repair broken concrete panels and smooth bumps along northbound Interstate 5 near Stanwood this spring.</description>
    </item>
    <item>
      <title>SR 26-Palouse River Bridge deck project in whitman County ready to start</title>
      <pubDate>Thu, 19 Mar 2009 22:40:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/10_SR26palousebridgedeck.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/10_SR26palousebridgedeck.htm</guid>
      <description>A project to repair the deck on a bridge near the Adams/Whitman County line will get underway on Monday, March 23, depending on weather.</description>
    </item>
    <item>
      <title>SR 16 bridge work pushes Burley Olalla past halfway mark</title>
      <pubDate>Wed, 18 Mar 2009 23:00:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/18_SR16_+BurleyOlalla_+girders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/18_SR16_+BurleyOlalla_+girders.htm</guid>
      <description>Girder-setting work will cause visual distraction on SR 16 in Kitsap County on Tuesday, March 24.</description>
    </item>
    <item>
      <title>Crews will close SR 20 lanes to inspect Deception Pass bridges</title>
      <pubDate>Wed, 18 Mar 2009 21:51:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/18_sr20deceptionpassbridgeinspections.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/18_sr20deceptionpassbridgeinspections.htm</guid>
      <description>Crews will close one lane of SR 20 next week to inspect the Deception Pass bridges.</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct construction contract marks progress, sustains local jobs</title>
      <pubDate>Wed, 18 Mar 2009 04:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/17-awvconstruction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/17-awvconstruction.htm</guid>
      <description>WSDOT has issued a request for bids to further prepare for removal of the southern mile of the Alaskan Way Viaduct. This project is one of several contracting opportunities over the next several years to remove the seismically vulnerable viaduct.</description>
    </item>
    <item>
      <title>Paving begins on I-5 widening project south of Olympia</title>
      <pubDate>Wed, 18 Mar 2009 00:35:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/I5_GrandMound_paving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/I5_GrandMound_paving.htm</guid>
      <description>Paving begins on I-5, Grand Mound to Maytown. Rolling slowdowns and lane closures allow work vehicles access to the work area.</description>
    </item>
    <item>
      <title>New roads, traffic signals will greet SR 20 drivers in Burlington next week</title>
      <pubDate>Wed, 18 Mar 2009 00:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/17_FredoniaNewLanesOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/17_FredoniaNewLanesOpen.htm</guid>
      <description>Crews will open two new roads, turn on two new traffic signals and permanently close a major intersection along State Route 20 next week in Burlington.</description>
    </item>
    <item>
      <title>WSDOT restructures State Rail and Marine Office</title>
      <pubDate>Tue, 17 Mar 2009 22:41:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/03-17-09_Railofficerestructure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/03-17-09_Railofficerestructure.htm</guid>
      <description>WSDOT restructures State Rail and Marine Office</description>
    </item>
    <item>
      <title>WSDOT Announces New Location for Public Open House on Draft Aviation Alternative Strategies</title>
      <pubDate>Tue, 17 Mar 2009 06:37:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/NewLocationOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/NewLocationOpenHouse.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) reminds the public of two upcoming open houses for the Long-Term Air Transportation Study (LATS). Each open house provides the public with an opportunity to learn more about LATS and comment on the recently released draft alternative strategies (pdf 1 mb). The location of the Olympia open house has been changed to: 

WSDOT Headquarters 
310 Maple Park Avenue SE 
Olympia WA 
Commission Board Room 
First floor (Entrance on west side o</description>
    </item>
    <item>
      <title>WSDOT narrows northbound First Avenue S. to one lane near Safeco Field</title>
      <pubDate>Sat, 14 Mar 2009 03:08:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/13-firstave.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/13-firstave.htm</guid>
      <description>Drivers may face significant delays on northbound First Avenue S. in Seattle starting Monday while crews work to widen an intersection near Safeco Field.</description>
    </item>
    <item>
      <title>Bridge inspections cause lane closures in Clark and Lewis counties next week</title>
      <pubDate>Sat, 14 Mar 2009 02:16:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/13_ClarkLewisBridgeInspections.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/13_ClarkLewisBridgeInspections.htm</guid>
      <description>VANCOUVER – WSDOT’s bridge inspection season kicks into gear next week with five bridges scheduled for inspection in southwest Washington.  Motorists traveling through Clark and Lewis counties early next week can expect single lane closures on SR 6, SR 503 and SR 507 as maintenance crews conduct routine inspections on structures along those routes.</description>
    </item>
    <item>
      <title>Semi-annual inspection closes Alaskan Way Viaduct next weekend</title>
      <pubDate>Sat, 14 Mar 2009 00:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/13-awv-inspection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/13-awv-inspection.htm</guid>
      <description>WSDOT maintenance crews will close the SR 99 Alaskan Way Viaduct for its semiannual inspection next weekend, March 21 and 22. Crews will close both decks of the viaduct from 6 a.m. to 6 p.m. on Saturday, March 21 and Sunday, March 22. The viaduct will be closed between Spokane Street through the Battery Street Tunnel. The Battery Street Tunnel will be closed the entire weekend, starting at 11 p.m. on Friday, March 20 and reopening by 5 a.m. on Monday, March 23 to provide extra time for crews to</description>
    </item>
    <item>
      <title>Drivers could face hour-long delays on I-5, SR 520 this weekend in Seattle, Bellevue</title>
      <pubDate>Fri, 13 Mar 2009 23:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/13_I5SR520WeekendConstruction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/13_I5SR520WeekendConstruction.htm</guid>
      <description>Drivers headed to Seattle or Bellevue this weekend could face hour-long delays on Interstate 5 and State Route 520 where crews will be working on highway preservation projects.</description>
    </item>
    <item>
      <title>WSDOT awards contract to stabilize riverbank along SR 542 near Glacier</title>
      <pubDate>Fri, 13 Mar 2009 23:21:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/13_542WarnickBluffAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/13_542WarnickBluffAward.htm</guid>
      <description>WSDOT will shore up a section of riverbank adjacent to SR 542 (Mount Baker Highway) to stabilize the road and provide better fish habitat.</description>
    </item>
    <item>
      <title>WSDOT celebrates 10 years of Amtrak Cascades service in the Pacific Northwest</title>
      <pubDate>Fri, 13 Mar 2009 03:17:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/03122009AmtrakCascades10years.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/03122009AmtrakCascades10years.htm</guid>
      <description>WSDOT celebrates 10 years of Amtrak Cascades service in the Pacific Northwest</description>
    </item>
    <item>
      <title>Pilot Reminder:  No Aircraft Operations at Cypress Island</title>
      <pubDate>Fri, 13 Mar 2009 02:10:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/CypressIslandReminder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/CypressIslandReminder.htm</guid>
      <description>Pilots are urged not to fly into or out of the Cypress Airstrip.  The state airstrip has been decommissioned for over a decade and is closed to all aircraft operations.</description>
    </item>
    <item>
      <title>Cold weather delays start of I-5 work in Bellingham</title>
      <pubDate>Thu, 12 Mar 2009 22:41:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/12_5BakerviewWorkDelayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/12_5BakerviewWorkDelayed.htm</guid>
      <description>Crews have decided to delay the start of panel repair work on I-5 near Bellingham by one week because of the recent stretch of cold weather.</description>
    </item>
    <item>
      <title>SR 104 Hood Canal Bridge Project hosts on-line webinar</title>
      <pubDate>Thu, 12 Mar 2009 22:29:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/SR104HCBWebinar.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/SR104HCBWebinar.htm</guid>
      <description>SR104 HCB Webinar</description>
    </item>
    <item>
      <title>One-way traffic moving again on slide-damaged SR 112</title>
      <pubDate>Thu, 12 Mar 2009 00:40:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/03_11_SR112reopening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/03_11_SR112reopening.htm</guid>
      <description>One-way traffic moving again on slide-damaged SR 112</description>
    </item>
    <item>
      <title>WSDOT schedules Mar. 18 I-5, Mellen Street to Blakeslee Junction open house</title>
      <pubDate>Wed, 11 Mar 2009 22:41:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/11_I-5MTBOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/11_I-5MTBOpenHouse.htm</guid>
      <description>CENTRALIA – The Washington State Department of Transportation invites the public to an open house to learn more about recent design refinements for the I-5, Mellen Street to Blakeslee Junction project.</description>
    </item>
    <item>
      <title>WSDOT celebrates start of US 395 safety project near Blue Bridge in Kennewick</title>
      <pubDate>Wed, 11 Mar 2009 22:32:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/11_us395safetyprojectevent.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/11_us395safetyprojectevent.htm</guid>
      <description>WSDOT, community leaders, and the contractor will celebrate the start of construction of the US 395, Columbia Drive to SR 250 project with a ceremony at 10 a.m. Thursday, March 12, at the Columbia Park East boat launch.</description>
    </item>
    <item>
      <title>WSDOT seeks public comments on Grays Harbor pontoon construction sites</title>
      <pubDate>Wed, 11 Mar 2009 05:13:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/10-pontoonsites.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/10-pontoonsites.htm</guid>
      <description>WSDOT wants to hear what the public thinks about potential State Route 520 bridge pontoon construction sites in Grays Harbor County. Comments from citizens could help WSDOT narrow the list of sites from three to two.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division increases service with spring sailing schedule</title>
      <pubDate>Wed, 11 Mar 2009 01:39:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/Springschedule_031009.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/Springschedule_031009.htm</guid>
      <description>WSDOT Ferries Division increases service with spring sailing schedule</description>
    </item>
    <item>
      <title>WSDOT awards SR 520 widening project in Redmond</title>
      <pubDate>Tue, 10 Mar 2009 22:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/10_SR520WideningAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/10_SR520WideningAward.htm</guid>
      <description>WSDOT awards SR 520 widening project in Redmond</description>
    </item>
    <item>
      <title>Gov. Gregoire and WSDOT announce first advertisements for transportation contracts in Kittitas, Pacific counties</title>
      <pubDate>Tue, 10 Mar 2009 06:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/09_Governorrelease.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/09_Governorrelease.htm</guid>
      <description>Gov. Chris Gregoire along with the Washington State Department of Transportation (WSDOT) today announced Washington’s first state highway construction “Washington Jobs Now” projects funded by the federal American Recovery and Reinvestment Act (AARA) were advertised to contractors.</description>
    </item>
    <item>
      <title>SR 104 Hood Canal Bridge truss arrives early in Port Gamble Bay</title>
      <pubDate>Tue, 10 Mar 2009 04:38:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/SR104HCB+Truss+arrival.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/SR104HCB+Truss+arrival.htm</guid>
      <description>SR104HCB Truss arrival</description>
    </item>
    <item>
      <title>SR 20 to close nightly for blasting north of Deception Pass</title>
      <pubDate>Tue, 10 Mar 2009 01:52:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/9_BlastingAtQuietCoveBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/9_BlastingAtQuietCoveBegins.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT terminates operating lease for CW Branch of Palouse River and Coulee City Rail System</title>
      <pubDate>Mon, 09 Mar 2009 23:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/03052009RailPCCoperatinglease.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/03052009RailPCCoperatinglease.htm</guid>
      <description>WSDOT terminates operating lease for CW Branch of Palouse River and Coulee City Rail System</description>
    </item>
    <item>
      <title>Crews wrap up SR 520 weekend work in Bellevue</title>
      <pubDate>Mon, 09 Mar 2009 18:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/9_SR520WorkComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/9_SR520WorkComplete.htm</guid>
      <description>SEATTLE – Despite dramatic weather conditions, crews working for WSDOT had a successful weekend, completing all the work they set out to do. Crews reopened all lanes of eastbound State Route 520 in Bellevue ahead of schedule, just after 3 a.m. Monday.</description>
    </item>
    <item>
      <title>WSDOT seals the deal on $1 million project in Mason County</title>
      <pubDate>Sat, 07 Mar 2009 09:09:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/03_06_CorrecctionsCntrChipseal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/03_06_CorrecctionsCntrChipseal.htm</guid>
      <description>WSDOT seals the deal on $1 million project in Mason County</description>
    </item>
    <item>
      <title>WSDOT awards Port Orchard safety corridor project on SR 160</title>
      <pubDate>Sat, 07 Mar 2009 08:58:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/03_06_SR160+Award.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/03_06_SR160+Award.htm</guid>
      <description>WSDOT awards Port Orchard safety corridor project on SR 160</description>
    </item>
    <item>
      <title>Snow forecast changes WSDOT construction plans this weekend</title>
      <pubDate>Sat, 07 Mar 2009 07:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/I-5_Const_Weekend030609.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/I-5_Const_Weekend030609.htm</guid>
      <description>The snow forecast has changed some Puget Sound construction plans. With a new forecast calling for up to four inches of snow between Northgate and Everett, contractor crews on the I-5 pavement repair work say they will not work on I-5 at all this weekend. Crews were schedule to cut, remove and repour 54 concrete panels and grind pavement in other places.</description>
    </item>
    <item>
      <title>US 101 Closures and delays in Grays Harbor</title>
      <pubDate>Sat, 07 Mar 2009 07:28:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/6_101_SimpsonAveCls.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/6_101_SimpsonAveCls.htm</guid>
      <description>Next week inspections and testing will cause delays on the US 101 Simpson Avenue Bridge.</description>
    </item>
    <item>
      <title>Crews getting a jump-start on I-5 panel replacement work in Bellingham</title>
      <pubDate>Sat, 07 Mar 2009 06:52:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/06_5BakerviewNightClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/06_5BakerviewNightClosures.htm</guid>
      <description>Construction on I-5 in Bellingham will kick into high gear next week, which means drivers can expect delays at night.</description>
    </item>
    <item>
      <title>Speed restrictions to affect traffic on State Route 21 in Ferry County</title>
      <pubDate>Fri, 06 Mar 2009 08:38:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/05_SR21SpeedLimitReduction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/05_SR21SpeedLimitReduction.htm</guid>
      <description>Speed limit reduction on SR 21 in Ferry County</description>
    </item>
    <item>
      <title>Here we go again: snow, ice, breathe, repeat</title>
      <pubDate>Fri, 06 Mar 2009 07:27:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/05_march_snow_ice.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/05_march_snow_ice.htm</guid>
      <description>Winter hasn’t given up its grip on Washington just yet. Snow and ice greeted drivers in Puget Sound’s higher elevations and mountain pass highways this morning. There could more snow to come in the overnight hours, and drivers should prepare for winter driving and possible black ice Friday morning.</description>
    </item>
    <item>
      <title>Weeknight closures on I-5 in Bellingham start Monday</title>
      <pubDate>Fri, 06 Mar 2009 07:25:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/05_5FerndaleNighttimeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/05_5FerndaleNighttimeClosure.htm</guid>
      <description>Panel replacement work scheduled to close a lane of I-5 all weekend in Bellingham has been canceled due to a forecast of snow and cold temperatures. Instead, crews will begin weeknight lane closures of I-5 to prepare for dowel bar installation on a five-mile stretch of I-5 between Ferndale and Bellingham.</description>
    </item>
    <item>
      <title>WSDOT contractor crews begin work Thursday on phase two of SR 169 Green River Bridge repair project</title>
      <pubDate>Thu, 05 Mar 2009 07:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/SR169GreenRiverBridge_030409.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/SR169GreenRiverBridge_030409.htm</guid>
      <description>Work to repair an 80-year-old bridge closed since November continues this week after WSDOT awarded a $3.2 million construction contract to Scarsella Brothers of Kent to complete phase two of the project.</description>
    </item>
    <item>
      <title>WSDOT Updates Methow Airport Layout Plan</title>
      <pubDate>Thu, 05 Mar 2009 06:34:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/MethowALP.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/MethowALP.htm</guid>
      <description>WSDOT UPDATES Methow's ALP</description>
    </item>
    <item>
      <title>WSDOT awards paving project on northbound I-5 in Everett</title>
      <pubDate>Wed, 04 Mar 2009 01:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/3_I5EverettAwards.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/3_I5EverettAwards.htm</guid>
      <description>WSDOT this week awarded Cemex Pacific Holdings, LLC a contract to repave nearly four miles of northbound I-5 between the Snohomish River Bridge in Everett and the Ebey Slough Bridge in Marysville. As part of the $3.3 million project, crews will also update striping, guardrail and drainage on I-5.</description>
    </item>
    <item>
      <title>Crews finish placing girders on new SR 6 bridge Thursday, Mar. 5</title>
      <pubDate>Wed, 04 Mar 2009 00:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/03_SR6BridgeGirderInstallation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/03_SR6BridgeGirderInstallation.htm</guid>
      <description>CHEHALIS – Crews are ahead of schedule on the SR 6, South Fork Chehalis River Bridge project as final bridge girders are installed Thursday, March 5. During final girder installation, motorists can expect a full night time closure of the highway from 7 p.m., Thursday to 4 a.m., Friday.</description>
    </item>
    <item>
      <title>Public Invited to Comment on Draft  Aviation Alternative Strategies</title>
      <pubDate>Tue, 03 Mar 2009 07:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/APCPublicReview.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/APCPublicReview.htm</guid>
      <description>The public is invited to comment on Washington’s draft Aviation System Plan summary report and draft alternative strategies. The Aviation Planning Council, with support from the Washington State Department of Transportation, has developed these draft products as part of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>WSDOT builds I-5 HOV lanes in Fife without noise walls</title>
      <pubDate>Tue, 03 Mar 2009 03:53:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/02_NoFifeNoiseWalls.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/02_NoFifeNoiseWalls.htm</guid>
      <description>The Washington State Department of Transportation has decided to not include noise walls in the I-5 Port of Tacoma Road to King County HOV project.</description>
    </item>
    <item>
      <title>SR 16 closures in Tacoma expedite demolition process</title>
      <pubDate>Tue, 03 Mar 2009 03:13:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/03/02_SR16_demo_closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/03/02_SR16_demo_closures.htm</guid>
      <description>Demolition closures planned on SR 16 the weekend of March 6 - 8. Part of the Westbound Nalley Valley project.</description>
    </item>
  </channel>
</rss>
