﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - January</title>
    <link>http://www.wsdot.wa.gov/News/2009/01/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Thu, 26 Nov 2009 00:40:16 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - January</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/News/2009/01/</link>
    </image>
    <item>
      <title>WSDOT Ferries Division releases revised draft Long-Range Plan</title>
      <pubDate>Sun, 01 Feb 2009 08:48:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/DraftLRP_013109.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/DraftLRP_013109.htm</guid>
      <description>WSDOT Ferries Division releases revised draft Long-Range Plan</description>
    </item>
    <item>
      <title>WSDOT seeks contractors for the first of three Senator George Sellar Bridge projects</title>
      <pubDate>Sat, 31 Jan 2009 03:43:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/30SR285BridgePjtBid.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/30SR285BridgePjtBid.htm</guid>
      <description>A project to add another lane to Wenatchee's Senator George Sellar Bridge goes out for bids.</description>
    </item>
    <item>
      <title>34-car Hiyu to continue serving Point Defiance/Tahlequah ferry route until end of February</title>
      <pubDate>Sat, 31 Jan 2009 03:20:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/Hiyu_013009.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/Hiyu_013009.htm</guid>
      <description>34-car Hiyu to continue serving Point Defiance/Tahlequah ferry route until end of February</description>
    </item>
    <item>
      <title>I-405 construction in Bellevue, Renton and Tukwila – Jan. 30 – Feb. 6</title>
      <pubDate>Sat, 31 Jan 2009 02:42:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/30_I-405RampandLaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/30_I-405RampandLaneClosures.htm</guid>
      <description>Drivers should plan for nighttime detours and delays as crews continue progress on I-405 construction projects between Bellevue and Tukwila.</description>
    </item>
    <item>
      <title>WSDOT crews close Seattle ramp to northbound I-5 this weekend</title>
      <pubDate>Sat, 31 Jan 2009 02:03:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/30_OliveWayRampClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/30_OliveWayRampClosed.htm</guid>
      <description>Drivers should plan for a closure of the Olive Way on-ramp to northbound I-5 this weekend as crews continue to repair a retaining wall damaged by a bus-involved collision on December 19, 2008.</description>
    </item>
    <item>
      <title>WSDOT responds quickly to small Kingston quake</title>
      <pubDate>Fri, 30 Jan 2009 23:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/30_Earthquake.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/30_Earthquake.htm</guid>
      <description>No damage to state highways and bridges has been reported following this morning’s earthquake. Within minutes of the earthquake, our dispatchers in the Traffic Management Center received an alert and began notifying our bridge and maintenance supervisors.</description>
    </item>
    <item>
      <title>WSDOT to reopen SR 508 at Bear Canyon late today</title>
      <pubDate>Fri, 30 Jan 2009 06:40:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/29_SR508Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/29_SR508Reopens.htm</guid>
      <description>CHEHALIS – Crews will reopen a section of SR 508 near Bear Canyon (mileposts 20 to 22) in central Lewis County by 10 p.m. today. The road has been closed due to a landslide since Jan. 8. Yesterday, WSDOT geotechnical engineers determined the highway may be repaired and reopened to local traffic only.</description>
    </item>
    <item>
      <title>I-90 flammable cargo restriction Feb. 2 through Feb. 11</title>
      <pubDate>Fri, 30 Jan 2009 04:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/29_FlammableCargo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/29_FlammableCargo.htm</guid>
      <description>SEATTLE - WSDOT will restrict flammable cargo in both directions of Interstate 90 from the Mount Baker Tunnel through the Mercer Island Lid beginning at 7 a.m. on Monday, Feb. 2. The restriction is expected to end by 4 p.m. on Wednesday, Feb. 11.</description>
    </item>
    <item>
      <title>WSDOT selects design-builder to construct new bridge, safer roadway on SR 532 in Stanwood</title>
      <pubDate>Fri, 30 Jan 2009 02:48:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/29_532StanwoodDB.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/29_532StanwoodDB.htm</guid>
      <description>The Washington State Department of Transportation has selected Parsons/Kuney, Joint Venture as the design-builder to improve safety on State Route 532 near Stanwood.</description>
    </item>
    <item>
      <title>WSDOT prepares to build bridge pontoons in Grays Harbor</title>
      <pubDate>Fri, 30 Jan 2009 01:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/29-pontoons.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/29-pontoons.htm</guid>
      <description>The Washington State Department of Transportation confirmed today at a public open house in Hoquiam that it is preparing to build pontoons in Grays Harbor County to replace the SR 520 bridge across Lake Washington.</description>
    </item>
    <item>
      <title>Expect delays on I-5, other local highways for striping work next week</title>
      <pubDate>Fri, 30 Jan 2009 00:25:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/29_ReplaceDamageStriping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/29_ReplaceDamageStriping.htm</guid>
      <description>VANCOUVER – Motorists traveling both directions on I-5, SR 500, SR 503 and SR 14 can expect delays next week as crews work to replace damaged pavement markings. Periodic right-lane closures and rolling slowdowns will occur between the hours of 9 a.m. and 3 p.m. each day. Motorists should expect 10- to 15-minute delays.</description>
    </item>
    <item>
      <title>Construction to close northbound I-205 on-ramp at Mill Plain, Saturday, Jan. 31</title>
      <pubDate>Thu, 29 Jan 2009 02:16:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/28_112thRampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/28_112thRampClosure.htm</guid>
      <description>VANCOUVER – Construction activities will close the northbound I-205 on-ramp from Mill Plain Boulevard on Saturday, Jan. 31, announces the Washington State Department of Transportation. The ramp closure will begin at 6 a.m. on Saturday and conclude at 6 a.m. Sunday morning.</description>
    </item>
    <item>
      <title>I-5 will reopen on time in Burlington</title>
      <pubDate>Wed, 28 Jan 2009 19:43:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/28_i5overpassopeningontime.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/28_i5overpassopeningontime.htm</guid>
      <description>Crews finished demolishing the east span of the SR 11/Chuckanut Drive overpass in Burlington and will reopen one lane of northbound I-5 to drivers on time at 5 a.m. Both lanes will be open by 7 a.m.</description>
    </item>
    <item>
      <title>SR 261 restricted to one lane Jan. 28 near Delaney</title>
      <pubDate>Tue, 27 Jan 2009 23:15:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/SR261_laneRestrictionJan28.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/SR261_laneRestrictionJan28.htm</guid>
      <description>WSDOT restricts SR 261 to one lane near Delany Jan. 28 

Drivers may experience short delays</description>
    </item>
    <item>
      <title>WSDOT Ferries Division announces improvements to fare collection policy</title>
      <pubDate>Tue, 27 Jan 2009 07:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/Farecollection_012609.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/Farecollection_012609.htm</guid>
      <description>WSDOT Ferries Division announces improvements to fare collection policy</description>
    </item>
    <item>
      <title>WSDOT drives pile for Hood Canal Bridge water shuttle docks</title>
      <pubDate>Sat, 24 Jan 2009 05:51:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/HCB+pile+driving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/HCB+pile+driving.htm</guid>
      <description>HCB pile driving</description>
    </item>
    <item>
      <title>Crews to set 36 girders for new I-405 bridge over Oakesdale Avenue SW</title>
      <pubDate>Sat, 24 Jan 2009 05:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/I-405_Oaksdale012309.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/I-405_Oaksdale012309.htm</guid>
      <description>The setting of the girders will require overnight closures of Oakesdale Avenue SW between SW 16th Street and SW Grady Way on:  Jan. 25-29 from 7 p.m. to 5:50 a.m. and Feb. 2-3 from 7 p.m. to 5:50 a.m.</description>
    </item>
    <item>
      <title>Storm repairs progress quickly, WSDOT to reopen SR 503</title>
      <pubDate>Sat, 24 Jan 2009 01:41:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/23_SR503Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/23_SR503Reopens.htm</guid>
      <description>VANCOUVER – Crews will reopen a section of SR 503 in southern Cowlitz County, Saturday, Jan. 24 much earlier than expected. The road has been closed since Jan. 8 from a landslide. Contractor crews worked diligently to repair this section of roadway, which sustained severe damage during recent storms.</description>
    </item>
    <item>
      <title>US 395 northbound lane and ramp restrictions Jan. 27</title>
      <pubDate>Sat, 24 Jan 2009 01:41:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/US395Lane_and+_ramp_restriction_Jan27.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/US395Lane_and+_ramp_restriction_Jan27.htm</guid>
      <description>WSDOT restricts northbound lane on US 395 and Columbia Drive on-ramp near Blue Bridge Jan. 27 

Northbound delays likely, consider alternate routes</description>
    </item>
    <item>
      <title>US 395 northbound lane and ramp restrictions Jan. 27</title>
      <pubDate>Sat, 24 Jan 2009 01:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/27_US395LaneandRampRestrictions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/27_US395LaneandRampRestrictions.htm</guid>
      <description>WSDOT restricts northbound lane on US 395 and Columbia Drive on-ramp near Blue Bridge Jan. 27 

Northbound delays likely, consider alternate routes</description>
    </item>
    <item>
      <title>WSDOT releases Amtrak Cascades Mid-Range Plan for next eight years</title>
      <pubDate>Fri, 23 Jan 2009 08:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/012309MidRangePlan.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/012309MidRangePlan.htm</guid>
      <description>WSDOT releases Amtrak Cascades Mid-Range Plan for next eight years.</description>
    </item>
    <item>
      <title>Maintenance work closes Seattle area roads this weekend</title>
      <pubDate>Fri, 23 Jan 2009 08:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/22_I5RoadRepairClosureProjects.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/22_I5RoadRepairClosureProjects.htm</guid>
      <description>Drivers should plan for daytime and nighttime road closures for several construction and maintenance projects near Seattle this weekend.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division extends public comment period on draft long-range plan through January 26</title>
      <pubDate>Fri, 23 Jan 2009 06:15:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/LRplan_012209.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/LRplan_012209.htm</guid>
      <description>WSDOT Ferries Division extends public comment period on draft long-range plan through January 26</description>
    </item>
    <item>
      <title>Passenger-only service on Port Townsend/Keystone route to continue through mid-February</title>
      <pubDate>Fri, 23 Jan 2009 06:14:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/PTKpo_012209.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/PTKpo_012209.htm</guid>
      <description>Passenger-only service on Port Townsend/Keystone route to continue through mid-February</description>
    </item>
    <item>
      <title>WSDOT expands e-mail updates to include Skagit and Island counties</title>
      <pubDate>Fri, 23 Jan 2009 03:42:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/22_skagitcountyemailupdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/22_skagitcountyemailupdates.htm</guid>
      <description>BURLINGTON – WSDOT has expanded its successful SR 20 e-mail updates to include all highway-related construction projects and traveler information for Skagit and Island counties. The expansion comes just as the 2009 construction season begins. The new year includes several large projects around the region, beginning with the replacement of the Chuckanut Drive bridge over I-5, starting Monday, Jan. 26.</description>
    </item>
    <item>
      <title>I-5 in Burlington to close for two nights during bridge demolition</title>
      <pubDate>Fri, 23 Jan 2009 01:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/22_i5northboundtocloseatnight.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/22_i5northboundtocloseatnight.htm</guid>
      <description>WSDOT crews will need to close northbound Interstate 5 in Burlington for two nights next week as they demolish part of the SR 11 (Chuckanut Drive) overpass in Burlington.</description>
    </item>
    <item>
      <title>WSDOT awards SR 536, SR 538 paving project in Mount Vernon</title>
      <pubDate>Fri, 23 Jan 2009 01:03:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/22_538536PavingAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/22_538536PavingAward.htm</guid>
      <description>WSDOT recently awarded a contract to repave a five-mile stretch of SR 536 (Memorial Highway), repave part of SR 538 (College Way) and replace the asphalt at the SR 538/Riverside Drive intersection. Cemex Pacific Holdings of Everett was awarded the contract Tuesday, Jan. 20, for its bid of $2.7 million.</description>
    </item>
    <item>
      <title>Hood Canal Bridge parts arriving in Port Gamble Bay</title>
      <pubDate>Fri, 23 Jan 2009 00:25:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/HCB+Port+Gamble+mooring.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/HCB+Port+Gamble+mooring.htm</guid>
      <description>HCB Port Gamble mooring</description>
    </item>
    <item>
      <title>New traffic camera installed on SR 539 near Lynden</title>
      <pubDate>Thu, 22 Jan 2009 03:25:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/21_539RiverRoadCamera.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/21_539RiverRoadCamera.htm</guid>
      <description>A new traffic camera is now available for drivers who travel SR 539 (Guide Meridan) south of Lynden.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division sells two passenger-only ferries</title>
      <pubDate>Thu, 22 Jan 2009 02:35:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/POF_012109.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/POF_012109.htm</guid>
      <description>WSDOT Ferries Division sells two passenger-only ferries</description>
    </item>
    <item>
      <title>WSDOT to ride Victoria Express wave for Hood Canal Bridge Project</title>
      <pubDate>Thu, 22 Jan 2009 01:46:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/HCB+Water+Shuttle.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/HCB+Water+Shuttle.htm</guid>
      <description>HCB water shuttle</description>
    </item>
    <item>
      <title>WSDOT moves forward with repaving work on SR 520 in Bellevue and Redmond</title>
      <pubDate>Wed, 21 Jan 2009 06:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/20_SR520PavingAwarded.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/20_SR520PavingAwarded.htm</guid>
      <description>WSDOT today awarded Granite Northwest a contract to repave nearly four miles of SR 520 between I-405 in Bellevue and West Lake Sammamish Parkway in Redmond. As part of the $9.4 million project, crews will also replace crumbling asphalt at the ends of five bridges with new concrete slabs.</description>
    </item>
    <item>
      <title>SR 11 Chuckanut Drive overpass in Burlington closing in one week</title>
      <pubDate>Tue, 20 Jan 2009 02:45:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/19_sr11overpassclosinginoneweek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/19_sr11overpassclosinginoneweek.htm</guid>
      <description>There is only one week remaining before the SR 11 Chuckanut Drive overpass in Burlington closes for two months for repairs. And now is a good time to start planning alternate routes around the closure.</description>
    </item>
    <item>
      <title>US 97 Blewett Pass reopens</title>
      <pubDate>Sat, 17 Jan 2009 09:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/16US97BlewettOpens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/16US97BlewettOpens.htm</guid>
      <description>After almost 10 days, US 97 Blewett Pass reopened at 6 p.m. Friday, January 16th.</description>
    </item>
    <item>
      <title>WSDOT opens new lane on northbound I-405 in Bellevue</title>
      <pubDate>Sat, 17 Jan 2009 05:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/16_I405NewLaneOpened.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/16_I405NewLaneOpened.htm</guid>
      <description>Crews early this morning opened a new I-405 northbound lane to help ease one of the worst traffic bottlenecks in the state.</description>
    </item>
    <item>
      <title>SR 202 in Fall City reopened after emergency repairs</title>
      <pubDate>Sat, 17 Jan 2009 05:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/16_SR202Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/16_SR202Reopens.htm</guid>
      <description>SR 202 in Fall City reopened after emergency repairs</description>
    </item>
    <item>
      <title>Storm recovery continues in Southwest Washington</title>
      <pubDate>Fri, 16 Jan 2009 08:00:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/15_SouthwestWAStormRecovery.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/15_SouthwestWAStormRecovery.htm</guid>
      <description>VANCOUVER – Many highways in Southwest Washington sustained damage during the recent storms and flooding. Throughout it all, WSDOT crews cleared mudslides, repaired roadways and cleaned ditches to keep roads open and passable.</description>
    </item>
    <item>
      <title>Crews reopen one lane of SR 20 east of Concrete</title>
      <pubDate>Thu, 15 Jan 2009 09:12:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/14_sr20opentoonelane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/14_sr20opentoonelane.htm</guid>
      <description>Crews will reopen one lane of SR 20 at 6 a.m., Thursday, Jan. 15 just east of Concrete. The highway has been closed for a week after slides buried the highway with mud and debris and tore out guardrail and power poles.</description>
    </item>
    <item>
      <title>I-5 Safety Rest Areas south of Olympia open</title>
      <pubDate>Thu, 15 Jan 2009 07:51:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/14_rest_area_open.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/14_rest_area_open.htm</guid>
      <description>The Maytown and Scatter Creek safety rest areas south of Olympia are now open following the completion of a six-month project to upgrade the facilities and their sewer and water systems.</description>
    </item>
    <item>
      <title>Crews reopen SR 542 to two lanes east of Deming</title>
      <pubDate>Thu, 15 Jan 2009 07:48:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/14_sr542lanesopeningatnight.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/14_sr542lanesopeningatnight.htm</guid>
      <description>Crews will reopen SR 542 (Mount Baker Highway) to a full two lanes at night just east of Deming starting tonight. The highway has been reduced to one lane since Friday, Jan. 9, after a mudslide came across the road. Daytime work and lane closures will continue into next week.</description>
    </item>
    <item>
      <title>WSDOT repairs of washed-out section of SR 202 near Fall City are nearly complete</title>
      <pubDate>Thu, 15 Jan 2009 06:29:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/14_SR202FloodRepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/14_SR202FloodRepairs.htm</guid>
      <description>WSDOT repairs of washed-out section of SR 202 near Fall City are nearly complete</description>
    </item>
    <item>
      <title>SR 261 restricted to one lane Jan. 14 near Delany</title>
      <pubDate>Wed, 14 Jan 2009 09:26:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/SR261_restricted_to-one-lane-Jan14.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/SR261_restricted_to-one-lane-Jan14.htm</guid>
      <description>WSDOT restricts SR 261 to one lane near Delany Jan. 14 

Drivers may experience short delays</description>
    </item>
    <item>
      <title>US 97 Blewett Pass is scheduled to reopen Friday</title>
      <pubDate>Wed, 14 Jan 2009 08:04:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/13US97BlewettReopeningDate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/13US97BlewettReopeningDate.htm</guid>
      <description>US 97 Blewett Pass is scheduled to reopen on Friday at 6 p.m.</description>
    </item>
    <item>
      <title>US 395 lane and ramp restriction Jan. 14 near Pasco</title>
      <pubDate>Wed, 14 Jan 2009 07:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/US395_lane_and_ramp_restricion.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/US395_lane_and_ramp_restricion.htm</guid>
      <description>WSDOT restricts southbound lane on US 395 and Lewis Street on-ramp near Blue Bridge Jan. 14 

Southbound delays likely, consider alternate routes</description>
    </item>
    <item>
      <title>Landslide closes SR 112 for several weeks</title>
      <pubDate>Wed, 14 Jan 2009 06:11:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/SR112Slideclosesroad.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/SR112Slideclosesroad.htm</guid>
      <description>State Route 112 remains closed to traffic following a massive landslide last week west of Joyce in Clallam County. The earth beneath the roadway continues to move, posing major safety concerns for crews.</description>
    </item>
    <item>
      <title>WSDOT awards project to improve I-5 interchange near Arlington</title>
      <pubDate>Wed, 14 Jan 2009 01:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/13_I5SR531interchange.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/13_I5SR531interchange.htm</guid>
      <description>On Monday, Jan. 12 WSDOT awarded Northwest Construction, Inc. the contract for a project to reduce congestion at the interchange of I-5 and State Route 531 (172nd Street NE) near Arlington.</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct proposal announcement</title>
      <pubDate>Tue, 13 Jan 2009 05:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/12-awv.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/12-awv.htm</guid>
      <description>On Tuesday, January 13, 2009, Gov. Chris Gregoire, along with King County Executive Ron Sims, City of Seattle Mayor Greg Nickels, and Chief Executive Officer of the Port of Seattle Tay Yoshitani announced the proposal to replace the Alaskan Way Viaduct that will be presented to the state Legislature for consideration.</description>
    </item>
    <item>
      <title>Crews make progress on SR 20 mudslides in Skagit County</title>
      <pubDate>Tue, 13 Jan 2009 03:25:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/12_sr20mudslidesblockroad.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/12_sr20mudslidesblockroad.htm</guid>
      <description>Crews working to clear mudslides and repair damage to SR 20 east of Concrete are making progress. They opened one emergency-access lane Saturday, Jan. 10, and WSDOT let utility crews in today to try and restore power to the surrounding area.</description>
    </item>
    <item>
      <title>Repairs to close section of SR 542 east of Bellingham</title>
      <pubDate>Tue, 13 Jan 2009 03:22:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/12_542RepairsCloseRoad.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/12_542RepairsCloseRoad.htm</guid>
      <description>Crews working to repair and reopen a section of SR 542 damaged by a mudslide Jan. 8 east of Deming are making rapid progress. One lane was reopened to traffic at 1 a.m. Jan. 9; crews hope to complete repairs and reopen both lanes to traffic by Jan. 16.</description>
    </item>
    <item>
      <title>Public invited to SR 302 scoping open house</title>
      <pubDate>Tue, 13 Jan 2009 01:51:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/SR302ScopingOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/SR302ScopingOpenHouse.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) invites the public to a scoping open house for the State Route 302 Corridor Study Monday, Jan. 12. At the event, the public will have the opportunity to comment on the purpose and need for the project and alternatives being considered.</description>
    </item>
    <item>
      <title>Interstate 5 and I-90 open to traffic - recovery work continues</title>
      <pubDate>Sat, 10 Jan 2009 06:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/9_recoverycontinues.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/9_recoverycontinues.htm</guid>
      <description>Interstate 5 is open to traffic from Vancouver, Washington to Vancouver British Columbia. Two of Washington's three main east-west mountain passes through the Cascades have been reopened but WSDOT officials today warn that there is much recovery work left to do.</description>
    </item>
    <item>
      <title>WSDOT Reopens I-5 through Lewis county</title>
      <pubDate>Sat, 10 Jan 2009 02:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/9_preparingtoopenI5.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/9_preparingtoopenI5.htm</guid>
      <description>WSDOT crews are preparing to reopen Interstate 5 to commercial vehicles over 10,000 GVW between Napavine and Grand Mound (mile post 68 to 88) at noon today. The road will open to passenger vehicles later in the day.</description>
    </item>
    <item>
      <title>WSDOT Updates media on plans to reopen i-5</title>
      <pubDate>Sat, 10 Jan 2009 01:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/09_ChehalisPressConference.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/09_ChehalisPressConference.htm</guid>
      <description>CHEHALIS – WSDOT is hosting a press conference at 10 a.m. today to give media an update on plans to reopen the 20-mile stretch of Interstate 5 in Thurston and Lewis counties that’s been closed since Wednesday night.</description>
    </item>
    <item>
      <title>WSDOT to reopen I-90 Snoqualmie Pass Friday morning</title>
      <pubDate>Fri, 09 Jan 2009 23:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/09_i90-snoqualmie-to-reopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/09_i90-snoqualmie-to-reopen.htm</guid>
      <description>HYAK – After working around the clock to clear snow, water, and debris from the roadway and shoulders, WSDOT will open the eastbound lanes of I-90 Snoqualmie Pass on Friday, Jan. 9 at 9 a.m. Westbound lanes will open by noon.</description>
    </item>
    <item>
      <title>WSDOT crews clearing roads as floodwaters receding; I-90 Snoqualmie Pass and I-5 in Lewis County remain closed</title>
      <pubDate>Fri, 09 Jan 2009 20:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/09_floodwaters-receding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/09_floodwaters-receding.htm</guid>
      <description>OLYMPIA - Floodwaters are subsiding in many areas and WSDOT continues working toward opening vital freight and travel routes across the state.</description>
    </item>
    <item>
      <title>Local traffic may travel US 12 between Packwood and Naches; westbound commercial vehicles held at Naches</title>
      <pubDate>Fri, 09 Jan 2009 11:15:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/08_US12Mudslides.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/08_US12Mudslides.htm</guid>
      <description>WSDOT has cleared multiple mudslides on US 12 between Packwood in Lewis County (mile post 131) and Naches (mile post 189) in Yakima County. WSDOT is allowing local traffic only to travel in both directions within this previously closed area.</description>
    </item>
    <item>
      <title>WSDOT Making progress on opening state highways, efforts continue on I-5 detour</title>
      <pubDate>Fri, 09 Jan 2009 10:09:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/08_mudSlideFoiled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/08_mudSlideFoiled.htm</guid>
      <description>WSDOT crews are making progress on opening roads closed because of flooding. More than 30 closures have been cleared since the peak of the flooding began. WSDOT crews worked hard today to establish a detour route on SR 7 for high priority trucks and vehicles stopped on either side of the I-5 closure. However, a new mud slide this afternoon foiled those hopes . WSDOT crews are not able to open SR 7 and the road will remain closed tonight. No alternate truck detours are available at this time.</description>
    </item>
    <item>
      <title>Flooding response in high gear, WSDOT opens US 2 east to Wenatchee</title>
      <pubDate>Fri, 09 Jan 2009 08:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/01_us2reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/01_us2reopens.htm</guid>
      <description>WSDOT is making progress on reopening highways to get families and freight moving through Washington again. Crews have spent today clearing debris and plowing snow slides on US 2 Stevens Pass and hope to get US 2 open east to Wenatchee this evening. US 97 remains closed, but vehicles can access I-90 taking SR 28 to Quincy then SR 281 to George  where they can intersect with I-90 to continue to Moses Lake.</description>
    </item>
    <item>
      <title>US 2 reopens over Stevens Pass after two day closure</title>
      <pubDate>Fri, 09 Jan 2009 07:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/08_US2Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/08_US2Reopens.htm</guid>
      <description>US 2 has reopened to traffic after a two day closure caused by flooding and avalanche danger.</description>
    </item>
    <item>
      <title>Next Aviation Planning Council Meeting:  Feb 5 in Richland</title>
      <pubDate>Fri, 09 Jan 2009 04:15:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/Feb5AviationPlanningCouncilMeeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/Feb5AviationPlanningCouncilMeeting.htm</guid>
      <description>On February 5, 2009 from 9:30 a.m. to 3:00 p.m., members of the Governor-appointed Aviation Planning Council will meet to continue work on the final phase of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>I-90 and I-5 remain closed -  focus on establishing detour routes</title>
      <pubDate>Fri, 09 Jan 2009 02:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/I5I90_RemainClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/I5I90_RemainClosed.htm</guid>
      <description>WSDOT and emergency response crews worked through the night to assess the status of major routes in Washington and the reports are indicating that I-90 Snoqualmie Pass will remain closed today. Interstate 5 in Lewis county also remains closed due to flooding.</description>
    </item>
    <item>
      <title>Rain may stop but rivers still rising</title>
      <pubDate>Thu, 08 Jan 2009 21:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/08_morningstormupdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/08_morningstormupdate.htm</guid>
      <description>More than 1,200 WSDOT crews plus National Guard members and Washington State Patrol troopers are out working to keep drivers safe and get close to 60 sections of roadway back open as soon as possible.</description>
    </item>
    <item>
      <title>Road closures as of 1/07/2009</title>
      <pubDate>Thu, 08 Jan 2009 10:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/07_I-5-closed-in-Lewis-county.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/07_I-5-closed-in-Lewis-county.htm</guid>
      <description>OLYMPIA - As expected, WSDOT has closed I-5 from US 12, milepost 68, to Grand Mound, milepost 88.</description>
    </item>
    <item>
      <title>State highway closures top 60</title>
      <pubDate>Thu, 08 Jan 2009 09:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/07_highway-closures-top-60.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/07_highway-closures-top-60.htm</guid>
      <description>OLYMPIA - Transportation officials are dealing with a large weather system that resulted in more than 60 road closures in Washington in the last 12 hours.</description>
    </item>
    <item>
      <title>WSDOT reminds pilots to check for temporary flight restrictions</title>
      <pubDate>Thu, 08 Jan 2009 08:47:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/FloodingTFR.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/FloodingTFR.htm</guid>
      <description>As rivers continue to rise and many areas of the state experience flooding, the Washington State Department of Transportation (WSDOT) Aviation reminds pilots to check for notices to airmen (NOTAMS) before flying.</description>
    </item>
    <item>
      <title>Rivers rapidly rising; Increasing risk to Interstate 5</title>
      <pubDate>Thu, 08 Jan 2009 03:38:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/07_RiversRising.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/07_RiversRising.htm</guid>
      <description>Major rivers in Washington are rapidly rising including rivers adjacent to Interstate 5 in Lewis county. Forecasts indicate that portions of Interstate 5 could be underwater as early as this afternoon.</description>
    </item>
    <item>
      <title>Know Before you go; Road closures in mountains and across state</title>
      <pubDate>Thu, 08 Jan 2009 00:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/07_floodclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/07_floodclosures.htm</guid>
      <description>All three major east-west mountain pass highways through the Cascade Mountains are closed at this hour due to avalanche danger and mudslides. Motorists should anticipate additional travel delays and road closures.</description>
    </item>
    <item>
      <title>Avalanche danger and flooding concerns increase with temperatures</title>
      <pubDate>Wed, 07 Jan 2009 09:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/06_flooding_avalanche_coming.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/06_flooding_avalanche_coming.htm</guid>
      <description>With another winter storm on the way, WSDOT crews are asking motorists to anticipate delays caused by avalanche control and, possibly, flooding that affects state highways. Motorists should be prepared for winter driving conditions in the mountain passes and the potential for flooding throughout Washington state.</description>
    </item>
    <item>
      <title>Snoqualmie Pass open; crews still fighting through Eastern Washington drifts</title>
      <pubDate>Tue, 06 Jan 2009 08:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/05_I90SnoqualmiePassOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/05_I90SnoqualmiePassOpen.htm</guid>
      <description>Drivers can now cross eastbound over I-90 Snoqualmie Pass but crews are still working on the westbound lanes.</description>
    </item>
    <item>
      <title>I-90 Snoqualmie Pass closed for avalanche danger</title>
      <pubDate>Tue, 06 Jan 2009 00:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/I90closed_for_avalanchedanger.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/I90closed_for_avalanchedanger.htm</guid>
      <description>WSDOT closes I-90 Snoqualmie Pass for high avalanche danger and poor visibility</description>
    </item>
    <item>
      <title>WSDOT approves $30 million for city and county bridges</title>
      <pubDate>Sat, 03 Jan 2009 05:14:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/2008citycountybridgegrants.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/2008citycountybridgegrants.htm</guid>
      <description>WSDOT approves $30 million for county and city bridges</description>
    </item>
    <item>
      <title>Mountain pass highways open; WSDOT gearing up for next storm</title>
      <pubDate>Sat, 03 Jan 2009 04:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/02_MtnPassOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/02_MtnPassOpen.htm</guid>
      <description>As WSDOT crews still fight blowing snow in the Palouse, all primary major east-west travel routes through the mountains are now open.</description>
    </item>
    <item>
      <title>US 12 White Pass reopens to traffic</title>
      <pubDate>Sat, 03 Jan 2009 03:22:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/02_WhitePassReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/02_WhitePassReopens.htm</guid>
      <description>VANCOUVER – Crews worked overnight and this morning to reopen US 12 White Pass following several natural snow slides near the summit Thursday, along with overnight snow accumulations.</description>
    </item>
    <item>
      <title>9 a.m. update: Stevens and Snoqualmie now open - avalanche crews working at White</title>
      <pubDate>Sat, 03 Jan 2009 01:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/02_MtnPassesStevensNowOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/02_MtnPassesStevensNowOpen.htm</guid>
      <description>The second of WSDOT's three primary east-west routes opened this morning, with US 2 now open over Stevens Pass.</description>
    </item>
    <item>
      <title>Damaged I-5 overpass in Burlington to be repaired starting in January</title>
      <pubDate>Sat, 03 Jan 2009 01:17:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/02_i5chuckanutbridgerepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/02_i5chuckanutbridgerepairs.htm</guid>
      <description>WSDOT is one step closer to starting repairs on the damaged I-5 Chuckanut Drive overpass in Burlington at exit 231. Vetch Construction of Camano Island was awarded the emergency repair contract on Dec. 18 and will start construction by the end of January.</description>
    </item>
    <item>
      <title>Stevens and Snoqualmie now open - avalanche crews working at White</title>
      <pubDate>Sat, 03 Jan 2009 01:01:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/02_PassOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/02_PassOpen.htm</guid>
      <description>The second of WSDOT's three primary east-west routes opened this morning, with US 2 now open over Stevens Pass. I-90 over Snoqualmie Pass opened to all traffic at 8 p.m. Thursday while US 12 – White Pass remains closed due to avalanche danger.</description>
    </item>
    <item>
      <title>Break in storm allows WSDOT crews to reopen I-90 Snoqualmie Pass; Stevens/White still closed</title>
      <pubDate>Fri, 02 Jan 2009 12:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/01_snoqualmie_open_early.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/01_snoqualmie_open_early.htm</guid>
      <description>Good news! WSDOT crews got a break from the storm and plan to re-open I-90 Snoqualmie Pass to all traffic around 8 p.m. today. Washington’s two other east-west mountain passes (US 12 – White Pass and US 2 – Stevens Pass) are expected to remain closed overnight.</description>
    </item>
    <item>
      <title>Avalanche danger continues for passes, WSDOT readies for overnight storm</title>
      <pubDate>Fri, 02 Jan 2009 07:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/1_3pm_mountainpassclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/1_3pm_mountainpassclosures.htm</guid>
      <description>Unless conditions change, Washington’s three main east-west mountain passes are expected to remain closed to traffic overnight. Another storm headed for Washington is expected to dump more snow on the Cascades overnight, which will keep the danger of avalanches high for mountain highways US 2, US 12 and I-90.</description>
    </item>
    <item>
      <title>WSDOT responding to mountain pass closures</title>
      <pubDate>Fri, 02 Jan 2009 02:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/01/01_am_mountainpassclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/01/01_am_mountainpassclosures.htm</guid>
      <description>Washington’s mountain passes are experiencing heavy snowfall and the avalanche risk to state highways through the mountains is extremely high.</description>
    </item>
  </channel>
</rss>