﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - 2008 News</title>
    <link>http://www.wsdot.wa.gov/News/2008/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Thu, 26 Nov 2009 07:49:33 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - 2008 News</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/News/2008/</link>
    </image>
    <item>
      <title>Next up in Tacoma: New SR 16 Nalley Valley viaduct</title>
      <pubDate>Thu, 01 Jan 2009 03:32:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/31_SR16NalleyValley_begins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/31_SR16NalleyValley_begins.htm</guid>
      <description>Three-year project to rebuild westbound Nalley Valley viaduct (I-5 to SR 16) starts Monday, Jan. 5.</description>
    </item>
    <item>
      <title>Single lane closures on SR 6 begin Monday, January 5</title>
      <pubDate>Thu, 01 Jan 2009 01:56:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/31_SR6LaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/31_SR6LaneClosures.htm</guid>
      <description>CHEHALIS – Drivers traveling across the South Fork Chehalis River Bridge on SR 6 will encounter brief delays when traffic on the bridge is temporarily reduced to one lane around-the-clock for five days. A temporary signal system on each side of the bridge will alternate traffic 24 hours a day for five consecutive days: Jan. 5 through Jan. 9.</description>
    </item>
    <item>
      <title>Weekend closure planned for southbound I-5 exit to Boylston Ave and Roanoke St in Seattle</title>
      <pubDate>Wed, 31 Dec 2008 09:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/I5_BoylstonClosures123008.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/I5_BoylstonClosures123008.htm</guid>
      <description>Noise wall construction will require crews to close one lane of southbound I-5 and the southbound I-5 exit to Boylston Avenue and Roanoke Street in Seattle this weekend.</description>
    </item>
    <item>
      <title>Plows and crews from western Washington cross the Cascades to assist WSDOT Eastern Region</title>
      <pubDate>Wed, 31 Dec 2008 05:01:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/30_PlowsAndCrews.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/30_PlowsAndCrews.htm</guid>
      <description>With a record snowfall in the Inland Northwest and more to come, crews from the Washington State Department of Transportation (WSDOT) plus area cities and counties have been overwhelmed with snow removal efforts.</description>
    </item>
    <item>
      <title>SR 520 floating bridge drawspan opening Saturday at noon</title>
      <pubDate>Sat, 27 Dec 2008 08:48:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/122608_SR520BridgeOpening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/122608_SR520BridgeOpening.htm</guid>
      <description>Washington State Department of Transportation bridge crews will open the drawspan of the State Route 520 Evergreen Point floating bridge to allow a tug boat to pass Saturday. The bridge drawspan will open Saturday, Dec. 27 at noon. Drivers can expect up to a 30-minute delay to allow the vessel through.</description>
    </item>
    <item>
      <title>Don we now our rain apparel? Warmer temperatures are welcome gifts to Washington drivers</title>
      <pubDate>Fri, 26 Dec 2008 07:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/25_rain_snow_coming.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/25_rain_snow_coming.htm</guid>
      <description>Western Washington drivers should see some relief today from the arctic blast of wind and snow that has kept them in the deep freeze for a week. Rain is likely from just south of Vancouver, B.C. all the way down to Vancouver, Washington. As the snow turns to rain and temperatures increase Thursday, Western Washington drivers could also find standing water on area roadways.</description>
    </item>
    <item>
      <title>WSDOT opens Biggs Rapids-Sam Hill Bridge at 4 p.m. today</title>
      <pubDate>Thu, 25 Dec 2008 08:05:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/24_BiggsReopensDayOf.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/24_BiggsReopensDayOf.htm</guid>
      <description>GOLDENDALE – The US 97 Biggs Rapids-Sam Hill Bridge permanently opened to all traffic at 4 p.m. today, announced the Washington State Department of Transportation (WSDOT). The bridge had been closed periodically since January 2008 for a complete replacement of the bridge deck.</description>
    </item>
    <item>
      <title>Warming in the western lowlands; expect winter driving conditions in mountains and Eastern Washington</title>
      <pubDate>Thu, 25 Dec 2008 06:51:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/24_snow_ponding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/24_snow_ponding.htm</guid>
      <description>Temperatures may be inching up in some areas, but drivers who think it’s time to revert to posted roadway speeds are finding themselves in ditches, snow banks or collisions with other cars. As the snow turns to rain and temperatures increase Thursday, Western Washington drivers could also find standing water on area roadways.</description>
    </item>
    <item>
      <title>Truck veers off I-5 at Allen Street in Kelso; I-5 still open</title>
      <pubDate>Thu, 25 Dec 2008 00:41:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/24_I-5CollisionatAllenStreet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/24_I-5CollisionatAllenStreet.htm</guid>
      <description>KELSO – A tractor-trailer slid down a steep embankment in the median of I-5 this morning, going between the northbound and southbound overpasses and blocking Allen Street (Exit 39) in Kelso.</description>
    </item>
    <item>
      <title>Afternoon update: The snow gift that keeps on giving: slush next hazard for drivers</title>
      <pubDate>Wed, 24 Dec 2008 08:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/23_Tuesday3pmUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/23_Tuesday3pmUpdate.htm</guid>
      <description>The light at the end of the tunnel seems to be getting closer and closer for Western Washington drivers, while those travelling over the Cascade Mountains and into Eastern Washington could see up to two feet of snow before Christmas.</description>
    </item>
    <item>
      <title>The snow gift that keeps on giving: slush next hazard for drivers</title>
      <pubDate>Wed, 24 Dec 2008 08:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/23_slush_driving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/23_slush_driving.htm</guid>
      <description>The light at the end of the tunnel seems to be getting closer and closer for Western Washington drivers, while those travelling over the Cascade Mountains and into Eastern Washington could see up to two feet of snow before Christmas.</description>
    </item>
    <item>
      <title>SR 14 is now open to all traffic; oversize loads still restricted</title>
      <pubDate>Wed, 24 Dec 2008 00:18:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/23_SR14Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/23_SR14Reopens.htm</guid>
      <description>VANCOUVER – The Washington State Department of Transportation (WSDOT) has reopened SR 14 to all traffic, except oversize loads are still restricted. Crews were able to take advantage of a break in the weather to plow snow and treat the roadway overnight, getting the pavement down to bare and wet conditions.</description>
    </item>
    <item>
      <title>Wet and snowy roads in Southwest Washington could be icy just in time for holiday traffic</title>
      <pubDate>Tue, 23 Dec 2008 09:58:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/22_WetSnowRoadSWWashington.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/22_WetSnowRoadSWWashington.htm</guid>
      <description>VANCOUVER – WSDOT’s road crews in Southwest Washington are taking advantage of a break in the weather to plow snow and treat the roads before the next system moves in, expected Tuesday night and Wednesday morning. Temperatures are dropping and commuters and holiday travelers should be geared up for slick conditions, be prepared and take it slow.</description>
    </item>
    <item>
      <title>Wet roads turning icy just in time for evening and holiday traffic</title>
      <pubDate>Tue, 23 Dec 2008 08:50:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/22_icy_commute.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/22_icy_commute.htm</guid>
      <description>As WSDOT crews clear highways and drivers gear up for another night of winter driving conditions, commuters and holiday travelers should be prepared and take it slow. The ice is scheduled to reappear just as commuters head home.</description>
    </item>
    <item>
      <title>SR 14 is now open to passenger vehicles; trucks still restricted</title>
      <pubDate>Tue, 23 Dec 2008 07:34:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/22_SR14Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/22_SR14Reopens.htm</guid>
      <description>VANCOUVER –  The Washington State Department of Transportation (WSDOT) has reopened SR 14 to passenger vehicle traffic from Washougal to the Bridge of the Gods (milepost 18 to milepost 42). Chains are required on vehicles without all wheel drive from Washougal to the town of Skamania (milepost 18 to milepost 31).</description>
    </item>
    <item>
      <title>Persistent snow meets tenacious crews - Update on state highways</title>
      <pubDate>Mon, 22 Dec 2008 13:54:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/21_persistantSnow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/21_persistantSnow.htm</guid>
      <description>Persistent snow meets tenacious crews - Update on state highways</description>
    </item>
    <item>
      <title>WSDOT closes SR 14 to all traffic</title>
      <pubDate>Mon, 22 Dec 2008 09:44:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/21_SR14ClosesAgain.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/21_SR14ClosesAgain.htm</guid>
      <description>VANCOUVER – Due to blizzard-like conditions, blowing snow and icy roads, the Washington State Department of Transportation (WSDOT) has closed SR 14 to all traffic from Washougal to the Bridge of the Gods (milepost 18 to milepost 42).</description>
    </item>
    <item>
      <title>Snow just keeps falling all over - break's over in Eastern Washington - Update on state highways</title>
      <pubDate>Mon, 22 Dec 2008 07:49:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/21_anotherDayOfSnowandIce.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/21_anotherDayOfSnowandIce.htm</guid>
      <description>Snow just keeps falling all over - break's over in Eastern Washington - Update on state highways</description>
    </item>
    <item>
      <title>WSDOT Traffic Advisory: WSDOT reopens SR 14 to passenger vehicles; trucks still restricted</title>
      <pubDate>Mon, 22 Dec 2008 04:37:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/21_SR14ReopensTruckRestrict.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/21_SR14ReopensTruckRestrict.htm</guid>
      <description>VANCOUVER –  The Washington State Department of Transportation (WSDOT) has reopened SR 14 to passenger vehicle traffic from Washougal to White Salmon (milepost 18 to milepost 64).</description>
    </item>
    <item>
      <title>Freezing rain and blowing snow make for treacherous driving conditions - Update on state highway closures and operational impacts</title>
      <pubDate>Mon, 22 Dec 2008 04:33:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/21_weatherUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/21_weatherUpdate.htm</guid>
      <description>Freezing rain and blowing snow make for treacherous driving conditions - Update on state highway closures and operational impacts</description>
    </item>
    <item>
      <title>Some WSDOT cameras in Puget Sound are offline</title>
      <pubDate>Mon, 22 Dec 2008 03:17:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/_21weathercameras.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/_21weathercameras.htm</guid>
      <description>Drivers hoping to check their commute throughout Puget Sound using WSDOT cameras are running into black space. About 30 percent of WSDOT cameras along key corridors are not working. The cameras are on the following routes: I-5, SR 520. I-90. I-405, SR 527, SR 202, and SR 18.</description>
    </item>
    <item>
      <title>Check your route: Winds and snow lead to road closures</title>
      <pubDate>Sun, 21 Dec 2008 15:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/20_11pm_closure_update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/20_11pm_closure_update.htm</guid>
      <description>WSDOT has closed I-90 over Snoqualmie Pass and SR 14 through the Columbia River Gorge due to winds, snow drifts and zero visibility. WSDOT advises drivers to stay off the roads tonight. Those who must travel should be prepared for hazardous winter driving conditions.  Combined with the ice and snow already on roads, drivers could see blizzard conditions in many places, especially mountain pass highways.</description>
    </item>
    <item>
      <title>WSDOT Traffic Advisory: WSDOT closes SR 14 to trucks</title>
      <pubDate>Sun, 21 Dec 2008 10:06:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/20_sr14_trucks_closed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/20_sr14_trucks_closed.htm</guid>
      <description>VANCOUVER – Due to extreme winter weather and icy road conditions, the Washington State Department of Transportation (WSDOT) has closed SR 14 to all truck traffic from Washougal to the US 97 Junction (milepost 18 to milepost 101).</description>
    </item>
    <item>
      <title>Saturday 3 p.m. Update: Be informed and safe if you must travel in Western Washington or through the Cascade mountains</title>
      <pubDate>Sun, 21 Dec 2008 07:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/20_blizzard_coming.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/20_blizzard_coming.htm</guid>
      <description>Those who must travel should be prepared for hazardous winter driving conditions for the next 24 hours.</description>
    </item>
    <item>
      <title>Draft Long-Range Plan available for public comment</title>
      <pubDate>Sat, 20 Dec 2008 10:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/DraftLRP_121908.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/DraftLRP_121908.htm</guid>
      <description>WSDOT Ferries Division seeks comments on its draft long-range plan</description>
    </item>
    <item>
      <title>Traveling, shopping, skiing, Seahawks, Zags? Prepare for possible whiteout driving conditions late Saturday</title>
      <pubDate>Sat, 20 Dec 2008 09:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/19_wild_weather_weekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/19_wild_weather_weekend.htm</guid>
      <description>OLYMPIA – As drivers venture out for weekend events and activities, another strong wind and snowstorm has its sights set on the Cascade Mountains and Western Washington. The snow and winds forecast for late Saturday into Sunday could cause near whiteout conditions on many highways in the south Puget Sound, Olympic Peninsula and in the mountain passes.</description>
    </item>
    <item>
      <title>At the request of the community, WSDOT delays the US 97A North of Wenatchee Unstable Slopes Project to 2010</title>
      <pubDate>Sat, 20 Dec 2008 06:15:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/19US97ANWenRockSlopeDelay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/19US97ANWenRockSlopeDelay.htm</guid>
      <description>Entiat businesses persuade WSDOT to reschedule a project to reduce the impact on tourist traffic.</description>
    </item>
    <item>
      <title>WSDOT reopens the Biggs Rapids-Sam Hill Bridge in time for the holidays</title>
      <pubDate>Sat, 20 Dec 2008 04:06:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/19_BiggsBridgeReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/19_BiggsBridgeReopens.htm</guid>
      <description>GOLDENDALE –The Washington State Department of Transportation (WSDOT) is delivering the newly redecked Biggs Bridge in time for the holidays, making travel over the Columbia River on US 97 faster and easier.</description>
    </item>
    <item>
      <title>WSDOT awards SR 9 widening project in Sedro-Woolley to Marshbank Construction</title>
      <pubDate>Sat, 20 Dec 2008 01:46:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/19_9MartinRoadBidAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/19_9MartinRoadBidAward.htm</guid>
      <description>WSDOT crews will straighten SR 9 and widen the lanes and shoulders to improve safety between Martin Road and Thunder Creek north of Sedro-Woolley next summer.</description>
    </item>
    <item>
      <title>Thursday 2 p.m. update: Winter driving conditions all over Washington; mountain pass and Eastern Washington snow measured in feet</title>
      <pubDate>Fri, 19 Dec 2008 05:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/18_commute_conditions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/18_commute_conditions.htm</guid>
      <description>A snowstorm that slowed Puget Sound commute drivers to a crawl brought more than a foot of snow to Spokane and Washington’s mountain pass highways.</description>
    </item>
    <item>
      <title>Compact snow and ice on highways in Spokane and Eastern Washington</title>
      <pubDate>Fri, 19 Dec 2008 04:30:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/18_SpokaneSnow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/18_SpokaneSnow.htm</guid>
      <description>Heavy snow continued to fall in most areas of Eastern Washington, the Spokane metropolitan area, and the Pullman vicinity overnight and into this morning.</description>
    </item>
    <item>
      <title>Snow and ice across the state; Central Puget Sound and Vancouver next target</title>
      <pubDate>Thu, 18 Dec 2008 07:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/17_pm_commute_snow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/17_pm_commute_snow.htm</guid>
      <description>The snowstorms that hit most areas around the state should visit both the Central Puget Sound and Vancouver areas later today.</description>
    </item>
    <item>
      <title>SR 502 Widening project access hearing set for Jan. 14</title>
      <pubDate>Thu, 18 Dec 2008 03:31:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/17_502WideningAccessHearing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/17_502WideningAccessHearing.htm</guid>
      <description>VANCOUVER - The Washington State Department of Transportation (WSDOT) will host a public open house and a formal access hearing on Wednesday, Jan. 14 for a project that will widen SR 502 from I-5 to Battle Ground.</description>
    </item>
    <item>
      <title>Be prepared: In ice and snow, take it slow</title>
      <pubDate>Wed, 17 Dec 2008 08:47:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/16_MoreSnow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/16_MoreSnow.htm</guid>
      <description>With more snow, ice and wind in the forecast, WSDOT advises drivers to prepare for winter driving conditions across the state.

Forecasters say the snow will start in Whatcom County late today, moving south and east by Wednesday afternoon. Wednesday Puget Sound evening commuters will see snow and ice.</description>
    </item>
    <item>
      <title>Prepare for more snow, hazardous driving conditions</title>
      <pubDate>Wed, 17 Dec 2008 08:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/16_StormPreparation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/16_StormPreparation.htm</guid>
      <description>With a winter storm watch in effect for much of western Washington, the Washington State Department of Transportation is geared up to fight whatever Mother Nature throws our way.</description>
    </item>
    <item>
      <title>WSDOT completes second Hood Canal Bridge truss</title>
      <pubDate>Wed, 17 Dec 2008 05:44:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/HCBTruss2.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/HCBTruss2.htm</guid>
      <description>HCBTruss2</description>
    </item>
    <item>
      <title>Port Townsend/Keystone route served by passenger only ferry for four weeks beginning in January</title>
      <pubDate>Tue, 16 Dec 2008 08:33:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/15_JanPOF.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/15_JanPOF.htm</guid>
      <description>Port Townsend/Keystone route to be served by passenger only ferry service while Steilacoom II is out of service.</description>
    </item>
    <item>
      <title>Light fixtures to be removed from SR 4 bridge in Kelso, Dec. 22 and 23</title>
      <pubDate>Tue, 16 Dec 2008 06:14:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/15_SR4PeterCrawfordBridgeLights.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/15_SR4PeterCrawfordBridgeLights.htm</guid>
      <description>KELSO – The Washington State Department of Transportation (WSDOT) will remove twenty-two light fixtures from the SR 4 Peter Crawford Bridge on December 22 and 23.</description>
    </item>
    <item>
      <title>WSDOT announces complicated, intense construction season set for 2009 in Puget Sound</title>
      <pubDate>Tue, 16 Dec 2008 06:10:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/15_2009ConstructionLaunch.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/15_2009ConstructionLaunch.htm</guid>
      <description>WSDOT announces complicated, intense construction season set for 2009 in Puget Sound</description>
    </item>
    <item>
      <title>WSDOT closes three scenic Cascades routes for the season</title>
      <pubDate>Tue, 16 Dec 2008 05:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/121508_passClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/121508_passClosures.htm</guid>
      <description>WSDOT announces that Chinook Pass, Cayuse Pass and the North Cascades Highway are closed for the season. After reviewing this past weekend’s snowfall accumulations and the forecast for more snow starting on Wednesday, WSDOT maintenance crews and avalanche forecasters agreed that the avalanche risk is too great to keep these seasonal highways open.</description>
    </item>
    <item>
      <title>WSDOT to open new southbound I-405 bridge over I-90 in phases</title>
      <pubDate>Tue, 16 Dec 2008 05:15:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/I405NewBridgeOverI90121508.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/I405NewBridgeOverI90121508.htm</guid>
      <description>Drivers heading south on I-405 will use a new freeway bridge over I-90 starting Tuesday morning.</description>
    </item>
    <item>
      <title>Emergency road closure violations can be dangerous and costly</title>
      <pubDate>Mon, 15 Dec 2008 07:36:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/roadclosedsafety.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/roadclosedsafety.htm</guid>
      <description>Emergency road closure violations can be dangerous and costly</description>
    </item>
    <item>
      <title>Drivers should prepare for icy Monday commute</title>
      <pubDate>Mon, 15 Dec 2008 07:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/14_icy_monday_commute.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/14_icy_monday_commute.htm</guid>
      <description>As the threat of snow fades, drivers should prepare for ice on area roads overnight and into Monday's commute.</description>
    </item>
    <item>
      <title>Monthly maintenance closure of SR 520 floating bridge Monday morning cancelled</title>
      <pubDate>Mon, 15 Dec 2008 04:09:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/14_SR520OpeningCancelled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/14_SR520OpeningCancelled.htm</guid>
      <description>Washington State Department of Transportation bridge crews have cancelled their scheduled maintenance work on the State Route 520 Evergreen Point Floating Bridge planned for early Monday morning.</description>
    </item>
    <item>
      <title>Drivers prepare for heavy snow in mountains tonight; icy roads and snow in lowlands Saturday</title>
      <pubDate>Sat, 13 Dec 2008 08:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/12_saturday_ice.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/12_saturday_ice.htm</guid>
      <description>A blast of winter weather should hit the mountains hard through the night, while drivers and road crews may face a tough challenge Saturday.</description>
    </item>
    <item>
      <title>A seventh traffic camera goes on-line in Wenatchee</title>
      <pubDate>Sat, 13 Dec 2008 08:01:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/12SR285TrafficCam.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/12SR285TrafficCam.htm</guid>
      <description>A new traffic camera focuses on the Wenatchee River Bridges.</description>
    </item>
    <item>
      <title>SR 504 at Coldwater Creek Closed for Winter Season, Starting December 12</title>
      <pubDate>Sat, 13 Dec 2008 06:35:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/12_SR504Closes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/12_SR504Closes.htm</guid>
      <description>CASTLE ROCK – The Washington State Department of Transportation (WSDOT) closed State Route 504 (Spirit Lake Highway) today, December 12, starting at the Hummocks Trail east of Coldwater Lake on Mount St. Helens due to heavy snowfall over the last 24 hours.</description>
    </item>
    <item>
      <title>Crews to close SR 20 lane and I-5 on-ramp overnight in Burlington</title>
      <pubDate>Sat, 13 Dec 2008 02:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/SR20onRampClosureI5NB.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/SR20onRampClosureI5NB.htm</guid>
      <description>Crews will close the northbound I-5 on ramp at SR 20 on Monday night, Dec. 15.</description>
    </item>
    <item>
      <title>BNSF crews to close railroad crossing on SR 9 in Van Zandt</title>
      <pubDate>Sat, 13 Dec 2008 02:34:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/SR9RailroadClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/SR9RailroadClosure.htm</guid>
      <description>VAN ZANDT - Burlington Northern Santa Fe crews will close a section of SR 9 in Van Zandt for two days to repair the railroad crossing.</description>
    </item>
    <item>
      <title>WSDOT completes six projects on US 2 between Monroe and Stevens Pass in 2008</title>
      <pubDate>Sat, 13 Dec 2008 02:18:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/12_US2SixProjectsComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/12_US2SixProjectsComplete.htm</guid>
      <description>Following through on a commitment to make US 2 safer, WSDOT announced today that in 2008 crews finished six safety and preservation projects on US 2 between Monroe and Stevens Pass.</description>
    </item>
    <item>
      <title>Westbound I-90 nighttime closures in Bellevue next week</title>
      <pubDate>Fri, 12 Dec 2008 23:48:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/12_I90at405Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/12_I90at405Closure.htm</guid>
      <description>Drivers should plan for nighttime detours and delays next week as crews close westbound I-90 at I-405 to prepare a new southbound freeway bridge that is expected to open to traffic sometime next week.</description>
    </item>
    <item>
      <title>Eight scenarios narrowed down to two for Alaskan Way Viaduct central waterfront</title>
      <pubDate>Fri, 12 Dec 2008 10:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/11-awvscenarios.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/11-awvscenarios.htm</guid>
      <description>WSDOT, King County, and the City of Seattle announced they are down to two options for replacing the central section of the Alaskan Way Viaduct and Seawall: an “I-5/surface/transit” hybrid alternative and an “SR 99 elevated bypass” hybrid alternative. These were developed from the previous eight scenarios. They are called “hybrids” because they package together the best elements from the previous eight, including improvements to I-5, surface streets, transit, and demand management.</description>
    </item>
    <item>
      <title>Weekend forecast: Big backups on SR 16 in Kitsap County</title>
      <pubDate>Fri, 12 Dec 2008 07:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/EBSR16BurleyWeekendClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/EBSR16BurleyWeekendClosures.htm</guid>
      <description>Weekend forecast: Big backups on SR 16 in Kitsap County</description>
    </item>
    <item>
      <title>Monthly maintenance closure of SR 520 floating bridge Monday morning</title>
      <pubDate>Fri, 12 Dec 2008 06:43:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/SR520BridgeClosure121108.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/SR520BridgeClosure121108.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct monthly maintenance work on the State Route 520 Evergreen Point Floating Bridge Monday at 12:30 a.m. and end at 5 a.m. The road will be closed to traffic for up to 30 minutes at a time.</description>
    </item>
    <item>
      <title>Drivers advised to prepare for winter blast in Southwest Washington and beyond</title>
      <pubDate>Fri, 12 Dec 2008 05:34:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/11_WinterWeatherComing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/11_WinterWeatherComing.htm</guid>
      <description>VANCOUVER – Drivers from Raymond to Vancouver, Chehalis to Goldendale and all points in between need to prepare for their first blast of winter weather Friday.</description>
    </item>
    <item>
      <title>34-car Hiyu to serve Point Defiance/Tahlequah ferry route for six weeks beginning on Jan. 5, 2009</title>
      <pubDate>Fri, 12 Dec 2008 05:19:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/Pointdefiance_121108.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/Pointdefiance_121108.htm</guid>
      <description>34-car Hiyu to serve Point Defiance/Tahlequah ferry route for six weeks beginning on Jan. 5, 2009</description>
    </item>
    <item>
      <title>Drivers advised to prepare for winter blast across most of Washington</title>
      <pubDate>Fri, 12 Dec 2008 04:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/11_first_winter_storm.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/11_first_winter_storm.htm</guid>
      <description>OLYMPIA – Drivers from Sekiu to Spokane, Vancouver to Bellingham and all points in between need to prepare for the first blast of winter weather Friday.</description>
    </item>
    <item>
      <title>Two weeks of nightly closures planned for NE 80th Street exit on Southbound I-5 in Seattle</title>
      <pubDate>Fri, 12 Dec 2008 04:26:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/121108_I5NoiseWall.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/121108_I5NoiseWall.htm</guid>
      <description>Late night and early morning drivers on heading south on I-5 will need to plan for detours during the next two weeks if they want to exit to NE 80th Street in Seattle. Construction crews building a noise wall along the west side of the freeway will set up a crane overnight on the off-ramp to unload and install noise wall panels from waiting delivery trucks.</description>
    </item>
    <item>
      <title>WSDOT upgrades 15 bridges in south Seattle and Renton</title>
      <pubDate>Fri, 12 Dec 2008 04:10:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/121108_southseattleSeismic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/121108_southseattleSeismic.htm</guid>
      <description>WSDOT crews wrapped up ten months of work to improve the safety of 89 columns supporting 14 critical bridge ramps along I-5, and one bridge on SR 900 in Renton. Upgrades make the bridges safer for drivers, buses and pedestrians during earthquakes.</description>
    </item>
    <item>
      <title>Chinook and Cayuse Passes close temporarily Dec. 11</title>
      <pubDate>Thu, 11 Dec 2008 08:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/ChinookandCayuseCloseDec11.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/ChinookandCayuseCloseDec11.htm</guid>
      <description>WSDOT Closes SR 410 (Chinook Pass) and SR 123 (Cayuse Pass) Temporarily</description>
    </item>
    <item>
      <title>WSDOT offers new tools for road and pass condition reports</title>
      <pubDate>Thu, 11 Dec 2008 06:51:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/10_Newtoolsforpassconditions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/10_Newtoolsforpassconditions.htm</guid>
      <description>WSDOT is now offering mountain pass reports via e-mail, text messages to cell phone and Twitter.</description>
    </item>
    <item>
      <title>SR 20 - North Cascades Highway closing Thursday</title>
      <pubDate>Thu, 11 Dec 2008 02:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/10SR20tempclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/10SR20tempclosure.htm</guid>
      <description>This weekend’s forecast calls for up to 3 feet of snow, high winds and colder temperatures in the North Cascades and has prompted the Washington State Department of Transportation to temporarily close the North Cascades Highway at 11:59 p.m. Thursday, Dec. 11.</description>
    </item>
    <item>
      <title>WSDOT opens additional lanes on the first of four improvement projects along I-5 in Lewis County</title>
      <pubDate>Wed, 10 Dec 2008 23:48:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/10_ThirdLaneRushRdto13th.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/10_ThirdLaneRushRdto13th.htm</guid>
      <description>CHEHALIS – Drivers on I-5 in Lewis County will have a safer, speedier trip Friday evening when crews open an additional lane in each direction between Rush Road and 13th Street, south of Chehalis.</description>
    </item>
    <item>
      <title>Emergency Rock Slope Repair Will Restrict Traffic in Tumwater Canyon</title>
      <pubDate>Wed, 10 Dec 2008 08:27:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/09US2TumwaterSlopeRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/09US2TumwaterSlopeRepair.htm</guid>
      <description>Emergency rock slope repairs west of Leavenworth in Tumwater Canyon will impact traffic Wednesday and Thursday, this week and Monday through Wednesday, next week.</description>
    </item>
    <item>
      <title>Single-lane closures planned for SR 529 this week</title>
      <pubDate>Wed, 10 Dec 2008 02:15:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/9_Single+lane+closure+on+northbound+SR+529.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/9_Single+lane+closure+on+northbound+SR+529.htm</guid>
      <description>WSDOT crews will close the left lane of northbound State Route 529 near the Steamboat Slough Bridge in Everett on Wednesday and Thursday to install a new a sign.</description>
    </item>
    <item>
      <title>New signal lights the way for SR 522 drivers in Bothell</title>
      <pubDate>Wed, 10 Dec 2008 01:18:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/09_SR522NewSignal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/09_SR522NewSignal.htm</guid>
      <description>WSDOT’s contractor, Mowat Construction, will turn on a new traffic signal at 8:00 a.m., Dec.11 at the intersection of SR 522 and Woodinville Drive. The new light is the latest safety improvement in the $50 million SR 522 UW Bothell/Cascadia Community College campus access project</description>
    </item>
    <item>
      <title>Single-lane closures scheduled on Tacoma’s Portland Avenue</title>
      <pubDate>Tue, 09 Dec 2008 08:14:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/PortlandAvenuelaneclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/PortlandAvenuelaneclosures.htm</guid>
      <description>Single-lane closures scheduled on Tacoma’s Portland Avenue</description>
    </item>
    <item>
      <title>WSDOT to build noise wall along I-5 in Burlington</title>
      <pubDate>Tue, 09 Dec 2008 05:54:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/08_i5noisewallproject.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/08_i5noisewallproject.htm</guid>
      <description>The Washington State Department of Transportation will build a noise wall along I-5 in Burlington to help reduce noise to nearby West View Elementary School. Construction on the $1.9 million project will start in mid-June 2009, shortly after school lets out for summer break.</description>
    </item>
    <item>
      <title>Chuckanut Drive rockslides cleared; road to open Tuesday near Bellingham</title>
      <pubDate>Tue, 09 Dec 2008 05:40:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/08_sr11chuckanutdriveopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/08_sr11chuckanutdriveopens.htm</guid>
      <description>Chuckanut Drive (State Route 11) will reopen to drivers by 5 p.m. Tuesday, Dec. 9, after more than a month of closures. The road has been closed near the Skagit-Whatcom county line since Nov. 7, when one of four separate slides blocked the road and left the hillside unstable. Crews have worked continuously to stabilize the hillside and reopen the road to drivers.</description>
    </item>
    <item>
      <title>Work begins on State Route 169 Green River Bridge</title>
      <pubDate>Sat, 06 Dec 2008 08:12:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/SR169GreenRiver120508.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/SR169GreenRiver120508.htm</guid>
      <description>WSDOT contractors begin emergency repair work near the State Route 169 Green River Bridge, Saturday, Dec. 6. Tri-State Construction crews will spend the next 30 days excavating a large section of road just south of the bridge, also called the Kummer Bridge.</description>
    </item>
    <item>
      <title>I-405 construction in Bellevue, Renton and Tukwila – Dec. 5-12</title>
      <pubDate>Sat, 06 Dec 2008 07:18:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/05_I405ConstructionUpdateDec5-12.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/05_I405ConstructionUpdateDec5-12.htm</guid>
      <description>Next week, drivers on I-405 should expect nighttime lane and ramp closures as crews continue work on several projects between Bellevue and Tukwila.</description>
    </item>
    <item>
      <title>Two weeks of I-90 closures in Bellevue</title>
      <pubDate>Sat, 06 Dec 2008 06:50:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/05_I90ClosureAtI405.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/05_I90ClosureAtI405.htm</guid>
      <description>Drivers should plan for nighttime delays and detours for the next two weeks as crews close I-90 at I-405 to prepare a new southbound freeway bridge to carry traffic.</description>
    </item>
    <item>
      <title>Northbound SR 529 closed in Everett on Sunday morning</title>
      <pubDate>Sat, 06 Dec 2008 00:35:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/05_SR529SundayClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/05_SR529SundayClosure.htm</guid>
      <description>WSDOT crews will close northbound SR 529 in Everett on Sunday morning to remove a sign bridge near the I-5 overpass that was damaged in a collision earlier this year.</description>
    </item>
    <item>
      <title>Report finds little change to regional economy with Alaskan Way Viaduct scenarios</title>
      <pubDate>Fri, 05 Dec 2008 05:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/4-awvregion.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/4-awvregion.htm</guid>
      <description>WSDOT, King County, and the City of Seattle released information on the final set of evaluation results for the eight scenarios under consideration for the Alaskan Way Viaduct and Seawall along the central waterfront. The newly-released results factor how each scenario and its construction might affect the local and regional economy. The agencies will use this information to create two to three hybrid scenarios which they will announce a week from today. A final recommendation is expected by the</description>
    </item>
    <item>
      <title>Northbound I-5 collector-distributor at S. Boeing Access Road to close all weekend</title>
      <pubDate>Fri, 05 Dec 2008 03:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/NB5atBoeingAccessCD.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/NB5atBoeingAccessCD.htm</guid>
      <description>Drivers should expect the northbound Interstate 5 collector-distributor ramp at South Boeing Access Road in Seattle to be closed this weekend. The closure from Friday, Dec. 5 at 9 p.m. until Sunday, Dec. 7 at 6 p.m. is necessary to install overhead signs.</description>
    </item>
    <item>
      <title>WSDOT and Sound Transit seek contractors to build Mountlake Terrace Freeway Station; project increases safety, gives commuters a new choice and creates jobs</title>
      <pubDate>Wed, 03 Dec 2008 07:09:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/2-mtlaketerraceAd.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/2-mtlaketerraceAd.htm</guid>
      <description>Today the Washington State Department of Transportation and Sound Transit announced they are looking for qualified contractors to build the Mountlake Terrace Freeway Station.</description>
    </item>
    <item>
      <title>Expect nightly lane closures of southbound I-5 south of Northgate in Seattle for noise wall construction</title>
      <pubDate>Wed, 03 Dec 2008 05:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/2_i5northgatenoisewallsconstructionclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/2_i5northgatenoisewallsconstructionclosures.htm</guid>
      <description>Southbound Interstate 5 drivers in Seattle should expect nighttime lane closures just south of Northgate starting next week.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division announces system-wide service adjustments for scheduled vessel maintenance in December</title>
      <pubDate>Wed, 03 Dec 2008 03:34:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/Vesselmoves_120208.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/Vesselmoves_120208.htm</guid>
      <description>WSDOT Ferries Division announces system-wide service adjustments for scheduled vessel maintenance in December</description>
    </item>
    <item>
      <title>New ferry on the way for Port Townsend/Keystone Route</title>
      <pubDate>Tue, 02 Dec 2008 08:19:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/1_PortTownsendKeystoneFerry.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/1_PortTownsendKeystoneFerry.htm</guid>
      <description>WSDOT announces new ferry on the way for Port Townsend/Keystone Route</description>
    </item>
    <item>
      <title>North Spokane Corridor/US 2 interchange project getting underway</title>
      <pubDate>Tue, 02 Dec 2008 08:06:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/11_US395nscinterchangejob.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/11_US395nscinterchangejob.htm</guid>
      <description>North Spokane Corridor/US 2 interchange project getting underway</description>
    </item>
    <item>
      <title>Hood Canal Bridge closure clock gets ticking</title>
      <pubDate>Tue, 02 Dec 2008 06:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/01_hood-canal-bridge-closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/01_hood-canal-bridge-closure.htm</guid>
      <description>HCBclosureclock</description>
    </item>
    <item>
      <title>I-82 westbound Exit 33 left lane closed Dec. 3</title>
      <pubDate>Tue, 02 Dec 2008 06:14:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/I82_westbound_ramp_left_lane_close_.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/I82_westbound_ramp_left_lane_close_.htm</guid>
      <description>WSDOT closes left lane of westbound I-82 off-ramp to Yakima Avenue December 3 

The right lane of Exit 33 is available. Delays should be minimal.</description>
    </item>
    <item>
      <title>US 101 closes at Purdy Creek Bridge for girder-setting</title>
      <pubDate>Tue, 02 Dec 2008 05:10:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/01_US101_PurdyCreek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/01_US101_PurdyCreek.htm</guid>
      <description>Closures scheduled on US 101 Purdy Creek Bridge for girder-setting work.</description>
    </item>
    <item>
      <title>WSDOT seeks public input on SR 19 – SR 20 corridor plan</title>
      <pubDate>Tue, 02 Dec 2008 01:47:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/12/SR19-20OpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/12/SR19-20OpenHouse.htm</guid>
      <description>WSDOT seeks public input on SR 19 – SR 20 corridor plan</description>
    </item>
    <item>
      <title>Seattle Marathon to close express lanes, freeway off-ramps this Sunday</title>
      <pubDate>Thu, 27 Nov 2008 10:11:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/SeattleMarathon112608.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/SeattleMarathon112608.htm</guid>
      <description>The Seattle Marathon will affect the express lanes and several freeway off-ramps in the Seattle area on Sunday, Nov. 30. Drivers should plan routes around the following freeway closures:</description>
    </item>
    <item>
      <title>WSDOT identifies interim construction plan to open more sections of the North Spokane Corridor</title>
      <pubDate>Wed, 26 Nov 2008 00:42:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/25_us395nscinterim.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/25_us395nscinterim.htm</guid>
      <description>WSDOT identifies interim construction plan to open more sections of the North Spokane Corridor</description>
    </item>
    <item>
      <title>Crews complete $20.7 million safety project on SR 9 near Arlington</title>
      <pubDate>Sat, 22 Nov 2008 03:49:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/SR9ArlingtonComplete112108.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/SR9ArlingtonComplete112108.htm</guid>
      <description>Crews today completed a $20.7 million project to improve safety on two miles of State Route 9 near Arlington. After reaching several major milestones this summer, crews worked throughout the fall to bring the project to a close.</description>
    </item>
    <item>
      <title>WSDOT makes the grade at Hood Canal Bridge park and rides</title>
      <pubDate>Sat, 22 Nov 2008 03:02:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/WSDOT+makes+the+grade+at+Hood+Canal+Bridge+park+and+rides.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/WSDOT+makes+the+grade+at+Hood+Canal+Bridge+park+and+rides.htm</guid>
      <description>SHINE – With the May-June 2009 closure of the SR 104 Hood Canal Bridge roughly six months away, WSDOT is making sure drivers have a smooth commute if they choose to use park and rides at Shine Pit and Port Gamble.</description>
    </item>
    <item>
      <title>Bare and wet roads this winter, delivered fresh from the dairy</title>
      <pubDate>Sat, 22 Nov 2008 01:24:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/21_BareWetRoadsDelivered.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/21_BareWetRoadsDelivered.htm</guid>
      <description>CHEHALIS – The Washington State Department of Transportation (WSDOT) is enlisting help from local cows to keep southwest Washington roads clear of snow and ice this winter.</description>
    </item>
    <item>
      <title>SR 155 Coulee Dam Bridge Beacons make winter encounters with a snowplow safer</title>
      <pubDate>Fri, 21 Nov 2008 16:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/21SR155BridgeBeacons.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/21SR155BridgeBeacons.htm</guid>
      <description>Flashing beacons on the bridge below Grand Coulee Dam alert motorists that there are snow plows at work.</description>
    </item>
    <item>
      <title>Ferries, Trains and Automobiles…Check your route before heading over the Puget Sound and through the mountains</title>
      <pubDate>Fri, 21 Nov 2008 07:34:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/20_thanksgiving_08_best_travel_time.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/20_thanksgiving_08_best_travel_time.htm</guid>
      <description>Thanksgiving is traditionally one of the busiest holidays for state highways. WSDOT is suggesting drivers enjoy more time with family friends by checking road reports before leaving home.</description>
    </item>
    <item>
      <title>WSDOT updates SR 520 corridor cost estimates</title>
      <pubDate>Fri, 21 Nov 2008 05:07:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/20-520costestimates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/20-520costestimates.htm</guid>
      <description>WSDOT released updated cost estimates today for the SR 520 Corridor Program, including three west side options developed through a mediation process, as well as costs for the Eastside Transit and HOV Project, the floating bridge and the pontoon construction site.</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct cost estimates an important step to narrowing the options early next month</title>
      <pubDate>Fri, 21 Nov 2008 04:09:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/20-awv-estimates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/20-awv-estimates.htm</guid>
      <description>WSDOT, King County, and the City of Seattle released conceptual cost estimates today for the elements that make up the eight scenarios being tested for the central section of the Alaskan Way Viaduct and Seawall. The eight scenarios include three surface options, two elevated options, and three below ground options on SR 99, as well as varying levels of investments in I-5, surface streets, transit, and demand management.</description>
    </item>
    <item>
      <title>Right lane closed on eastbound I-82 Umatilla Bridge Nov. 20</title>
      <pubDate>Thu, 20 Nov 2008 09:30:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/EastboundLaneClosed_on_I82Bridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/EastboundLaneClosed_on_I82Bridge.htm</guid>
      <description>WSDOT closes right lane of eastbound I-82 Umatilla Bridge Nov. 20 for annual inspection 

Eastbound drivers should plan for minor delays.</description>
    </item>
    <item>
      <title>The Ribbon is Cut at the US 2/97 Peshastin East Interchange</title>
      <pubDate>Thu, 20 Nov 2008 08:34:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/19US2PeshastinEastRibbonCut.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/19US2PeshastinEastRibbonCut.htm</guid>
      <description>Secretary Hammond was the Keynote speaker at the US 2/97 Peshastin East Interchange Ribbon Cutting ceremony was held this afternoon in Chelan County.</description>
    </item>
    <item>
      <title>WSDOT Eastern Region crews on the job with winter road duties</title>
      <pubDate>Thu, 20 Nov 2008 08:23:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/19_EasternRegionSnowPlan.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/19_EasternRegionSnowPlan.htm</guid>
      <description>WSDOT Eastern Region crews on the job with winter road duties</description>
    </item>
    <item>
      <title>WSDOT invites public to open house for proposed Northern Columbia Basin Railroad project</title>
      <pubDate>Thu, 20 Nov 2008 05:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/111908NCBRRopenhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/111908NCBRRopenhouse.htm</guid>
      <description>WSDOT invites public to open house for proposed Northern Columbia Basin Railroad project.</description>
    </item>
    <item>
      <title>Fourth rockslide blocks new section of Chuckanut Drive south of Bellingham</title>
      <pubDate>Thu, 20 Nov 2008 04:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/11_FourthChuckanutRockslide.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/11_FourthChuckanutRockslide.htm</guid>
      <description>A new rockslide is restricting access to Chuckanut Drive (SR 11) about four miles south of the Whatcom-Skagit county line at milepost 9.7.</description>
    </item>
    <item>
      <title>Ferry service resumes on Seattle/Bremerton route</title>
      <pubDate>Wed, 19 Nov 2008 08:13:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/18_Sea-BremServiceResumes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/18_Sea-BremServiceResumes.htm</guid>
      <description>Seattle/Bremerton ferry route resumes service</description>
    </item>
    <item>
      <title>Slide movement raises public safety concerns, prompts long-term SR 169 Green River Bridge closure</title>
      <pubDate>Wed, 19 Nov 2008 07:17:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/SR169_KummerBridge111808.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/SR169_KummerBridge111808.htm</guid>
      <description>WSDOT is closing the 80-year-old State Route 169 Green River Bridge for at least six months due to concerns over public safety. After reviewing extensive data gathered by electronic sensors in the landslide zone near the State Route 169 Kummer Bridge in Black Diamond, WSDOT geotechnical engineers have determined the structure is vulnerable to significant land movement.</description>
    </item>
    <item>
      <title>WSDOT wins national award for communications on I-5 project in Seattle</title>
      <pubDate>Wed, 19 Nov 2008 04:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/14_I5Award.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/14_I5Award.htm</guid>
      <description>WSDOT's campaign to warn commuters of massive lane closures on Interstate 5 in Seattle won the National Partnership for Highway Quality's (NPHQ) 2008 Gold Award for Public Communications.</description>
    </item>
    <item>
      <title>More lanes to open on Guide Meridian near Bellingham</title>
      <pubDate>Wed, 19 Nov 2008 02:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/18_539NewLanesOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/18_539NewLanesOpen.htm</guid>
      <description>Crews will open the last one and a half miles of new lanes on the Guide Meridian (SR 539) north of Bellingham on Wednesday morning, Nov. 19, substantially completing the four-mile, $66-million widening and safety improvement project between Horton and Ten Mile roads.</description>
    </item>
    <item>
      <title>WSDOT reopens SR 169 bridge over Green River at 6 p.m. Saturday, Nov. 15</title>
      <pubDate>Sun, 16 Nov 2008 08:11:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/15_SR169Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/15_SR169Reopens.htm</guid>
      <description>WSDOT bridge experts have determined the SR 169 Kummer Bridge over the Green River is safe for traffic.</description>
    </item>
    <item>
      <title>November 14 – 8 p.m. update: Slides continue to block roads in King and Skagit counties</title>
      <pubDate>Sat, 15 Nov 2008 12:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/14_Nov148pmUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/14_Nov148pmUpdate.htm</guid>
      <description>Roads in King and Skagit counties remain blocked due to landslides.</description>
    </item>
    <item>
      <title>WSDOT experts keep SR 169 over Green River closed for another 24 hours</title>
      <pubDate>Sat, 15 Nov 2008 08:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/14_169Closed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/14_169Closed.htm</guid>
      <description>Preliminary reports show the SR 169 Kummer Bridge over the Green River is not moving, but must remain closed to traffic while WSDOT geotechnical experts gather more information.</description>
    </item>
    <item>
      <title>Hood Canal Bridge closure bus schedules available on-line</title>
      <pubDate>Sat, 15 Nov 2008 06:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/14_hood-canal-bridge-bus-schedules.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/14_hood-canal-bridge-bus-schedules.htm</guid>
      <description>TACOMA – Drivers looking to get out of their cars and into fare-free buses during the May-June 2009 Hood Canal Bridge closure can start getting ready now.</description>
    </item>
    <item>
      <title>Minor delays expected on SR 529 through Marysville</title>
      <pubDate>Sat, 15 Nov 2008 04:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/14_EbeySloughInspections.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/14_EbeySloughInspections.htm</guid>
      <description>Drivers can expect minor delays on State Route 529 through Marysville this weekend. WSDOT crews are inspecting the Ebey Slough Bridge and will close a lane in order to complete the work.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division advises travelers to plan ahead for Thanksgiving holiday travel</title>
      <pubDate>Sat, 15 Nov 2008 03:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/Thanksgiving_111408.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/Thanksgiving_111408.htm</guid>
      <description>WSDOT Ferries Division advises travelers to plan ahead for Thanksgiving holiday travel</description>
    </item>
    <item>
      <title>WSDOT removes trees on US 101 near Olympia</title>
      <pubDate>Sat, 15 Nov 2008 02:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/14_101_crewsremovetrees.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/14_101_crewsremovetrees.htm</guid>
      <description>Next week crews will remove danger trees along southbound US 101 near Olympia.</description>
    </item>
    <item>
      <title>WSDOT awards I-5 pavement repair project in Bellingham to Penhall Company</title>
      <pubDate>Sat, 15 Nov 2008 01:06:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/14_i-5projectawardedtoPenhall.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/14_i-5projectawardedtoPenhall.htm</guid>
      <description>Crews will repair and replace cracked and unstable concrete panels on southbound I-5 north of Bellingham next summer.</description>
    </item>
    <item>
      <title>Flood waters recede, crews reopen US 12 near Randle</title>
      <pubDate>Fri, 14 Nov 2008 12:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/13_US12Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/13_US12Reopens.htm</guid>
      <description>RANDLE - Flood waters have receded relatively quickly allowing WSDOT maintenance crews to reopen US 12 near Randle in Lewis county. The road was closed completely late Wednesday night because of flood waters from nearby Davis Creek and the Cowlitz River.</description>
    </item>
    <item>
      <title>November 13 - 6:15 p.m. update: Flood waters receding from state highways:</title>
      <pubDate>Fri, 14 Nov 2008 10:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/111308_floodUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/111308_floodUpdate.htm</guid>
      <description>November 13 - 6:15 p.m. update: Floodwaters receding from state highways</description>
    </item>
    <item>
      <title>November 13 - 4:30 p.m. update: Floodwaters receding from state highways</title>
      <pubDate>Fri, 14 Nov 2008 08:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/13_430pm_flood_update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/13_430pm_flood_update.htm</guid>
      <description>As rivers receded today, many state highways have re-opened for travel.</description>
    </item>
    <item>
      <title>Transportation results present different choices after Alaskan Way Viaduct begins to come down in 2012</title>
      <pubDate>Fri, 14 Nov 2008 07:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/13-AWVchoices.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/13-AWVchoices.htm</guid>
      <description>WSDOT, King County, and the City of Seattle released new information today about how the Seattle-area transportation system could operate after the central section of the Alaskan Way Viaduct is taken down. Results show that the transportation system can handle forecasted population growth, there are little changes to travel times on I-5, and trips that continue to use SR 99 to make trips through downtown experience increased travel times.</description>
    </item>
    <item>
      <title>Time for political signs to come down along state highways</title>
      <pubDate>Fri, 14 Nov 2008 06:08:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/13_election_signs_down.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/13_election_signs_down.htm</guid>
      <description>While Inauguration Day doesn’t come until January, WSDOT reminds those living adjacent to state highway: it’s time to take down the political signs.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division to begin removal of Unocal Pier in Edmonds</title>
      <pubDate>Fri, 14 Nov 2008 05:48:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/Unocalpier_111308.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/Unocalpier_111308.htm</guid>
      <description>WSDOT Ferries Division to begin removal of Unocal Pier in Edmonds</description>
    </item>
    <item>
      <title>Bids opened for contract to build new 64-car ferries for Port Townsend/Keystone route</title>
      <pubDate>Fri, 14 Nov 2008 04:39:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/64Carbid_111308.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/64Carbid_111308.htm</guid>
      <description>Bids opened for contract to build new 64-car ferries for Port Townsend/Keystone route</description>
    </item>
    <item>
      <title>November 13 - 11 a.m. update: Flooding continues to affect state highways</title>
      <pubDate>Fri, 14 Nov 2008 04:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/13_FloodingContinuestoaffectroads.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/13_FloodingContinuestoaffectroads.htm</guid>
      <description>The heavy rain has passed, but flood waters may continue to rise throughout the day. Drivers are encouraged to slow down, drive for conditions and expect water over several area roads.</description>
    </item>
    <item>
      <title>Drill work complete on I-90; helicopters fly south for the winter</title>
      <pubDate>Fri, 14 Nov 2008 00:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/WSDOTcompletesdrillworkonI90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/WSDOTcompletesdrillworkonI90.htm</guid>
      <description>WSDOT has completed its geotechnical drilling work for the 2008 season just as winter weather begins reaching the roadway.</description>
    </item>
    <item>
      <title>November 12 - 6:30 p.m. Update: find out where waters rising on state highways</title>
      <pubDate>Thu, 13 Nov 2008 10:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/12_6pm_flood_update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/12_6pm_flood_update.htm</guid>
      <description>The rains my be moving out, but WSDOT is still watching river levels and landslide prone areas overnight. Drivers should slow down, drive for conditions and heed warnings posted on road signs and Highway Advisory Radio.</description>
    </item>
    <item>
      <title>Two-lane exit reduced to one lane in downtown Bellevue</title>
      <pubDate>Thu, 13 Nov 2008 10:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/12_405Girders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/12_405Girders.htm</guid>
      <description>A crane parked temporarily on a southbound I-405 exit in downtown Bellevue will resume placing bridge girders Wednesday night.</description>
    </item>
    <item>
      <title>WSDOT closes SR 169 over Green River after signs of slide</title>
      <pubDate>Thu, 13 Nov 2008 09:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/12_169ClosedFlood.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/12_169ClosedFlood.htm</guid>
      <description>WSDOT engineers and WSP closed the SR 169 Kummer Bridge over the Green River near Black Diamond Wednesday after geotechnical experts detected small movements in the soil holding up the bridge.</description>
    </item>
    <item>
      <title>I-82 westbound lane restriciton near Selah Nov. 13</title>
      <pubDate>Thu, 13 Nov 2008 08:53:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/I82WBLaneRestrictedForGuardrailRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/I82WBLaneRestrictedForGuardrailRepair.htm</guid>
      <description>WSDOT repairs guardrail, closes right lane on I-82 bridges near Selah November 13 

One westbound lane restricted. Delays should be minimal.</description>
    </item>
    <item>
      <title>Chuckanut Drive to remain closed for several weeks near Bellingham</title>
      <pubDate>Thu, 13 Nov 2008 06:19:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/12_sr11chuckanutdriveclosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/12_sr11chuckanutdriveclosed.htm</guid>
      <description>A three-mile section of Chuckanut Drive (SR 11) will remain closed for several weeks after a rockslide Monday, Nov. 10, sent boulders the size of cars crashing on to the road south of Bellingham.</description>
    </item>
    <item>
      <title>Know before you go: Find out where waters rising on state highways</title>
      <pubDate>Thu, 13 Nov 2008 06:05:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/12_afternoon_flood_update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/12_afternoon_flood_update.htm</guid>
      <description>OLYMPIA – Most fared well, but Nature’s deluge did not spare all state highways. Today coastal areas in Clallam, Grays Harbor, and Pacific counties, in addition to areas in Pierce and Lewis counties, have water over the roadway in places.</description>
    </item>
    <item>
      <title>New US 101 on-ramp near Shelton now open</title>
      <pubDate>Thu, 13 Nov 2008 04:07:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/12_101_NewRampOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/12_101_NewRampOpen.htm</guid>
      <description>Today, Nov. 12, WSDOT opened the US 101 to SR 3 on-ramp in Mason County.</description>
    </item>
    <item>
      <title>SR 22 restricted to one-way traffic Nov. 12, 13</title>
      <pubDate>Wed, 12 Nov 2008 09:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/SR22OneWayTrafficNov12_13_Mabton.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/SR22OneWayTrafficNov12_13_Mabton.htm</guid>
      <description>WSDOT restricts drivers to one-way alternating traffic on SR 22 near Mabton, Nov. 12 and 13 

Drivers should plan for delays and consider alternate routes.</description>
    </item>
    <item>
      <title>New pavement markings and signs on SR 240 roundabout in Richland</title>
      <pubDate>Wed, 12 Nov 2008 08:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/NewSignsandStripes_SR240_Richland.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/NewSignsandStripes_SR240_Richland.htm</guid>
      <description>WSDOT installs new pavement markings and signs on SR 240 roundabout in Richland 

Oversize loads are prohibited. Drivers should plan for delays and consider alternate routes.</description>
    </item>
    <item>
      <title>Unstable slope slides onto Chuckanut Drive, blocking both lanes</title>
      <pubDate>Tue, 11 Nov 2008 06:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/10_11MajorChuckanutRockslide.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/10_11MajorChuckanutRockslide.htm</guid>
      <description>A second rockslide crashed onto SR 11 (Chuckanut Drive) blocking both lanes at milepost 13.3, near</description>
    </item>
    <item>
      <title>New slide threatens Chuckanut Drive; road to remain closed</title>
      <pubDate>Tue, 11 Nov 2008 04:38:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/10_11RockslideClosesChuckanutDrive.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/10_11RockslideClosesChuckanutDrive.htm</guid>
      <description>A second rockslide is threatening Chuckanut Drive (SR 11), approximately three miles north of a rockslide that closed the road Friday, Nov. 7. The new slide area is at milepost 13.3, near the Whatcom-Skagit county line. Crews will keep the road closed indefinitely as engineers inspect the area.</description>
    </item>
    <item>
      <title>Crews begin a two-year project to preserve I-5 bridges in the Puget Sound area</title>
      <pubDate>Tue, 11 Nov 2008 04:18:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/10_I5BridgeRetrofit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/10_I5BridgeRetrofit.htm</guid>
      <description>Today, WSDOT and contractor Granite Northwest crews will kick off a two-year project to improve 19 bridges on I-5 from Tukwila to Lynnwood.</description>
    </item>
    <item>
      <title>Traffic shift, speed reduction in place on SR 16</title>
      <pubDate>Tue, 11 Nov 2008 02:30:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/SR16BurleyWestReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/SR16BurleyWestReopens.htm</guid>
      <description>Traffic shift, speed reduction in place on SR 16</description>
    </item>
    <item>
      <title>Manette Bridge closed during daytime commute next week</title>
      <pubDate>Mon, 10 Nov 2008 22:54:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/10_MannetteBridgedaytimeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/10_MannetteBridgedaytimeClosure.htm</guid>
      <description>Manette Bridge closed during daytime commute next week</description>
    </item>
    <item>
      <title>New US 101 on-ramp near Shelton provides safer access</title>
      <pubDate>Sat, 08 Nov 2008 02:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/NOV07_US101_SR3_On-Ramp_Opens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/NOV07_US101_SR3_On-Ramp_Opens.htm</guid>
      <description>New US 101 on-ramp near Shelton provides safer access</description>
    </item>
    <item>
      <title>Status of Aviation Planning Council Revisions of Draft Statewide Aviation Policies</title>
      <pubDate>Fri, 07 Nov 2008 08:19:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/RevisedStatewideAviationPolicies.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/RevisedStatewideAviationPolicies.htm</guid>
      <description>The Aviation Planning Council, as part of the Long-Term Air Transportation Study (LATS), has been in the process of developing draft statewide aviation policies. The Council has developed revised policy language based on public input solicited in July and August 2008. The Council has preliminarily adopted policies related to capacity, the environment, and land use. It will be reviewing its subcommittee’s recommended policy revisions on safety, stewardship, economy and mobility at its December 4,</description>
    </item>
    <item>
      <title>WSDOT workers ready for rain, snow and wind. Are you?</title>
      <pubDate>Fri, 07 Nov 2008 07:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/RainSnowWindDOTIsReady.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/RainSnowWindDOTIsReady.htm</guid>
      <description>WSDOT crews are ready for wind, snow and rain tonight and tomorrow. WSDOT is reminding drivers to be ready too.</description>
    </item>
    <item>
      <title>Crews to set bridge girders over I-405 in downtown Bellevue</title>
      <pubDate>Fri, 07 Nov 2008 07:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/06_I405GirderSetting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/06_I405GirderSetting.htm</guid>
      <description>Crews are getting ready to take a major step towards improving access in downtown Bellevue.</description>
    </item>
    <item>
      <title>SR 16 reduced to one lane this weekend in Kitsap County</title>
      <pubDate>Fri, 07 Nov 2008 03:08:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/SR16BurleyWestOneLane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/SR16BurleyWestOneLane.htm</guid>
      <description>SR 16 reduced to one lane this weekend in Kitsap County</description>
    </item>
    <item>
      <title>Next Aviation Planning Council Meeting: December 4 in Spokane</title>
      <pubDate>Fri, 07 Nov 2008 01:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/AviationPlanningCouncilDec4.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/AviationPlanningCouncilDec4.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Rolling slowdown on I-5 near Smokey Point canceled for Thursday morning</title>
      <pubDate>Wed, 05 Nov 2008 03:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/05_SmokeyPointRollingSlowdownsCanceled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/05_SmokeyPointRollingSlowdownsCanceled.htm</guid>
      <description>SMOKEY POINT – Snohomish County utility crews have finished work ahead of schedule and will not need to a conduct rolling slowdown on Interstate 5 near Smokey Point Thursday morning.</description>
    </item>
    <item>
      <title>North Spokane Corridor construction video on the internet</title>
      <pubDate>Tue, 04 Nov 2008 06:03:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/11/11_US395NSCnewvideoreleased.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/11/11_US395NSCnewvideoreleased.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) has released a new video presentation showing the construction progress of the new North Spokane Corridor (NSC) highway.</description>
    </item>
    <item>
      <title>WSDOT crews closing US 12  near Randle due to flooding</title>
      <pubDate>Thu, 13 Nov 2008 22:46:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/12_US12ClosesNearRandle.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/12_US12ClosesNearRandle.htm</guid>
      <description>RANDLE - WSDOT maintenance crews are in the process of closing both directions of US 12 near Randle in Lewis county (milepost 115) due to flooding. Rising water from nearby Davis Creek and Cowlitz River is flooding the roadway after steady rainfall Wednesday.</description>
    </item>
    <item>
      <title>48-car Rhododendron to return to Point Defiance/Tahlequah route starting Saturday, Nov. 1</title>
      <pubDate>Sat, 01 Nov 2008 04:56:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/103108_Rhododendronreturn.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/103108_Rhododendronreturn.htm</guid>
      <description>48-car Rhododendron to return to Point Defiance/Tahlequah route starting Saturday, Nov. 1</description>
    </item>
    <item>
      <title>WSDOT drilling crews begin testing soil on SR 520 corridor</title>
      <pubDate>Sat, 01 Nov 2008 04:08:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/31_SR520drilling.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/31_SR520drilling.htm</guid>
      <description>On Monday, Nov. 3, crews working for the Washington State Department of Transportation (WSDOT) will begin the second stage of a geotechnical drilling program to test soil conditions for the design of the new SR 520 corridor. There will be both daytime and nighttime drilling work depending on the location. Residents and travelers are likely to see drill rigs in the SR 520 corridor through March 2009.</description>
    </item>
    <item>
      <title>Drivers: Prepare yourself and your car for winter driving</title>
      <pubDate>Sat, 01 Nov 2008 03:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/31_winter_reminder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/31_winter_reminder.htm</guid>
      <description>OLYMPIA – WSDOT starts its 24-hour winter reports at midnight and advises drivers to be ready for winter weather.</description>
    </item>
    <item>
      <title>WSDOT contractors finish replacing damaged I-405 culvert in Renton</title>
      <pubDate>Sat, 01 Nov 2008 03:16:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/31_I405ThunderHillsCulvert.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/31_I405ThunderHillsCulvert.htm</guid>
      <description>On Friday, Oct. 31 crews finished installing a new culvert to carry Thunder Hills Creek underneath Interstate 405 in Renton.</description>
    </item>
    <item>
      <title>I-5 Maytown Safety Rest area opening delayed until Dec. 12</title>
      <pubDate>Fri, 31 Oct 2008 23:44:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/31_maytown_delay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/31_maytown_delay.htm</guid>
      <description>OLYMPIA - Limited services at the Maytown Safety Rest Area on southbound I-5 south of Olympia will remain through early December.</description>
    </item>
    <item>
      <title>End of Daylight Savings means dark days, greater risk of pedestrian fatalities</title>
      <pubDate>Fri, 31 Oct 2008 22:48:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/30_DaylightSavings.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/30_DaylightSavings.htm</guid>
      <description>As our daylight hours grow shorter, the Washington State Department of Transportation reminds motorists and pedestrians to pay extra attention to pedestrian safety. November 2 marks the end of Daylight Savings Time and begins the most difficult time of year for drivers to see walkers and bikers.</description>
    </item>
    <item>
      <title>WSDOT travel information and 5-1-1 service not available late Saturday</title>
      <pubDate>Fri, 31 Oct 2008 22:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/31_websiteoutage.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/31_websiteoutage.htm</guid>
      <description>WSDOT’s traffic information will be unavailable for four hours late Saturday.</description>
    </item>
    <item>
      <title>The Iron Goat Interpretive Site Closes for Winter November 3rd</title>
      <pubDate>Fri, 31 Oct 2008 04:56:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/30US2IronGoatCloses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/30US2IronGoatCloses.htm</guid>
      <description>The US 2 Iron Goat Interpretive site and rest area, west of Stevens Pass, closes for the winter next Monday.</description>
    </item>
    <item>
      <title>SR 16 to I-5 ramp closures Saturday east of Nalley Valley viaduct</title>
      <pubDate>Thu, 30 Oct 2008 21:12:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/30_SR16toI5closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/30_SR16toI5closure.htm</guid>
      <description>SR 16 to I-5 ramp closures Saturday east of Nalley Valley viaduct</description>
    </item>
    <item>
      <title>Utility work on SR 4 to slow traffic Friday and into next week</title>
      <pubDate>Thu, 30 Oct 2008 03:09:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/29_UtilityWorkonSR4.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/29_UtilityWorkonSR4.htm</guid>
      <description>SKAMOKAWA – Motorists traveling eastbound on SR 4 between the Naselle River and Skamokawa (mile posts 6 to 22) will encounter delays for four weekdays, beginning on Friday, October 31.</description>
    </item>
    <item>
      <title>WSDOT crews to close lanes on I-5 Ship Canal Bridge in Seattle tonight</title>
      <pubDate>Thu, 30 Oct 2008 01:29:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/29_ShipCanalBarrierWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/29_ShipCanalBarrierWork.htm</guid>
      <description>WSDOT maintenance crews will close one left lane in both directions of the Interstate 5 Ship Canal Bridge tonight, Wednesday, Oct. 29.</description>
    </item>
    <item>
      <title>Speed enforcement cameras out of Chehalis work zone</title>
      <pubDate>Wed, 29 Oct 2008 06:52:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/28_camera_out_Chehalis.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/28_camera_out_Chehalis.htm</guid>
      <description>CHEHALIS – Automated traffic safety cameras (ATSC) are no longer active in a Lewis County work zone.</description>
    </item>
    <item>
      <title>US 101 Simpson Avenue Bridge closes tomorrow</title>
      <pubDate>Wed, 29 Oct 2008 06:48:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/US101SimpsonClosesTomorrow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/US101SimpsonClosesTomorrow.htm</guid>
      <description>US 101 Simpson Avenue Bridge closes tomorrow</description>
    </item>
    <item>
      <title>Weekend lane closures planned for SR 16 in Kitsap County</title>
      <pubDate>Wed, 29 Oct 2008 03:51:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/SR16BurleyOlallalaneclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/SR16BurleyOlallalaneclosures.htm</guid>
      <description>Weekend lane closures planned for SR 16 in Kitsap County</description>
    </item>
    <item>
      <title>Travel Washington Apple Line provides needed bus service in North Central Washington</title>
      <pubDate>Wed, 29 Oct 2008 01:44:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/28US97AppleLine.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/28US97AppleLine.htm</guid>
      <description>A ribbon cutting ceremony in Omak celebrated bus service from Omak to Wenatchee and Ellensburg on Tuesday morning.</description>
    </item>
    <item>
      <title>SR 302 Corridor Study focus of open houses</title>
      <pubDate>Tue, 28 Oct 2008 01:40:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/27_SR302_openhouses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/27_SR302_openhouses.htm</guid>
      <description>SR 302 corridor study open houses set for Oct. 27 and Oct. 29.</description>
    </item>
    <item>
      <title>Damaged I-5 overpass in Burlington gets money for replacement</title>
      <pubDate>Mon, 27 Oct 2008 23:24:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/27_i5bridgerepairsgetmoney.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/27_i5bridgerepairsgetmoney.htm</guid>
      <description>More than $1 million is now available to replace a damaged portion of the Chuckanut Drive (SR 11) overpass at the I-5 interchange in Burlington. During construction, I-5 will be closed at night and Chuckanut Drive may be closed for up to two months.</description>
    </item>
    <item>
      <title>WSDOT calls for Regional Mobility Grant project proposals to reduce delay and improve connectivity</title>
      <pubDate>Sat, 25 Oct 2008 06:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/24_RegionalMobilityGrant.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/24_RegionalMobilityGrant.htm</guid>
      <description>SEATTLE - WSDOT is now accepting Regional Mobility Grant project proposals from cities, counties, transit systems through December 18, 2008.</description>
    </item>
    <item>
      <title>90-car ferry Sealth to serve Anacortes-San Juan Islands route</title>
      <pubDate>Sat, 25 Oct 2008 05:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/24_SealthFerryRoute.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/24_SealthFerryRoute.htm</guid>
      <description>ANACORTES – The 90-car ferry Sealth is scheduled to begin service on the Anacortes/San Juan Islands route on Sunday, Oct. 26. This means a slight reduction in vehicle capacity for the route.</description>
    </item>
    <item>
      <title>No new settlement on the Alaskan Way Viaduct</title>
      <pubDate>Sat, 25 Oct 2008 00:48:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/24-awvsettlement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/24-awvsettlement.htm</guid>
      <description>WSDOT bridge inspection crews reported that they found no new settlement or structural damage from last week's inspection of the Alaskan Way Viaduct. In April, WSDOT completed work to strengthen four column foundations between Columbia Street and Yesler Way that had settled approximately 5.5 inches since the 2001 Nisqually Earthquake.</description>
    </item>
    <item>
      <title>WSDOT completes emergency repair to collapsed culvert on SR 531 north of Smokey Point</title>
      <pubDate>Fri, 24 Oct 2008 22:57:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/24_SR531EmergencyRepairComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/24_SR531EmergencyRepairComplete.htm</guid>
      <description>Crews working for the Washington State Department of Transportation have reopened both lanes of SR 531 over Cougar Creek on Lakewood Road.</description>
    </item>
    <item>
      <title>Freight and local economy get a boost as SR 519 project kicks off near Seattle’s sports stadiums</title>
      <pubDate>Fri, 24 Oct 2008 07:04:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/23-sr519.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/23-sr519.htm</guid>
      <description>WSDOT broke ground Thursday on a $67 million project to improve traffic, freight mobility and pedestrian safety on SR 519 near the sports stadiums in Seattle’s SODO neighborhood. This project will help keep drivers moving as construction gets underway to replace the south end of the Alaskan Way Viaduct.</description>
    </item>
    <item>
      <title>Sign work, rumble strips cause lane closures on I-5 next week</title>
      <pubDate>Fri, 24 Oct 2008 07:01:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/23_I5SR502SignsandRumbleStrips.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/23_I5SR502SignsandRumbleStrips.htm</guid>
      <description>BATTLE GROUND – Final sign work and rumble strip installation will cause day time single lane closures and night time double lane closures on I-5 near the new SR 502 Interchange next week, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Weekend closure of westbound SR 522 in Bothell may cause delays on I-405</title>
      <pubDate>Fri, 24 Oct 2008 04:22:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/23_SR522westboundclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/23_SR522westboundclosure.htm</guid>
      <description>All roads may lead to delays for drivers traveling on I-405 or SR 522 in Bothell this weekend.  Crews working for WSDOT contractor Mowat Construction will close all lanes of westbound SR 522 between I-405 and Kaysner Way from 11 p.m. Friday, Oct. 24 through 5 a.m. Monday, Oct. 27. During the closure, crews will connect the westbound lanes to a newly built and lower roadway.</description>
    </item>
    <item>
      <title>US 101 Simpson Avenue Bridge closes next week</title>
      <pubDate>Thu, 23 Oct 2008 04:46:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/US101SimpsonBridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/US101SimpsonBridgeClosure.htm</guid>
      <description>US 101 Simpson Avenue Bridge closes next week</description>
    </item>
    <item>
      <title>Final Aurora Bridge Fence advisory committee meeting Tuesday in Seattle</title>
      <pubDate>Wed, 22 Oct 2008 05:54:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/17_SR99FinalAuroraMeeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/17_SR99FinalAuroraMeeting.htm</guid>
      <description>SEATTLE –The Aurora Bridge Fence Project advisory committee will meet for the sixth and last time on Tuesday, Oct. 21. 

The meeting will be held from 6 p.m. to 8 p.m. in Room 109 at Seattle Pacific University's Otto Miller Hall, located at 3469 Third Ave. W. in Seattle.</description>
    </item>
    <item>
      <title>Northbound ramp from I-5 to SR 502 will close for sign work Thursday and Friday</title>
      <pubDate>Wed, 22 Oct 2008 05:14:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/21_SR502SignWorkClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/21_SR502SignWorkClosures.htm</guid>
      <description>BATTLE GROUND – The new interchange at I-5 and SR 502 is open to traffic, but WSDOT crews will need to temporarily close the off-ramp from northbound I-5 to the interchange and the adjacent Gee Creek Rest Area entrance to install overhead directional signs.</description>
    </item>
    <item>
      <title>Road sensor repairs on eastbound I-90, Cabin Creek, October 22</title>
      <pubDate>Wed, 22 Oct 2008 02:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/RoadSensorRepairsOn_Eastbound_I90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/RoadSensorRepairsOn_Eastbound_I90.htm</guid>
      <description>WSDOT repairs road sensors on eastbound I-90, Cabin Creek, Oct. 22 

Drivers can expect to slow down through the work zone</description>
    </item>
    <item>
      <title>SR 108 in Mason County closes overnight Friday</title>
      <pubDate>Wed, 22 Oct 2008 01:15:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/21_108_Cls24Hrs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/21_108_Cls24Hrs.htm</guid>
      <description>WSDOT and PSP Railroad are closing SR 108 for 24 hours this Friday.</description>
    </item>
    <item>
      <title>Road sensor repairs on US 12, SR 410 Oct. 21 near Naches</title>
      <pubDate>Tue, 21 Oct 2008 06:52:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/RoadSensorRepairsOnUS12_SR410.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/RoadSensorRepairsOnUS12_SR410.htm</guid>
      <description>WSDOT repairs road sensors on US 12 and SR 410 west of Naches, Oct. 21 

Drivers can expect delays of up to 15 minutes</description>
    </item>
    <item>
      <title>Vehicle knocks off section of guardrail at Seneca off-ramp</title>
      <pubDate>Tue, 21 Oct 2008 03:42:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/20_AWVGuardrailDamaged.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/20_AWVGuardrailDamaged.htm</guid>
      <description>A vehicle hit a 30-foot section of guardrail on the Seneca Street off-ramp from the Alaskan Way Viaduct today at 10:45 a.m.</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct Reopened After Semiannual Inspections</title>
      <pubDate>Mon, 20 Oct 2008 23:14:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/20_AWVReopened.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/20_AWVReopened.htm</guid>
      <description>WSDOT maintenance crews re-opened both northbound and southbound lanes on the Alaskan Way Viaduct around 12:30 p.m., more than five hours ahead of schedule.</description>
    </item>
    <item>
      <title>Speed limit on I-5 to return to 70 MPH at SR 502 interchange</title>
      <pubDate>Sat, 18 Oct 2008 05:00:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/17_SR502SpeedLimitRevision.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/17_SR502SpeedLimitRevision.htm</guid>
      <description>BATTLE GROUND – Starting Monday, October 20, motorists traveling on I-5 in the vicinity of Battle Ground will notice the speed limit return to 70 MPH, after a reduction to 60 MPH through the SR 502 Interchange work zone.</description>
    </item>
    <item>
      <title>Crews begin emergency repair to collapsed culvert on SR 531 north of Smokey Point</title>
      <pubDate>Sat, 18 Oct 2008 03:46:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/17_SR531Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/17_SR531Closure.htm</guid>
      <description>Washington State Department of Transportation crews will close SR 531 over Cougar Creek on Lakewood Road beginning Tuesday to make emergency repairs to a collapsed culvert.</description>
    </item>
    <item>
      <title>Lanes restricted on I-182 and SR 240 Oct. 20, 21 in Tri-Cities</title>
      <pubDate>Sat, 18 Oct 2008 03:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/LanesRestricted_on_I182andSR240.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/LanesRestricted_on_I182andSR240.htm</guid>
      <description>WSDOT restricts lanes on I-182 and SR 240 for sign inspections Oct. 20, 21 in the Tri-Cities 

Drivers should plan for delays and consider alternate routes.</description>
    </item>
    <item>
      <title>188-car ferry Walla Walla returns to service after necessary repairs</title>
      <pubDate>Sat, 18 Oct 2008 00:58:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/Wallawallareturn_101708.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/Wallawallareturn_101708.htm</guid>
      <description>188-car ferry Walla Walla returns to service after necessary repairs</description>
    </item>
    <item>
      <title>Bridge Inspection Work Causes Lane Closures in Cowlitz, Pacific and Wahkiakum Counties Next Week</title>
      <pubDate>Fri, 17 Oct 2008 06:48:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/16_CowPacWahkBridgeInspections.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/16_CowPacWahkBridgeInspections.htm</guid>
      <description>VANCOUVER – Motorists traveling through Cowlitz, Pacific and Wahkiakum counties early next week should expect single lane closures on I-5, SR 4, SR 6, SR 505 and US 101 as bridge maintenance crews conduct routine inspections on seven of the region’s bridges.</description>
    </item>
    <item>
      <title>Spanaway Loop Road at SR 7 closes again</title>
      <pubDate>Fri, 17 Oct 2008 06:04:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/SR7SpanawayLoopRoadclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/SR7SpanawayLoopRoadclosure.htm</guid>
      <description>Spanaway Loop Road at SR 7 closes again</description>
    </item>
    <item>
      <title>Several I-405 lane closures this weekend in Renton</title>
      <pubDate>Fri, 17 Oct 2008 01:12:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/I405_WeekendClosures%29101608.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/I405_WeekendClosures%29101608.htm</guid>
      <description>Construction crews will close several lanes of Interstate 405 in Renton this weekend. During the closures, crews will retrofit the NE 44th Street overpass to meet current seismic standards and to better withstand earthquakes.</description>
    </item>
    <item>
      <title>US 2/97 Peshastin East Interchange Opens this Weekend</title>
      <pubDate>Thu, 16 Oct 2008 23:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/16US2_97PeshastinEIchgOpens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/16US2_97PeshastinEIchgOpens.htm</guid>
      <description>Traffic will be using the new US 2/97 Peshastin East Interchange when the new ramps and overpass are opened in stages, this weekend.</description>
    </item>
    <item>
      <title>Report confirms WSDOT roads are key to freight economics</title>
      <pubDate>Thu, 16 Oct 2008 22:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/16_freighteconomicimpactreport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/16_freighteconomicimpactreport.htm</guid>
      <description>WSDOT Releases Freight Transportation Economic Report on I-5 and I-90 Closures</description>
    </item>
    <item>
      <title>WSDOT and the community cut the ribbon on new SR 502 interchange</title>
      <pubDate>Thu, 16 Oct 2008 06:03:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/15_SR502InterchangeOpens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/15_SR502InterchangeOpens.htm</guid>
      <description>At noon today, WSDOT, Kerr Contractors and the local community joined together to officially open the new SR 502 Interchange.</description>
    </item>
    <item>
      <title>Repairs coming next year for Battery Street Tunnel</title>
      <pubDate>Thu, 16 Oct 2008 06:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/15-Repairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/15-Repairs.htm</guid>
      <description>Repairs will begin next fall for the aging Battery Street Tunnel connecting the north end of the Alaskan Way Viaduct to Aurora Avenue N. As part of the Alaskan Way Viaduct and Seawall Replacement Program, this work will improve driver safety in the Battery Street Tunnel by installing a new fire alarm system, a new sprinkler system, tunnel closure signs and signals, new ventilation fan controls, and new lighting. Crews will also reinforce the roof beam connections and add an emergency exit stairw</description>
    </item>
    <item>
      <title>Trucks and cars should prepare now for winter driving; Big rigs need chains onboard by Nov. 1</title>
      <pubDate>Thu, 16 Oct 2008 05:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/15_winter_driving_prepare.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/15_winter_driving_prepare.htm</guid>
      <description>OLYMPIA – The Washington State Department of Transportation (WSDOT) and Washington State Patrol (WSP) advise drivers to plan now for winter driving.</description>
    </item>
    <item>
      <title>Crews complete work on SR 528 in Marysville</title>
      <pubDate>Thu, 16 Oct 2008 03:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/528_workcomplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/528_workcomplete.htm</guid>
      <description>Today, WSDOT and contractor Granite Northwest crews finished a $1.4 million project to repave half a mile of State Route 528 (4th Street) in Marysville and replace a water main beneath the roadway.</description>
    </item>
    <item>
      <title>Crews remove I-90 flammable cargo restriction</title>
      <pubDate>Thu, 16 Oct 2008 03:51:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/15_FlammableCargo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/15_FlammableCargo.htm</guid>
      <description>WSDOT crews have lifted the flammable cargo restriction in both directions of Interstate 90 from the Mount Baker Tunnel through the Mercer Island Lid. The restriction began at 7 a.m. on Monday, Oct. 6.</description>
    </item>
    <item>
      <title>Overnight lane closures planned for Thursday on I-5 through Lynnwood and south Everett</title>
      <pubDate>Thu, 16 Oct 2008 00:07:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/15_I-5LaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/15_I-5LaneClosures.htm</guid>
      <description>Drivers can expect delays on Interstate 5 through Lynnwood and south Everett on Thursday night for roadwork.</description>
    </item>
    <item>
      <title>Lanes more visible on I-90 near Snoqualmie Pass</title>
      <pubDate>Wed, 15 Oct 2008 22:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/LanesMoreVisibleOn_I90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/LanesMoreVisibleOn_I90.htm</guid>
      <description>WSDOT makes lane markers more visible on I-90 near Snoqualmie Pass</description>
    </item>
    <item>
      <title>Lanes more visible on I-90 near Snoqualmie Pass</title>
      <pubDate>Wed, 15 Oct 2008 22:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/Lanes_more_visible_0n_I90_Snoqualmie_Pass.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/Lanes_more_visible_0n_I90_Snoqualmie_Pass.htm</guid>
      <description>FOR IMMEDIATE RELEASE October 15, 2008 

WSDOT makes lane markers more visible on I-90 near Snoqualmie Pass</description>
    </item>
    <item>
      <title>WSDOT and city of Toppenish host open house for new safety project on SR 22 between I-82 and Toppenish</title>
      <pubDate>Wed, 15 Oct 2008 22:18:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/ToppenishOpenHouse101508.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/ToppenishOpenHouse101508.htm</guid>
      <description>and the city of Toppenish will be hosting an open house to share information regarding the SR 22 – I-82 Toppenish Safety Improvements project on Tuesday, Oct. 21 at the Toppenish Middle School.</description>
    </item>
    <item>
      <title>SR 520 floating bridge maintenance closures Wednesday and Thursday mornings</title>
      <pubDate>Wed, 15 Oct 2008 04:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/14_SR520MaintenanceClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/14_SR520MaintenanceClosures.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct maintenance work on the SR 520 Evergreen Point floating bridge Wednesday and Thursday mornings.</description>
    </item>
    <item>
      <title>Daytime delays on the ramp from southbound I-405 to eastbound I-90 in Bellevue tomorrow</title>
      <pubDate>Tue, 14 Oct 2008 06:05:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/I405_closure_Oct14.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/I405_closure_Oct14.htm</guid>
      <description>Drivers can expect delays on the ramp from southbound I-405 to eastbound I-90 tomorrow while crews pour concrete for the deck of the new southbound I-405 bridge over I-90. Drivers should expect delays while crews use a pilot car to guide concrete trucks safely into and out of the work zone on the ramp from southbound I-405 to eastbound I-90 from 8 a.m. to 1 p.m.</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct closed this weekend for semiannual inspections</title>
      <pubDate>Tue, 14 Oct 2008 05:45:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/13-Viaductclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/13-Viaductclosure.htm</guid>
      <description>WSDOT maintenance crews will close the Alaskan Way Viaduct for its semiannual inspection on Oct. 18 and 19 to ensure the structure remains safe for drivers. Crews will close both decks of the viaduct from 6 a.m. on Saturday, Oct. 18 to 6 p.m. on Sunday, Oct. 19. The viaduct will be closed between Spokane Street through the Battery Street Tunnel. The closure is extended overnight on Saturday to provide extra time for crews to repair damaged concrete roadway panels near Spokane Street.</description>
    </item>
    <item>
      <title>Overnight lane closures planned for I-405 near Bothell</title>
      <pubDate>Tue, 14 Oct 2008 04:31:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/13_I405MaintenanceClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/13_I405MaintenanceClosure.htm</guid>
      <description>Drivers can expect delays on Interstate 405 near Bothell on Tuesday and Wednesday nights for maintenance of the freeway.</description>
    </item>
    <item>
      <title>Know before you go: WSDOT installs traffic cameras on north end of Vashon Island</title>
      <pubDate>Tue, 14 Oct 2008 03:54:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/Vashontrafficcamera_101308.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/Vashontrafficcamera_101308.htm</guid>
      <description>Know before you go: WSDOT installs traffic cameras on north end of Vashon Island</description>
    </item>
    <item>
      <title>Northbound I-5 an uphill climb this weekend</title>
      <pubDate>Sat, 11 Oct 2008 20:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/9_5_WkendWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/9_5_WkendWork.htm</guid>
      <description>Northbound I-5 work expected to cause delays this weekend.</description>
    </item>
    <item>
      <title>North Central Region Administrator Don Senn Retires</title>
      <pubDate>Sat, 11 Oct 2008 05:52:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/10NCRAdministratorRetires.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/10NCRAdministratorRetires.htm</guid>
      <description>After 42 years, North Central Region Administrator Don Senn is retiring</description>
    </item>
    <item>
      <title>Final repairs begin on unstable slope on SR 169 over Green River</title>
      <pubDate>Sat, 11 Oct 2008 04:19:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/10_SR169GreenRiver.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/10_SR169GreenRiver.htm</guid>
      <description>The second phase of repair work to stabilize a landslide near the SR 169 bridge over the Green River will begin on Monday, Oct. 13 when contractor Tri-State Construction shuts down one lane of the bridge as early as 6 a.m. to begin moving equipment onto the site.</description>
    </item>
    <item>
      <title>WSDOT prepares for emergency repairs to collapsed culvert on SR 531 north of Smokey Point</title>
      <pubDate>Sat, 11 Oct 2008 04:05:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/10_CulvertCollapse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/10_CulvertCollapse.htm</guid>
      <description>Drivers can expect short delays on SR 531 north of Smokey Point on Monday, Oct. 13, when WSDOT engineers begin boring exploratory holes into a collapsed culvert.</description>
    </item>
    <item>
      <title>Federal agency gives I-90 Snoqualmie Pass widening project green light for construction</title>
      <pubDate>Sat, 11 Oct 2008 01:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/I90ROD.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/I90ROD.htm</guid>
      <description>The Federal Highway Administration (FHWA) has signed an Environmental Impact Statement Record of Decision (ROD) giving the Washington State Department of Transportation’s (WSDOT) long-awaited I-90 Snoqualmie Pass East Project (I-90 Project) the green light to move forward with construction in the spring.</description>
    </item>
    <item>
      <title>WSDOT reminds campaigns of rules for posting signs</title>
      <pubDate>Sat, 11 Oct 2008 00:52:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/10_PoliticalSignReminder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/10_PoliticalSignReminder.htm</guid>
      <description>OLYMPIA – As local and national elections heat up across the state and country, more and more political signs start appearing along Washington roadsides.</description>
    </item>
    <item>
      <title>Daytime delays on the ramp from southbound I-405 to eastbound I-90 in Bellevue today</title>
      <pubDate>Fri, 10 Oct 2008 22:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/10_I90405Delays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/10_I90405Delays.htm</guid>
      <description>Drivers can expect delays on the ramp from southbound I-405 to eastbound I-90 on Friday, Oct. 10 while crews pour concrete for the deck of the new southbound I-405 bridge over I-90.</description>
    </item>
    <item>
      <title>Drivers face busy weekend on Puget Sound highways</title>
      <pubDate>Fri, 10 Oct 2008 21:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/10_BusyTravelWeekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/10_BusyTravelWeekend.htm</guid>
      <description>Drivers will want to prepare for possible delays and some big changes on area highways beginning today:</description>
    </item>
    <item>
      <title>WSDOT crews begin test drilling in Lake Washington for new SR 520 bridge</title>
      <pubDate>Fri, 10 Oct 2008 03:37:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/9-520testdrilling.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/9-520testdrilling.htm</guid>
      <description>On Monday, Oct. 13, crews working for the Washington State Department of Transportation (WSDOT) will begin a geotechnical drilling program to test soil conditions for the design of the new SR 520 corridor.</description>
    </item>
    <item>
      <title>New Bellevue-to-Mercer Island HOV lane opens on I-90 as partners complete first phase of expansions</title>
      <pubDate>Fri, 10 Oct 2008 02:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/9-newhovI90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/9-newhovI90.htm</guid>
      <description>The first stage of a three-stage project to add new high-occupancy vehicle (HOV) lanes in both directions of Interstate 90 between Bellevue and Seattle is complete, with the new westbound HOV lane opening overnight and welcoming commuters Friday morning.</description>
    </item>
    <item>
      <title>Plan ahead for full closure of eastbound US 2 near Everett on Friday</title>
      <pubDate>Fri, 10 Oct 2008 01:00:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/9_US2TrestleRestripe.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/9_US2TrestleRestripe.htm</guid>
      <description>Weather permitting, crews will completely close eastbound US 2 between I-5 and SR 204 overnight on Friday, Oct. 10 while they restripe the eastbound trestle. During the closure, crews will remove more than two miles of striping and restripe the trestle to create two lanes of traffic and a wider, 14-foot right shoulder. Drivers should prepare for a long detour and add extra time for their trips.</description>
    </item>
    <item>
      <title>Redmond’s intersection construction will affect SR 520 this weekend</title>
      <pubDate>Fri, 10 Oct 2008 00:12:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/09_RedmondConstructionAffectsSR520.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/09_RedmondConstructionAffectsSR520.htm</guid>
      <description>Construction work at a major city of Redmond intersection will affect drivers on SR 520 this weekend.</description>
    </item>
    <item>
      <title>Overnight lane closure planned for I-5 in Marysville</title>
      <pubDate>Thu, 09 Oct 2008 05:28:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/08_NorthboundI-5Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/08_NorthboundI-5Closure.htm</guid>
      <description>Drivers can expect travel disruptions on Interstate 5 near Marysville tonight as crews perform maintenance on the Union Slough Bridge</description>
    </item>
    <item>
      <title>WSDOT awards Westbound Nalley Valley contract</title>
      <pubDate>Thu, 09 Oct 2008 03:08:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/08_SR16WBNV_award.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/08_SR16WBNV_award.htm</guid>
      <description>WSDOT awards contract for Westbound Nalley Valley.</description>
    </item>
    <item>
      <title>Monthly maintenance closure of SR 520 floating bridge this Thursday</title>
      <pubDate>Thu, 09 Oct 2008 01:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/SR520_MonthlyMaintOpening100808.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/SR520_MonthlyMaintOpening100808.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct monthly maintenance work on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>Spanaway Loop Road at SR 7 closes next two weekends</title>
      <pubDate>Wed, 08 Oct 2008 23:07:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/SpanawayLoopRoadatSR7closes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/SpanawayLoopRoadatSR7closes.htm</guid>
      <description>Spanaway Loop Road at SR 7 closes next two weekends</description>
    </item>
    <item>
      <title>Aberdeen’s ‘Hart’ of transportation retires</title>
      <pubDate>Wed, 08 Oct 2008 22:38:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/8_Hart_Retires.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/8_Hart_Retires.htm</guid>
      <description>Aberdeen PE retires after 50+ years of state service.</description>
    </item>
    <item>
      <title>New HOV lane opens on Westbound I-90 at Bellevue Way this Friday</title>
      <pubDate>Wed, 08 Oct 2008 05:16:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/7-NewHOV-I90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/7-NewHOV-I90.htm</guid>
      <description>`Beginning Friday, Oct. 10, westbound I-90 carpoolers, vanpoolers and transit will be traveling in a new HOV lane between Bellevue and Mercer Island. With the new lane comes a number of changes for drivers.</description>
    </item>
    <item>
      <title>Expect delays on US 12 west of Naches Oct. 8 and 9</title>
      <pubDate>Tue, 07 Oct 2008 22:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/US12_Delays_October_8_9_Near_Naches.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/US12_Delays_October_8_9_Near_Naches.htm</guid>
      <description>TRAFFIC ADVISORY October 7, 2008 
WSDOT installs traffic recorders on US 12 west of Naches, Oct. 8-9 
Drivers can expect delays of up to 15 minutes</description>
    </item>
    <item>
      <title>Nugents Corner safety improvements featured at open house in Deming</title>
      <pubDate>Tue, 07 Oct 2008 01:46:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/06_539NugentsOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/06_539NugentsOpenHouse.htm</guid>
      <description>People interested in learning more about several safety projects planned for Mount Baker Highway (SR 542) are invited to attend an open house hosted by WSDOT on Thursday, Oct. 9.</description>
    </item>
    <item>
      <title>Crews will close road to Artist Point near Mount Baker at 5 p.m. Monday</title>
      <pubDate>Tue, 07 Oct 2008 00:45:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/06_542ArtistPointClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/06_542ArtistPointClosed.htm</guid>
      <description>WSDOT crews will close the road to Artist Point (SR 542) for the season at 5 p.m. Monday, Oct. 6.</description>
    </item>
    <item>
      <title>Systems upgrade may cause Web site, traffic camera outage</title>
      <pubDate>Tue, 07 Oct 2008 00:43:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/06_InternetPageOutage.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/06_InternetPageOutage.htm</guid>
      <description>Internet users trying to use the Seattle area traffic page on the Washington Department of Transportation Web site may notice a disruption on Wednesday, Oct. 8.</description>
    </item>
    <item>
      <title>Walk to School Day October 8</title>
      <pubDate>Mon, 06 Oct 2008 23:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/WalktoSchoolDay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/WalktoSchoolDay.htm</guid>
      <description>Washington State schools to celebrate International Walk to School Day on October 8.</description>
    </item>
    <item>
      <title>Asotin County Road Projects Win State and Federal Awards</title>
      <pubDate>Mon, 06 Oct 2008 23:08:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/AsotinCountyProjectsWinAwards.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/AsotinCountyProjectsWinAwards.htm</guid>
      <description>FOR IMMEDIATE RELEASE October 6, 2008 

Asotin County Safety Project Wins Federal and State Recognition</description>
    </item>
    <item>
      <title>WSDOT to review I-5 crash near Thurston/Lewis County line</title>
      <pubDate>Mon, 06 Oct 2008 22:15:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/03_CableCrossover.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/03_CableCrossover.htm</guid>
      <description>WSDOT to review I-5 crash near Thurston/Lewis County line</description>
    </item>
    <item>
      <title>WSDOT to open new lanes on SR 539 north of Bellingham</title>
      <pubDate>Sat, 04 Oct 2008 03:20:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/03_539SmithSignalLanes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/03_539SmithSignalLanes.htm</guid>
      <description>After more than a year of construction, WSDOT will start to open nearly two miles of additional lanes on the Guide Meridian (SR 539) north of Bellingham.</description>
    </item>
    <item>
      <title>I-82 lane restrictions Oct. 6-9 near Selah</title>
      <pubDate>Sat, 04 Oct 2008 03:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/I82TrafficRestrictedForRecorderInstallation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/I82TrafficRestrictedForRecorderInstallation.htm</guid>
      <description>WSDOT restricts I-82 traffic to install traffic recorders Oct. 6-9 near Selah</description>
    </item>
    <item>
      <title>Nighttime closure for Hood Canal Bridge scheduled Oct. 7</title>
      <pubDate>Sat, 04 Oct 2008 01:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/Nighttime+closure+for+Hood+Canal+Bridge+scheduled+Oct.+7.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/Nighttime+closure+for+Hood+Canal+Bridge+scheduled+Oct.+7.htm</guid>
      <description>HCB closes 90minutes</description>
    </item>
    <item>
      <title>Hood Canal Bridge 90-minute, nighttime closure scheduled Oct. 7</title>
      <pubDate>Sat, 04 Oct 2008 00:05:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/03_HoodCanalBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/03_HoodCanalBridge.htm</guid>
      <description>The SR 104 Hood Canal Bridge will close for 90 minutes next week as WSDOT and contractor Kiewit-General continue ballasting measurements on the west half.</description>
    </item>
    <item>
      <title>I-90 flammable cargo restriction next week</title>
      <pubDate>Fri, 03 Oct 2008 22:07:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/03_I90FlammableRestriction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/03_I90FlammableRestriction.htm</guid>
      <description>WSDOT will restrict flammable cargo in both directions of I-90 from the Mount Baker Tunnel through the Mercer Island Lid beginning at 7 a.m. on Monday, Oct. 6.</description>
    </item>
    <item>
      <title>WSDOT completes new I-5 interchange at SR 502 under budget, ahead of schedule</title>
      <pubDate>Fri, 03 Oct 2008 04:47:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/02_502RibbonCuttingFirstRelease.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/02_502RibbonCuttingFirstRelease.htm</guid>
      <description>BATTLE GROUND – Drivers in central and northern Clark County will have safer and more convenient access to I-5 when WSDOT opens a new freeway interchange at SR 502 later this month.</description>
    </item>
    <item>
      <title>Intersection construction on SR 520 in Redmond delayed</title>
      <pubDate>Fri, 03 Oct 2008 03:31:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/02_RedmondIntersectionDelayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/02_RedmondIntersectionDelayed.htm</guid>
      <description>City of Redmond crews have postponed weekend lane closures at the intersection of SR 520, Avondale and Union Hill roads due to unfavorable weather conditions.</description>
    </item>
    <item>
      <title>Weather puts kibosh on weekend work along I-5</title>
      <pubDate>Thu, 02 Oct 2008 23:29:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/02_weatherkiboshI_5.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/02_weatherkiboshI_5.htm</guid>
      <description>Weather puts kibosh on weekend work along I-5</description>
    </item>
    <item>
      <title>City of Shoreline chosen for award by WSDOT and FHWA</title>
      <pubDate>Thu, 02 Oct 2008 22:30:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/02_ShorelineAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/02_ShorelineAward.htm</guid>
      <description>City of Shoreline chosen for award by WSDOT and FHWA</description>
    </item>
    <item>
      <title>Emergency work on SR 542 near Mount Baker starts Monday</title>
      <pubDate>Thu, 02 Oct 2008 02:53:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/01_542RazorhoneEmergencyRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/01_542RazorhoneEmergencyRepair.htm</guid>
      <description>Crews will start work Monday, Oct. 6, to repair a damaged retaining wall at the Razor Hone Creek bridge on Mount Baker Highway (SR 542) near the Mount Baker ski area.</description>
    </item>
    <item>
      <title>Closures planned this weekend along SR 16 and I-5</title>
      <pubDate>Thu, 02 Oct 2008 02:19:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/01_closuresonI_5_SR16.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/01_closuresonI_5_SR16.htm</guid>
      <description>Closures planned this weekend along SR 16 and I-5</description>
    </item>
    <item>
      <title>Cowlitz County Lexington Bridge Chosen for Award by WSDOT and FHWA</title>
      <pubDate>Thu, 02 Oct 2008 01:22:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/10/01_CowlitzAwardLexingtonBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/10/01_CowlitzAwardLexingtonBridge.htm</guid>
      <description>VANCOUVER – The Federal Highway Administration (FHWA) and Washington State Department of Transportation (WSDOT) awarded Cowlitz County with the 2008 Award of Excellence for “Best County Project” for the Lexington Bridge project connecting SR 411 to I-5 over the Cowlitz River.</description>
    </item>
    <item>
      <title>Learn More About the Aviation Planning Council’s Progress at Tri-Cities Public Meeting</title>
      <pubDate>Wed, 01 Oct 2008 00:57:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/LATSOctPublicMeeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/LATSOctPublicMeeting.htm</guid>
      <description>The Washington State Department of Transportation (LATS) invites you to learn about the Aviation Planning Council’s progress, as part of the Long-Term Air Transportation, at an upcoming public meeting.</description>
    </item>
    <item>
      <title>Online I-5 flow map stretches south to Olympia</title>
      <pubDate>Tue, 30 Sep 2008 22:14:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/30_5_OlympiaFlowOnline.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/30_5_OlympiaFlowOnline.htm</guid>
      <description>Olympia traffic flow map available online</description>
    </item>
    <item>
      <title>WSDOT's search for SR 532's A-team continues: Applicant list narrowed to four design-builders</title>
      <pubDate>Tue, 30 Sep 2008 03:56:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/29_SR+532applicantfinalists.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/29_SR+532applicantfinalists.htm</guid>
      <description>Two months after starting the search for a contractor to construct improvements on SR 532 in Stanwood, the Washington State Department of Transportation has narrowed the list of applicants from seven to four teams.</description>
    </item>
    <item>
      <title>Construction is coming for SR 519 project near stadiums in Seattle</title>
      <pubDate>Tue, 30 Sep 2008 03:23:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/29-SR519construction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/29-SR519construction.htm</guid>
      <description>A $67 million project critical to the success of the Alaskan Way Viaduct program was awarded to Kiewit Pacific Co. last week to build a new SR 519 interchange near the Seattle sports stadiums.</description>
    </item>
    <item>
      <title>Crews open new roadway on eastbound SR 522 in Bothell</title>
      <pubDate>Tue, 30 Sep 2008 01:13:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/29_SR522Eastboundlanesopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/29_SR522Eastboundlanesopen.htm</guid>
      <description>Crews worked around the clock all weekend to get newly-built eastbound SR 522 lanes ready for Monday morning commuters. At 4 a.m., Monday, Sept. 29, crews wrapped up the final striping and opened eastbound SR 522 in Bothell. Drivers are now traveling on new, straighter lanes.</description>
    </item>
    <item>
      <title>Procession closes US 101 in Port Angeles</title>
      <pubDate>Sat, 27 Sep 2008 03:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/ProcessionClosesUS101.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/ProcessionClosesUS101.htm</guid>
      <description>Procession closes US 101 in Port Angeles</description>
    </item>
    <item>
      <title>I-82 Eastbound Lanes Restricted Sep. 29 near Selah</title>
      <pubDate>Fri, 26 Sep 2008 08:05:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/I_82_eastbound_lanes_restricted_near_selah.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/I_82_eastbound_lanes_restricted_near_selah.htm</guid>
      <description>WSDOT restricts I-82 eastbound traffic to inspect bridges September 29 near Selah</description>
    </item>
    <item>
      <title>Repairing I-5 panels requires lane closures three nights</title>
      <pubDate>Fri, 26 Sep 2008 05:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/25I-5PanelReplacement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/25I-5PanelReplacement.htm</guid>
      <description>Repairing I-5 panels requires lane closures three nights</description>
    </item>
    <item>
      <title>SR 162 bridge closure this weekend in Sumner</title>
      <pubDate>Fri, 26 Sep 2008 03:14:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/25_SR+162BridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/25_SR+162BridgeClosure.htm</guid>
      <description>SR 162 bridge closure this weekend in Sumner</description>
    </item>
    <item>
      <title>WSDOT invites public to weigh in on Aurora Bridge fence options at Seattle meeting</title>
      <pubDate>Fri, 26 Sep 2008 02:15:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/25-AuroraBridgeFence.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/25-AuroraBridgeFence.htm</guid>
      <description>Members of the public can learn more next Tuesday about design options for a fence on Seattle’s State Route 99 Aurora Bridge.</description>
    </item>
    <item>
      <title>Intersection construction in Redmond will affect SR 520</title>
      <pubDate>Fri, 26 Sep 2008 01:33:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/25_RedmondConstruction520Delays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/25_RedmondConstruction520Delays.htm</guid>
      <description>Construction work at a major city of Redmond intersection will affect drivers on SR 520 for the next two weekends:</description>
    </item>
    <item>
      <title>Clear skies, closed road: Get ready for full closure of eastbound SR 522 in Bothell</title>
      <pubDate>Fri, 26 Sep 2008 00:22:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/25_SR522Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/25_SR522Closure.htm</guid>
      <description>With the onset of autumn, crews working on SR 522 in Bothell know to take advantage good weather.</description>
    </item>
    <item>
      <title>SR 520 floating bridge maintenance closures early Wednesday morning</title>
      <pubDate>Wed, 24 Sep 2008 06:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/SR520FloatBridgeMaintenanceSept24.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/SR520FloatBridgeMaintenanceSept24.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct maintenance work on the SR 520 Evergreen Point floating bridge early Wednesday morning.</description>
    </item>
    <item>
      <title>Pile driving in Burlington back on track for SR 20 project</title>
      <pubDate>Wed, 24 Sep 2008 04:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/23_20PileDrivingNoise.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/23_20PileDrivingNoise.htm</guid>
      <description>Crews will work Monday through Saturday, 7 a.m. to 9 p.m. to pound pilings for the new I-5 southbound on- and off-ramp.</description>
    </item>
    <item>
      <title>WSDOT connects final Hood Canal Bridge pontoons</title>
      <pubDate>Wed, 24 Sep 2008 04:26:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/WSDOT+connects+final+Hood+Canal+Bridge+pontoons.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/WSDOT+connects+final+Hood+Canal+Bridge+pontoons.htm</guid>
      <description>HCB UVWX connection</description>
    </item>
    <item>
      <title>Crews direct Sauk River away from SR 530 near Rockport</title>
      <pubDate>Wed, 24 Sep 2008 03:17:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/23-530SaukRiverRealignment.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/23-530SaukRiverRealignment.htm</guid>
      <description>Crews are building a unique wall along SR 530 south of Rockport to help shift and direct the Sauk River away from the highway.</description>
    </item>
    <item>
      <title>Crews pave the way to project completion on SR 9 near Arlington</title>
      <pubDate>Wed, 24 Sep 2008 02:25:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/23_SR9SchlomanPaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/23_SR9SchlomanPaving.htm</guid>
      <description>Today, crews will start final paving work on two miles of SR 9 near Arlington, bringing a $20.7 million safety improvement project nearer to a close.</description>
    </item>
    <item>
      <title>Overnight lane closures planned for I-5 through south Everett tonight</title>
      <pubDate>Wed, 24 Sep 2008 01:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/23_SouthEverettClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/23_SouthEverettClosure.htm</guid>
      <description>Drivers can expect delays on southbound Interstate 5 through south Everett tonight as crews work to finish Sound Transit’s South Everett Freeway Station.</description>
    </item>
    <item>
      <title>Volunteers needed to count Washington's bicyclists and pedestrians</title>
      <pubDate>Tue, 23 Sep 2008 23:52:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/23_bikeandpedcounts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/23_bikeandpedcounts.htm</guid>
      <description>WSDOT needs volunteers for counting Washington's bicyclist and pedestrians.</description>
    </item>
    <item>
      <title>Road to Artist Point open again</title>
      <pubDate>Tue, 23 Sep 2008 23:03:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/23_sr542ArtistPointOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/23_sr542ArtistPointOpen.htm</guid>
      <description>The road to Artist Point is open again. Crews reopened the three-mile stretch of road early this morning above the ski resort at the end of Mount Baker Highway (SR 542).</description>
    </item>
    <item>
      <title>Region-wide pavement restoration project complete</title>
      <pubDate>Tue, 23 Sep 2008 01:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/SouthCentralRegionChipSealComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/SouthCentralRegionChipSealComplete.htm</guid>
      <description>FOR IMMEDIATE RELEASE 

WSDOT and contractor finish region-wide pavement restoration (chip seal) project</description>
    </item>
    <item>
      <title>Road to Artist Point temporarily closed due to snow</title>
      <pubDate>Tue, 23 Sep 2008 00:14:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/22_542SnowArtistPoint.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/22_542SnowArtistPoint.htm</guid>
      <description>WSDOT crews temporarily closed the road to Artist Point on Monday morning because of snow in the area.</description>
    </item>
    <item>
      <title>Pierce County allows WSDOT Ferries Division to keep Steilacoom II ferry for Port Townsend/Keystone ferry route</title>
      <pubDate>Sat, 20 Sep 2008 03:46:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/SteilacoomII_0919085.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/SteilacoomII_0919085.htm</guid>
      <description>Pierce County allows WSDOT Ferries Division to keep Steilacoom II ferry for Port Townsend/Keystone ferry route</description>
    </item>
    <item>
      <title>Four nights of SR 167 ramp closures in Puyallup</title>
      <pubDate>Sat, 20 Sep 2008 03:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/09_19EB167RampClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/09_19EB167RampClosed.htm</guid>
      <description>Four nights of SR 167 ramp closures in Puyallup</description>
    </item>
    <item>
      <title>Lanes and ramps restricted on US 395 September 22-25</title>
      <pubDate>Sat, 20 Sep 2008 01:45:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/LanesandRampsRestrictedonUS395.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/LanesandRampsRestrictedonUS395.htm</guid>
      <description>WSDOT restricts lanes and ramps on the US 395 Blue Bridge between Pasco and Kennewick September 22-25 

Drivers should plan for delays and consider alternate routes.</description>
    </item>
    <item>
      <title>Crossing at West 39th St. to close as rail construction project begins</title>
      <pubDate>Fri, 19 Sep 2008 22:20:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/19_W39thStRailCrossingCloses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/19_W39thStRailCrossingCloses.htm</guid>
      <description>VANCOUVER – Burlington Northern Santa Fe Railroad (BNSF) will close the rail crossing at W. 39th Street starting Monday, September 29 to commence construction on a rail bypass line.</description>
    </item>
    <item>
      <title>Public comments requested on SR 520 Eastside Transit and HOV Project; open house September 23</title>
      <pubDate>Fri, 19 Sep 2008 08:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/18-SR520openhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/18-SR520openhouse.htm</guid>
      <description>WSDOT is seeking community comments as we move forward with environmental review and design for the Eastside Transit and HOV Project. We are hosting a meeting next week for the public to provide scoping comments for the project’s upcoming environmental analysis. We are also seeking public comments on our design concepts, including how the new transit stops and community lids will look and function.</description>
    </item>
    <item>
      <title>Crews close Southbound I-5 Saturday night to test fire suppression system under Convention Center</title>
      <pubDate>Fri, 19 Sep 2008 07:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/18_I5COnventionCenterClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/18_I5COnventionCenterClosure.htm</guid>
      <description>WSDOT maintenance crews will close all lanes of southbound Interstate 5 under the Washington State Convention and Trade Center overnight on Saturday to test the fire suppression system. The I-5 express lanes will run in the southbound direction during the closure to help drivers around the area.</description>
    </item>
    <item>
      <title>WSDOT, Governor, Mayors and happy commuters celebrate the completion of SR 202 work east of Redmond</title>
      <pubDate>Fri, 19 Sep 2008 05:40:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/18_SR202opening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/18_SR202opening.htm</guid>
      <description>Today, more than thirty people, including workers, local leaders and very satisfied commuters, joined Gov. Christine Gregoire and Transportation Secretary Paula Hammond to celebrate the opening of the SR 202 widening project east of Redmond.</description>
    </item>
    <item>
      <title>Lane closure on I-5 in Tacoma overnight Saturday</title>
      <pubDate>Fri, 19 Sep 2008 04:13:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/I5TacomaLaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/I5TacomaLaneClosures.htm</guid>
      <description>Lane closure on I-5 in Tacoma overnight Saturday</description>
    </item>
    <item>
      <title>Kingston Terminal sidewalk improvement project begins Monday</title>
      <pubDate>Fri, 19 Sep 2008 03:57:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/18KingstonSidewalkImprovements.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/18KingstonSidewalkImprovements.htm</guid>
      <description>Kingston Terminal sidewalk improvement project begins Monday</description>
    </item>
    <item>
      <title>North Spokane Corridor open house coming up next week</title>
      <pubDate>Thu, 18 Sep 2008 05:14:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/17_us395nscopenhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/17_us395nscopenhouse.htm</guid>
      <description>An informational Open House meeting for the North Spokane Corridor is scheduled for Thursday, September 25, 2008</description>
    </item>
    <item>
      <title>WSDOT holds ribbon cutting for Travel Washington Dungeness Line</title>
      <pubDate>Thu, 18 Sep 2008 04:06:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/09_17NewDungenessLine.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/09_17NewDungenessLine.htm</guid>
      <description>WSDOT holds ribbon cutting for Travel Washington Dungeness Line</description>
    </item>
    <item>
      <title>Overnight lane closures planned for I-5 through south Everett on Thursday</title>
      <pubDate>Thu, 18 Sep 2008 04:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/09_SouthEverettClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/09_SouthEverettClosure.htm</guid>
      <description>Drivers can expect delays on northbound Interstate 5 through south Everett on Thursday night as crews work to finish Sound Transit’s South Everett park and ride lot.</description>
    </item>
    <item>
      <title>Weekend lane closures on northbound I-405 in south Bellevue</title>
      <pubDate>Thu, 18 Sep 2008 02:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/17_I405WideningAt112thSE.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/17_I405WideningAt112thSE.htm</guid>
      <description>Crews paving this weekend means drivers heading northbound on I-405 in Bellevue should plan extra time for their trips and expect delays.</description>
    </item>
    <item>
      <title>WSDOT releases annual report on cable median barrier in Washington State</title>
      <pubDate>Wed, 17 Sep 2008 23:04:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/17_CableBarrierUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/17_CableBarrierUpdate.htm</guid>
      <description>Today WSDOT released the 2008 annual report on cable median barrier in Washington State. The report is a follow up to the June 2007 report requested by Governor Chris Gregoire.</description>
    </item>
    <item>
      <title>Delays expected during four-day SR 539 closure north of Bellingham</title>
      <pubDate>Wed, 17 Sep 2008 03:06:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/16_539CulvertReplacementDelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/16_539CulvertReplacementDelays.htm</guid>
      <description>Drivers should expect delays on the Guide Meridian (SR 539) and detour routes this weekend during a four-day closure of the highway to replace a culvert at Deer Creek.</description>
    </item>
    <item>
      <title>Give ‘em a brake or you could get a ticket in southwest Washington</title>
      <pubDate>Tue, 16 Sep 2008 06:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/15_workzone_camera_launch.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/15_workzone_camera_launch.htm</guid>
      <description>The Washington State Department of Transportation launched a pilot project today utilizing automated speed enforcement cameras to cite motorists driving too fast through construction work zones.</description>
    </item>
    <item>
      <title>Plans shared, ideas sought at Port Angeles workshop</title>
      <pubDate>Tue, 16 Sep 2008 06:04:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/15_104_HCBWorkshpSoon.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/15_104_HCBWorkshpSoon.htm</guid>
      <description>WSDOT works with the community to host a workshop about living through the closure of the Hood Canal Bridge.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division holds public meetings to focus on the future of the ferry system</title>
      <pubDate>Tue, 16 Sep 2008 05:54:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/15_FACPublicMeetings.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/15_FACPublicMeetings.htm</guid>
      <description>WSDOT Ferries Division invites the public to the third series of 2008 public meetings focusing on the development of the ferry system’s long-range plan. Public comments received at the meetings will help inform the ferry system’s draft long-range plan due out mid-November.</description>
    </item>
    <item>
      <title>Lanes restricted on SR 397 between Pasco and Kennewick Sep. 16-17</title>
      <pubDate>Tue, 16 Sep 2008 05:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/SR397_lanesRestrictedForBridgeRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/SR397_lanesRestrictedForBridgeRepair.htm</guid>
      <description>WSDOT Travel Advisory 

WSDOT restricts lanes on SR 397 bridge between Pasco and Kennewick</description>
    </item>
    <item>
      <title>Picture a roundabout at Sharpes Corner on SR 20 in Anacortes</title>
      <pubDate>Mon, 15 Sep 2008 22:35:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/15_SR20RoundaboutOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/15_SR20RoundaboutOpenHouse.htm</guid>
      <description>The public is invited to an open house to discuss updated plans to build a roundabout at Sharpes Corner on State Route 20.</description>
    </item>
    <item>
      <title>Crews begin permanent repairs to US 2 east of Index</title>
      <pubDate>Sat, 13 Sep 2008 05:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/12_US2IndexSlide.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/12_US2IndexSlide.htm</guid>
      <description>Starting Monday, Sept. 15 and continuing through November, drivers can expect single-lane weekday closures on US 2 east of Index as crews start permanent repairs to the highway.</description>
    </item>
    <item>
      <title>Crews to switch traffic to new pavement on SR 539 north of Bellingham</title>
      <pubDate>Sat, 13 Sep 2008 03:07:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/12_539PavingLaneSwitch.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/12_539PavingLaneSwitch.htm</guid>
      <description>It’s been a bumpy ride for drivers on the Guide Meridian (SR 539) lately, but that will soon be a thing of the past. Starting Tuesday morning, Sept. 16, crews will switch drivers to new pavement between Horton and Axton roads.</description>
    </item>
    <item>
      <title>Northbound I-5 ramp to US 101 closes Saturday</title>
      <pubDate>Sat, 13 Sep 2008 02:31:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/NorthboundI5toUS101closes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/NorthboundI5toUS101closes.htm</guid>
      <description>Northbound I-5 ramp to US 101 closes Saturday</description>
    </item>
    <item>
      <title>Mount Baker Highway projects on display in Glacier, Deming</title>
      <pubDate>Sat, 13 Sep 2008 00:23:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/12_sr542openhouses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/12_sr542openhouses.htm</guid>
      <description>A new bridge, two roundabouts, realigned sections of road, paving and riverbank protection are just a few of the safety projects planned for Mount Baker Highway (SR 542) in the coming years. People interested in learning more about these projects can attend open houses in Glacier and Deming hosted by the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>Next project to take down the Alaskan Way Viaduct is underway</title>
      <pubDate>Fri, 12 Sep 2008 22:44:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/12-AWVnext.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/12-AWVnext.htm</guid>
      <description>WSDOT, King County and the City of Seattle broke ground today on a project to relocate nearly one mile of electrical lines that are attached to the Alaskan Way Viaduct in preparation for removing the southern mile of the viaduct starting in 2009.</description>
    </item>
    <item>
      <title>Drivers on the Olympic Peninsula get safer roads</title>
      <pubDate>Thu, 11 Sep 2008 22:59:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/PeninsulaSafetyWrapsUp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/PeninsulaSafetyWrapsUp.htm</guid>
      <description>Drivers on the Olympic Peninsula get safer roads</description>
    </item>
    <item>
      <title>Washington Emergency Responders Working Together to Get Traffic Moving</title>
      <pubDate>Thu, 11 Sep 2008 22:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/11_EmergencyResponderConference.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/11_EmergencyResponderConference.htm</guid>
      <description>Collisions, stalls and other traffic incidents cause more than half of urban congestion. Emergency responders are coming together to get traffic incidents off the roadways faster and keep traffic moving.</description>
    </item>
    <item>
      <title>Overnight lane closures planned for I-5 through south Everett on Thursday</title>
      <pubDate>Thu, 11 Sep 2008 06:15:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/10_I5EverettThursday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/10_I5EverettThursday.htm</guid>
      <description>Drivers can expect lane closures on southbound and northbound Interstate 5 through south Everett on Thursday night while crews upgrade signs.</description>
    </item>
    <item>
      <title>Monthly maintenance closures for SR 520 floating bridge early Thursday morning</title>
      <pubDate>Thu, 11 Sep 2008 06:11:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/10_SR520MonthlyOpening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/10_SR520MonthlyOpening.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct monthly maintenance work on the SR 520 Evergreen Point floating bridge early Thursday morning.</description>
    </item>
    <item>
      <title>Lane closures planned for I-5 under Convention Center</title>
      <pubDate>Thu, 11 Sep 2008 05:32:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/08_ConventionCenterClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/08_ConventionCenterClosure.htm</guid>
      <description>For the next two weekends, WSDOT crews will close multiple lanes of Interstate 5 under the Washington State Convention and Trade Center in Seattle to test the fire suppression system. This is a new system that requires a yearly test and several lane closures.</description>
    </item>
    <item>
      <title>Gov. Gregoire honors top 25 companies with "Commute Smart Award"</title>
      <pubDate>Thu, 11 Sep 2008 03:20:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/10_CommuteSmartAwards.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/10_CommuteSmartAwards.htm</guid>
      <description>Washington employers with exceptional employee transportation programs were honored with the “Governor’s Commute Smart Award” during Wednesday’s closing luncheon of WSDOT's Public Transportation Conference and Expo in Kennewick.</description>
    </item>
    <item>
      <title>Speed limit drops on eastbound SR 16 at Burley Olalla</title>
      <pubDate>Wed, 10 Sep 2008 06:46:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/SR16BurleyOlallaSpeedReduction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/SR16BurleyOlallaSpeedReduction.htm</guid>
      <description>Speed limit drops on eastbound SR 16 at Burley Olalla</description>
    </item>
    <item>
      <title>US 2/97 Peshastin East Interchange traffic shift coming Saturday</title>
      <pubDate>Wed, 10 Sep 2008 06:39:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/09US2_97PeshastinEshift.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/09US2_97PeshastinEshift.htm</guid>
      <description>Motorists will be using the new interchange at Peshastin six months earlier than originally planned.</description>
    </item>
    <item>
      <title>Public invited to open houses as decision on central waterfront section of Alaskan Way Viaduct nears</title>
      <pubDate>Wed, 10 Sep 2008 04:29:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/09-awvopenhouses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/09-awvopenhouses.htm</guid>
      <description>Transportation departments for the State, King County, and City of Seattle are hosting three public scoping open houses over the next two weeks to share information about the eight draft scenarios for the central waterfront replacement of the Alaskan Way Viaduct. These scenarios were first released to the public in June.</description>
    </item>
    <item>
      <title>Hood Canal Bridge closes four times this week</title>
      <pubDate>Wed, 10 Sep 2008 01:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/09_hood-canal-bridge-closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/09_hood-canal-bridge-closures.htm</guid>
      <description>HoodCanalBridgeBallasting</description>
    </item>
    <item>
      <title>WSDOT Public Transportation Conference being held in Kennewick</title>
      <pubDate>Sat, 06 Sep 2008 23:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/06_PublicTransportationConference.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/06_PublicTransportationConference.htm</guid>
      <description>OLYMPIA - The Washington State Department of Transportation (WSDOT) is pleased to present the 32nd Annual Public Transportation Conference and Expo on September 7-10 in Kennewick. More than 350 attendees</description>
    </item>
    <item>
      <title>Work zone speed enforcement cameras now in Southwest Washington</title>
      <pubDate>Sat, 06 Sep 2008 04:21:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/05_work_zone_camera_kickoff.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/05_work_zone_camera_kickoff.htm</guid>
      <description>CHEHALIS – Drivers on I-5 through Southwest Washington will see a new tool to keep drivers, passengers and roadway workers safe.</description>
    </item>
    <item>
      <title>Speed limit drops on US 101 near Shelton</title>
      <pubDate>Sat, 06 Sep 2008 04:05:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/Sep05_Speed_drop_US101Purdy.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/Sep05_Speed_drop_US101Purdy.htm</guid>
      <description>Speed limit drops on US 101 near Shelton</description>
    </item>
    <item>
      <title>Crews prepare for emergency repairs on SR 542 near Mt. Baker</title>
      <pubDate>Sat, 06 Sep 2008 03:50:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/05_542RazorhoneEmergencyRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/05_542RazorhoneEmergencyRepair.htm</guid>
      <description>A retaining wall that supports a bridge over Mount Baker Highway (SR 542) is sloughing away from the road, creating a gap under the road shoulder.</description>
    </item>
    <item>
      <title>New camera in Olympia helps motorists know before they go</title>
      <pubDate>Sat, 06 Sep 2008 02:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/05_NewOlympiaCamera.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/05_NewOlympiaCamera.htm</guid>
      <description>New camera in Olympia helps motorists see traffic from the comfort of their computers.</description>
    </item>
    <item>
      <title>Four-day closure of Guide Meridian planned north of Bellingham</title>
      <pubDate>Sat, 06 Sep 2008 00:26:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/05_539DeercreekFullClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/05_539DeercreekFullClosure.htm</guid>
      <description>Crews will completely close the Guide Meridian (SR 539) north of Bellingham between Smith and Axton roads for four days in September to replace the Deer Creek culvert.</description>
    </item>
    <item>
      <title>Washington named "Most Bicycling Friendly State"</title>
      <pubDate>Fri, 05 Sep 2008 23:06:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/05_bicycling-friendly-state.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/05_bicycling-friendly-state.htm</guid>
      <description>Citing our state's bicycle policies, facilities and programs, the League of American Bicyclists has named Washington as the nation’s number one "Bicycle Friendly State."</description>
    </item>
    <item>
      <title>Snoqualmie Point View Park Project Chosen for Award by WSDOT and FHWA</title>
      <pubDate>Fri, 05 Sep 2008 22:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/05_snoqualmie-point-view-park.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/05_snoqualmie-point-view-park.htm</guid>
      <description>The Federal Highway Administration (FHWA) and WSDOT awarded the City of Snoqualmie and the Mountains to Sound Greenway Trust with the 2008 Award of Excellence for "Best Special Project"</description>
    </item>
    <item>
      <title>Puyallup Fair traffic starts today</title>
      <pubDate>Fri, 05 Sep 2008 22:54:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/5_512_FairTrafficToday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/5_512_FairTrafficToday.htm</guid>
      <description>If you're trotting or galloping, you should prepare yourself for Puyallup Fair traffic.</description>
    </item>
    <item>
      <title>Traffic sensor repairs to close two lanes of I-5 southbound near Kelso</title>
      <pubDate>Fri, 05 Sep 2008 05:00:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/04_I5LaneClosuresSensorRepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/04_I5LaneClosuresSensorRepairs.htm</guid>
      <description>KELSO – Motorists traveling on I-5 southbound near Kelso (mile post 44) will encounter left and center lane closures between 8 p.m. tonight and 5 a.m. Friday morning, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Expect traffic slowdowns and intermittent lane closures on I-90 Snoqualmie Pass through October</title>
      <pubDate>Fri, 05 Sep 2008 05:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/slowdownsthroughoctober.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/slowdownsthroughoctober.htm</guid>
      <description>Beginning September 8 through the first significant snowfall, drivers can expect up to 20-minute delays and rolling slowdowns on I-90 just east of Snoqualmie Pass near Keechelus Lake.</description>
    </item>
    <item>
      <title>Final paving starts Sept. 8 on Guide Meridian north of Bellingham</title>
      <pubDate>Fri, 05 Sep 2008 02:53:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/04_539HortonFinalPaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/04_539HortonFinalPaving.htm</guid>
      <description>Starting Sept. 8, crews will put down the final layer of asphalt between Horton and Ten Mile roads.</description>
    </item>
    <item>
      <title>Amtrak Cascades ridership seeing record growth in 2008</title>
      <pubDate>Fri, 05 Sep 2008 02:20:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/09042008_AmtrakCascadesridership.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/09042008_AmtrakCascadesridership.htm</guid>
      <description>Amtrak Cascades ridership seeing record growth in 2008</description>
    </item>
    <item>
      <title>Section of a state-owned rail line destroyed in Swanson Lake fire restored to service</title>
      <pubDate>Fri, 05 Sep 2008 02:18:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/09042008_raillinerestored.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/09042008_raillinerestored.htm</guid>
      <description>Section of a state-owned rail line destroyed in Swanson Lake fire restored to service</description>
    </item>
    <item>
      <title>Shoulder driving OK on SR 302 ramp</title>
      <pubDate>Fri, 05 Sep 2008 02:05:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/04_SR302_restripe_ramp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/04_SR302_restripe_ramp.htm</guid>
      <description>SR 302 ramp in Purdy restriped for shoulder lane.</description>
    </item>
    <item>
      <title>Crews improve safety on SR 104 in Edmonds</title>
      <pubDate>Thu, 04 Sep 2008 23:57:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/04_SR104ferryrestripe.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/04_SR104ferryrestripe.htm</guid>
      <description>As summer winds to a close, WSDOT and city of Edmonds engineers are starting work to improve safety for both ferry riders and local drivers on SR 104 (Edmonds Way) in Edmonds. Starting next week, crews will make two key changes to reduce collisions and congestion on this busy route.</description>
    </item>
    <item>
      <title>WSDOT closes right and center lanes on northbound I-5 for emergency concrete panel repairs</title>
      <pubDate>Thu, 04 Sep 2008 23:39:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/04_I5EmergencyDoubleLaneClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/04_I5EmergencyDoubleLaneClosure.htm</guid>
      <description>KELSO – Motorists traveling on I-5 northbound near Kelso (milepost 44) will encounter right and center lane closures through 6 p.m. tonight, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>SR 240 lanes open ahead of schedule in Richland</title>
      <pubDate>Thu, 04 Sep 2008 05:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/SR240_opens_ahead_of_schedule.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/SR240_opens_ahead_of_schedule.htm</guid>
      <description>WSDOT finishes ahead of schedule, all lanes open on SR 240 in Richland</description>
    </item>
    <item>
      <title>WSDOT reminds drivers of US 97, Biggs Rapids – Sam Hill Bridge closure Sep. 8</title>
      <pubDate>Wed, 03 Sep 2008 06:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/02_BiggsClosureReminder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/02_BiggsClosureReminder.htm</guid>
      <description>GOLDENDALE – Starting Monday, September 8, 2008, the Biggs Rapids – Sam Hill Bridge will be closed to all traffic until construction is completed in early 2009.</description>
    </item>
    <item>
      <title>WSDOT counts show drop in Labor Day travel</title>
      <pubDate>Wed, 03 Sep 2008 06:02:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/02_laborday08_recap.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/02_laborday08_recap.htm</guid>
      <description>OLYMPIA – Predictions were just about right as travel numbers show just a slight dip in most locations from Labor Day 2007. Volumes on I-90 Snoqualmie Pass, I-5 north of Seattle and south of Olympia dropped slightly from 2007. However, it was US 2 over Stevens Pass (9 percent) that saw the largest decline.</description>
    </item>
    <item>
      <title>Next Aviation Planning Council Meeting:  October 2 in Seattle</title>
      <pubDate>Wed, 03 Sep 2008 05:04:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/AviationPlanningCouncilOct2.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/AviationPlanningCouncilOct2.htm</guid>
      <description>On October 2 from 9:30 a.m. to 3 p.m., members of the Governor-appointed Aviation Planning Council will meet for the eighth time to continue work on the final phase of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>Dry weather allows for portion of SR 506 to close for bridge repairs</title>
      <pubDate>Wed, 03 Sep 2008 03:43:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/09/02_SR506ClosesDeckResurfacing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/09/02_SR506ClosesDeckResurfacing.htm</guid>
      <description>VADER – The Washington State Department of Transportation (WSDOT) will close the west end of State Route 506 starting at Telegraph Road (milepost 8) for one week in September.</description>
    </item>
    <item>
      <title>Ahead of schedule; contractors finish first phase of work to stabilize SR 169 near Green River</title>
      <pubDate>Sat, 06 Sep 2008 04:59:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/05_GreenRiverBridgeRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/05_GreenRiverBridgeRepair.htm</guid>
      <description>Both lanes of SR 169 over the Green River are now open.</description>
    </item>
    <item>
      <title>Aurora Bridge Fence advisory committee meets Tuesday in Seattle</title>
      <pubDate>Fri, 05 Sep 2008 04:18:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/04_AuroraBridgeFenceMeeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/04_AuroraBridgeFenceMeeting.htm</guid>
      <description>The State Route 99 Aurora Bridge Fence advisory committee will meet on Tuesday, Sept. 9 to review WSDOT’s latest design alternatives.</description>
    </item>
    <item>
      <title>Both lanes of Boulder Creek bridge to open near Glacier</title>
      <pubDate>Thu, 04 Sep 2008 05:05:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/03_sr542BoulderCreekBridgeOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/03_sr542BoulderCreekBridgeOpen.htm</guid>
      <description>Both lanes of the new Boulder Creek bridge are scheduled to open to traffic Thursday, Sept. 4. The bridge has been under construction since June of 2007.</description>
    </item>
    <item>
      <title>Pile driver collapses in WSDOT work zone in Burlington</title>
      <pubDate>Thu, 04 Sep 2008 03:38:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/03_sr20piledrivercollapse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/03_sr20piledrivercollapse.htm</guid>
      <description>No one was injured after a pile driving crane collapsed at a work site near SR 20 and I-5 in Burlington earlier today.</description>
    </item>
    <item>
      <title>Two downtown Interstate 5 express lane ramps closing early</title>
      <pubDate>Wed, 03 Sep 2008 04:57:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/02_ExpressLaneOnRampEarlyClose.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/02_ExpressLaneOnRampEarlyClose.htm</guid>
      <description>Two I-5 express lane on ramps will close early tonight and tomorrow for repaving work by WSDOT maintenance crews.</description>
    </item>
    <item>
      <title>Crews on the fast track; first phase of work to stabilize SR 169 near the Green River ahead of schedule</title>
      <pubDate>Sat, 30 Aug 2008 07:49:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/29_GreenRiverOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/29_GreenRiverOpen.htm</guid>
      <description>Crews working for WSDOT made quick work of a big job stabilizing a slope at the SR 169 bridge over the Green River. They completed the most difficult work of the first phase nearly two weeks ahead of schedule.</description>
    </item>
    <item>
      <title>US 101 slope-repair starts next week in Mason County</title>
      <pubDate>Sat, 30 Aug 2008 03:35:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/29_US101_holiday_begins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/29_US101_holiday_begins.htm</guid>
      <description>Slope repair project begins on US 101 in Mason County at Holiday Hills.</description>
    </item>
    <item>
      <title>SR 162 paving project complete</title>
      <pubDate>Sat, 30 Aug 2008 03:17:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/29_SR162_pavingdone.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/29_SR162_pavingdone.htm</guid>
      <description>SR 162 paving in Orting finishes today.</description>
    </item>
    <item>
      <title>Overnight lane closures planned for I-5 through south Everett</title>
      <pubDate>Sat, 30 Aug 2008 02:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/29_EverettLaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/29_EverettLaneClosures.htm</guid>
      <description>EVERETT – Late night and early morning drivers can expect delays through south Everett next week as crews close multiple lanes of southbound Interstate 5 for striping of the roadway.</description>
    </item>
    <item>
      <title>Construction worker injured on I-405 in Renton</title>
      <pubDate>Sat, 30 Aug 2008 02:00:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/29_InjuredWorker.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/29_InjuredWorker.htm</guid>
      <description>Late Thursday night a construction worker was injured on southbound I-405 near SR 167 while installing electrical conduit in the median. The cause of the accident is currently being investigated.</description>
    </item>
    <item>
      <title>WSDOT temporarily limits trucks to center lane of I-5 at the N. Fork Lewis River Bridge</title>
      <pubDate>Sat, 30 Aug 2008 00:02:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/29_NForkLewisRiverBridgeTruckLimit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/29_NForkLewisRiverBridgeTruckLimit.htm</guid>
      <description>WOODLAND – Beginning Tuesday, September 2, all vehicles with trailers over 10,000 pounds traveling southbound on I-5 at the North Fork Lewis River Bridge (milepost 19.83) will be temporarily limited to the center lane, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Repair work nears completion at SR 169 bridge over Green River</title>
      <pubDate>Fri, 29 Aug 2008 04:56:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/28_GreenRiverRepairFridayLane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/28_GreenRiverRepairFridayLane.htm</guid>
      <description>The first phase of repair work is nearing substantial completion on an unstable slope at the south end of the SR 169 bridge over the Green River near Black Diamond.</description>
    </item>
    <item>
      <title>Wireless Internet access no longer available at rest areas</title>
      <pubDate>Fri, 29 Aug 2008 04:34:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/28_RestAreaWiFi.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/28_RestAreaWiFi.htm</guid>
      <description>Wireless Internet access will no longer be available at Washington’s wireless highway safety rest areas due to a lack of consistent subscribers.</description>
    </item>
    <item>
      <title>SR 123 in Mount Rainier National Park to close for roadway and safety repairs</title>
      <pubDate>Thu, 28 Aug 2008 07:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/27_123MtRainierSafetyRepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/27_123MtRainierSafetyRepairs.htm</guid>
      <description>Beginning Tuesday, September 2, drivers can expect a total closure of nearly eleven miles of SR 123 from Cayuse Pass to Stevens Canyon Road Monday through Thursdays from 7 a.m. to 5 p.m. for roadway repair and safety improvements</description>
    </item>
    <item>
      <title>Crews to switch traffic signals at I-5/SR 20 interchange in Burlington</title>
      <pubDate>Thu, 28 Aug 2008 02:31:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/27_20offrampsignalswitch.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/27_20offrampsignalswitch.htm</guid>
      <description>Drivers can expect delays Thursday morning at the northbound I-5/State Route 20 interchange in Burlington.</description>
    </item>
    <item>
      <title>WSDOT seeks public input on SR 19 – SR 20 corridor plan</title>
      <pubDate>Wed, 27 Aug 2008 06:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/26_SR19_SR20_corridorplan.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/26_SR19_SR20_corridorplan.htm</guid>
      <description>Open house for SR 19, SR 20 Corridor Plan.</description>
    </item>
    <item>
      <title>Rolling slow downs on I-90 near Snoqualmie Pass August 27 and 28</title>
      <pubDate>Wed, 27 Aug 2008 05:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/I-90_slowdowns_for_tree_removal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/I-90_slowdowns_for_tree_removal.htm</guid>
      <description>WSDOT conducts rolling slow downs on I-90 near Snoqualmie Pass Aug. 27 and 28 for tree removal. Drivers should plan for delays.</description>
    </item>
    <item>
      <title>Learn how WSDOT will connect communities across Interstate 90</title>
      <pubDate>Wed, 27 Aug 2008 04:11:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/I90OpenHouses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/I90OpenHouses.htm</guid>
      <description>WSDOT’s I-90 Snoqualmie Pass East Project team released the Final Environmental Impact Statement.</description>
    </item>
    <item>
      <title>Northbound I-5 Gee Creek Safety Rest Area in Clark Co. closing Wednesday</title>
      <pubDate>Wed, 27 Aug 2008 02:04:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/26_GeeCreekClosureSR502IC.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/26_GeeCreekClosureSR502IC.htm</guid>
      <description>RIDGEFIELD – The northbound Gee Creek Safety Rest Area in Clark County will be closed starting at noon on Wednesday, August 27, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>US 97, Biggs Rapids – Sam Hill Bridge closes Sep. 8 for final stage of construction</title>
      <pubDate>Tue, 26 Aug 2008 06:57:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/25_US97BiggsClosedSep8.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/25_US97BiggsClosedSep8.htm</guid>
      <description>The final stage of a project that is replacing the US 97, Biggs Rapids – Sam Hill Memorial Bridge concrete deck will begin a week after Labor Day, announces the Washington State Department of Transportation (WSDOT). Starting Monday, September 8, 2008, the bridge will be closed to all traffic until work is completed in early 2009.</description>
    </item>
    <item>
      <title>Swanson Lake fire destroys trestle and ties along a four-mile section of a state-owned rail line</title>
      <pubDate>Tue, 26 Aug 2008 06:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/20080825firedestroystrestle.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/20080825firedestroystrestle.htm</guid>
      <description>Swanson Lake fire destroys a trestle and ties along a four-mile section of a state-owned rail line</description>
    </item>
    <item>
      <title>Best times to travel for Labor Day Weekend</title>
      <pubDate>Tue, 26 Aug 2008 04:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/25_labor_day_best_travel_times.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/25_labor_day_best_travel_times.htm</guid>
      <description>WSDOT has tools available to help drivers who do plan to head out on the road for the last official weekend of summer.</description>
    </item>
    <item>
      <title>Rain delays work at I-5 South Thurston County Safety Rest Areas</title>
      <pubDate>Tue, 26 Aug 2008 03:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/25_rest_area_work_extended.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/25_rest_area_work_extended.htm</guid>
      <description>OLYMPIA – The late August deluge has delayed work at the Safety Rest Areas on I-5 south of Olympia.</description>
    </item>
    <item>
      <title>Reminder:  Submit your comments on the draft Aviation Stormwater Manual</title>
      <pubDate>Tue, 26 Aug 2008 01:12:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/DraftStormwaterManual.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/DraftStormwaterManual.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) Aviation reminds the public to submit comments on the draft Aviation Stormwater Facility Design Manual during the 30-day public comment period, which began on August 12. Written comments on the draft manual must be submitted by 5 p.m. on Friday, September 12, 2008.</description>
    </item>
    <item>
      <title>I-90 westbound restricted to one lane east of Snoqualmie Pass Aug. 26</title>
      <pubDate>Sat, 23 Aug 2008 05:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/I90WestboundTrafficRestricted.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/I90WestboundTrafficRestricted.htm</guid>
      <description>WSDOT restricts traffic to one lane westbound on I-90 east of Snoqualmie Pass 

Drivers should plan for delays</description>
    </item>
    <item>
      <title>WSDOT restricts lanes on US 395 Aug. 25-28 in Kennewick</title>
      <pubDate>Sat, 23 Aug 2008 04:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/US395LanesRestrictedInKennewick.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/US395LanesRestrictedInKennewick.htm</guid>
      <description>WSDOT restricts lanes on US 395 August 25-28 in Kennewick 
Drivers should plan for delays</description>
    </item>
    <item>
      <title>Striping changes for I-5 in Burlington</title>
      <pubDate>Sat, 23 Aug 2008 01:56:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/22_i5temporarystripingchange.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/22_i5temporarystripingchange.htm</guid>
      <description>Crews will temporarily change the striping on I-5 in Burlington next week, shifting drivers in both directions a little closer to the median.</description>
    </item>
    <item>
      <title>Utility work causes lane closure on SR 512 tonight</title>
      <pubDate>Fri, 22 Aug 2008 06:21:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/SR512laneclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/SR512laneclosure.htm</guid>
      <description>Utility work causes lane closure on SR 512 tonight</description>
    </item>
    <item>
      <title>Repair work to begin on SR 169 bridge over Green River</title>
      <pubDate>Fri, 22 Aug 2008 02:57:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/21_LongTermGreenRiverRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/21_LongTermGreenRiverRepair.htm</guid>
      <description>Work on a long-term repair of an unstable slope under the south end of the SR 169 bridge over the Green River near Black Diamond will begin Monday, Aug. 25.</description>
    </item>
    <item>
      <title>Closures and construction to affect I-5 and I-90 express lanes schedule this weekend</title>
      <pubDate>Fri, 22 Aug 2008 00:25:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/21_ExpressLaneSchedules.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/21_ExpressLaneSchedules.htm</guid>
      <description>Construction, maintenance and a training exercise will affect the operation of the Interstate 5 and Interstate 90 express lanes this weekend and early next week.</description>
    </item>
    <item>
      <title>Paving, signal work for SR 502 Interchange project to impact traffic this weekend</title>
      <pubDate>Thu, 21 Aug 2008 06:32:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/20_FinalPavingWorkImpacts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/20_FinalPavingWorkImpacts.htm</guid>
      <description>BATTLE GROUND – Final paving for the I-5, SR 502 Interchange Project will close portions of NE 10th Avenue and NE 219th Street this weekend, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Lift, shift, dig: SR 522 crews heat up work in Bothell</title>
      <pubDate>Thu, 21 Aug 2008 05:39:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/20_SR522Girder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/20_SR522Girder.htm</guid>
      <description>Drivers headed westbound on SR 522 in Bothell on Friday, Aug. 22 will see big equipment, busy crews and heavy construction near Woodinville Drive.</description>
    </item>
    <item>
      <title>Hood Canal Bridge closes three times Thursday</title>
      <pubDate>Thu, 21 Aug 2008 01:24:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/20_104_HCBClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/20_104_HCBClosures.htm</guid>
      <description>Tomorrow the Hood Canal Bridge will close three times for upgrades.</description>
    </item>
    <item>
      <title>Construction on South Fork Chehalis River Bridge Replacement to begin Aug. 25</title>
      <pubDate>Wed, 20 Aug 2008 06:20:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/19_ConstructionBeginsSForkChehalisBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/19_ConstructionBeginsSForkChehalisBridge.htm</guid>
      <description>CHEHALIS – A project to build a new bridge over the South Fork of the Chehalis River on State Route 6 will begin August 25, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Eastbound lane restriction on I-82 Umatilla Bridge</title>
      <pubDate>Tue, 19 Aug 2008 23:36:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/I82Bridge_Eastbound_LaneRestriction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/I82Bridge_Eastbound_LaneRestriction.htm</guid>
      <description>WSDOT closes left lane on eastbound I-82 Columbia River Bridge near Umatilla</description>
    </item>
    <item>
      <title>Rain drops in the forecast delay SR 506 closure, bridge repairs</title>
      <pubDate>Tue, 19 Aug 2008 00:54:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/18_SR506Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/18_SR506Closure.htm</guid>
      <description>VADER – Spotty weather and rainy conditions are forcing the Washington State Department of Transportation (WSDOT) to delay closing State Route 506 this week in order to repair the bridge over Lacamas Creek. The work has been postponed until the forecast predicts a stretch of dry weather.</description>
    </item>
    <item>
      <title>Noise walls coming to eastbound Tacoma Narrows Bridge</title>
      <pubDate>Mon, 18 Aug 2008 23:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/14_TNBNoiseWalls.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/14_TNBNoiseWalls.htm</guid>
      <description>Noise walls coming to eastbound Tacoma Narrows Bridge</description>
    </item>
    <item>
      <title>Wilburton Tunnel demolition complete; WSDOT crews in Bellevue open southbound I-405 to traffic</title>
      <pubDate>Mon, 18 Aug 2008 23:36:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/18_WilburtonComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/18_WilburtonComplete.htm</guid>
      <description>Wilburton Tunnel demolition complete; WSDOT crews in Bellevue open southbound I-405 to traffic</description>
    </item>
    <item>
      <title>Drivers on I-405 in Bellevue see the light at the end of the Wilburton tunnel one week early</title>
      <pubDate>Mon, 18 Aug 2008 04:57:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/_17_nothirdweekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/_17_nothirdweekend.htm</guid>
      <description>Crews finished demolishing the Wilburton Tunnel over southbound I-405 in Bellevue this weekend, one week ahead of schedule. All that remains of the tunnel is the debris, and it should be removed so southbound lanes can open by 5 a.m., Monday. The third weekend closure is no longer needed.</description>
    </item>
    <item>
      <title>I-405 Wilburton tunnel demolition milestone reached</title>
      <pubDate>Sun, 17 Aug 2008 02:48:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/16_TunnelRoofGone.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/16_TunnelRoofGone.htm</guid>
      <description>Demolition crews made a major breakthrough today when they brought down the roof of the Wilburton Tunnel on southbound I-405.</description>
    </item>
    <item>
      <title>Traffic Advisory: Sunday morning closure of Interstate 90 reversible center roadway</title>
      <pubDate>Sat, 16 Aug 2008 04:49:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/15_I90ReversibleLanesAdvisory.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/15_I90ReversibleLanesAdvisory.htm</guid>
      <description>The Interstate 90 reversible center roadway will be closed Sunday, Aug. 17 from 5 a.m. to noon.</description>
    </item>
    <item>
      <title>Overnight and daytime lane closures planned for I-5 through south Everett</title>
      <pubDate>Sat, 16 Aug 2008 02:21:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/15_EverettLane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/15_EverettLane.htm</guid>
      <description>Drivers can expect delays through south Everett next week as crews close multiple lanes in both directions of Interstate 5 for striping and paving.</description>
    </item>
    <item>
      <title>WSDOT completes US 12 rumble strip project in Lewis County</title>
      <pubDate>Fri, 15 Aug 2008 06:57:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/14_US12RumbleStripComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/14_US12RumbleStripComplete.htm</guid>
      <description>CHEHALIS – Drivers on US 12 between I-5 and Randle may notice new rumble strips down the center of the roadway, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Crews continue crunching away on the Wilburton tunnel on I-405 in Bellevue</title>
      <pubDate>Fri, 15 Aug 2008 05:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/14_I405SecondWeekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/14_I405SecondWeekend.htm</guid>
      <description>The crunchers, breakers and dump trucks return to Bellevue this weekend as crews continue the demolition of the Wilburton Tunnel.</description>
    </item>
    <item>
      <title>Pavement repairs to close several ramps in Vancouver</title>
      <pubDate>Fri, 15 Aug 2008 05:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/14_PavementRepairsCloseRamps.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/14_PavementRepairsCloseRamps.htm</guid>
      <description>VANCOUVER – Pavement repairs will close several ramps on I-5, I-205 and SR 500 starting this weekend, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Bridge preservation on US 101 requires openings</title>
      <pubDate>Fri, 15 Aug 2008 05:10:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/US101RiversideBridgePreservation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/US101RiversideBridgePreservation.htm</guid>
      <description>Bridge preservation on US 101 requires openings</description>
    </item>
    <item>
      <title>Lane closures announced for bridge maintenance and repair work on four Spokane bridges</title>
      <pubDate>Fri, 15 Aug 2008 03:19:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/14_SpokaneBridgeMaintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/14_SpokaneBridgeMaintenance.htm</guid>
      <description>Spokane drivers should be aware of a series of nighttime lane closures beginning next week.  Crews will need work space to perform bridge maintenance and minor repairs on four bridges – three on I 90 and one on Trent Avenue (SR 290).</description>
    </item>
    <item>
      <title>Tacoma Narrows Bridge Project needs your vote for national People's Choice Award</title>
      <pubDate>Thu, 14 Aug 2008 01:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/13_PeoplesChoiceAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/13_PeoplesChoiceAward.htm</guid>
      <description>The Tacoma Narrows Bridge project is one of 10 signature transportation projects named today as finalists for the prestigious “America’s Transportation Award,” reflecting the best in management and innovation by the American Association of State Highway Transportation Officials (AASHTO).</description>
    </item>
    <item>
      <title>Night time lane closures begin next week for US 97, Biggs Bridge project, complete closure begins September 3</title>
      <pubDate>Thu, 14 Aug 2008 00:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/13_BiggsNightSingleLaneClosuresBegin.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/13_BiggsNightSingleLaneClosuresBegin.htm</guid>
      <description>GOLDENDALE – Night time single lane closures for the US 97, Biggs Rapids-Sam Hill Bridge Deck Replacement Project begin August 18, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Weekend paving for SR 502 Interchange to close portions of NE 10th Avenue near Duluth</title>
      <pubDate>Wed, 13 Aug 2008 23:06:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/13_SR502PavingClosesNE10thAve.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/13_SR502PavingClosesNE10thAve.htm</guid>
      <description>BATTLE GROUND – Paving work for the I-5, SR 502 Interchange Project will close portions of NE 10th Avenue this weekend, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Travel delays possible: crews to conduct monthly maintenance tests of SR 520 Evergreen Point floating bridge</title>
      <pubDate>Wed, 13 Aug 2008 04:12:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/12_520Maintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/12_520Maintenance.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct monthly maintenance work on the SR 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>I-5 Maytown Safety Rest Area closed to all traffic Aug. 18 - 24</title>
      <pubDate>Wed, 13 Aug 2008 03:52:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/12_maytown_closed_week.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/12_maytown_closed_week.htm</guid>
      <description>OLYMPIA – No traffic will be allowed at the I-5 southbound Maytown Safety Rest Area south of Olympia for six days, starting at 7 a.m. Monday, Aug. 18. The Safety Rest Area is scheduled to reopen at noon, Aug. 24.</description>
    </item>
    <item>
      <title>Drivers take alternate routes to avoid backups on southbound I-405 near the Wilburton Tunnel in Bellevue</title>
      <pubDate>Tue, 12 Aug 2008 07:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/11_I405TrafficWilburton.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/11_I405TrafficWilburton.htm</guid>
      <description>WSDOT thanks drivers for using alternate routes to help avoid backups this weekend on I-405 in Bellevue while crews removed a portion of the Wilburton Tunnel.</description>
    </item>
    <item>
      <title>Public comments welcome on draft Aviation Stormwater Manual</title>
      <pubDate>Tue, 12 Aug 2008 05:28:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/AviationStormwaterDraftReview.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/AviationStormwaterDraftReview.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) Aviation is inviting the public to comment on the draft Aviation Stormwater Facility Design Manual during a 30-day public comment period. Written comments on the draft manual must be submitted by 5 p.m. on Friday, September 12, 2008. Comments can be submitted by standard mail, fax or email to:</description>
    </item>
    <item>
      <title>WSDOT Crews in Bellevue open southbound I-405 to traffic</title>
      <pubDate>Mon, 11 Aug 2008 20:10:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/11_SB405Opens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/11_SB405Opens.htm</guid>
      <description>Southbound I-405 between SE 8th Street and the I-405/I-90 interchange opened to traffic at 4 a.m. this morning after highway crews worked around the clock over the weekend to remove a section of the Wilburton Tunnel.</description>
    </item>
    <item>
      <title>WSDOT crews in Renton reopen all southbound I-405 lanes to traffic</title>
      <pubDate>Sun, 10 Aug 2008 23:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/I405_RentonOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/I405_RentonOpen.htm</guid>
      <description>Crews in Renton successfully shifted southbound I-405 traffic onto the new I-405 bridge over Oakesdale Ave. SW at 5:30 p.m. on Saturday.  All southbound lanes in Renton are now open.</description>
    </item>
    <item>
      <title>Pack your patience for your drive on I-405 this weekend</title>
      <pubDate>Sat, 09 Aug 2008 21:27:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/09_PackYourPatience.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/09_PackYourPatience.htm</guid>
      <description>You’ve planned two extra hours for your trip, called 511, checked the WSDOT Web site and made sure you have a full tank of gas.</description>
    </item>
    <item>
      <title>US 2/97 - School Street intersection safety project to start</title>
      <pubDate>Sat, 09 Aug 2008 03:58:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/08US2_97SchoolStreetContract.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/08US2_97SchoolStreetContract.htm</guid>
      <description>A safety project that limits left turns across US 2/97 at School Street, north of Wenatchee, is starting.</description>
    </item>
    <item>
      <title>SR 155 bridge in Omak will close for two days later this month</title>
      <pubDate>Sat, 09 Aug 2008 03:54:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/08SR155OmakBridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/08SR155OmakBridgeClosure.htm</guid>
      <description>A bridge in downtown Omak will be closed for two days to reinforce bridge piers undermined by last winter's high waters in the Okanogan River.</description>
    </item>
    <item>
      <title>SR 16 project to build new interchange kicks off</title>
      <pubDate>Sat, 09 Aug 2008 03:42:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/SR16Burleygroundbreaking.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/SR16Burleygroundbreaking.htm</guid>
      <description>SR 16 project to build new interchange kicks off</description>
    </item>
    <item>
      <title>Overnight lane closures planned for both directions of I-5 through south Everett</title>
      <pubDate>Sat, 09 Aug 2008 03:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/08_EverettLaneClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/08_EverettLaneClosure.htm</guid>
      <description>Late night and early morning drivers can expect delays through south Everett this week as crews close multiple lanes in both directions of Interstate 5 for striping and sign installation.</description>
    </item>
    <item>
      <title>Disruption of WSDOT's traffic map and cameras this weekend</title>
      <pubDate>Sat, 09 Aug 2008 00:08:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/08_TrafficMapDisruptions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/08_TrafficMapDisruptions.htm</guid>
      <description>Internet users trying to find traffic information on the Washington State Department of Transportation Web site will notice disruptions this weekend.</description>
    </item>
    <item>
      <title>Public invited to upcoming SR 99 Aurora Bridge fence meetings in Seattle</title>
      <pubDate>Fri, 08 Aug 2008 23:31:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/06_SR99AuroraFenceMeetings.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/06_SR99AuroraFenceMeetings.htm</guid>
      <description>WSDOT invites the public to four upcoming meetings of the State Route 99 Aurora Bridge Fence advisory committee.  

All meetings will be held from 6 pm. to 8 p.m. in Room 109 at Otto Miller Hall at Seattle Pacific University, located at 3469 Third Avenue W. (between W. Nickerson Street and W. Ewing Street).</description>
    </item>
    <item>
      <title>It's Crunch Time: Heavy equipment in place to remove the Wilburton Tunnel</title>
      <pubDate>Fri, 08 Aug 2008 04:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/01_I405Wilburton.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/01_I405Wilburton.htm</guid>
      <description>Major I-405 closures in South Bellevue are just one day away, total closure begins Friday night at 11 p.m. WSDOT traffic engineers predict major traffic congestion.</description>
    </item>
    <item>
      <title>On ramp to westbound US 12 closed Aug. 7-9 in Yakima</title>
      <pubDate>Thu, 07 Aug 2008 23:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/US12_OnRampClosed_Aug7thru9.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/US12_OnRampClosed_Aug7thru9.htm</guid>
      <description>On-ramp closed from 16th Avenue to westbound US 12 August 7-9 in Yakima 

Fruitvale Blvd. is recommended detour</description>
    </item>
    <item>
      <title>Plan for a little extra time if you are traveling on I-405 to Renton or Tukwila this weekend</title>
      <pubDate>Thu, 07 Aug 2008 06:28:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/Aug05_RentonPlanExtraTime.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/Aug05_RentonPlanExtraTime.htm</guid>
      <description>It’s going to be a busy weekend for construction on I-405.</description>
    </item>
    <item>
      <title>Portion of SR 506 to close for bridge repairs</title>
      <pubDate>Wed, 06 Aug 2008 02:20:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/05_BridgeRepairsSR506Closing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/05_BridgeRepairsSR506Closing.htm</guid>
      <description>VADER – The Washington State Department of Transportation (WSDOT) will close the west end of State Route 506 starting at Telegraph Road (milepost 8) for one week in August.</description>
    </item>
    <item>
      <title>Aviation Planning Council to Meet August 7 in Vancouver</title>
      <pubDate>Tue, 05 Aug 2008 04:54:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/APCMeetingAugust7.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/APCMeetingAugust7.htm</guid>
      <description>On August 7 from 10:30 a.m. to 3 p.m., members of the Governor-appointed Aviation Planning Council will meet for the seventh time to continue work on the final phase of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>Overnight lane closures planned for I-5 through south Everett</title>
      <pubDate>Tue, 05 Aug 2008 04:13:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/04_EverettLaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/04_EverettLaneClosures.htm</guid>
      <description>Crews working for WSDOT on Interstate 5 in south Everett are giving striping another chance after last week’s rain delayed their plans.</description>
    </item>
    <item>
      <title>Guide Meridian to close at night for bridge construction north of Bellingham</title>
      <pubDate>Tue, 05 Aug 2008 00:44:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/04_539Tenmilegirderplacement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/04_539Tenmilegirderplacement.htm</guid>
      <description>Crews building a new bridge over Ten Mile Creek will intermittently close both lanes of the Guide Meridian (SR 539) on Wednesday night, August 6, as they lift 10 large girders into place.</description>
    </item>
    <item>
      <title>Hood Canal Bridge Project floats past 80 percent mark</title>
      <pubDate>Sat, 02 Aug 2008 08:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/1_hcbfloatspast80percentmark.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/1_hcbfloatspast80percentmark.htm</guid>
      <description>HCB Final pontoon float-out</description>
    </item>
    <item>
      <title>Intermittent disruption of WSDOT’s south Bellevue area traffic cameras</title>
      <pubDate>Sat, 02 Aug 2008 06:44:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/01_I405TrafficCamerasDisconnected.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/01_I405TrafficCamerasDisconnected.htm</guid>
      <description>Internet users trying to find traffic information on the Washington State Department of Transportation Web site may notice intermittent disruptions on Sunday, Aug. 3.</description>
    </item>
    <item>
      <title>WSDOT reaches milestone SR 532 project, begins search for design-build contractor</title>
      <pubDate>Sat, 02 Aug 2008 01:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/532_1RFQ.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/532_1RFQ.htm</guid>
      <description>The Washington State Department of Transportation is moving forward with improvements to the SR 532 corridor between Camano Island and I-5. The department this week issued a Request for Qualifications (RFQ) to contractors interested in designing and building the project.</description>
    </item>
    <item>
      <title>Britton Road intersection closed for paving</title>
      <pubDate>Fri, 01 Aug 2008 23:10:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/08/01_542BrittonIntesectionClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/08/01_542BrittonIntesectionClosed.htm</guid>
      <description>Crews will need to close the Britton Road intersection Monday, Aug. 4, to finish paving and striping at SR 542 (Mount Baker Highway).</description>
    </item>
    <item>
      <title>Update: Collision on northbound I-5 in Tukwila</title>
      <pubDate>Fri, 01 Aug 2008 20:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/31_I5Duwamish.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/31_I5Duwamish.htm</guid>
      <description>All lanes of northbound I-5 at the Duwamish Curves in Tukwila are now open.</description>
    </item>
    <item>
      <title>Completion of bridge marks milestone for I-5, SR 502 interchange project</title>
      <pubDate>Fri, 01 Aug 2008 04:32:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/31_SR502BridgeMilestone.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/31_SR502BridgeMilestone.htm</guid>
      <description>BATTLE GROUND – The I-5, SR 502 Interchange project reached a milestone this week as the final structural component of the new SR 502 Interchange Bridge was completed, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Renovation at I-5 Maytown Safety Rest Area; Portable Toilets only August to October</title>
      <pubDate>Fri, 01 Aug 2008 01:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/31_maytow_restarea_rennovate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/31_maytow_restarea_rennovate.htm</guid>
      <description>OLYMPIA – Monday, WSDOT will start an extreme makeover at the Maytown Safety Rest Area south of Olympia. This extreme makeover will take a bit longer than seven days.</description>
    </item>
    <item>
      <title>Routine Hood Canal Bridge inspections may cause traffic delays</title>
      <pubDate>Fri, 01 Aug 2008 00:00:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/Routine+Hood+Canal+Bridge+inspections+may+cause+traffic+delays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/Routine+Hood+Canal+Bridge+inspections+may+cause+traffic+delays.htm</guid>
      <description>SR104HCBinspections2008</description>
    </item>
    <item>
      <title>SR 520 Bridge inspection finds small cracks, but overall results find bridge in good shape</title>
      <pubDate>Thu, 31 Jul 2008 22:43:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/31_520BridgeInspectionResults.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/31_520BridgeInspectionResults.htm</guid>
      <description>The SR 520 Bridge is in good shape according to Washington State Department of Transportation crews that finished analysis of the SR 520 bridge annual inspection this week.</description>
    </item>
    <item>
      <title>SR 704 cross-base project off the ground</title>
      <pubDate>Thu, 31 Jul 2008 07:23:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/30_SR704_groundbreaking.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/30_SR704_groundbreaking.htm</guid>
      <description>Secretary Hammond breaks ground on first cross-base project.</description>
    </item>
    <item>
      <title>SR 4 rock stabilization project progresses, closures now minimal</title>
      <pubDate>Thu, 31 Jul 2008 06:36:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/30_SR4ProgressingClosuresMinimal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/30_SR4ProgressingClosuresMinimal.htm</guid>
      <description>KELSO – After three weeks of successful rock scaling along State Route 4, 45-minute closures have ceased as the project moves forward into the next phase, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Overnight lane closures planned for I-5 through south Everett</title>
      <pubDate>Wed, 30 Jul 2008 04:32:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/30_SouthEverett.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/30_SouthEverett.htm</guid>
      <description>SEATTLE – Drivers could experience delays through south Everett on Wednesday, July 30 as crews close multiple lanes of Interstate 5 for striping. The work is part of Sound Transit’s South Everett Freeway Station project.</description>
    </item>
    <item>
      <title>Traffic detour coming at Peace Arch border station</title>
      <pubDate>Tue, 29 Jul 2008 23:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/29_i5changesattheborder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/29_i5changesattheborder.htm</guid>
      <description>Southbound traffic from Canada will be facing a new detour at the Peace Arch Border Station beginning Tuesday, August 5. All southbound traffic will be directed off the freeway at the D Street Exit 276 to Blaine as they leave the border station.</description>
    </item>
    <item>
      <title>Prep for 2009 Hood Canal Bridge closure delays traffic now</title>
      <pubDate>Tue, 29 Jul 2008 05:21:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/Prep+for+2009+Hood+Canal+Bridge+closure+delays+traffic+now.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/Prep+for+2009+Hood+Canal+Bridge+closure+delays+traffic+now.htm</guid>
      <description>SR104Ballastingwork</description>
    </item>
    <item>
      <title>Night closure of Guide Meridian planned for bridge construction</title>
      <pubDate>Mon, 28 Jul 2008 23:08:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/28_539girderplacementclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/28_539girderplacementclosure.htm</guid>
      <description>Crews will intermittently close both lanes of the Guide Meridian (SR 539) on Thursday night, July 31, to lift 10 large girders into place for a new bridge over Four Mile Creek.</description>
    </item>
    <item>
      <title>Crews to stripe I-5, on- and off-ramps in Bellingham</title>
      <pubDate>Mon, 28 Jul 2008 23:05:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/28_I5lanerampstriping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/28_I5lanerampstriping.htm</guid>
      <description>Now that crews have finished panel repair work and repaved on- and off-ramps on I-5 in Bellingham, they need to add permanent striping.</description>
    </item>
    <item>
      <title>US 395 lanes restricted July 28-31 in Kennewick</title>
      <pubDate>Mon, 28 Jul 2008 21:46:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/Lanes_Restricted_on_US395_in_Kennewick.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/Lanes_Restricted_on_US395_in_Kennewick.htm</guid>
      <description>WSDOT closes lanes on US 395 to repair pavement July 28-31 in Kennewick</description>
    </item>
    <item>
      <title>WSDOT Clarifies Claims Concerning State's Enforcement of Airport Grant Provisions</title>
      <pubDate>Sat, 26 Jul 2008 06:31:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/WSDOTClarifiesClaimsReGrantAssurances.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/WSDOTClarifiesClaimsReGrantAssurances.htm</guid>
      <description>A recent article by the Aircraft Owners and Pilot Association (AOPA) took issue with the Washington State Department Transportation's decision to require public airport owners to repay airport grants when closing an airport.  AOPA believes the state should pursue untested legal action against small communities with the hope to prevent airport closures.  WSDOT's decision to pursue repayment of grants is consistent with the Federal Aviation Administration's (FAA) practices, as well as with most st</description>
    </item>
    <item>
      <title>Smooth ride restored on I-82 between Selah Creek and Yakima</title>
      <pubDate>Sat, 26 Jul 2008 05:20:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/I82_PavingComplete_betweenSelahCreekandYakima.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/I82_PavingComplete_betweenSelahCreekandYakima.htm</guid>
      <description>WSDOT and contractor finish paving and restore a smooth ride on I-82 Selah Creek to Yakima</description>
    </item>
    <item>
      <title>Construction and upgrades to affect WSDOT traffic Web site</title>
      <pubDate>Sat, 26 Jul 2008 04:53:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/25_SR167andWebsiteUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/25_SR167andWebsiteUpdates.htm</guid>
      <description>Internet users trying to find Seattle area traffic information on WSDOT’s Web site may notice disruptions this weekend.</description>
    </item>
    <item>
      <title>US 97 back to normal between Wapato and Toppenish</title>
      <pubDate>Sat, 26 Jul 2008 03:41:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/US97_BackToNormalBTWN_Wapato_Toppenish.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/US97_BackToNormalBTWN_Wapato_Toppenish.htm</guid>
      <description>US 97 traffic back to normal between Wapato and Toppenish</description>
    </item>
    <item>
      <title>I-5 northbound lane closed at night in Burlington next week</title>
      <pubDate>Sat, 26 Jul 2008 02:17:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/25_I5FredoniaNBClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/25_I5FredoniaNBClosure.htm</guid>
      <description>Crews will close the right lane of northbound I-5 in Burlington to continue improvements to the SR 20 interchange (exit 230) during the week of July 28.</description>
    </item>
    <item>
      <title>Crews to pave intersection of SR 542, Britton Road east of Bellingham</title>
      <pubDate>Sat, 26 Jul 2008 01:23:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/25_sr542brittonroadpaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/25_sr542brittonroadpaving.htm</guid>
      <description>Commuters who regularly use the Britton Road intersection on Mount Baker Highway (SR 542) can expect delays Monday and Tuesday, July 28 and 29, as crews repave the intersection to improve safety for drivers.</description>
    </item>
    <item>
      <title>Paving in Clinton temporarily delayed</title>
      <pubDate>Fri, 25 Jul 2008 23:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/25_SR525ClintonPavingDelayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/25_SR525ClintonPavingDelayed.htm</guid>
      <description>Crews paving a section of SR 525 on Whidbey Island are on hold until a new liquid asphalt supplier can be found and a new asphalt mix is approved.</description>
    </item>
    <item>
      <title>North Creek Trail segment closed for one month under SR 522 in Bothell</title>
      <pubDate>Fri, 25 Jul 2008 21:55:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/24_SR522NorthCreekTrail.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/24_SR522NorthCreekTrail.htm</guid>
      <description>North Creek Trail segment closed for one month under SR 522 in Bothell.</description>
    </item>
    <item>
      <title>US 97 remains closed near Toppenish</title>
      <pubDate>Fri, 25 Jul 2008 04:20:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/US97_remains_closed_near-Toppenish.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/US97_remains_closed_near-Toppenish.htm</guid>
      <description>WSDOT detours US 97 traffic onto local roads near Toppenish one additional night
 
I-82 and SR 22 are recommended as alternate routes</description>
    </item>
    <item>
      <title>Crews to stripe highways on Whidbey Island next week</title>
      <pubDate>Fri, 25 Jul 2008 02:57:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/24_525sr20restriping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/24_525sr20restriping.htm</guid>
      <description>WSDOT crews will restripe SR 525 and SR 20 starting Monday, July 28 and lasting through Thursday afternoon, July 31.</description>
    </item>
    <item>
      <title>Crews get started building noise walls along I-5 in Seattle</title>
      <pubDate>Fri, 25 Jul 2008 02:26:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/24_RoanokeNoiseWall.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/24_RoanokeNoiseWall.htm</guid>
      <description>Crews get started building noise walls along I-5 in Seattle</description>
    </item>
    <item>
      <title>Crews to close one lane of Mount Baker Highway east of Bellingham</title>
      <pubDate>Thu, 24 Jul 2008 22:30:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/24_542coresampling.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/24_542coresampling.htm</guid>
      <description>Drivers who regularly commute on Mount Baker Highway (SR 542) will need to plan a few extra minutes into their drive next Monday and Tuesday, July 28 and 29.</description>
    </item>
    <item>
      <title>New shorter schedule for weekend lane closures on southbound I-5 Ship Canal Bridge in Seattle</title>
      <pubDate>Thu, 24 Jul 2008 05:12:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/23_I5ShipCanalSecondWeekendClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/23_I5ShipCanalSecondWeekendClosure.htm</guid>
      <description>For the second weekend in a row, WSDOT bridge maintenance crews will close lanes on Interstate 5 Ship Canal Bridge to repair damaged pavement.</description>
    </item>
    <item>
      <title>Four near misses in two days has WSDOT reminding drivers to “Give 'em a Brake”</title>
      <pubDate>Thu, 24 Jul 2008 03:26:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/23_5_WZcollisions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/23_5_WZcollisions.htm</guid>
      <description>After many near misses this week, WSDOT asks drivers to slow down and pay attention near work zones.</description>
    </item>
    <item>
      <title>WSDOT and the City of Selah host open house to present projects to relieve traffic congestion in downtown Selah</title>
      <pubDate>Thu, 24 Jul 2008 02:48:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/SelahOpenHouse2308.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/SelahOpenHouse2308.htm</guid>
      <description>WSDOT staff and the City of Selah will be hosting an open house to share information regarding the project to re-route SR 823 through Selah and the East Fremont Street improvement. This is your opportunity to see the design and talk with the experts.</description>
    </item>
    <item>
      <title>Replacement I-5 bridge and light rail to Clark College selected as Locally Preferred Alternative</title>
      <pubDate>Thu, 24 Jul 2008 01:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/23_ReplI5Bridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/23_ReplI5Bridge.htm</guid>
      <description>As a result of the RTC Board’s vote Tuesday, the Columbia River Crossing project’s six partner agencies have selected a replacement I-5 bridge and light rail extension to Clark College as the project’s Locally Preferred Alternative.</description>
    </item>
    <item>
      <title>Join the conversation with the new Guide Meridian blog</title>
      <pubDate>Thu, 24 Jul 2008 01:27:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/23_539newprojectblog.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/23_539newprojectblog.htm</guid>
      <description>Drivers, residents and travelers interested in joining the conversation about the Guide Meridian (SR 539) widening project in Whatcom County have a new way to make their voices heard.</description>
    </item>
    <item>
      <title>Burley Olalla Road to SR 16 closure date changes</title>
      <pubDate>Thu, 24 Jul 2008 00:40:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/SR16Burleyclosuredate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/SR16Burleyclosuredate.htm</guid>
      <description>Burley Olalla Road to SR 16 closure date changes</description>
    </item>
    <item>
      <title>Lane closed on Mount Baker Highway at Britton Road in Bellingham</title>
      <pubDate>Wed, 23 Jul 2008 22:00:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/23_sr542brittonroadlanesclosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/23_sr542brittonroadlanesclosed.htm</guid>
      <description>Drivers can expect delays and slowdowns on June 23 and 24 at the Britton Road intersection on Mount Baker Highway (SR 542).</description>
    </item>
    <item>
      <title>Nighttime lane closures planned on I-5 through south Everett this week</title>
      <pubDate>Wed, 23 Jul 2008 07:08:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/23_EverettClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/23_EverettClosures.htm</guid>
      <description>SEATTLE – Some late night and early morning drivers could have an extended trip through south Everett this week due to a series of lane closures on Interstate 5. Crews working for WSDOT will close two lanes of northbound I-5 on Wednesday, July 23 and the two left lanes of southbound I-5 on Thursday, July 24 to stripe the roadway. The work is part of Sound Transit’s South Everett Freeway Station project.</description>
    </item>
    <item>
      <title>US 2/97 - School Street Intersection Safety Project Goes to Bid</title>
      <pubDate>Wed, 23 Jul 2008 06:06:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/22US297SchoolStreetBarrier.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/22US297SchoolStreetBarrier.htm</guid>
      <description>A safety improvement project on US 2/97 at School Street, north of Wenatchee has been advertised for private contractor bids.</description>
    </item>
    <item>
      <title>Shoring up for safety: I-5 Everett crews start expansion joint repair</title>
      <pubDate>Wed, 23 Jul 2008 02:02:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/22_I5ExpJt.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/22_I5ExpJt.htm</guid>
      <description>Starting Wednesday, July 23 crews will repair a dozen expansion joints on I-5 between Marine View Drive and 41st Street.</description>
    </item>
    <item>
      <title>Construction closes northbound I-205 on-ramp at Mill Plain</title>
      <pubDate>Wed, 23 Jul 2008 00:00:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/22_I-205_Ramp_Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/22_I-205_Ramp_Closure.htm</guid>
      <description>Construction activities on I-205 near Mill Plain will shut down the on-ramp onto I-205 northbound from Mill Plain on the night of July 24, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Tacoma Narrows Bridge project team takes top honors</title>
      <pubDate>Tue, 22 Jul 2008 22:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/22_TNBTopHonors.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/22_TNBTopHonors.htm</guid>
      <description>The Western Association of State Highway Transportation Officials (WASHTO) this week awarded one of its highest honors, the “America’s Transportation Award,” to the Washington State Department of Transportation's new Tacoma Narrows Bridge project.</description>
    </item>
    <item>
      <title>I-5 and WSDOT’s maintenance budget hit again by wire thieves</title>
      <pubDate>Tue, 22 Jul 2008 21:10:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/22_I_5_MaintenanceHitbyWireThieves.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/22_I_5_MaintenanceHitbyWireThieves.htm</guid>
      <description>I-5 and WSDOT’s maintenance budget hit again by wire thieves</description>
    </item>
    <item>
      <title>It’s Crunch Time: Southbound I-405 to close for three weekends in August</title>
      <pubDate>Tue, 22 Jul 2008 04:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/21_WilburtonTunnel.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/21_WilburtonTunnel.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) recently announced traffic and mitigation plans for the upcoming Wilburton Tunnel removal near Bellevue.  For several weeks, crews have removed dirt and vegetation from the tunnel to prepare for its demolition.</description>
    </item>
    <item>
      <title>SR 14 westbound ramps will close for paving on night of July 24</title>
      <pubDate>Tue, 22 Jul 2008 02:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/21_SR14LieserRampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/21_SR14LieserRampClosure.htm</guid>
      <description>VANCOUVER – Drivers on westbound State Route 14 in Vancouver will notice closed on- and off -ramps at the Lieser Road Interchange, at night time this week.</description>
    </item>
    <item>
      <title>US 101 bridge-replacement project starts Monday</title>
      <pubDate>Sat, 19 Jul 2008 05:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/18_US101_PurdyBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/18_US101_PurdyBridge.htm</guid>
      <description>US 101 Purdy Creek Bridge north of Shelton will be replaced.</description>
    </item>
    <item>
      <title>Construction, closure of Maurin Rd. continues through July 28</title>
      <pubDate>Sat, 19 Jul 2008 05:09:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/18_ContinuedClosureMaurinRd.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/18_ContinuedClosureMaurinRd.htm</guid>
      <description>CHEHALIS – Maurin Road will continue to be closed to traffic through Monday, July 28, while contractors finish widening work, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Road closes for SR 16 interchange project</title>
      <pubDate>Sat, 19 Jul 2008 04:37:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/SR16BurleyOlallaRoadcloses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/SR16BurleyOlallaRoadcloses.htm</guid>
      <description>Road closes for SR 16 interchange project</description>
    </item>
    <item>
      <title>I-5 lane and ramps closed at night in Burlington next week</title>
      <pubDate>Sat, 19 Jul 2008 04:04:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/18_i5lanesrampsclosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/18_i5lanesrampsclosed.htm</guid>
      <description>Crews will close one lane and two ramps next week on I-5 in Burlington to begin improvements to the SR 20 interchange.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division continues biodiesel testing with fueling of Klahowya</title>
      <pubDate>Sat, 19 Jul 2008 02:51:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/18_biodieselKlahowya.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/18_biodieselKlahowya.htm</guid>
      <description>WSDOT Ferries Division continues biodiesel testing with fueling of Klahowya</description>
    </item>
    <item>
      <title>Lower speed limit for drivers in SR 20 work zone near Deception Pass</title>
      <pubDate>Fri, 18 Jul 2008 23:12:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/18_SpeedLimitReduction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/18_SpeedLimitReduction.htm</guid>
      <description>WSDOT will temporarily lower the speed limit for three miles on SR 20, near Deception Pass, to improve safety for drivers and construction workers.</description>
    </item>
    <item>
      <title>Crews start paving SR 525 in Clinton on Sunday night</title>
      <pubDate>Fri, 18 Jul 2008 22:46:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/18_ClintonPavingBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/18_ClintonPavingBegins.htm</guid>
      <description>For the next week, crews will work at night on State Route 525 on Whidbey Island.</description>
    </item>
    <item>
      <title>SR 162 paving requires 24-hour closure near Buckley</title>
      <pubDate>Fri, 18 Jul 2008 03:03:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/17_SR162_pavingclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/17_SR162_pavingclosure.htm</guid>
      <description>SR 162 closed for 24 hours for paving.</description>
    </item>
    <item>
      <title>I-5 lane closed around the clock next week near Bellingham</title>
      <pubDate>Fri, 18 Jul 2008 02:48:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/17_i5lanesclosednextweek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/17_i5lanesclosednextweek.htm</guid>
      <description>The around-the-clock lane closure north of Bellingham will end Friday morning. It will start again Sunday evening and last for one more week while crews to continue removing and replacing broken concrete panels.</description>
    </item>
    <item>
      <title>US 97 traffic detoured onto local roads near Toppenish July 21-24</title>
      <pubDate>Thu, 17 Jul 2008 05:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/US97DetourontoLocalRoads.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/US97DetourontoLocalRoads.htm</guid>
      <description>WSDOT detours US 97 traffic onto local roads near Toppenish July 21-24. I-82 and SR 22 are recommended as alternate routes</description>
    </item>
    <item>
      <title>Overnight lane closures on I-5 through south Everett</title>
      <pubDate>Thu, 17 Jul 2008 04:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/I-5ClosuresInSouthEverett.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/I-5ClosuresInSouthEverett.htm</guid>
      <description>SEATTLE – Drivers in south Everett should expect delays Thursday night as crews close two lanes in both directions of Interstate 5. Crews will stripe the on-and off-ramps to the new park and ride lot and part of I-5 under the 112th Street bridge.  The work is part of Sound Transit’s South Everett Freeway Station project.</description>
    </item>
    <item>
      <title>Artist Point to open Friday morning</title>
      <pubDate>Thu, 17 Jul 2008 01:24:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/16_sr542artistpointopensfriday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/16_sr542artistpointopensfriday.htm</guid>
      <description>Crews will open the last mile of the road to Artist Point at 8 a.m. Friday, July 18. The 2.7-mile stretch of Mount Baker Highway (SR 542) has been closed since September 28, 2007. Artist Point boasts 360-degree views of Mount Shuksan and Mount Baker, as well as access to a variety of trails.</description>
    </item>
    <item>
      <title>Crews open new lane on SR 20 near Burlington</title>
      <pubDate>Thu, 17 Jul 2008 01:13:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/16_Fredonia1Complete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/16_Fredonia1Complete.htm</guid>
      <description>WSDOT opened the wider, safer two-mile stretch of roadway near Burlington to eastbound drivers Tuesday afternoon, July 15.</description>
    </item>
    <item>
      <title>Upgrade to WSDOT Web site and 5-1-1 service Wednesday, July 16</title>
      <pubDate>Thu, 17 Jul 2008 00:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/16_NetworkUpgrade.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/16_NetworkUpgrade.htm</guid>
      <description>OLYMPIA - WSDOT will be upgrading network equipment on Wednesday from 9:15 p.m. until 9:30 p.m. to enhance Website support for data, voice and video.</description>
    </item>
    <item>
      <title>Weekend lane closures on I-5 Ship Canal Bridge in Seattle</title>
      <pubDate>Wed, 16 Jul 2008 23:41:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/16_I5ShipCanalLaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/16_I5ShipCanalLaneClosures.htm</guid>
      <description>Drivers traveling through Seattle can expect weekend lane closures on the Interstate 5 Ship Canal Bridge for the next two weekends as WSDOT crews repair potholes on the upper bridge deck.</description>
    </item>
    <item>
      <title>Lewis and Clark Bridge Inspection Work Scheduled for July 21-22, 24-25</title>
      <pubDate>Wed, 16 Jul 2008 06:40:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/15_NarrowLanesLewisClarkBridgeInspection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/15_NarrowLanesLewisClarkBridgeInspection.htm</guid>
      <description>LONGVIEW – Drivers on the Lewis and Clark Bridge over the Columbia River between Longview, WA and Rainier, OR will notice narrower lanes during the daytime July 21-22 and 24-25, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>I-5 bridge repairs finished early in Burlington</title>
      <pubDate>Wed, 16 Jul 2008 05:39:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/15_i5bridgerepairscomplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/15_i5bridgerepairscomplete.htm</guid>
      <description>Bridge crews finished temporary repairs on the damaged Chuckanut Drive overpass (exit 231) in Burlington two nights earlier than expected. Both lanes of Chuckanut Drive over I-5 will reopen this afternoon. Crews are in the process of picking up cones and changing weight restriction signs.</description>
    </item>
    <item>
      <title>WSDOT Asks Drivers Not to Park along SR 141 for Viewing of Fires</title>
      <pubDate>Tue, 15 Jul 2008 07:01:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/14_SR141NoParking.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/14_SR141NoParking.htm</guid>
      <description>BINGEN – Drivers on SR 141 are asked to not park their vehicles on the shoulders of SR 141, in the vicinity of Trout Lake (mile posts 19 through 23) as the efforts to fight the fires near Mt. Adams continue, asks the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Foundation work for new I-5 ramps to start Wednesday in Burlington</title>
      <pubDate>Tue, 15 Jul 2008 04:04:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/14_SR20PilingWorkBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/14_SR20PilingWorkBegins.htm</guid>
      <description>A machine will act like a giant hammer to pound concrete 72 pilings into the ground. The pilings will support the new bridge that will become the southbound I-5 on- and off-ramps at the SR 20 intersection.</description>
    </item>
    <item>
      <title>North Wenatchee Park and Ride Ribbon Cutting</title>
      <pubDate>Tue, 15 Jul 2008 01:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/14NWenatcheeParkRide.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/14NWenatcheeParkRide.htm</guid>
      <description>The newest Park and Ride Lot in North Central Washington opens Tuesday in North Wenatchee with a Ribbon Cutting Ceremony.</description>
    </item>
    <item>
      <title>Intermittent closures planned at intersection of Guide, Pole roads</title>
      <pubDate>Mon, 14 Jul 2008 23:04:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/14_SR539PoleRoadWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/14_SR539PoleRoadWork.htm</guid>
      <description>Drivers can expect travel disruptions and delays on the Guide Meridian on Monday and Tuesday nights, July 14-15, as Puget Sound Energy crews wrap up underground cable work</description>
    </item>
    <item>
      <title>Further inspections reveal severe damage to I-5 overpass in Burlington</title>
      <pubDate>Sat, 12 Jul 2008 04:58:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/11_i5bridgedamageatchuckanut.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/11_i5bridgedamageatchuckanut.htm</guid>
      <description>Further inspections of the damage to the Chuckanut Drive overpass (exit 231) over I-5 in Burlington confirmed engineers’ worst fears. The battered bridge support beams will have to be replaced.</description>
    </item>
    <item>
      <title>I-5 lanes and ramps closed at night through Bellingham next week</title>
      <pubDate>Sat, 12 Jul 2008 04:09:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/11_i5laneandrampclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/11_i5laneandrampclosures.htm</guid>
      <description>Crews will close lanes and ramps next week on I-5 in Bellingham to finish sealing new concrete panels and to install guardrail.</description>
    </item>
    <item>
      <title>SR 20 paving south of Oak Harbor starts Tuesday</title>
      <pubDate>Sat, 12 Jul 2008 04:07:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/11_sr20pavingsouthofoakharbor.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/11_sr20pavingsouthofoakharbor.htm</guid>
      <description>Crews will start laying the final layer of asphalt on SR 20 south of Oak Harbor on Tuesday night, July 15, and plan to finish the work in two weeks, as long as the weather stays nice.</description>
    </item>
    <item>
      <title>WSDOT forms advisory committee for Aurora Bridge fence project in Seattle</title>
      <pubDate>Fri, 11 Jul 2008 23:30:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/10_99aurorabridgefence.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/10_99aurorabridgefence.htm</guid>
      <description>Design is under way on a WSDOT project to deter people from jumping off of the State Route 99 Aurora Bridge in Seattle.  WSDOT has formed an advisory committee to represent community, business and local government interests as the design moves forward.</description>
    </item>
    <item>
      <title>Bridge over I-5 damaged by tall load in Burlington: Weight restrictions imposed indefinitely</title>
      <pubDate>Fri, 11 Jul 2008 08:25:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/10_11chuckanutdriveoverpass.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/10_11chuckanutdriveoverpass.htm</guid>
      <description>A truck towing an excavator on northbound I-5 hit and severely damaged the SR 11 Chuckanut Drive overpass in Burlington Thursday, July 10. Three of the six bridge girders had concrete and rebar damage. The girders are the structural support beams for the bridge.</description>
    </item>
    <item>
      <title>SR 9 closed next weekend while crews install culvert</title>
      <pubDate>Fri, 11 Jul 2008 03:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/10_sr9culvertclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/10_sr9culvertclosure.htm</guid>
      <description>Next weekend, crews will close State Route 9 near Arlington to install a six-foot square box culvert beneath the highway at Kackman Creek.</description>
    </item>
    <item>
      <title>Draft Statewide Aviation Policies Available for Public Review</title>
      <pubDate>Fri, 11 Jul 2008 03:49:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/DraftAviationPolicies.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/DraftAviationPolicies.htm</guid>
      <description>The Washington Aviation Planning Council is seeking your input on draft statewide aviation policies, which are being developed as part of the Long-Term Air Transportation Study.  The draft policies are designed to address statewide aviation issues in the areas of land use, environment, capacity, new technology, safety, mobility, stewardship, preservation, access and economy.</description>
    </item>
    <item>
      <title>I-5 lane closed for one week north of Bellingham</title>
      <pubDate>Fri, 11 Jul 2008 02:45:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/10_i5weeklonglaneclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/10_i5weeklonglaneclosures.htm</guid>
      <description>More I-5 lane closures are in store for Bellingham drivers. This time they’ll be north of Bellingham and not in the heart of town. One lane will close around the clock for one week starting Sunday night, July 13, as crews remove and replace broken concrete panels.</description>
    </item>
    <item>
      <title>Utility work on SR 302 in Purdy begins July 14</title>
      <pubDate>Thu, 10 Jul 2008 23:22:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/10_SR302UtilityWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/10_SR302UtilityWork.htm</guid>
      <description>Utility work on SR 302 in Purdy begins July 14</description>
    </item>
    <item>
      <title>I-5 Toutle River Rest Area in Cowlitz Co. Closing for Construction</title>
      <pubDate>Thu, 10 Jul 2008 23:17:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/10_ToutleRestAreaClosingforPaver.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/10_ToutleRestAreaClosingforPaver.htm</guid>
      <description>CASTLE ROCK – The Toutle River Rest Area on northbound I-5 in Cowlitz County will close due to construction, for two evenings, on July 15 and July 16, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Closures this weekend for paving on SR 900 in Tukwila</title>
      <pubDate>Thu, 10 Jul 2008 06:12:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/9_SR900Paving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/9_SR900Paving.htm</guid>
      <description>Crews working for WSDOT will pave a portion of State Route 900 (Martin Luther King Junior Way S.) in Tukwila this weekend.  Crews will remove deteriorating pavement, rebuild the roadbed and repave the highway between the northbound Interstate 5 exit to SR 900 and the intersection at S. Boeing Access Road/S. Ryan Way.</description>
    </item>
    <item>
      <title>Weeklong Closure of Maurin Rd for Widening Begins July 14</title>
      <pubDate>Thu, 10 Jul 2008 03:46:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/09_MaurinRdClosedforWidening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/09_MaurinRdClosedforWidening.htm</guid>
      <description>CHEHALIS – Beginning July 14, Maurin Road in Chehalis will be closed for one week as construction crews widen the roadway from two to four lanes, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Annual inspection to close SR 520 Evergreen Point floating bridge this weekend</title>
      <pubDate>Wed, 09 Jul 2008 05:10:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/08_SR520BridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/08_SR520BridgeClosure.htm</guid>
      <description>Washington State Department of Transportation crews will close the SR 520 Evergreen Point floating bridge beginning at 11 p.m. Friday, July 11 for its annual inspection and maintenance work.</description>
    </item>
    <item>
      <title>July brings no freedom from wire theft</title>
      <pubDate>Wed, 09 Jul 2008 04:49:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/SR7Julywiretheft.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/SR7Julywiretheft.htm</guid>
      <description>July brings no freedom from wire theft</description>
    </item>
    <item>
      <title>WSDOT closes lanes on I-182 and US 395 in Tri-Cities</title>
      <pubDate>Wed, 09 Jul 2008 03:46:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/LanesRestrictedonI182andUS395.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/LanesRestrictedonI182andUS395.htm</guid>
      <description>WSDOT closes lanes on I-182 and US 395 to inspect bridges in the Tri-Cities</description>
    </item>
    <item>
      <title>Construction Closes Northbound I-205 Lanes, Ramp to Westbound Mill Plain</title>
      <pubDate>Tue, 08 Jul 2008 22:37:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/08_WeekendClosuresI205NBMillPlainWB.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/08_WeekendClosuresI205NBMillPlainWB.htm</guid>
      <description>VANCOUVER – Drivers will notice a closed ramp, in addition to other impacts to traffic on I-205 in Vancouver over the weekend, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>I-5 Paving Project near Castle Rock Begins July 10</title>
      <pubDate>Tue, 08 Jul 2008 05:04:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/07_I5CastleRocktoSR505PaverBeginsJuly10.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/07_I5CastleRocktoSR505PaverBeginsJuly10.htm</guid>
      <description>KELSO – A project to pave and provide safety improvements to I-5 from Castle Rock to SR 505 will begin on July 10 announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>WSDOT starts search for design-builder to construct SR 532 corridor improvements</title>
      <pubDate>Tue, 08 Jul 2008 04:54:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/7_532LOI.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/7_532LOI.htm</guid>
      <description>The Washington State Department of Transportation is soliciting letters of interest from companies planning to apply to provide design-build services for a project to improve the SR 532 corridor between Camano Island and I-5.</description>
    </item>
    <item>
      <title>Seattle to Portland Bicycle Classic - July 12 and 13; Drivers Encouraged to Allow Extra Travel Time</title>
      <pubDate>Tue, 08 Jul 2008 04:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/07_STP_route_impacts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/07_STP_route_impacts.htm</guid>
      <description>Organizers predict a record 9,500 bicyclists will be on local roads and highways for the 2008 Group Health Seattle to Portland Bicycle Classic (STP). The 200-mile ride between Seattle and Portland is schedule for Saturday, July 12 and Sunday, July 13.</description>
    </item>
    <item>
      <title>SR 169 bridge over Green River open in both directions</title>
      <pubDate>Mon, 07 Jul 2008 22:05:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/07_SR169GreenRiverRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/07_SR169GreenRiverRepair.htm</guid>
      <description>Both directions of SR 169 at the Kummer bridge near Black Diamond opened at 6:10 p.m. Thursday, July 3, after crews finished emergency repair work.</description>
    </item>
    <item>
      <title>Flammable cargo restricted on I-5 under Convention Center</title>
      <pubDate>Thu, 03 Jul 2008 22:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/3_I-5FlammableRestriction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/3_I-5FlammableRestriction.htm</guid>
      <description>SEATTLE - WSDOT will restrict flammable cargo in both directions of I-5 under the Washington State Convention and Trade Center in Seattle from 7 a.m. to 4 p.m. on Tuesday, July 8.</description>
    </item>
    <item>
      <title>I-82 ramps closed for Yakima fireworks event</title>
      <pubDate>Thu, 03 Jul 2008 06:14:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/I82_ramps_closed_for-Yakima-fireworks_event.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/I82_ramps_closed_for-Yakima-fireworks_event.htm</guid>
      <description>WSDOT and YPD close I-82 off-ramps to SR 24/Nob Hill Blvd. during Independence Day fireworks display</description>
    </item>
    <item>
      <title>Four new cameras to view I-90 near Snoqualmie Pass</title>
      <pubDate>Thu, 03 Jul 2008 03:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/2_NewcamerasonI90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/2_NewcamerasonI90.htm</guid>
      <description>WSDOT provides four new portable cameras to keep an eye on I-90 traffic near Snoqualmie Pass</description>
    </item>
    <item>
      <title>Rock Stabilization Project, Long Closures on SR 4 Begin July 8</title>
      <pubDate>Thu, 03 Jul 2008 02:41:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/02_LongClosuresAheadonSR4.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/02_LongClosuresAheadonSR4.htm</guid>
      <description>KELSO – Plan ahead before you travel on SR 4 for the next few weeks, starting on Tuesday, July 8, warns the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Murray Morgan Bridge opens for festival</title>
      <pubDate>Thu, 03 Jul 2008 00:54:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/MurraryMorganopensforfestival.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/MurraryMorganopensforfestival.htm</guid>
      <description>Murray Morgan Bridge opens for festival</description>
    </item>
    <item>
      <title>Fiber-optic installation means delays for Roy drivers</title>
      <pubDate>Thu, 03 Jul 2008 00:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/02_SR702FiberOptic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/02_SR702FiberOptic.htm</guid>
      <description>Fiber-optic installation means delays for Roy drivers</description>
    </item>
    <item>
      <title>Public Encouraged to Attend July Open Houses for the Long-Term Air Transportation Study</title>
      <pubDate>Wed, 02 Jul 2008 05:34:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/LATSJulyOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/07/LATSJulyOpenHouse.htm</guid>
      <description>The Washington Aviation Planning Council is seeking your input on draft statewide aviation policies, which were recently developed as part of the Long-Term Air Transportation Study. The policies were designed to address statewide aviation issues in the areas of land use, environment, capacity, new technology, safety, mobility, stewardship, preservation, access and economy.</description>
    </item>
    <item>
      <title>Crews begin noise wall construction project along southbound I-5 in north Seattle</title>
      <pubDate>Tue, 01 Jul 2008 07:26:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/063008_noisewall.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/063008_noisewall.htm</guid>
      <description>Starting this week, construction crews working for WSDOT will take the first steps toward building new noise walls along southbound Interstate 5 in the Green Lake and Licton Springs neighborhoods of Seattle.</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct and Seawall Replacement program moving forward:  Environmental assessment for removing one mile of viaduct made public</title>
      <pubDate>Tue, 01 Jul 2008 04:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/30-awv_ea.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/30-awv_ea.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) and the Federal Highway Administration (FHWA) took another step toward replacing the Alaskan Way Viaduct. WSDOT and FHWA have released the environmental assessment for the South Holgate Street to South King Street Viaduct Replacement Project. This project is adjacent to and south of the stadiums and will replace one mile, or approximately 40 percent, of the vulnerable Alaskan Way Viaduct.</description>
    </item>
    <item>
      <title>Last of 2005 gas tax phases takes effect July 1</title>
      <pubDate>Tue, 01 Jul 2008 04:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/30_last-2005-gas-tax-phase.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/30_last-2005-gas-tax-phase.htm</guid>
      <description>OLYMPIA - The final 1.5-cent gas tax increase from the 2005 transportation revenue package takes effect July 1.</description>
    </item>
    <item>
      <title>Where's WSDOT? Track the trek to Artist Point on the Web</title>
      <pubDate>Tue, 01 Jul 2008 03:37:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/30_sr542roadtoartistpoint.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/30_sr542roadtoartistpoint.htm</guid>
      <description>Experience the trek through the snow to Artist Point like never before. Follow crews virtually on the WSDOT Web site as they work their way to one of the highest lookouts in the state. Artist Point sits more than 5,000 feet above sea level at the end of Mount Baker Highway and spends most of the year buried beneath snow.</description>
    </item>
    <item>
      <title>I-5 and SR 14 Ramp Closures Scheduled for Vancouver Fourth of July Fireworks Display</title>
      <pubDate>Tue, 01 Jul 2008 02:04:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/I-5_4thofJuly.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/I-5_4thofJuly.htm</guid>
      <description>In a cooperative effort by the Washington State Department of Transportation (WSDOT), the Washington State Patrol (WSP) and the City of Vancouver, several on-and off-ramps on I-5 and State Route 14 will be closed between 6 p.m. and 12 midnight on the Fourth of July to help control traffic flow around the fireworks display area.</description>
    </item>
    <item>
      <title>Tolls on Tacoma Narrows Bridge increase July 1</title>
      <pubDate>Tue, 01 Jul 2008 01:50:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/30_tolls-tacoma-narrows-bridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/30_tolls-tacoma-narrows-bridge.htm</guid>
      <description>GIG HARBOR – Toll rates on the Tacoma Narrows Bridge increase to $4.00 for cash toll payers and $2.75 for electronic toll payers, effective July 1, 2008 through June 30, 2009.</description>
    </item>
    <item>
      <title>US 12 westbound on-ramp closed in Yakima June 30 - July 3</title>
      <pubDate>Sat, 28 Jun 2008 04:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/US12_westbound_onramp_closed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/US12_westbound_onramp_closed.htm</guid>
      <description>WSDOT closes westbound on-ramp to US 12 from 16th Avenue in Yakima June 30 - July 3
Drivers should allow a little extra time to reach westbound US 12.</description>
    </item>
    <item>
      <title>Hood Canal Bridge Team pours it on one last time</title>
      <pubDate>Sat, 28 Jun 2008 04:28:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/HCBFinalPourCTC.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/HCBFinalPourCTC.htm</guid>
      <description>HCBTeamfinalpourCTC</description>
    </item>
    <item>
      <title>Eastbound SR 16 lane closures scheduled near toll plaza</title>
      <pubDate>Sat, 28 Jun 2008 03:40:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/27_16_closuresneartoll.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/27_16_closuresneartoll.htm</guid>
      <description>SR 16 eastbound lane closures Tuesday near toll booths.</description>
    </item>
    <item>
      <title>WSDOT contractors begin repair work on SR 169</title>
      <pubDate>Sat, 28 Jun 2008 02:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/27_SR169Repair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/27_SR169Repair.htm</guid>
      <description>WSDOT contractors will begin emergency repair work on State Route 169 a day earlier than planned in an effort to get in, get the work done, and get out before the July Fourth holiday weekend.</description>
    </item>
    <item>
      <title>SR 105 Johns River Bridge gets new paint</title>
      <pubDate>Sat, 28 Jun 2008 01:19:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/SR105JohnsRiverBridgepaint.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/SR105JohnsRiverBridgepaint.htm</guid>
      <description>SR 105 Johns River Bridge gets new paint</description>
    </item>
    <item>
      <title>Construction affects I-90 express lane schedule</title>
      <pubDate>Fri, 27 Jun 2008 21:50:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/27_I90TemporaryExpressLaneSchedule.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/27_I90TemporaryExpressLaneSchedule.htm</guid>
      <description>Beginning Monday, June 30 drivers will notice big barrels and attenuator trucks on the I-90 express lanes on Mercer Island, along with temporary changes to the express lane schedule.</description>
    </item>
    <item>
      <title>SR 9 near Arlington closed all weekend as crews reach major milestone</title>
      <pubDate>Fri, 27 Jun 2008 06:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/26_SR9Schloman.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/26_SR9Schloman.htm</guid>
      <description>Crews are getting ready to open a new segment of State Route 9 near Arlington next week. Starting Friday night, drivers should plan to take an alternate route as crews close SR 9 for the weekend in order to connect the new roadway with the existing highway.</description>
    </item>
    <item>
      <title>Draft solution packages for central section of Alaskan Way Viaduct and Seawall released</title>
      <pubDate>Fri, 27 Jun 2008 06:49:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/26-viaductsolutions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/26-viaductsolutions.htm</guid>
      <description>The State of Washington, King County, and the City of Seattle released draft solution packages today that will be evaluated as ways to keep people and goods moving when the central section of the Alaskan Way Viaduct is taken down in 2012. The packages consist of SR 99 options, coupled with improvements to transit, I-5, the downtown street grid, and transportation management strategies.</description>
    </item>
    <item>
      <title>Best times to travel for Independence Day Weekend</title>
      <pubDate>Fri, 27 Jun 2008 06:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/26_fourth_july_travel.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/26_fourth_july_travel.htm</guid>
      <description>OLYMPIA – Fourth of July is a Friday for 2008 and WSDOT’s Web site offers new tools for drivers hitting the road.</description>
    </item>
    <item>
      <title>Seafair Marathon to close eastbound SR 520 floating bridge</title>
      <pubDate>Fri, 27 Jun 2008 05:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/626_520SeafairClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/626_520SeafairClosure.htm</guid>
      <description>Drivers should expect closures of eastbound SR 520 and the floating bridge from 6:45 a.m. to 9 a.m. on Sunday, June 29 for this year’s VM Team Medicine Seafair Marathon.</description>
    </item>
    <item>
      <title>Work on second Wiser Lake bridge under way</title>
      <pubDate>Fri, 27 Jun 2008 04:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/26_539WiserLakeBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/26_539WiserLakeBridge.htm</guid>
      <description>Crews will begin building a widened causeway across the lake Monday, June 30, to support the two additional Guide Meridian lanes.</description>
    </item>
    <item>
      <title>US 2 brimming with summertime activity – bicyclists, construction crews and motorists will share the road</title>
      <pubDate>Thu, 26 Jun 2008 23:31:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/23_2BicyclistsAndSummerConstruction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/23_2BicyclistsAndSummerConstruction.htm</guid>
      <description>US 2 brimming with summertime activity – bicyclists, construction crews and motorists will share the road</description>
    </item>
    <item>
      <title>Drivers should expect delays on SR 529 between Everett and Marysville Wednesday</title>
      <pubDate>Thu, 26 Jun 2008 23:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/24_529BridgeInspectionClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/24_529BridgeInspectionClosures.htm</guid>
      <description>Drivers should expect delays on SR 529 between Everett and Marysville Wednesday
WSDOT crews will inspect two bridges</description>
    </item>
    <item>
      <title>Final Hood Canal Bridge lift spans arrive in Seattle</title>
      <pubDate>Thu, 26 Jun 2008 05:02:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/HCBLiftSpansArriveJune26.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/HCBLiftSpansArriveJune26.htm</guid>
      <description>HCBLiftSpansArrive</description>
    </item>
    <item>
      <title>WSDOT flags traffic through US 97/SR 22 intersection in Toppenish June 26</title>
      <pubDate>Thu, 26 Jun 2008 03:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/US97_SR22_Signal_+Replacement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/US97_SR22_Signal_+Replacement.htm</guid>
      <description>WSDOT will flag traffic through US 97/SR 22 intersection in Toppenish on Thursday, June 26</description>
    </item>
    <item>
      <title>WSDOT crews assess unstable slope south of SR 169 bridge near Black Diamond</title>
      <pubDate>Wed, 25 Jun 2008 07:20:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/24_SR169Slide.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/24_SR169Slide.htm</guid>
      <description>WSDOT crews have completed the emergency drill work on the unstable slope south of the Dan Evans Bridge over the Green River on State Route 169. WSDOT geotechnical experts have concluded the slope is too unstable to allow traffic on the northbound lane. The bridge will reopen to one lane of alternating traffic on the southbound lane by 7 p.m. Tuesday.</description>
    </item>
    <item>
      <title>Unstable slope under SR 169 bridge near Enumclaw forces WSDOT to perform emergency inspections and repairs</title>
      <pubDate>Tue, 24 Jun 2008 08:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/23_SR169GreenRiver.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/23_SR169GreenRiver.htm</guid>
      <description>Unstable slope under SR 169 bridge near Enumclaw forces WSDOT to perform emergency inspections and repairs</description>
    </item>
    <item>
      <title>Hood Canal Bridge faces 45-minute closure on June 26</title>
      <pubDate>Tue, 24 Jun 2008 02:58:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/HCBclosureJune26.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/HCBclosureJune26.htm</guid>
      <description>HCBclosureJune26</description>
    </item>
    <item>
      <title>Wait times now available for all four border crossings</title>
      <pubDate>Tue, 24 Jun 2008 02:45:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/23_i5borderwaittimes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/23_i5borderwaittimes.htm</guid>
      <description>Drivers can choose the border crossing with the shortest lines by taking advantage of new border wait times provided by the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>Flagger killed today on US 101</title>
      <pubDate>Tue, 24 Jun 2008 02:34:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/23_101_Flaggerkilled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/23_101_Flaggerkilled.htm</guid>
      <description>A flagger working for Lakeside Industries was killed in a work zone today.</description>
    </item>
    <item>
      <title>I-82 eastbound lanes restricted June 23-26 in Pasco</title>
      <pubDate>Tue, 24 Jun 2008 00:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/I+82_LanesRestricted+on+I82Monday_Thursday_Pasco.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/I+82_LanesRestricted+on+I82Monday_Thursday_Pasco.htm</guid>
      <description>WSDOT closes left and center lanes on eastbound I-182 June 23-26 between Road 100 and Road 68 in Pasco</description>
    </item>
    <item>
      <title>Help shape the future of I-5 in Bellingham</title>
      <pubDate>Mon, 23 Jun 2008 23:05:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/23_i5masterplanopenhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/23_i5masterplanopenhouse.htm</guid>
      <description>WSDOT recently finished researching and analyzing I-5 through Bellingham and found problems that need funding and improvements. The community is invited to learn more about the problems and discuss improvements at an open house this week.</description>
    </item>
    <item>
      <title>I-5 lane, ramp closures in Pierce County next week</title>
      <pubDate>Sat, 21 Jun 2008 05:11:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/20_I5_Pierceclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/20_I5_Pierceclosures.htm</guid>
      <description>I-5 lane and ramp closures in south Pierce County.</description>
    </item>
    <item>
      <title>Quarterly inspection shows repairs may have halted Alaskan Way Viaduct settlement</title>
      <pubDate>Sat, 21 Jun 2008 00:50:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/20-viaductinspectionresults.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/20-viaductinspectionresults.htm</guid>
      <description>Results from last week's inspection of the Alaskan Way Viaduct showed no structural damage or additional settlement of the columns between Columbia Street and Yesler Way. WSDOT completed work in April to strengthen the column foundations in that area.</description>
    </item>
    <item>
      <title>Cross-base construction around the corner</title>
      <pubDate>Fri, 20 Jun 2008 22:26:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/20_spanloop_704.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/20_spanloop_704.htm</guid>
      <description>Spanaway Loop to SR 7 project starts next month (July 2008).</description>
    </item>
    <item>
      <title>SR 4 Rock Scaling Project, Road Closures Begin July 7</title>
      <pubDate>Fri, 20 Jun 2008 04:33:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/19_SR4RockScalingtoBegin.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/19_SR4RockScalingtoBegin.htm</guid>
      <description>KELSO – A project that will make SR 4 near the Cowlitz/Wahkiakum county line safer from falling rocks is set to begin on Monday, July 7, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Weekend Ramp Closures Planned for SR 500 – I-205 Interchange Project</title>
      <pubDate>Fri, 20 Jun 2008 04:21:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/19_SR500WeekendRampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/19_SR500WeekendRampClosures.htm</guid>
      <description>VANCOUVER – Two loop ramps connecting I-205 and SR 500 will be completely closed Saturday and Sunday for construction, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Bridge repair work closes Manette Bridge next week</title>
      <pubDate>Fri, 20 Jun 2008 01:26:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/SR303ManetteBridgerepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/SR303ManetteBridgerepairs.htm</guid>
      <description>Bridge repair work closes Manette Bridge next week</description>
    </item>
    <item>
      <title>Delays expected on SR 302 in Purdy</title>
      <pubDate>Fri, 20 Jun 2008 00:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/SR302PurdyCreekdelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/SR302PurdyCreekdelays.htm</guid>
      <description>Delays expected on SR 302 at Purdy Spit.</description>
    </item>
    <item>
      <title>Latest news on building a new SR 520 at open houses</title>
      <pubDate>Thu, 19 Jun 2008 06:31:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/18-sr520openhouses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/18-sr520openhouses.htm</guid>
      <description>WSDOT will share the latest plans for the SR 520 bridge replacement with the public at open houses next week in Seattle and Bellevue. The new plans are a result of the mediation process on the west side of Lake Washington and collaboration with the Eastside communities.</description>
    </item>
    <item>
      <title>The public has its say: ‘Move forward with South Point to Lofall’</title>
      <pubDate>Thu, 19 Jun 2008 04:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/Hood+Canal+Shuttle+Survey+June+2008.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/Hood+Canal+Shuttle+Survey+June+2008.htm</guid>
      <description>HCBsurveyresultsJune2008</description>
    </item>
    <item>
      <title>Columbia River Crossing Task Force to recommend one alternative at June 24 meeting</title>
      <pubDate>Thu, 19 Jun 2008 04:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/18_CRCTaskForce.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/18_CRCTaskForce.htm</guid>
      <description>VANCOUVER - The 39-member panel advising the Columbia River Crossing project will meet for the last time Tuesday, June 24, to recommend which of five alternatives best meets the community's needs and helps address congestion, mobility and safety problems on I-5 between Vancouver and Portland.</description>
    </item>
    <item>
      <title>Help shape the future of I-5 in Skagit County</title>
      <pubDate>Thu, 19 Jun 2008 03:12:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/18_i5interstatemasterplan.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/18_i5interstatemasterplan.htm</guid>
      <description>WSDOT recently finished researching and analyzing I-5 through Skagit County and found problems that need funding and improvements. The community is invited to learn more about the problems and discuss improvements at an open house next week.</description>
    </item>
    <item>
      <title>WSDOT slows eastbound I-90 traffic near Snoqualmie Pass</title>
      <pubDate>Thu, 19 Jun 2008 01:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/eastboundI_90SlowsForHolicopter.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/eastboundI_90SlowsForHolicopter.htm</guid>
      <description>WSDOT slows eastbound I-90 traffic near Snoqualmie Pass while helicopters place nets onto stabilized slope</description>
    </item>
    <item>
      <title>$4.30 a Gallon? Dump the Pump, June 19!</title>
      <pubDate>Thu, 19 Jun 2008 00:19:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/18_dumpthepump.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/18_dumpthepump.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) wants commuters to know about the many ways to save money at the gas pump. The state invests in and promotes a variety of commute options as alternatives to driving alone, including the use of carpools, vanpools, buses, bicycling, walking, compressed work hours, and working from home. To find your local transit system or about commute options in your area, visit the WSDOT Web site. 
http://www.wsdot.wa.gov/choices/statewide</description>
    </item>
    <item>
      <title>Advanced Warning Beacons Coming to Easy Street on US 2/97</title>
      <pubDate>Wed, 18 Jun 2008 23:26:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/18US2EasyStWarningBeacons.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/18US2EasyStWarningBeacons.htm</guid>
      <description>"Prepare to Stop When Flashing" signs and beacons are going up on US 2/97 north of Wenatchee.</description>
    </item>
    <item>
      <title>Advanced Warning Beacons Coming to Omak on US 97</title>
      <pubDate>Wed, 18 Jun 2008 23:21:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/18US97OmakWarningBeacons.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/18US97OmakWarningBeacons.htm</guid>
      <description>"Prepare to Stop When Flashing" signs with beacons are being installed on US 97 at Omak's busiest intersection.</description>
    </item>
    <item>
      <title>Celebrate the new park and ride with WSDOT and Ben Franklin Transit</title>
      <pubDate>Wed, 18 Jun 2008 06:48:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/06_ColumbiaParkTrailPR.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/06_ColumbiaParkTrailPR.htm</guid>
      <description>Ben Franklin Transit officials and the Washington State Department of Transportation (WSDOT) will hold a project dedication ceremony on Friday, June 20 at 11 a.m. The media, local officials, business leaders, and citizens are invited to help celebrate the newly expanded Columbia Park Trail Park and Ride.</description>
    </item>
    <item>
      <title>West side widening complete on Guide Meridian project</title>
      <pubDate>Wed, 18 Jun 2008 04:51:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/17_SR539WestWideningComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/17_SR539WestWideningComplete.htm</guid>
      <description>Drivers who regularly travel the Guide Meridian between Horton and Ten Mile roads will notice a smoother trip – and fewer delays – starting Wednesday morning.</description>
    </item>
    <item>
      <title>Brief outage to WSDOT Web site and 5-1-1 service late Wednesday</title>
      <pubDate>Wed, 18 Jun 2008 04:50:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/17_WSDOT_Brief_web_down.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/17_WSDOT_Brief_web_down.htm</guid>
      <description>The Internet and telephone travel information provided by the Washington State Department of Transportation (WSDOT) will not be available from 9:15 p.m. until 9:45 p.m. on Wednesday, June 18.</description>
    </item>
    <item>
      <title>WSDOT to inspect I-5 bridge this weekend in Mount Vernon</title>
      <pubDate>Tue, 17 Jun 2008 23:04:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/17_I5VernonBridgeInspect.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/17_I5VernonBridgeInspect.htm</guid>
      <description>WSDOT bridge maintenance crews will close lanes on the I-5 Skagit River Bridge in Mount Vernon June 21-22.</description>
    </item>
    <item>
      <title>WSDOT crews inspect the Alaskan Way Viaduct on June 17 without lane closures</title>
      <pubDate>Tue, 17 Jun 2008 04:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/16-viaduct-inspection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/16-viaduct-inspection.htm</guid>
      <description>A quarterly inspection of the Alaskan Way Viaduct will take place tomorrow, June 17. No lane closures will be required.</description>
    </item>
    <item>
      <title>WSDOT replacing damaged I-405 culvert in Renton</title>
      <pubDate>Sat, 14 Jun 2008 07:11:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/13_I405Culvert.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/13_I405Culvert.htm</guid>
      <description>Starting Monday, June 16, crews will begin installing the new culvert that will carry Thunder Hills Creek underneath Interstate 405 near Benson Road in Renton.  

Last December’s rain storm created a torrent of water that resulted in a sinkhole along the I-405 and the collapse of the old Thunder Hills Creek culvert.  New culvert installation will occur between 7 a.m. and 4 p.m. on weekdays, and should continue for four to six weeks.  Replacing the culvert will protect I-405 against flood damag</description>
    </item>
    <item>
      <title>I-5 ramps, lanes to close next week in Bellingham</title>
      <pubDate>Sat, 14 Jun 2008 05:40:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/13_I5RampandSeal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/13_I5RampandSeal.htm</guid>
      <description>Crews will close several I-5 on- and off-ramps in Bellingham next week to pave them, and close lanes of I-5 to seal cracks.</description>
    </item>
    <item>
      <title>SR 526 in Mukilteo gets a facelift this summer</title>
      <pubDate>Sat, 14 Jun 2008 05:24:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/061308_SR526_repave.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/061308_SR526_repave.htm</guid>
      <description>On Monday, June 16, WSDOT and contractor Granite Northwest Inc. will begin work to repave three miles of highway and complete safety improvements to State Route 526 in Mukilteo.</description>
    </item>
    <item>
      <title>I-182 lanes restricted Monday-Thursday near Pasco</title>
      <pubDate>Sat, 14 Jun 2008 05:18:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/I182_lanesRestrictedMondayThruThursdayInPasco.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/I182_lanesRestrictedMondayThruThursdayInPasco.htm</guid>
      <description>I-182: Left and center lanes restricted Monday –Thursday between Road 100 and Road 68 in Pasco</description>
    </item>
    <item>
      <title>Summer work begins on SR 528 in Marysville</title>
      <pubDate>Sat, 14 Jun 2008 00:11:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/13_SR528MarysvillePaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/13_SR528MarysvillePaving.htm</guid>
      <description>Beginning this Sunday, June 15, nighttime drivers through Marysville will notice construction crews at work on State Route 528 (4th Street).</description>
    </item>
    <item>
      <title>US 101 bridge project prompts lane and width restrictions</title>
      <pubDate>Fri, 13 Jun 2008 01:52:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/12_US101LaneWidth.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/12_US101LaneWidth.htm</guid>
      <description>US 101 bridge project prompts lane and width restrictions</description>
    </item>
    <item>
      <title>WSDOT provides options to help commuters beat the high cost of gas</title>
      <pubDate>Fri, 13 Jun 2008 01:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/12_CommuterOptions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/12_CommuterOptions.htm</guid>
      <description>WSDOT is helping to keep Washington moving by providing commuters with options for getting to work. WSDOT invests in and promotes a variety of commute options as alternatives to driving alone, including the use of carpools, vanpools, buses, bicycling, walking, compressed work hours, and working from home.</description>
    </item>
    <item>
      <title>Expect Right Lane Closure on I-5 South near Ostrander Creek</title>
      <pubDate>Fri, 13 Jun 2008 01:22:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/12_I5LaneClosedPanelReplacement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/12_I5LaneClosedPanelReplacement.htm</guid>
      <description>OSTRANDER – Motorists traveling I-5 southbound near Ostrander Creek (milepost 45) will encounter another right lane closure starting Monday morning through Thursday afternoon, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Bridge Inspection Closes Lanes on Biggs Bridge, June 17-18</title>
      <pubDate>Thu, 12 Jun 2008 05:52:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/11_US97BiggsBridgeInspection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/11_US97BiggsBridgeInspection.htm</guid>
      <description>GOLDENDALE – Bridge inspection of the Sam Hill-Biggs Rapid Bridge will result in single-lane day-time closures, June 17-18, announced the Washington State Department of Transportation (WSDOT). In the event of high winds, lane closures may extend to Thursday, June 19.</description>
    </item>
    <item>
      <title>Night work to close lane on Hood Canal Bridge</title>
      <pubDate>Thu, 12 Jun 2008 02:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/11_hoodcanalbridgework.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/11_hoodcanalbridgework.htm</guid>
      <description>Night work to close lane on Hood Canal Bridge</description>
    </item>
    <item>
      <title>WSDOT Awards $1.1 Million Towards 2008 Airport Improvement Projects</title>
      <pubDate>Thu, 12 Jun 2008 02:02:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/2008AirportAidProjects200806.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/2008AirportAidProjects200806.htm</guid>
      <description>WSDOT Awards $1.1 Million towards 2008 Airport Improvement Projects</description>
    </item>
    <item>
      <title>State Transportation Commission to hold meeting in Moses Lake</title>
      <pubDate>Wed, 11 Jun 2008 23:18:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/11TransCommMosesLake.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/11TransCommMosesLake.htm</guid>
      <description>The State Transportation Commission meets in Moses Lake next Tuesday.</description>
    </item>
    <item>
      <title>Planned lane closures for I-5 through south Everett</title>
      <pubDate>Wed, 11 Jun 2008 03:16:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/10_LaneClosuresThroughSEverett.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/10_LaneClosuresThroughSEverett.htm</guid>
      <description>SEATTLE - WSDOT crews will close the three left lanes of northbound I-5 through south Everett Tuesday, June 10 through Thursday, June 12 to install electrical wiring as part of Sound Transit’s south Everett freeway station. All southbound lanes will remain open.</description>
    </item>
    <item>
      <title>WSDOT to Close Right Lane on I-5 North near Castle Rock</title>
      <pubDate>Tue, 10 Jun 2008 23:26:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/10_I5PanelReplacement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/10_I5PanelReplacement.htm</guid>
      <description>CASTLE ROCK – Motorists traveling I-5 northbound near Castle Rock (milepost 51) will encounter a right lane closure starting Wednesday morning through Thursday afternoon, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Four new signs to help drivers change course</title>
      <pubDate>Tue, 10 Jun 2008 04:18:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/09_NewTravelTimes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/09_NewTravelTimes.htm</guid>
      <description>SEATTLE – Starting today WSDOT delivers four new popular travel times signs from Federal Way to Bellevue along Interstate 5 and State Route 167.</description>
    </item>
    <item>
      <title>First Hood Canal Bridge lift span arrives in Seattle</title>
      <pubDate>Tue, 10 Jun 2008 04:09:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/0609HCBliftspaninseattle.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/0609HCBliftspaninseattle.htm</guid>
      <description>First Hood Canal Bridge lift span arrives in Seattle</description>
    </item>
    <item>
      <title>Help improve safety on Mount Baker Highway near Deming; Discuss problems, potential improvements at open house</title>
      <pubDate>Tue, 10 Jun 2008 03:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/09_sr542openhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/09_sr542openhouse.htm</guid>
      <description>WSDOT would like to hear from residents and drivers about safety problems on Mount Baker Highway (State Route 542) between Everson-Goshen Road and Nugents Corner (SR 9).</description>
    </item>
    <item>
      <title>WSDOT mountain pass crews halt summer work to fight snow</title>
      <pubDate>Tue, 10 Jun 2008 02:03:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/09_spring_snowfall_mountains.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/09_spring_snowfall_mountains.htm</guid>
      <description>It’s not summer yet. A winter storm warning has WSDOT crews quickly switching from mowers to snowplows in the mountain passes.</description>
    </item>
    <item>
      <title>Smooth ride ahead for SR 162 drivers</title>
      <pubDate>Sat, 07 Jun 2008 05:29:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/06SR162_pavingbegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/06SR162_pavingbegins.htm</guid>
      <description>SR 162 paving project in Orting begins Monday, June 9.</description>
    </item>
    <item>
      <title>I-5 barrier replacement improves safety in Pierce County</title>
      <pubDate>Thu, 05 Jun 2008 02:02:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/04_I5barrier_tacoma.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/04_I5barrier_tacoma.htm</guid>
      <description>I-5 barrier project starts in Lakewood/Tacoma.</description>
    </item>
    <item>
      <title>Speed limit drops on US 101 for bridge replacement</title>
      <pubDate>Wed, 04 Jun 2008 05:30:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/0603US101speedreduction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/0603US101speedreduction.htm</guid>
      <description>Speed limit drops on US 101 for bridge replacement</description>
    </item>
    <item>
      <title>Two young artists win top prize in state-wide WSDOT and I-90 Wildlife Coalition art contest</title>
      <pubDate>Wed, 04 Jun 2008 02:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/BridgingFutures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/BridgingFutures.htm</guid>
      <description>Two young artists were honored for their participation in the fourth annual Bridging Futures Art and Essay Contest.</description>
    </item>
    <item>
      <title>Load restrictions on all ferry routes for low clearance vehicles due to extreme low tides</title>
      <pubDate>Tue, 03 Jun 2008 23:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/load-restrictions-on-all-ferry-routes-low+tides.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/load-restrictions-on-all-ferry-routes-low+tides.htm</guid>
      <description>SEATTLE—Puget Sound will be experiencing extreme low tides beginning today through Saturday, July 5, 2008.</description>
    </item>
    <item>
      <title>6,500 warm up to toll lanes; SR 167 HOT lanes completes opening month</title>
      <pubDate>Tue, 03 Jun 2008 04:25:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/2-hotlanes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/06/2-hotlanes.htm</guid>
      <description>More than 6,500 Good To Go! customers used the SR 167 HOT (high occupancy toll) lanes during their first month of operation. Solo drivers who chose to pay to use the HOT lanes saved an average of 10 minutes in travel time on trips between Auburn and Renton and paid an average toll of $1.50. The highest toll paid was $5.75 during the evening commute on May 21. That toll bought approximately 27 minutes in saved travel time.</description>
    </item>
    <item>
      <title>Construction Begins on I-205, Mill Plain – NE 112th Connector Project, Jun 9</title>
      <pubDate>Sat, 07 Jun 2008 04:39:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/06_I-205MillPlain112thConnectorBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/06_I-205MillPlain112thConnectorBegins.htm</guid>
      <description>VANCOUVER – Starting next week, drivers along northbound I-205 may begin seeing orange barrels and construction equipment in the vicinity of the Mill Plain exit. A project that will provide a direct connection for motorists traveling to NE 112th Avenue from the northbound I-205 off-ramp at Mill Plain Boulevard begins construction Monday, June 9, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Crossing the finish line on I-5 in Everett</title>
      <pubDate>Fri, 06 Jun 2008 02:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/5_NewEverettHOVRamps.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/5_NewEverettHOVRamps.htm</guid>
      <description>EVERETT – This morning, WSDOT Secretary of State Paula Hammond joined Atkinson-CH2M Hill staff, state, local officials and the community to celebrate the final milestone of the I-5 Everett HOV freeway expansion project. The opening of two new I-5 HOV ramps at Broadway Avenue marks the last major piece of the third-largest project in Washington State history.</description>
    </item>
    <item>
      <title>Three Sunday closures planned for I-5 express lanes</title>
      <pubDate>Fri, 06 Jun 2008 02:06:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/5_I-5ExpressLaneClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/5_I-5ExpressLaneClosure.htm</guid>
      <description>SEATTLE - WSDOT crews will close the I-5 express lanes for the next three Sundays from 7 a.m. to noon to clean out the drains under the highway. Traffic will resume in the northbound direction by 1 p.m. Southbound service will not be offered for these days.</description>
    </item>
    <item>
      <title>Chinook Pass to open at noon on June 5</title>
      <pubDate>Thu, 05 Jun 2008 05:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/ChinookPassOpensJune5_2008.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/ChinookPassOpensJune5_2008.htm</guid>
      <description>SR 410: Chinook Pass to open at noon on June 5
Traffic is restricted to one lane, three miles east of the summit</description>
    </item>
    <item>
      <title>WSDOT Invites Public to Pre-Construction Open House for the I-205, NE 112th Connector Project</title>
      <pubDate>Wed, 04 Jun 2008 06:08:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/03_I-205PreConstructionOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/03_I-205PreConstructionOpenHouse.htm</guid>
      <description>VANCOUVER – The Washington State Department of Transportation (WSDOT) invites the public to a pre-construction open house for the I-205, Mill Plain – NE 112th Connector project. Guests will have an opportunity to learn about the project and its associated traffic impacts during the two-year construction period.</description>
    </item>
    <item>
      <title>Lane Closures planned this week for I-5 in South Everett</title>
      <pubDate>Wed, 04 Jun 2008 04:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/3_EverettClosurePlanned.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/3_EverettClosurePlanned.htm</guid>
      <description>SEATTLE – WSDOT crews plan a series of night lane closures on northbound and southbound I-5 through South Everett on Tuesday, June 3 and Wednesday, June 4. Crews will also conduct an overnight rolling slowdown of northbound I-5 on Thursday, June 5.</description>
    </item>
    <item>
      <title>Contractor Selected, Emergency Repair Work on US 12 begins June 2, Expect Delays</title>
      <pubDate>Sat, 31 May 2008 01:56:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/30_US12EmergencyCulvertRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/30_US12EmergencyCulvertRepair.htm</guid>
      <description>CHEHALIS – Emergency repair work on US 12, just west of White Pass Ski Resort at milepost 148.8, will begin Monday, June 2 announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Labree Bridge Girder Setting Closures Postponed until June 3rd</title>
      <pubDate>Sat, 31 May 2008 01:46:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/30_LaBreeMilestonePostponed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/30_LaBreeMilestonePostponed.htm</guid>
      <description>CHEHALIS – The planned setting of the girders for the new Labree Bridge over I-5 has been postponed one day.</description>
    </item>
    <item>
      <title>I-90 flammable cargo restricted next week between Seattle and Mercer Island</title>
      <pubDate>Sat, 31 May 2008 01:42:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/30_I90FlammableRestriction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/30_I90FlammableRestriction.htm</guid>
      <description>WSDOT will restrict flammable cargo in both directions of I-90 from the Mount Baker Tunnel through the Mercer Island Lid beginning at 7 a.m. on Monday, June 2. The restriction is expected to end by 4 p.m. on Wednesday, June 11.</description>
    </item>
    <item>
      <title>REVISED: 34-car Hiyu to operate on the Point Defiance/Tahlequah route starting Sunday, June 1</title>
      <pubDate>Fri, 30 May 2008 23:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/34-car-hiyu-point-defiance-tahlequah-route-june-1.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/34-car-hiyu-point-defiance-tahlequah-route-june-1.htm</guid>
      <description>SEATTLE – The WSDOT Ferries Division announced today that due to an emergent problem with a blown shaft seal on Pierce County’s ferry, the Christine Anderson, the 60-car Rhododendron will be replaced by the 34-car Hiyu a day earlier than expected on the Point Defiance/Tahlequah ferry route (South Vashon to Tacoma).</description>
    </item>
    <item>
      <title>Go early or go late to avoid the wait in Bellingham</title>
      <pubDate>Fri, 30 May 2008 22:43:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/30_I-5BellingLastWeekndClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/30_I-5BellingLastWeekndClosure.htm</guid>
      <description>Crews are hoping this weekend of closures will be the last they need to complete the replacement of cracked concrete panels on I-5 in Bellingham.</description>
    </item>
    <item>
      <title>Crews begin rumble strip work on US 2 between Monroe and Stevens Pass</title>
      <pubDate>Fri, 30 May 2008 22:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/27_US2RumbleStrips.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/27_US2RumbleStrips.htm</guid>
      <description>Drivers should plan ahead and expect delays this week on US 2. Crews will begin work on a $3.9 million project to install rumble strips and high-visibility striping on US 2 between Monroe and Stevens Pass to help reduce serious collisions on the highway.</description>
    </item>
    <item>
      <title>West Olympia traffic subject of open houses</title>
      <pubDate>Fri, 30 May 2008 07:29:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/29_WOlyAccess_openhouses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/29_WOlyAccess_openhouses.htm</guid>
      <description>West Olympia Access Study partnership hosts open houses.</description>
    </item>
    <item>
      <title>Ramp, Lane Closures Planned for SR 500 – I-205 Interchange Project</title>
      <pubDate>Fri, 30 May 2008 01:16:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/29_SR500_I205InterchangeProject.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/29_SR500_I205InterchangeProject.htm</guid>
      <description>VANCOUVER – Significant traffic impacts will accompany a project that will improve westbound SR 500 in the vicinity of the I-205 Interchange, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>WSDOT data shows Memorial Day weekend traffic down</title>
      <pubDate>Thu, 29 May 2008 22:59:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/28_MemorialTrafficDown.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/28_MemorialTrafficDown.htm</guid>
      <description>Four dollar a gallon gas took its toll on holiday travel, as traffic was down about 3 percent this Memorial Day weekend.</description>
    </item>
    <item>
      <title>I-5 lanes to be closed all weekend in Bellingham</title>
      <pubDate>Thu, 29 May 2008 05:14:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/28_BhamI5WeekndClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/28_BhamI5WeekndClosure.htm</guid>
      <description>More good weather means more lane closures for drivers on I-5 in Bellingham. Crews will close lanes on I-5 in Bellingham all weekend to replace broken concrete panels.</description>
    </item>
    <item>
      <title>Aviation Planning Council to Meet June 5 in Spokane</title>
      <pubDate>Thu, 29 May 2008 02:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/AviationPlanningCouncilMeetingJune5.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/AviationPlanningCouncilMeetingJune5.htm</guid>
      <description>On June 5, 2008 members of the Governor-appointed Aviation Planning Council will meet for the sixth time to continue work on the final phase of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>Out with the old, in with the new:  Crews open 41st Street on-ramp to southbound I-5 in Everett</title>
      <pubDate>Thu, 29 May 2008 02:13:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/I5_EverettNewRamp41st.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/I5_EverettNewRamp41st.htm</guid>
      <description>This Friday night, crews working to improve Interstate 5 through Everett will change the way drivers get to southbound I-5 at 41st Street.</description>
    </item>
    <item>
      <title>Construction near Deception Pass will cause delays this weekend</title>
      <pubDate>Thu, 29 May 2008 01:37:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/28_SR20MeadowCreekBridgeOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/28_SR20MeadowCreekBridgeOpen.htm</guid>
      <description>Crews will close a lane on SR 20, two miles east of the Deception Pass bridges, to complete paving and open the new bridge to traffic.</description>
    </item>
    <item>
      <title>I-5 - Rush Road to 13th Street Widening Project Reaches a Milestone, Lane Closures Scheduled</title>
      <pubDate>Wed, 28 May 2008 23:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/28_LabreeInterchangeMilestone.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/28_LabreeInterchangeMilestone.htm</guid>
      <description>CHEHALIS – The I-5, Rush Road to 13th Street widening project will reach an important milestone next week, as crews set the girders for the new Labree Bridge over I-5, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>WSDOT data shows Memorial Day weekend traffic down</title>
      <pubDate>Wed, 28 May 2008 22:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/28_MemorialTrafDown.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/28_MemorialTrafDown.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Two lanes restricted on eastbound I-90 Snoqualmie Pass</title>
      <pubDate>Wed, 28 May 2008 06:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/TwoLanesRestrictedonI90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/TwoLanesRestrictedonI90.htm</guid>
      <description>I-90: WSDOT restricts two lanes on eastbound I-90 Snoqualmie Pass to protect traffic from potential rock fall</description>
    </item>
    <item>
      <title>I-5 Scatter Creek rest area closes to passenger vehicles for three months</title>
      <pubDate>Sat, 24 May 2008 05:38:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/0523I5ScatterCreekcloses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/0523I5ScatterCreekcloses.htm</guid>
      <description>I-5 Scatter Creek rest area closes to passenger vehicles for three months</description>
    </item>
    <item>
      <title>State Map Available in time for Memorial Day</title>
      <pubDate>Sat, 24 May 2008 04:34:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/23_StateMapRelease.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/23_StateMapRelease.htm</guid>
      <description>While it’s not like waiting in line all night for the latest version of Grand Theft Auto, people do get excited about the biennial release of the WSDOT state map.</description>
    </item>
    <item>
      <title>SR 500 – I-205 Interchange Improvements Begin Next Week, Expect Significant Closures</title>
      <pubDate>Sat, 24 May 2008 02:00:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/23_SR500I205InterchangetoBegin.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/23_SR500I205InterchangetoBegin.htm</guid>
      <description>VANCOUVER – A project that will make improvements to westbound SR 500 in the vicinity of the I-205 Interchange is set to begin May 27.</description>
    </item>
    <item>
      <title>Clallam County safety project starts next week</title>
      <pubDate>Sat, 24 May 2008 01:33:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/23_SR112_safetyprojectstarts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/23_SR112_safetyprojectstarts.htm</guid>
      <description>SR 112 safety project gets started in Clallam County.</description>
    </item>
    <item>
      <title>WSDOT seeks public input on Hood Canal Bridge</title>
      <pubDate>Sat, 24 May 2008 01:10:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/23_104_HCBSurvey.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/23_104_HCBSurvey.htm</guid>
      <description>WSDOT HCB team is conducting a survey for use in finaling the plans for the 2009 bridge closure.</description>
    </item>
    <item>
      <title>Bainbridge Island Ferry Terminal Safety Improvement Project: New Rules of the Road</title>
      <pubDate>Fri, 23 May 2008 23:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/bainbridge-island-ferry-terminal-safety-improvements.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/bainbridge-island-ferry-terminal-safety-improvements.htm</guid>
      <description>BAINBRIDGE ISLAND - Changes are in store at the Bainbridge Island Ferry Terminal beginning Thursday, May 29.</description>
    </item>
    <item>
      <title>Open House for Three Senator George Sellar Bridge Projects Set</title>
      <pubDate>Fri, 23 May 2008 06:22:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/22SR285SellarBridgeOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/22SR285SellarBridgeOpenHouse.htm</guid>
      <description>The most recent design changes for three Senator George Sellar Bridge projects are the subject of an open house in Wenatchee on Wednesday, May 28th.</description>
    </item>
    <item>
      <title>Drivers should plan ahead for paving delays on SR 202 in Redmond beginning May 26</title>
      <pubDate>Fri, 23 May 2008 06:03:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/22_SR202Paving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/22_SR202Paving.htm</guid>
      <description>Drivers should plan ahead for paving delays on SR 202 in Redmond beginning May 26</description>
    </item>
    <item>
      <title>SR 206 is open to limited traffic-washout repair work continues</title>
      <pubDate>Fri, 23 May 2008 05:58:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/22_SR206open.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/22_SR206open.htm</guid>
      <description>SR 206 is open to limited traffic-washout repair work continues</description>
    </item>
    <item>
      <title>Nesting eagles will delay paving in Oak Harbor</title>
      <pubDate>Fri, 23 May 2008 05:21:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/22_NestingEaglesSR20.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/22_NestingEaglesSR20.htm</guid>
      <description>Crews have postponed paving State Route 20 south of Oak Harbor until July 15 due to the presence of a pair of bald eagles nesting nearby. Federal and state laws say the protected bird needs a wide berth when nesting and raising young.</description>
    </item>
    <item>
      <title>Mudslide closes SR 900 at NE Park Drive</title>
      <pubDate>Fri, 23 May 2008 03:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/22_SR900Mudslide.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/22_SR900Mudslide.htm</guid>
      <description>SEATTLE – A mudslide has closed the right westbound lane of State Route 900 at NE Park Drive in Renton. Crews expect to have the lane open by this Friday at 12:00 noon. On Wednesday night, a rain squall moved through the area and flooded a WSDOT pumping station at a construction site. The floodwater sent debris onto the roadway and eroded two to four feet of soil underneath the asphalt, undermining its stability.</description>
    </item>
    <item>
      <title>Tank of gas: $75; Knowing where you’re going: priceless</title>
      <pubDate>Fri, 23 May 2008 02:12:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/22_2008StateMapRelease.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/22_2008StateMapRelease.htm</guid>
      <description>SEATTLE – While it’s not like waiting in line all night for the latest version of Grand Theft Auto, people do get excited about the biennial release of the WSDOT state map.</description>
    </item>
    <item>
      <title>WSDOT Breaks Ground on I-205, NE 112th Connector Project</title>
      <pubDate>Fri, 23 May 2008 01:56:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/22_I205MillPlainGroundBreakingEvent.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/22_I205MillPlainGroundBreakingEvent.htm</guid>
      <description>VANCOUVER – Washington State Department of Transportation (WSDOT) invites the public and media to attend a ground-breaking event celebrating the start of construction of the I-205, Mill Plain – NE 112th Connector project.</description>
    </item>
    <item>
      <title>SR 20 improvements continue east of Deception Pass</title>
      <pubDate>Fri, 23 May 2008 00:31:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/22_QuietCoveStage2.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/22_QuietCoveStage2.htm</guid>
      <description>WSDOT will continue safety improvements along SR 20 east of Deception Pass to reduce collisions and improve traffic flow.</description>
    </item>
    <item>
      <title>I-5 speed-limit reduction extends two miles</title>
      <pubDate>Thu, 22 May 2008 08:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/21_I5_speed_extended.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/21_I5_speed_extended.htm</guid>
      <description>I-5 speed-limit reduction in south Thurston extended into Lewis County to eliminate multiple speed changes.</description>
    </item>
    <item>
      <title>SR 123 Cayuse Pass reopens Friday; SR 410 Chinook Pass remains closed</title>
      <pubDate>Thu, 22 May 2008 05:36:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/21_CayuseReopening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/21_CayuseReopening.htm</guid>
      <description>SR 123 Cayuse Pass reopens Friday; SR 410 Chinook Pass remains closed</description>
    </item>
    <item>
      <title>This week's I-82 ramp closure cancelled near Selah</title>
      <pubDate>Thu, 22 May 2008 05:31:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/I+82_ramp_closure_+cancelled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/I+82_ramp_closure_+cancelled.htm</guid>
      <description>I-82: WSDOT cancels this week's ramp closure; Eastbound on-ramp from Selah (SR 823) will remain open through the Memorial Day weekend</description>
    </item>
    <item>
      <title>New SR 20 lanes to open Thursday west of Burlington</title>
      <pubDate>Wed, 21 May 2008 05:18:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/20_FredoniaStage1Opens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/20_FredoniaStage1Opens.htm</guid>
      <description>Crews have widened a one-mile stretch of SR 20 to four lanes from Higgins Airport Way to Memorial Highway. Crews will turn on new signals at the Memorial Highway and Higgins Airport Way intersections, and will open one lane in each direction between 9 and 11 a.m. Thursday, May 22.</description>
    </item>
    <item>
      <title>SR 206 washout repair work underway</title>
      <pubDate>Wed, 21 May 2008 05:16:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/20_SR206+washout+repairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/20_SR206+washout+repairs.htm</guid>
      <description>SR 206 washout repair work underway</description>
    </item>
    <item>
      <title>SR 20 - North Cascades Highway Reopens after a Five Day Closure Due to Snow Slides</title>
      <pubDate>Wed, 21 May 2008 04:57:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/20SR20Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/20SR20Reopens.htm</guid>
      <description>The North Cascades Highway reopened at 3 p.m. on Tuesday, May 20th, following a five day closure due to snow slides.</description>
    </item>
    <item>
      <title>Historic Deception Pass guardrail replacement project finishing early</title>
      <pubDate>Wed, 21 May 2008 00:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/20_DeceptionLogRail.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/20_DeceptionLogRail.htm</guid>
      <description>The new log rail on SR 20 in Deception Pass State Park takes the best of today’s safety standards and blends it with the craftsmanship of yesterday’s original stone masons and carpenters.</description>
    </item>
    <item>
      <title>Columbia River Crossing project invites comment at public hearings</title>
      <pubDate>Tue, 20 May 2008 22:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/19_I5ColumbiaRiverCrossing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/19_I5ColumbiaRiverCrossing.htm</guid>
      <description>VANCOUVER - The Oregon and Washington transportation departments invite public testimony on the Interstate 5 Columbia River Crossing project at two hearings Wednesday, May 28, and Thursday, May 29, to help sponsor agencies choose one alternative that meets project goals.</description>
    </item>
    <item>
      <title>WSDOT Driver Tip: US 2, Snoqualmie Pass, I-5 busy on Memorial Day Weekend</title>
      <pubDate>Tue, 20 May 2008 06:53:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/19_memorial_day_08.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/19_memorial_day_08.htm</guid>
      <description>Drivers headed to the mountains this holiday weekend should be prepared for additional traffic, especially on US 2 Stevens Pass and I-90 over Snoqualmie Pass.</description>
    </item>
    <item>
      <title>SR 20 - North Cascades Highway Reopens at 3 p.m. Tuesday</title>
      <pubDate>Tue, 20 May 2008 05:56:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/19SR20ReopensTuesday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/19SR20ReopensTuesday.htm</guid>
      <description>The North Cascades Highway will reopen Tuesday afternoon when maintenance crews have cleared snowslides and repaired road damage.</description>
    </item>
    <item>
      <title>WSDOT Invites Public to SR 502 Widening Open House, May 20</title>
      <pubDate>Tue, 20 May 2008 04:58:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/19_SR502WideningOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/19_SR502WideningOpenHouse.htm</guid>
      <description>VANCOUVER – The Washington State Department of Transportation (WSDOT) invites the public to a project scoping meeting for the SR 502 Widening, I-5 to Battle Ground project.  Guests will have an opportunity to comment on the project’s purpose and need as well as give feedback on the project’s scope.</description>
    </item>
    <item>
      <title>Sam Hill - Biggs Rapids Bridge to Re-Open Today, May 19, at 6 p.m.</title>
      <pubDate>Mon, 19 May 2008 23:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/19_BiggsReopening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/19_BiggsReopening.htm</guid>
      <description>GOLDENDALE – After a near five-month closure, Washington State Department of Transportation (WSDOT) is pleased to announce the re-opening of the US 97, Sam Hill – Biggs Rapids  Bridge, to all traffic for the 2008 summer vacation season, beginning May 19 at 6 p.m. The bridge will remain open throughout the entire summer season, until September 3, 2008, when it will close again for the remainder of construction activities. All previous weight restrictions have also been lifted.</description>
    </item>
    <item>
      <title>Washout on SR 206 closes highway to Mt. Spokane</title>
      <pubDate>Mon, 19 May 2008 22:38:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/19_sr206washout.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/19_sr206washout.htm</guid>
      <description>Water cascading through small creek tributaries blocked culverts and washed out a section of State Route 206 on Mt. Spokane late Sunday, May 18th</description>
    </item>
    <item>
      <title>Traffic cameras show I-5 construction and backups in Bellingham</title>
      <pubDate>Sat, 17 May 2008 20:57:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/17_i5BellinghamTrafficCameras.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/17_i5BellinghamTrafficCameras.htm</guid>
      <description>Before taking to the road this weekend, be sure to check the Bellingham traffic cameras for a bird’s-eye view of construction and backups on I-5.</description>
    </item>
    <item>
      <title>Go early or go late to avoid the wait - I-5 in Bellingham is reduced to one lane all weekend</title>
      <pubDate>Sat, 17 May 2008 02:33:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/16_i5laneclosuresinBellingham.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/16_i5laneclosuresinBellingham.htm</guid>
      <description>Early birds and night owls may have an advantage in avoiding long delays and backups on I-5 in Bellingham this weekend. Drivers who travel in the middle of the day on Saturday or Sunday can expect delays of at least 30 minutes and backups several miles long.</description>
    </item>
    <item>
      <title>Ramps and Roadways near Montlake Bridge to Close for Foot Race</title>
      <pubDate>Sat, 17 May 2008 01:27:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/518_MontlakeBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/518_MontlakeBridge.htm</guid>
      <description>Seattle Police will close SR 513 (Montlake Boulevard) and ramps leading to the Montlake Bridge for the Nordstrom Beat the Bridge run Sunday, May 18 in the morning.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division notes kick-off of busy summer season</title>
      <pubDate>Sat, 17 May 2008 00:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/ferries-division-kick-off-of-busy-summer-season.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/ferries-division-kick-off-of-busy-summer-season.htm</guid>
      <description>SEATTLE - Memorial Day traditionally means the arrival of summer crowds wanting to take a trip on a Washington State Ferry.</description>
    </item>
    <item>
      <title>Spirit Lake Memorial Highway, Johnston Ridge Observatory Reopened at 7:00 a.m. Today</title>
      <pubDate>Fri, 16 May 2008 23:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/16_SR504ReopensMay16.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/16_SR504ReopensMay16.htm</guid>
      <description>MOUNT ST. HELENS – After a record winter, the Washington State Department of Transportation (WSDOT) reopened Mt. St. Helens’ Spirit Lake Memorial Highway (State Route 504) to the Johnston Ridge Observatory at 7 a.m. on Friday, May 16. The Johnston Ridge Observatory will be open daily from 10 a.m. to 6 p.m. beginning on May 16.</description>
    </item>
    <item>
      <title>Crews to close northbound I-5 in Everett</title>
      <pubDate>Fri, 16 May 2008 04:34:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/Crews+to+close+northbound+I-5+in+Everett.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/Crews+to+close+northbound+I-5+in+Everett.htm</guid>
      <description>EVERETT – WSDOT crews and contractors will close all northbound lanes of I-5 in south Everett from 1 a.m. to 7 a.m. Sunday, May 18 as part of the new Sound Transit Freeway Station. All southbound lanes will remain open.</description>
    </item>
    <item>
      <title>Rising mercury increases avalanche watch; Weekend highway closures certain, flooding possible</title>
      <pubDate>Fri, 16 May 2008 04:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/15_avalanche_flood_threat.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/15_avalanche_flood_threat.htm</guid>
      <description>OLYMPIA – Warm temperatures expected this weekend have WSDOT experts monitoring Washington’s mountain pass highways for avalanche control work. The Northwest Avalanche Center has also issued warnings for back country areas.</description>
    </item>
    <item>
      <title>SR 20, North Cascades Highway is closed due to avalanche danger</title>
      <pubDate>Fri, 16 May 2008 03:25:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/15_northcascadeshighwayclosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/15_northcascadeshighwayclosed.htm</guid>
      <description>The North Cascades Highway is closed due to avalanche danger. The highway will remain closed through the weekend (May 16-19).</description>
    </item>
    <item>
      <title>Chip-seal projects begin in Thurston, Mason counties</title>
      <pubDate>Fri, 16 May 2008 03:04:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/051508ThurstonMasonchipseals.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/051508ThurstonMasonchipseals.htm</guid>
      <description>Chip-seal projects begin in Thurston, Mason counties</description>
    </item>
    <item>
      <title>WTSC News: Sunday marks start of extra patrols on the US 2 Traffic Safety Corridor</title>
      <pubDate>Fri, 16 May 2008 02:27:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/15_US2Patrols.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/15_US2Patrols.htm</guid>
      <description>If you’re taking a trip on US 2 this summer, expect to see more law enforcement vehicles out on the highway. This Sunday marks the beginning of extra patrols targeting driver behaviors responsible for the most serious collisions on US 2: speeding, driving under the influence, tail-gating, and aggressive driving.</description>
    </item>
    <item>
      <title>Port Townsend/Keystone ferry route reservations program starts just in time for Memorial Day weekend</title>
      <pubDate>Fri, 16 May 2008 00:06:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/port-townsend-keystone-ferry-route-reservations.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/port-townsend-keystone-ferry-route-reservations.htm</guid>
      <description>SEATTLE – In preparation for the busy Memorial Day weekend, WSDOT Ferries Division is rolling out the second phase of its new pilot reservations program for the Port Townsend/Keystone route.</description>
    </item>
    <item>
      <title>North Spokane Corridor aerial video now available on the web.</title>
      <pubDate>Thu, 15 May 2008 06:06:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/14_us395nscvideo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/14_us395nscvideo.htm</guid>
      <description>North Spokane Corridor aerial video now available on the web.</description>
    </item>
    <item>
      <title>Transportation secretary breaks ground on I-5 widening</title>
      <pubDate>Thu, 15 May 2008 02:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/14_I5GrandMount_Hammond.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/14_I5GrandMount_Hammond.htm</guid>
      <description>Secretary Hammond turns dirt at the Grand Mound to Maytown groundbreaking.</description>
    </item>
    <item>
      <title>I-5 lanes to be closed all weekend in Bellingham</title>
      <pubDate>Wed, 14 May 2008 23:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/14_i5bellinghamlanesclosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/14_i5bellinghamlanesclosed.htm</guid>
      <description>Crews will close lanes on I-5 in Bellingham all weekend</description>
    </item>
    <item>
      <title>SR 16 Burley Olalla work gives glimpse of upcoming project closure</title>
      <pubDate>Wed, 14 May 2008 21:51:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/14_SR16BurleyOlalla.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/14_SR16BurleyOlalla.htm</guid>
      <description>SR 16 Burley Olalla work gives glimpse of upcoming project closure</description>
    </item>
    <item>
      <title>Open House set for the US 2/97 - School St. Proposed Closure</title>
      <pubDate>Wed, 14 May 2008 06:23:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/13US2_97SchoolSt.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/13US2_97SchoolSt.htm</guid>
      <description>On Thursday, there's a public open house on our plan to end left turns on and off US 2/97 to School St., north of Wenatchee, to improve safety.</description>
    </item>
    <item>
      <title>Spirit Lake Memorial Highway, Johnston Ridge Observatory Reopen May 16</title>
      <pubDate>Wed, 14 May 2008 04:49:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/13_SR504andObservatoryReopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/13_SR504andObservatoryReopen.htm</guid>
      <description>MOUNT ST. HELENS – After a record winter, the Washington State Department of Transportation (WSDOT) will reopen Mt. St. Helens’ Spirit Lake Memorial Highway (State Route 504) to the Johnston Ridge Observatory at 7 a.m. on Friday, May 16.</description>
    </item>
    <item>
      <title>WSDOT Alerts Motorists to Daytime I-5, NE 78th Street Off-Ramp Closures, Saturday May 17</title>
      <pubDate>Wed, 14 May 2008 00:37:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/13_I5NE78thRampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/13_I5NE78thRampClosures.htm</guid>
      <description>VANCOUVER – Motorists can expect closures of the I-5 north and southbound off-ramps at NE 78th Street in Hazel Dell beginning Saturday, May 17, from 10 a.m. to 2 p.m. The closures are necessary for the safety of motorists and pedestrians during the annual Hazel Dell Parade.</description>
    </item>
    <item>
      <title>US 395: Right lane restricted Wednesday, May 14</title>
      <pubDate>Tue, 13 May 2008 23:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/US395LaneRestrictedonWednesdayMay14.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/US395LaneRestrictedonWednesdayMay14.htm</guid>
      <description>US 395: Right lane restricted Wednesday, May 14 between 7th Street and Kennewick Ave. in Kennewick</description>
    </item>
    <item>
      <title>WSDOT restricts lanes for US 12 Snake River Bridge inspection</title>
      <pubDate>Tue, 13 May 2008 07:05:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/US12_SnakerRiverBridgeInspection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/US12_SnakerRiverBridgeInspection.htm</guid>
      <description>US 12: WSDOT crews close lanes on Snake River Bridge for bridge inspection, expect delays near Burbank Tuesday through Friday, May 13-15</description>
    </item>
    <item>
      <title>Amtrak Cascades offers new connecting bus service</title>
      <pubDate>Tue, 13 May 2008 06:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/12AmtrakCascadesNewbusservice.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/12AmtrakCascadesNewbusservice.htm</guid>
      <description>Amtrak Cascades offers new connecting bus service for Everett, Mt. Vernon, and Bellingham communities</description>
    </item>
    <item>
      <title>I-90: WSDOT restricts one lane eastbound near Cle Elum</title>
      <pubDate>Tue, 13 May 2008 00:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/I90_oneLaneRestrictedEastboundatCleElum.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/I90_oneLaneRestrictedEastboundatCleElum.htm</guid>
      <description>I-90: WSDOT restricts one lane eastbound near Cle Elum</description>
    </item>
    <item>
      <title>WSDOT Installs Median Rumble Strips on SR 503 Beginning Tuesday, May 13</title>
      <pubDate>Sat, 10 May 2008 04:18:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/09_SR503LaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/09_SR503LaneClosures.htm</guid>
      <description>VANCOUVER – Installation of median rumble strips on SR 503 from Brush Prairie (milepost 4.68) to Battle Ground (milepost 8) will begin on Tuesday, May 13, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Expect Lane Closures on I-5 in Lewis County on Sunday Night, May 11 and Thursday Night, May 15</title>
      <pubDate>Sat, 10 May 2008 02:28:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/09_I5LaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/09_I5LaneClosures.htm</guid>
      <description>CHEHALIS – Motorists should expect alternating single lane closures on I-5 north and southbound in Lewis County between Rush Road (mile post 72) and the 13th Street Interchange (mile post 76).</description>
    </item>
    <item>
      <title>Clemons Road to US 12 closes next week</title>
      <pubDate>Fri, 09 May 2008 23:24:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/050908US12ClemonsRoadclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/050908US12ClemonsRoadclosure.htm</guid>
      <description>Clemons Road to US 12 closes next week</description>
    </item>
    <item>
      <title>Fiber optic cable project getting started on US 2/Division Street in Spokane</title>
      <pubDate>Fri, 09 May 2008 05:09:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/08_us2_spokanefiberoptic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/08_us2_spokanefiberoptic.htm</guid>
      <description>Fiber optic cable project getting started on US 2/Division Street in Spokane</description>
    </item>
    <item>
      <title>More to “know before you go” in Tacoma</title>
      <pubDate>Fri, 09 May 2008 04:23:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/050808Flowmapextension.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/050808Flowmapextension.htm</guid>
      <description>More to “know before you go” in Tacoma</description>
    </item>
    <item>
      <title>Scoping Open House Scheduled May 20 for SR 502, Widening From I-5 to Battle Ground Project</title>
      <pubDate>Fri, 09 May 2008 01:46:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/08_502WideningScopingOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/08_502WideningScopingOpenHouse.htm</guid>
      <description>VANCOUVER - The Washington State Department of Transportation (WSDOT) invites the public to a project scoping meeting for the SR 502 widening project.</description>
    </item>
    <item>
      <title>Speed limit drops to 60 mph south of Olympia</title>
      <pubDate>Thu, 08 May 2008 05:22:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/07_I5_GM2MT_speedreduction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/07_I5_GM2MT_speedreduction.htm</guid>
      <description>Speed reduction to 60 mph and groundbreaking event kickoff two and a half year widening project in south Thurston County.</description>
    </item>
    <item>
      <title>WSDOT Lowers Speed Limit on Portion of SR 502 in Battle Ground</title>
      <pubDate>Thu, 08 May 2008 05:08:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/07_SpeedLimitRevisiononSR502.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/07_SpeedLimitRevisiononSR502.htm</guid>
      <description>BATTLE GROUND – Beginning May 7, motorists will notice new speed limit signs denoting a speed limit revision on SR 502 in Battle Ground.</description>
    </item>
    <item>
      <title>I-5 flow maps in Tacoma in and out today</title>
      <pubDate>Thu, 08 May 2008 00:16:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/I_5+Tacomaflowmaps.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/I_5+Tacomaflowmaps.htm</guid>
      <description>TACOMA – The flow maps showing traffic volumes on I-5 through Tacoma will be out intermittently today due to a technical glitch.</description>
    </item>
    <item>
      <title>WSDOT, King County, City of Seattle Host Open Houses to Hear from You on the Alaskan Way Viaduct</title>
      <pubDate>Wed, 07 May 2008 23:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/05-AWV-openhouses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/05-AWV-openhouses.htm</guid>
      <description>What’s new with the Alaskan Way Viaduct? WSDOT, King County, and the City of Seattle are hosting three open houses throughout Seattle starting this week to give an update on the project and listen to your comments on potential solutions for the viaduct along the central waterfront.</description>
    </item>
    <item>
      <title>Construction of new US 101 on-ramp from SR 3 begins</title>
      <pubDate>Wed, 07 May 2008 05:59:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/05062008US101SR3newonramp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/05062008US101SR3newonramp.htm</guid>
      <description>Construction of new US 101 on-ramp from SR 3 begins</description>
    </item>
    <item>
      <title>SR 520 Daytime outage planned</title>
      <pubDate>Wed, 07 May 2008 01:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/6_sr520daytimeoutageplanned.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/6_sr520daytimeoutageplanned.htm</guid>
      <description>Crews will cut power between mid-span and Montlake Boulevard from 7 a.m. to 4 p.m. on Wednesday, May 7, for routine electrical maintenance.</description>
    </item>
    <item>
      <title>Exploratory work begins on I-90 at Snoqualmie Pass</title>
      <pubDate>Tue, 06 May 2008 21:28:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/Exploratorywork+beginsonI-90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/Exploratorywork+beginsonI-90.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT sees hopeful signs in first weekday commute on the SR 167 HOT lanes</title>
      <pubDate>Tue, 06 May 2008 06:31:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/5_SR167Mondaycommute.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/5_SR167Mondaycommute.htm</guid>
      <description>Results from the Monday morning commute on SR 167 indicate that high occupancy toll (HOT) lanes increased traffic volumes in the highway’s historically underused carpool lane by 10 percent with solo-drivers paying tolls that never exceeded $2. While drivers were still growing accustomed to the new rules of the road, project managers hailed the first weekday morning commute on the SR 167 HOT lanes as a success on multiple levels.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division announces launch of Port Townsend/Keystone route reservations system</title>
      <pubDate>Tue, 06 May 2008 00:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/ferries-division-launch-of-route-reservations-system.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/ferries-division-launch-of-route-reservations-system.htm</guid>
      <description>SEATTLE – WSDOT Ferries Division is introducing three changes to the ferry system to better serve customers this summer and beyond.</description>
    </item>
    <item>
      <title>WSDOT ready for first SR 167 HOT lanes weekday commute</title>
      <pubDate>Mon, 05 May 2008 07:51:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/4_SR167HOTLanesSunday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/4_SR167HOTLanesSunday.htm</guid>
      <description>At 5 a.m. Monday, weekday commuters will get their first taste of the SR 167 HOT lanes in action.
 
Washington state’s first high occupancy toll (HOT) lanes opened Saturday morning and traffic conditions over the weekend provided WSDOT project managers a variety of scenarios to evaluate the HOT lanes.</description>
    </item>
    <item>
      <title>SR 167 HOT lanes begin tolling</title>
      <pubDate>Sun, 04 May 2008 04:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/HOTLanesOpening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/HOTLanesOpening.htm</guid>
      <description>SR 167 HOT Lanes Pilot Project begins tolling operations with Transportatioh Secretary Paula Hammond proclaiming all systems are Good To Go!</description>
    </item>
    <item>
      <title>Survey gains valuable feedback on truck parking needs for Washington</title>
      <pubDate>Sat, 03 May 2008 02:01:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/02_TruckParkingSurvey.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/02_TruckParkingSurvey.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) surveyed more than 450 truck drivers and nearly 100 trucking companies to get feedback on truck parking in Washington.</description>
    </item>
    <item>
      <title>Drivers take note: Two Saturdays of I-5 closures in south Everett</title>
      <pubDate>Fri, 02 May 2008 06:04:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/1_I5SouthEverettClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/1_I5SouthEverettClosures.htm</guid>
      <description>Work is steadily progressing on the Sound Transit South Everett Freeway Station project as crews prepare to wrap up this fall. For the next two Saturdays, drivers can expect overnight closures of I-5 while crews install five new sign bridges and remove the wooden platforms they used to work on the new bridge decks.</description>
    </item>
    <item>
      <title>One-year countdown to Hood Canal Bridge closure starts … now</title>
      <pubDate>Fri, 02 May 2008 01:14:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/01_SR104_HCBCountdown.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/01_SR104_HCBCountdown.htm</guid>
      <description>One year countdown to HCB closure starts today, May 1.</description>
    </item>
    <item>
      <title>WSDOT Reminds Campaigns of Rules for Posting Signs</title>
      <pubDate>Fri, 02 May 2008 00:29:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/01_campaign_sign_remind.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/01_campaign_sign_remind.htm</guid>
      <description>As local and national elections heat up across the state and country, more and more political signs start appearing along Washington roadsides. WSDOT reminds campaigners that it’s illegal to post campaign signs on the state highway right-of-way. Signs (other than those used for traffic control) within the right-of-way are prohibited.</description>
    </item>
    <item>
      <title>New HOT lanes striping changing the way people drive on SR 167 between Renton and Auburn</title>
      <pubDate>Thu, 01 May 2008 23:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/01_SR167HOTStriping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/01_SR167HOTStriping.htm</guid>
      <description>he State Route 167 high occupancy toll (HOT) lanes open this Saturday between Renton and Auburn, and carpoolers are already getting a preview of how the lanes will work.

Crews have placed the double white stripe that separates the HOT lane from the regular lane and the dashed line that indicates the access zones where drivers can enter or exit the HOT lane.  New road rules for carpools, vanpool, transit and motorcycles are in effect. New rules for toll-paying solo drivers start Saturday, May</description>
    </item>
    <item>
      <title>SR 25 paving work set to start in Stevens County</title>
      <pubDate>Thu, 01 May 2008 23:22:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/01_SR25PavingBossburgCanada.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/01_SR25PavingBossburgCanada.htm</guid>
      <description>SR 25 paving work set to start in Stevens County</description>
    </item>
    <item>
      <title>SR 20 - North Cascades Highway Opens</title>
      <pubDate>Thu, 01 May 2008 23:15:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/01SR20NCHReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/01SR20NCHReopens.htm</guid>
      <description>SR 20, the North Cascades Highway reopened for the season at 8 a.m. this morning.</description>
    </item>
    <item>
      <title>US 12 closed for several hours Thursday near Alpowa Summit</title>
      <pubDate>Thu, 01 May 2008 07:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/05/US12_closednearAlpowaSummit_Thrusday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/05/US12_closednearAlpowaSummit_Thrusday.htm</guid>
      <description>WSDOT Travel Advisory 

WSDOT and WSP to close US 12 near Alpowa Summit for several hours on Thursday</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Tue, 06 May 2008 01:45:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/55_520closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/55_520closure.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct monthly maintenance work on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>Full weekend closures for several ramps on I-5 in Everett:  Prepare for detours and plan extra time</title>
      <pubDate>Thu, 01 May 2008 08:10:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/30_I5EverettRampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/30_I5EverettRampClosures.htm</guid>
      <description>If weather permits, crews in Everett will close several ramps on I-5 in north Everett starting at 8 p.m. Friday, May 1 until 5 a.m. Monday, May 5</description>
    </item>
    <item>
      <title>US 101 Simpson Ave. Bridge re-opens to traffic</title>
      <pubDate>Thu, 01 May 2008 02:34:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/US101SimpsonBridgereopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/US101SimpsonBridgereopens.htm</guid>
      <description>US 101 Simpson Ave. Bridge re-opens to traffic</description>
    </item>
    <item>
      <title>Additional trips added to Port Townsend/Keystone ferry schedule beginning Sunday, May 11</title>
      <pubDate>Thu, 01 May 2008 00:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/additional-trips-port-townsend-keystone-route.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/additional-trips-port-townsend-keystone-route.htm</guid>
      <description>SEATTLE – WSDOT Ferries Division is adding sailings to the Port Townsend-Keystone ferry schedule beginning Sunday, May 11 and continuing through the peak summer season until October 13.</description>
    </item>
    <item>
      <title>Weather, Construction Lengthens I-5 Gee Creek Rest Area Closure</title>
      <pubDate>Wed, 30 Apr 2008 07:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/04-28-08_GeeCreekClosuresContinue.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/04-28-08_GeeCreekClosuresContinue.htm</guid>
      <description>RIDGEFIELD – The northbound Gee Creek Safety Rest Area on I-5 in Clark County will remain closed until noon on Friday, May 2 due to weather-dependent construction work. The southbound rest area will remain open to travelers.</description>
    </item>
    <item>
      <title>SR 20 - North Cascades Highway Opens Thursday at 8 a.m.</title>
      <pubDate>Wed, 30 Apr 2008 01:44:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/29SR20ReopenDate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/29SR20ReopenDate.htm</guid>
      <description>SR 20 - The North Cascades Highway opens Thursday morning</description>
    </item>
    <item>
      <title>Planned Lane Closures for Monday Night, April 28 on I-5 In Lewis County Postponed</title>
      <pubDate>Tue, 29 Apr 2008 05:15:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/28_RushRdLaneClosuresPostponed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/28_RushRdLaneClosuresPostponed.htm</guid>
      <description>VANCOUVER – Work that would have resulted in lane closures on I-5 north and southbound in Lewis County between Rush Road (milepost 72) and the 13th Street Interchange (milepost 76) on Monday Night, April 28 has been postponed due to anticipated wet weather.</description>
    </item>
    <item>
      <title>TNB bike/pedestrian path narrowed May 5-8</title>
      <pubDate>Tue, 29 Apr 2008 00:25:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/28_16_TNBPedLane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/28_16_TNBPedLane.htm</guid>
      <description>Bike/ped lane will narrow on eastbound Tacoma Narrows Bridge.</description>
    </item>
    <item>
      <title>Aviation Planning Council to Meet May 1 in Seattle</title>
      <pubDate>Mon, 28 Apr 2008 23:40:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/May1AviationPlanningCouncil.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/May1AviationPlanningCouncil.htm</guid>
      <description>On May 1, 2008 members of the Governor-appointed Aviation Planning Council will meet for the fifth time to continue work on the final phase of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>Reminder: I-5 is reduced to one lane through Bellingham all weekend</title>
      <pubDate>Sat, 26 Apr 2008 22:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/26_i5laneclosedallweekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/26_i5laneclosedallweekend.htm</guid>
      <description>A reminder to drivers who are taking to the road this sunny weekend, there is only one lane open southbound through Bellingham. The southbound right lane of I-5 closed at 10 p.m. Friday night in Bellingham and will remain closed until 6 a.m. Monday. Significant delays and backups are expected during the daytime this weekend.</description>
    </item>
    <item>
      <title>A perfect 10 on I-5 in Everett: Crews open last segment of 10 new HOV miles</title>
      <pubDate>Sat, 26 Apr 2008 07:13:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/425_I5Everett.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/425_I5Everett.htm</guid>
      <description>Neither rain, nor snow, nor sleet, nor hail could stop I-5 Everett crews from reaching their goal of opening all 10 new miles of HOV lanes by the end of April.</description>
    </item>
    <item>
      <title>Drivers already seeing double striping for SR 167 HOT lanes between Renton and Auburn</title>
      <pubDate>Sat, 26 Apr 2008 07:06:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/25_SR167DoubleStriping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/25_SR167DoubleStriping.htm</guid>
      <description>As each day passes, drivers are seeing more and more signs that high occupancy toll (HOT) lanes are coming soon to State Route 167 between Renton and Auburn.

 

Crews are finally getting the dry weather they need to place the second white stripe that will separate the HOT lanes from the general purpose lanes. On Thursday night crews placed nearly seven miles of the second stripe on southbound SR 167 between Renton and S. 277th Street.  A dry and warmer weekend forecast means crews could com</description>
    </item>
    <item>
      <title>Intersection Safety Project South of Othello Begins Wednesday</title>
      <pubDate>Sat, 26 Apr 2008 06:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/25SR24SafetyEnhancement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/25SR24SafetyEnhancement.htm</guid>
      <description>A low cost safety enhancement project south of Othello begins.</description>
    </item>
    <item>
      <title>WSDOT prepares for the last avalanche control work of the season on I-90 Snoqualmie Pass</title>
      <pubDate>Sat, 26 Apr 2008 03:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/25_SnoqualmiePassControlWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/25_SnoqualmiePassControlWork.htm</guid>
      <description>It seems spring has finally arrived on I-90 Snoqualmie Pass, and with the warm temperatures forecasted for the weekend, WSDOT Avalanche Specialists will need to conduct avalanche control work on Saturday afternoon.</description>
    </item>
    <item>
      <title>480,000 pound boiler makes the trip through Bellevue and Seattle this weekend</title>
      <pubDate>Sat, 26 Apr 2008 02:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/25_I5SuperloadBoiler.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/25_I5SuperloadBoiler.htm</guid>
      <description>SEATTLE – Puget Sound drivers will have wide eyes this weekend as a 480,000 pound "superload" boiler makes the trip through Bellevue and Seattle on its way to Ferndale.</description>
    </item>
    <item>
      <title>Crews will close I-90 at the I-405 interchange in Bellevue to set girders for new bridge</title>
      <pubDate>Sat, 26 Apr 2008 00:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/24_SBellevueGirders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/24_SBellevueGirders.htm</guid>
      <description>Crews will close I-90 at the I-405 interchange in Bellevue to set girders for new bridge</description>
    </item>
    <item>
      <title>I-5 rolling slowdown scheduled south of Olympia</title>
      <pubDate>Fri, 25 Apr 2008 22:39:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/25_I5_GM2MT_slowdown.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/25_I5_GM2MT_slowdown.htm</guid>
      <description>Rolling slowdown on I-5 near Maytown, mp 95.</description>
    </item>
    <item>
      <title>SR 290/Starr Road Intersection Improvement project near Spokane gets underway</title>
      <pubDate>Fri, 25 Apr 2008 06:39:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/24_SR290_newturnlane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/24_SR290_newturnlane.htm</guid>
      <description>SR 290/Starr Road intersection improvement project near Spokane getting underway</description>
    </item>
    <item>
      <title>WSDOT Ferries Division Peak Season Begins May 1</title>
      <pubDate>Fri, 25 Apr 2008 00:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/ferries-division-peak-season-begins-may-1.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/ferries-division-peak-season-begins-may-1.htm</guid>
      <description>SEATTLE – On Thursday, May 1, the peak season officially begins at WSDOT Ferries Division with an additional 25 percent surcharge applied generally to full fare vehicle/driver tickets.</description>
    </item>
    <item>
      <title>Expect Lane Closures on I-5 in Lewis County on Monday Night, April 28</title>
      <pubDate>Thu, 24 Apr 2008 07:01:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/23_I5ChehalisSingleLaneClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/23_I5ChehalisSingleLaneClosure.htm</guid>
      <description>CHEHALIS – Motorists should expect alternating single lane closures on I-5 north and southbound in Lewis county between Rush Road (milepost 72) and the 13th Street Interchange (milepost 76).  Closures are will take place between 9 p.m. on Monday evening April 28, and 3 a.m. Tuesday morning, April 29.</description>
    </item>
    <item>
      <title>Lane restrictions on SR 224 will delay traffic Thursday in Richland</title>
      <pubDate>Thu, 24 Apr 2008 04:54:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/SR224_laneRestrictionsThursday_Richland.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/SR224_laneRestrictionsThursday_Richland.htm</guid>
      <description>SR 224 (Van Giesen) : lane restrictions Thursday will delay traffic at intersection with SR 240 in Richland</description>
    </item>
    <item>
      <title>I-5 lane closed all weekend in Bellingham</title>
      <pubDate>Thu, 24 Apr 2008 03:49:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/23_i5WeekendWorkStartsFriday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/23_i5WeekendWorkStartsFriday.htm</guid>
      <description>Starting Friday night, crews will close one lane of southbound I-5 all weekend through Bellingham to replace broken concrete panels. Drivers should expect significant delays during the 56-hour lane closure and plan accordingly.</description>
    </item>
    <item>
      <title>WSDOT, Sound Transit invite Kirkland community to celebrate new Totem Lake Freeway Station</title>
      <pubDate>Thu, 24 Apr 2008 02:58:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/23_TotemLakeCommunityEvent.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/23_TotemLakeCommunityEvent.htm</guid>
      <description>On Saturday, April 26, Sound Transit, WSDOT, and the City of Kirkland will host a community celebration to thank the Totem Lake community for their help and patience during construction of the new freeway overpass, bus station, and direct access ramps.</description>
    </item>
    <item>
      <title>First new Hood Canal Bridge transition span complete</title>
      <pubDate>Wed, 23 Apr 2008 05:10:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/First+new+Hood+Canal+Bridge+transition+span+complete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/First+new+Hood+Canal+Bridge+transition+span+complete.htm</guid>
      <description>First new Hood Canal Bridge transition span complete</description>
    </item>
    <item>
      <title>New signs for SR 112 National Scenic Byway</title>
      <pubDate>Tue, 22 Apr 2008 06:40:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/21_112_NewSignsUnveiled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/21_112_NewSignsUnveiled.htm</guid>
      <description>WSDOT and others unveiled new signs for the SR 112 National Scenic Byway.</description>
    </item>
    <item>
      <title>WSDOT kicks off 2008 Puget Sound construction year with multiple milestones</title>
      <pubDate>Tue, 22 Apr 2008 03:32:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/21_NWRConstruction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/21_NWRConstruction.htm</guid>
      <description>WSDOT kicks off 2008 Puget Sound construction year with multiple milestones</description>
    </item>
    <item>
      <title>More Changes Coming For WSDOT Ferries Division</title>
      <pubDate>Tue, 22 Apr 2008 00:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/more-changes-for-ferries-division.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/more-changes-for-ferries-division.htm</guid>
      <description>SEATTLE – Today, WSDOT Ferries Division Assistant Secretary David Moseley announced the resignation of his second in command, Traci Brewer-Rogstad.  Ms. Brewer-Rogstad rose through the ranks at the ferry system and has served the past two years as Deputy Director and Chief of Staff.</description>
    </item>
    <item>
      <title>WSDOT collects pavement samples along Hoquiam streets</title>
      <pubDate>Mon, 21 Apr 2008 23:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/042108Hoquiampavementsampling.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/042108Hoquiampavementsampling.htm</guid>
      <description>WSDOT collects pavement samples along Hoquiam streets</description>
    </item>
    <item>
      <title>WSDOT Invites Public to the SR 14 Camas-Washougal Widening &amp; Interchange Open House, April 22</title>
      <pubDate>Sat, 19 Apr 2008 01:13:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/18_CWWideningOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/18_CWWideningOpenHouse.htm</guid>
      <description>CAMAS – An opportunity for the public to learn more about the updated design of the SR 14 Camas-Washougal Widening &amp; Interchange Project will take place April 22, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Know before you go: Rapid weather changes will make driving a challenge</title>
      <pubDate>Sat, 19 Apr 2008 01:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/WeatherChangesOnMountainPasses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/WeatherChangesOnMountainPasses.htm</guid>
      <description>Weather forecasters are still predicting heavy snowfall in the mountain passes this weekend, which could make driving a challenge. Lowland drivers could also face freezing temperatures.</description>
    </item>
    <item>
      <title>SR 305 slope repair may cause delays</title>
      <pubDate>Fri, 18 Apr 2008 22:49:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/18_SR305_AgateSlopeRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/18_SR305_AgateSlopeRepair.htm</guid>
      <description>Slope repair on SR 305 at Agate Pass.</description>
    </item>
    <item>
      <title>Two-weeks of bridge maintenance in Aberdeen</title>
      <pubDate>Fri, 18 Apr 2008 05:28:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/Aberdeenbridgemaintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/Aberdeenbridgemaintenance.htm</guid>
      <description>Two-weeks of bridge maintenance in Aberdeen</description>
    </item>
    <item>
      <title>SR 16 on-ramp in Tacoma sheds HOV designation</title>
      <pubDate>Fri, 18 Apr 2008 05:12:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/SR16rampshedsHOVdesignation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/SR16rampshedsHOVdesignation.htm</guid>
      <description>SR 16 on-ramp in Tacoma sheds HOV designation</description>
    </item>
    <item>
      <title>Carpoolers on northbound I-5 in Everett will find the drive less taxing</title>
      <pubDate>Fri, 18 Apr 2008 03:15:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/17_I5EverettHOV.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/17_I5EverettHOV.htm</guid>
      <description>For carpoolers on I-5 in Everett, mid-April brings relief from both tax stress and a taxing commute.  If dry weather allows crews to restripe, drivers will notice a new northbound HOV lane between Broadway Avenue and US 2 Friday morning, April 18.</description>
    </item>
    <item>
      <title>Cold, wet weather foils I-5 weekend work in Bellingham</title>
      <pubDate>Thu, 17 Apr 2008 05:05:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/16_i5weekendworkdelayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/16_i5weekendworkdelayed.htm</guid>
      <description>The cold, wet and possibly snowy weather forecast for this weekend has forced crews to indefinitely delay weekend-long lane closures planned for I-5 in Bellingham April 18-21.</description>
    </item>
    <item>
      <title>Move it or lose it: I-5 tow zone stretches south</title>
      <pubDate>Thu, 17 Apr 2008 02:24:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/16_TowAwayZoneExtends.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/16_TowAwayZoneExtends.htm</guid>
      <description>Move it or lose it: I-5 tow zone stretches south</description>
    </item>
    <item>
      <title>Laying down the line for driver safety; WSDOT crews kick off striping season</title>
      <pubDate>Thu, 17 Apr 2008 02:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/08Striping_Season.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/08Striping_Season.htm</guid>
      <description>Crews will spend the next six months re-striping more than 4,500 miles on dozens of highways around the Puget Sound area between the King/Pierce county line and the U.S./Canadian border.</description>
    </item>
    <item>
      <title>Wire thieves continue assault on Tacoma</title>
      <pubDate>Thu, 17 Apr 2008 01:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/16_Wiretheftassault.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/16_Wiretheftassault.htm</guid>
      <description>Wire thieves continue assault on Tacoma</description>
    </item>
    <item>
      <title>Spring snow storms continue on Snoqualmie Pass</title>
      <pubDate>Wed, 16 Apr 2008 04:56:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/I90_SpringSnowStorms.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/I90_SpringSnowStorms.htm</guid>
      <description>Spring snow storms continue on I-90 Snoqualmie Pass; Drivers should prepare for delays</description>
    </item>
    <item>
      <title>Fiber-optic work darkens I-5 Tacoma Cams</title>
      <pubDate>Wed, 16 Apr 2008 02:47:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/15_Fiber+optic+work+I5.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/15_Fiber+optic+work+I5.htm</guid>
      <description>Fiber-optic work darkens I-5 Tacoma Cams</description>
    </item>
    <item>
      <title>Hood Canal Bridge Project water shuttle dock location changes</title>
      <pubDate>Wed, 16 Apr 2008 02:36:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/Hood+Canal+Bridge+Project+water+shuttle+dock+location+changes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/Hood+Canal+Bridge+Project+water+shuttle+dock+location+changes.htm</guid>
      <description>Hood Canal Bridge Project water shuttle dock location changes</description>
    </item>
    <item>
      <title>I-5 Gee Creek Safety Rest Areas in Clark Co. Closing for Maintenance</title>
      <pubDate>Wed, 16 Apr 2008 00:59:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/15_GeeCreekRestAreaClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/15_GeeCreekRestAreaClosure.htm</guid>
      <description>RIDGEFIELD – The Gee Creek Safety Rest Areas on I-5 in Clark County will be closed alternately between Monday, April 21 and Wednesday, April 30, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>San Juan Islands ferry route downsized for one week with 90-car Sealth</title>
      <pubDate>Wed, 16 Apr 2008 00:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/san-juan-islands-ferry-route-downsized.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/san-juan-islands-ferry-route-downsized.htm</guid>
      <description>SEATTLE – Beginning Sunday, April 20, WSDOT Ferries Division will downsize the San Juan Islands route for a week to complete an annual U.S. Coast Guard required inspection on the 144-car Elwha.</description>
    </item>
    <item>
      <title>Traffic engineers tweak weekend I-5 express lane schedule</title>
      <pubDate>Sat, 12 Apr 2008 02:02:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/11_expresslanes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/11_expresslanes.htm</guid>
      <description>Traffic engineers have officially extended I-5 southbound express lane service one hour on Saturdays and Sundays. Now the I-5 express lanes will regularly close southbound at 1 p.m. and reopen northbound by 2 p.m. on weekends.</description>
    </item>
    <item>
      <title>Spring finally arrives on I-90 Snoqualmie Pass, creating need for avalanche control work; Drivers should prepare for delays</title>
      <pubDate>Sat, 12 Apr 2008 01:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/SnoqualmiePassControlWork11.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/SnoqualmiePassControlWork11.htm</guid>
      <description>It may feel like spring in the mountains today, but winter is still lingering around. In the last two weeks, I-90 Snoqualmie Pass has received about five feet of fresh snow, add that to a forecast predicting warm temperatures this weekend, and you get conditions ideal for natural avalanches.</description>
    </item>
    <item>
      <title>Traffic delays at US 101/SR 8 interchange</title>
      <pubDate>Sat, 12 Apr 2008 01:13:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/US101SR8trafficdelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/US101SR8trafficdelays.htm</guid>
      <description>Traffic delays at US 101/SR 8 interchange</description>
    </item>
    <item>
      <title>Elma rest area on SR 8 closed Wednesday</title>
      <pubDate>Fri, 11 Apr 2008 02:12:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/10_SR8_ElmaRestArea.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/10_SR8_ElmaRestArea.htm</guid>
      <description>Elma rest area closes for maintenance.</description>
    </item>
    <item>
      <title>Wire theft continues in Pierce County</title>
      <pubDate>Thu, 10 Apr 2008 20:10:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/09_SR16MoreWireTheft.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/09_SR16MoreWireTheft.htm</guid>
      <description>Wire theft in Tacoma knocks out VMS.</description>
    </item>
    <item>
      <title>Work in winter showers brings springtime driver power on I-5 in Everett</title>
      <pubDate>Thu, 10 Apr 2008 08:45:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/9_I5EverettHOVOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/9_I5EverettHOVOpen.htm</guid>
      <description>Springtime in Everett means more than just flowers opening.  If dry weather allows for restriping this weekend, crews will open 2.5 new miles of carpool lane on southbound I-5 between US 2 and Lowell.</description>
    </item>
    <item>
      <title>State Patrol: no double-crossing in SR 167 HOT Lanes; Crews begin installing double striping, access zones this week</title>
      <pubDate>Thu, 10 Apr 2008 02:49:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/9_HOTlanesstriping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/9_HOTlanesstriping.htm</guid>
      <description>WSDOT crews begin adding a second solid line to separated HOT lanes from the general purpose lanes. It is illegal to cros the double white line once it appears.</description>
    </item>
    <item>
      <title>GSA changes Nexus Lane at Peace Arch border crossing</title>
      <pubDate>Wed, 09 Apr 2008 20:45:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/08_i5nexuslaneclosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/08_i5nexuslaneclosed.htm</guid>
      <description>The northbound I-5 Nexus lane at the Peace Arch border crossing will close intermittently from midnight to noon each day, Monday through Friday, for the next three weeks starting Wednesday, April 9.</description>
    </item>
    <item>
      <title>Open House Scheduled for SR 14 Camas-Washougal Widening &amp; Interchange Project April 22</title>
      <pubDate>Wed, 09 Apr 2008 06:11:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/08_SR14OpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/08_SR14OpenHouse.htm</guid>
      <description>CAMAS – The Washington State Department of Transportation (WSDOT) would like to invite the public to an open house to learn more about the updated design of the SR 14 Camas-Washougal Widening &amp; Interchange Project.</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Wed, 09 Apr 2008 02:23:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/49520bridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/49520bridge.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct monthly maintenance work on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>I-5 weekend closures in Bellingham are delayed</title>
      <pubDate>Tue, 08 Apr 2008 03:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/07_i5laneclosuresdelayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/07_i5laneclosuresdelayed.htm</guid>
      <description>The weekend-long lane closures of I-5 planned for April 11-14 in Bellingham have been delayed.</description>
    </item>
    <item>
      <title>Slide repair work along SR 305 next week</title>
      <pubDate>Fri, 04 Apr 2008 23:17:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/SR305sliderepairwork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/SR305sliderepairwork.htm</guid>
      <description>Slide repair work along SR 305 next week</description>
    </item>
    <item>
      <title>Lawmakers to discuss the future transportation needs of Skagit and Island counties</title>
      <pubDate>Fri, 04 Apr 2008 21:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/4_RTPOmeetsApr23.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/4_RTPOmeetsApr23.htm</guid>
      <description>The Island and Skagit County Regional Transportation Planning Organization Policy Board will meet at 10 a.m. Wednesday, April 23, to identify and discuss transportation challenges.</description>
    </item>
    <item>
      <title>WSDOT celebrates start of SR 522- UW Bothell/Cascadia Community College Campus Access project with students and local leaders</title>
      <pubDate>Fri, 04 Apr 2008 06:42:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/3_SR522UWBothellCascadia.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/3_SR522UWBothellCascadia.htm</guid>
      <description>More than 200 people packed the UW Bothell Events Center this afternoon to celebrate years of hard work and effort to find funding and then break ground on the UW Bothell/Cascadia College Campus Access project.</description>
    </item>
    <item>
      <title>Ground is Broken to begin the US 2/97 Peshastin East Interchange Project</title>
      <pubDate>Fri, 04 Apr 2008 01:50:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/03US2_97PeshastinEIntGB.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/03US2_97PeshastinEIntGB.htm</guid>
      <description>A ground breaking ceremony kicked off construction of a new diamond interchange at the junction of US 2 and US 97 in Chelan County.</description>
    </item>
    <item>
      <title>US 2 Paving work in Lincoln County starts</title>
      <pubDate>Fri, 04 Apr 2008 00:52:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/04_US2crestonpaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/04_US2crestonpaving.htm</guid>
      <description>US 2 paving in Lincoln County</description>
    </item>
    <item>
      <title>WSDOT to re-bid contract for 50-car ferries</title>
      <pubDate>Thu, 03 Apr 2008 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/wsdot-to-re-bid-contract-for-50-car-ferries.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/wsdot-to-re-bid-contract-for-50-car-ferries.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Drivers reminded to remove studded tires before Sunday</title>
      <pubDate>Thu, 03 Apr 2008 06:03:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/02_stud_tire_remind.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/02_stud_tire_remind.htm</guid>
      <description>OLYMPIA – With short and long-term weather forecasts indicating more typical April weather, WSDOT reminds drivers it’s time to remove studded tires.</description>
    </item>
    <item>
      <title>Deck Repairs Cause Closure of Two Lanes on I-5 North near Woodland</title>
      <pubDate>Thu, 03 Apr 2008 05:49:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/02_I-5LaneClosureWoodland.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/02_I-5LaneClosureWoodland.htm</guid>
      <description>WOODLAND – Motorists traveling I-5 northbound over the North Fork Lewis River Bridge (milepost 19.87) will encounter right and center lane closures on Thursday night and early Friday morning for bridge maintenance activities, announces the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>HOT lanes open this month on SR 167 between Renton and Auburn</title>
      <pubDate>Thu, 03 Apr 2008 05:42:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/02SR167HOTlanesopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/02SR167HOTlanesopen.htm</guid>
      <description>On April 26, Washington’s first ever high occupancy toll (HOT) lanes will begin offering solo drivers a new choice for their commute on State Route 167. The SR 167 HOT Lanes Pilot Project will assess how variable tolling can help make the state’s roadways more efficient and less congested.</description>
    </item>
    <item>
      <title>Important Milestone Reached on US 97- Biggs Bridge Project</title>
      <pubDate>Thu, 03 Apr 2008 05:30:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/02_MilestoneReachedonUS97.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/02_MilestoneReachedonUS97.htm</guid>
      <description>GOLDENDALE – The project replacing the US 97, Biggs Bridge concrete deck has reached the important milestone of completing the pour of the Washington approach span of the bridge, announced the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>SR 28 at Rock Island Dam Reopens 12 Hours Early</title>
      <pubDate>Wed, 02 Apr 2008 05:28:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/01SR28ReopenedEarly.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/01SR28ReopenedEarly.htm</guid>
      <description>SR 28 reopens early after a successful 92 hour rock scaling effort.</description>
    </item>
    <item>
      <title>Outage planned tomorrow for I-5 traffic cams in Tacoma</title>
      <pubDate>Wed, 02 Apr 2008 04:35:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/01_TacomaCamOutage.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/01_TacomaCamOutage.htm</guid>
      <description>Outage planned tomorrow for I-5 traffic cams in Tacoma</description>
    </item>
    <item>
      <title>WSDOT seeks comments on Washington State Bicycle Facilities and Pedestrian Walkways Plan</title>
      <pubDate>Wed, 02 Apr 2008 01:33:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/01_WashingtonStateBicycleFacilities.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/01_WashingtonStateBicycleFacilities.htm</guid>
      <description>OLYMPIA – What do Washington’s communities need when it comes to bicycle and pedestrian transportation?  How can the state help to meet those needs?  What would encourage people to walk or bicycle more often?</description>
    </item>
    <item>
      <title>I-5 Toutle River Rest Areas in Cowlitz Co. Closing for Maintenance</title>
      <pubDate>Wed, 02 Apr 2008 01:25:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/04/01_ToutleRestAreaClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/04/01_ToutleRestAreaClosures.htm</guid>
      <description>CASTLE ROCK – The Toutle River Safety Rest Areas on I-5 in Cowlitz County will be closed Monday, April 14 through Wednesday, April 16, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>WSDOT opens doors for public to view the I-82/Valley Mall Boulevard Interchange design</title>
      <pubDate>Tue, 01 Apr 2008 00:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/31ValleyMallRoundabouts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/31ValleyMallRoundabouts.htm</guid>
      <description>It seems WSDOT has gone round and round when it comes to public opinion about roundabouts. However, at an open house in Union Gap, the public seemed to be ready to embrace the idea that roundabouts will make driving through this interchange much easier.</description>
    </item>
    <item>
      <title>US 101 Chehalis River Bridge lane closures</title>
      <pubDate>Sat, 29 Mar 2008 05:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/0328US101ChehalisRiverlaneclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/0328US101ChehalisRiverlaneclosures.htm</guid>
      <description>US 101 Chehalis River Bridge lane closures</description>
    </item>
    <item>
      <title>Crews target noxious weeds on Bainbridge Island</title>
      <pubDate>Fri, 28 Mar 2008 04:23:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/0327SR305Bainbridgeweeds.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/0327SR305Bainbridgeweeds.htm</guid>
      <description>Crews target noxious weeds on Bainbridge Island</description>
    </item>
    <item>
      <title>Viaduct continues to sink; Repairs almost complete to halt settlement</title>
      <pubDate>Fri, 28 Mar 2008 01:21:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/27-viaductsinking.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/27-viaductsinking.htm</guid>
      <description>Preliminary results from last weekend’s inspection revealed that the Alaskan Way Viaduct has settled another 3/8ths of an inch, bringing the total amount of settlement to approximately five-and-a-half inches. The columns continue to settle incrementally between Columbia Street and Yesler Way where repairs are nearly complete to strengthen several column foundations. No new structural damage was caused by the additional settlement.</description>
    </item>
    <item>
      <title>Studded tire deadline extended in Washington and Oregon</title>
      <pubDate>Fri, 28 Mar 2008 01:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/27_stud_tire_extension.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/27_stud_tire_extension.htm</guid>
      <description>OLYMPIA – The studded tire deadline is extended through April 5.</description>
    </item>
    <item>
      <title>Hours and miles of delays possible during I-5 construction in Bellingham</title>
      <pubDate>Thu, 27 Mar 2008 22:52:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/27_i5constructiondrawsnear.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/27_i5constructiondrawsnear.htm</guid>
      <description>Drivers can avoid big backups in Bellingham this April and May if they plan ahead now. Night lane closures start 11 p.m. Monday, March 31, and weekend-long lane closures will follow soon after.</description>
    </item>
    <item>
      <title>Bids opened for contract to build new 50-car ferry</title>
      <pubDate>Thu, 27 Mar 2008 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/bids-opened-for-contract-to-build-new-50-car-ferry.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/bids-opened-for-contract-to-build-new-50-car-ferry.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Aviation Planning Council to Meet April 3 in Seattle</title>
      <pubDate>Wed, 26 Mar 2008 04:14:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/APCApril.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/APCApril.htm</guid>
      <description>On April 3, 2008 members of the Governor-appointed Aviation Planning Council will meet for the fourth time to continue work on the final phase of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>Work to reduce crossover collisions on US 2 begins this spring</title>
      <pubDate>Wed, 26 Mar 2008 01:31:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/25_CorridorRumbleAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/25_CorridorRumbleAward.htm</guid>
      <description>As early as May, drivers could see crews working on US 2 on a project that will help reduce serious collisions on the highway between Monroe and Stevens Pass.</description>
    </item>
    <item>
      <title>Hood Canal Bridge shoulder work continues through April</title>
      <pubDate>Tue, 25 Mar 2008 00:48:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/Hood+Canal+Bridge+shoulder+work+continues+through+April.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/Hood+Canal+Bridge+shoulder+work+continues+through+April.htm</guid>
      <description>Hood Canal Bridge shoulder work continues through April</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct Reopened After Semiannual Inspections</title>
      <pubDate>Sun, 23 Mar 2008 23:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/23-viaduct-reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/23-viaduct-reopens.htm</guid>
      <description>WSDOT maintenance crews re-opened all lanes on the Alaskan Way Viaduct shortly before 3 p.m., three hours ahead of schedule. The viaduct was closed for its semiannual inspections on March 22 and 23.</description>
    </item>
    <item>
      <title>Drivers should expect delays westbound over I-90 Snoqualmie Pass due to avalanche control clean-up work</title>
      <pubDate>Sun, 23 Mar 2008 05:35:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/22avalanchecontrolwork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/22avalanchecontrolwork.htm</guid>
      <description>Drivers heading westbound over I-90 Snoqualmie Pass should expect delays.</description>
    </item>
    <item>
      <title>I-5 lane closures south of Olympia</title>
      <pubDate>Sat, 22 Mar 2008 05:18:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/ScatterCreeklaneclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/ScatterCreeklaneclosures.htm</guid>
      <description>I-5 lane closures south of Olympia</description>
    </item>
    <item>
      <title>SR 28 Closed for Four Days Beginning Next Friday</title>
      <pubDate>Sat, 22 Mar 2008 04:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/21SR28RockIslandClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/21SR28RockIslandClosure.htm</guid>
      <description>Rock Slope Stabilization across from Rock Island Dam between Wenatchee and Quincy will close SR 28 from Friday night, March 28th through Wednesday morning, April 2nd.</description>
    </item>
    <item>
      <title>Preservation prompts weight restriction on Manette Bridge in Kitsap County</title>
      <pubDate>Sat, 22 Mar 2008 04:08:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/21_SR303_Manette_restriction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/21_SR303_Manette_restriction.htm</guid>
      <description>The Manette Bridge, which spans the Port Washington Narrows in Bremerton, will be on “light duty” starting next week when a heavy-load restriction goes into effect.</description>
    </item>
    <item>
      <title>SR 504 to Coldwater Visitor Center Reopens on Thursday, March 20</title>
      <pubDate>Fri, 21 Mar 2008 06:17:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/20_SR504_Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/20_SR504_Reopens.htm</guid>
      <description>CASTLE ROCK – Section of State Route 504 (Spirit Lake Highway) from mile post 34 to mile post 43 reopened to traffic Thursday, March 20, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Anacortes/Sidney, BC sailings return with spring ferry schedule on March 30</title>
      <pubDate>Thu, 20 Mar 2008 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/anacortessidney-bc-sailings-return-with-spring-ferry-schedule-on.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/anacortessidney-bc-sailings-return-with-spring-ferry-schedule-on.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Easter backups expected at Tacoma Narrows Bridge Toll Plaza</title>
      <pubDate>Wed, 19 Mar 2008 23:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/031908EasterTNBtraffic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/031908EasterTNBtraffic.htm</guid>
      <description>Easter backups expected at Tacoma Narrows Bridge Toll Plaza</description>
    </item>
    <item>
      <title>Sign unveiling marks official launch of US 2 traffic safety corridor project</title>
      <pubDate>Wed, 19 Mar 2008 01:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/18_US2SafetyCorridor.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/18_US2SafetyCorridor.htm</guid>
      <description>State and local officials gathered with community members this morning in Sultan to unveil new signs designating US 2 a traffic safety corridor.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division adjusts maintenance schedule to optimize spring service</title>
      <pubDate>Tue, 18 Mar 2008 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-adjusts-maintenance-schedule-to-optimize.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-adjusts-maintenance-schedule-to-optimize.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Little people, big celebration in Tacoma</title>
      <pubDate>Tue, 18 Mar 2008 04:34:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/48th-Pacificoverpass.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/48th-Pacificoverpass.htm</guid>
      <description>Transportation secretary, 140 students cut ribbon on I-5 construction</description>
    </item>
    <item>
      <title>US 395 restricted for inspection on Blue Bridge in Pasco</title>
      <pubDate>Mon, 17 Mar 2008 19:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/lanesrestrictedonUS395BlueBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/lanesrestrictedonUS395BlueBridge.htm</guid>
      <description>US 395: WSDOT restricts traffic on Blue Bridge near Pasco during inspection</description>
    </item>
    <item>
      <title>Crews Close Alaskan Way Viaduct for Semiannual Inspections on March 22 and 23</title>
      <pubDate>Sat, 15 Mar 2008 06:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/14-viaductinspections.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/14-viaductinspections.htm</guid>
      <description>WSDOT maintenance crews will close the Alaskan Way Viaduct for its semiannual inspection on March 22 and March 23. Crews will close both viaduct decks between 6 a.m. and 6 p.m. on Saturday, March 22 and from 6 a.m. to 6 p.m. on Sunday, March 23 between Spokane Street through the Battery Street Tunnel. The Battery Street Tunnel will remain closed overnight on Saturday.</description>
    </item>
    <item>
      <title>Repaired crane puts project back on track; crews set bridge girders on SR 9 north of Arlington next week</title>
      <pubDate>Sat, 15 Mar 2008 01:00:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/14_SR9SchlomanGirder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/14_SR9SchlomanGirder.htm</guid>
      <description>Next Monday, crews working to improve State Route 9 between Arlington and Bryant will begin setting girders for a new bridge that will take the highway over Harvey Creek and Harvey Creek Road.</description>
    </item>
    <item>
      <title>US 12 construction closes portion of Dell Ave., Walla Walla</title>
      <pubDate>Fri, 14 Mar 2008 23:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/14_US12Construction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/14_US12Construction.htm</guid>
      <description>US 12 construction permanently closes a portion of Dell Avenue in Walla Walla</description>
    </item>
    <item>
      <title>Hood Canal Bridge shoulder work continues</title>
      <pubDate>Fri, 14 Mar 2008 23:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/14_HoodCanalBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/14_HoodCanalBridge.htm</guid>
      <description>Drivers traveling across the Hood Canal Bridge this month may notice WSDOT activity along the bridge’s northwest shoulder.</description>
    </item>
    <item>
      <title>SR 20 North Cascades Highway Reopening Begins March 24th</title>
      <pubDate>Fri, 14 Mar 2008 07:21:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/031308NCHreopening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/031308NCHreopening.htm</guid>
      <description>The annual spring effort to reopen the North Cascades Highway is scheduled to begin March 24th.</description>
    </item>
    <item>
      <title>I-5 Everett HOV crews have nose to the grindstone, eyes on the finish line</title>
      <pubDate>Fri, 14 Mar 2008 04:51:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/13_I-5EverettLasts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/13_I-5EverettLasts.htm</guid>
      <description>Crews are making good progress on the Pacific Avenue girder replacement project, but the work hasn’t stopped elsewhere on I-5 in Everett.</description>
    </item>
    <item>
      <title>SR 6 near Pe Ell Reopens Fully as Crews Complete Repairs, March 16</title>
      <pubDate>Fri, 14 Mar 2008 04:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/13_SR6_Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/13_SR6_Reopens.htm</guid>
      <description>CHEHALIS – Contractor crews will complete repairs and reopen State Route 6 near Pe Ell (milepost 27) to traffic on Sunday, March 16, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>I-90/Latah Creek Bridge and Lindeke Street Guardrail project starts</title>
      <pubDate>Fri, 14 Mar 2008 01:16:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/13_I90spokanebridgeguardrail.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/13_I90spokanebridgeguardrail.htm</guid>
      <description>I-90 bridge guardrail project ready to start</description>
    </item>
    <item>
      <title>I-82 westbound exit ramp to Yakima closed</title>
      <pubDate>Thu, 13 Mar 2008 06:19:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/I82_exit_ramp_closed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/I82_exit_ramp_closed.htm</guid>
      <description>I-82: westbound exit ramp into Yakima closed for guardrail repair</description>
    </item>
    <item>
      <title>Inspection Causes Right Lane Closure on I-5 Southbound at the Cowlitz River Bridge this Weekend</title>
      <pubDate>Thu, 13 Mar 2008 05:27:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/12_I-5LaneClosedonCowlitzRiverBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/12_I-5LaneClosedonCowlitzRiverBridge.htm</guid>
      <description>CHEHALIS – Motorists traveling I-5 southbound over the Cowlitz River Bridge (milepost 59.06) will encounter a right lane closure on Saturday and possibly Sunday for bridge inspection activities, announces the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>I-82 eastbound lane restricted near Union Gap</title>
      <pubDate>Thu, 13 Mar 2008 01:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/I82lanerestricion.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/I82lanerestricion.htm</guid>
      <description>I-82: One eastbound lane restricted for guardrail repair near Union Gap
On Wednesday,</description>
    </item>
    <item>
      <title>I-5 lanes closed April 1 in Bellingham</title>
      <pubDate>Thu, 13 Mar 2008 01:23:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/12_i5lanesclosedinApril.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/12_i5lanesclosedinApril.htm</guid>
      <description>Fixing I-5 through Bellingham is no joke, even though work does begin on April Fools Day.</description>
    </item>
    <item>
      <title>Traffic-signal work blacks out Waaga Way intersection</title>
      <pubDate>Thu, 13 Mar 2008 00:20:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/12_3_WaagaBlkOut.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/12_3_WaagaBlkOut.htm</guid>
      <description>WSDOT crews will black out the Waaga Way intersection for signal work Thursday, March 13.</description>
    </item>
    <item>
      <title>Vessel repairs completed early; Hiyu to begin service in San Juan Islands Thursday, March 13</title>
      <pubDate>Wed, 12 Mar 2008 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/vessel-repairs-completed-early-hiyu-to-begin-service-in-san-juan.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/vessel-repairs-completed-early-hiyu-to-begin-service-in-san-juan.htm</guid>
      <description></description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Tue, 11 Mar 2008 22:57:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/11_SR520MonthlyMaintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/11_SR520MonthlyMaintenance.htm</guid>
      <description>WSDOT bridge crews will conduct monthly maintenance work on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>WSDOT receives clean fiscal report from State Auditor's Office</title>
      <pubDate>Tue, 11 Mar 2008 07:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/10_CleanFiscalReport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/10_CleanFiscalReport.htm</guid>
      <description>OLYMPIA – For the first time in 21 years, the Washington State Department of Transportation annual fiscal audit included no report findings by the State Auditor’s Office.</description>
    </item>
    <item>
      <title>Reducing greenhouse gas emissions one vehicle at a time</title>
      <pubDate>Tue, 11 Mar 2008 03:29:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/10_CTRgreen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/10_CTRgreen.htm</guid>
      <description>The Governor’s Commute Trip Reduction (CTR) Board approved 58 new local and regional CTR plans that will increase the share of commuters who get to work by ways other than driving alone. These plans set goals to reduce the number of drive-alone commute trips to CTR worksites by 10 percent and to reduce the number of vehicle miles traveled to CTR worksites by 13 percent by 2011.</description>
    </item>
    <item>
      <title>Spring in Paris with the upcoming Wheel Options Campaign</title>
      <pubDate>Tue, 11 Mar 2008 00:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/10_wheelopitionsparis.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/10_wheelopitionsparis.htm</guid>
      <description>"Ohh la la!" That’s what a commuter could be saying if they win the trip for two to Paris, France during this spring’s Wheel Options campaign. When commuters participate in Wheel Options at least twice from March 9 - 22, they will be eligible to win a trip to Paris for two, including airfare, lodging and a Rick Steves' Best of Paris Tour. Anyone who shares the commute to work in the state of Washington may participate. Share your commute by carpool, vanpool, bus or train or do anything other tha</description>
    </item>
    <item>
      <title>WSDOT Ferries Division invites public to meet new assistant secretary and discuss future of the ferry system</title>
      <pubDate>Mon, 10 Mar 2008 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-invites-public-to-meet-new-assistant-secr.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-invites-public-to-meet-new-assistant-secr.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Ferry Service Adjustments on Seattle/Bremerton and Anacortes/San Juan Routes Delayed</title>
      <pubDate>Sat, 08 Mar 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/ferry-service-adjustments-on-seattlebremerton-and-anacortessan-j.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/ferry-service-adjustments-on-seattlebremerton-and-anacortessan-j.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Crews repair lighting system dimmed by thieves on SR 8</title>
      <pubDate>Sat, 08 Mar 2008 08:12:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/07_CrewsrepairlightingSR8.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/07_CrewsrepairlightingSR8.htm</guid>
      <description>Crews repair lighting system dimmed by thieves on SR 8</description>
    </item>
    <item>
      <title>Sinkhole on SR 31 north of Metaline Falls affecting traffic</title>
      <pubDate>Sat, 08 Mar 2008 07:58:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/03_SR31sinkholerepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/03_SR31sinkholerepair.htm</guid>
      <description>Sinkhole on SR 31 north of Metaline Falls affecting traffic</description>
    </item>
    <item>
      <title>Safety upgrades planned for Skagit, Whatcom highways</title>
      <pubDate>Sat, 08 Mar 2008 06:45:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/07_SR9SafetyImprovementProject.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/07_SR9SafetyImprovementProject.htm</guid>
      <description>Numerous safety upgrades are planned for several stretches of rural highway in Skagit and Whatcom counties. Crews will install or replace sections of guardrail, flashing beacons, centerline and shoulder rumble strips, and recessed pavement markers.</description>
    </item>
    <item>
      <title>Amtrak Cascades ridership sets all-time record in 2007</title>
      <pubDate>Sat, 08 Mar 2008 04:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/AmtrakCascadesridershipsetsall-timerecordin2007.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/AmtrakCascadesridershipsetsall-timerecordin2007.htm</guid>
      <description>Amtrak Cascades 2007 ridership report</description>
    </item>
    <item>
      <title>New speed sensors shed light on first morning commute through traffic split in Everett</title>
      <pubDate>Fri, 07 Mar 2008 21:32:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/7_TrafficSensors.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/7_TrafficSensors.htm</guid>
      <description>Drivers on southbound Interstate 5 navigated around a split in traffic through downtown Everett for the first time this morning.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division launches testing phase of biodiesel fuel project</title>
      <pubDate>Fri, 07 Mar 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-launches-testing-phase-of-biodiesel-fuel.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-launches-testing-phase-of-biodiesel-fuel.htm</guid>
      <description></description>
    </item>
    <item>
      <title>US 395/BNSF tunnel project for North Spokane corridor getting underway</title>
      <pubDate>Fri, 07 Mar 2008 07:00:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/03_US395BNSFtunnel.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/03_US395BNSFtunnel.htm</guid>
      <description>BNSF tunnel project for North Spokane corridor getting underway</description>
    </item>
    <item>
      <title>WSDOT Ferries Division announces updated spring and summer service adjustments due to vessel maintenance needs</title>
      <pubDate>Thu, 06 Mar 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-announces-updated-spring-and-summer-servi.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-announces-updated-spring-and-summer-servi.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Ferry service resumes on Point Defiance/Tahlequah route Thursday, March 6</title>
      <pubDate>Wed, 05 Mar 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/ferry-service-resumes-on-point-defiancetahlequah-route-thursday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/ferry-service-resumes-on-point-defiancetahlequah-route-thursday.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Time to split:  Crews build construction zone in the middle of southbound I-5 in Everett</title>
      <pubDate>Wed, 05 Mar 2008 08:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/4_I5EverettTrafficSplit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/4_I5EverettTrafficSplit.htm</guid>
      <description>Starting 4:30 a.m. Thursday, March 6, drivers in Everett will see something very different: a 1.25-mile traffic split around a construction zone in the middle of southbound I-5. Because the unusual lane configuration will be unfamiliar to drivers, WSDOT is reducing the speed limit to 50 mph from the Snohomish River bridge through the construction zone to keep crews and drivers safe.</description>
    </item>
    <item>
      <title>SR 20 interchange improvements to start this year in Burlington</title>
      <pubDate>Wed, 05 Mar 2008 07:11:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/04_SR20widenedToInterstate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/04_SR20widenedToInterstate.htm</guid>
      <description>Relief is on the way for the 22,000 drivers who use the State Route 20 interchange at I-5 in Burlington each day.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division Offers Alternatives During Point Defiance/Tahlequah Ferry Route Closure</title>
      <pubDate>Sun, 02 Mar 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-offers-alternatives-during-point-defiance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-offers-alternatives-during-point-defiance.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Two weeks of lane closures for the US 12 Wishkah River Bridge</title>
      <pubDate>Fri, 07 Mar 2008 02:06:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/6_12_WishkahLaneClsrs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/6_12_WishkahLaneClsrs.htm</guid>
      <description>US 12 faces two weeks of lane closures beginning next week.</description>
    </item>
    <item>
      <title>Pacific Avenue girder replacement under way; Crews have a busy Wednesday night on I-5 in Everett</title>
      <pubDate>Wed, 05 Mar 2008 09:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/4_I5EverettPacificGirder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/4_I5EverettPacificGirder.htm</guid>
      <description>On Thursday morning, crews will begin replacing a damaged girder on southbound I-5 over Pacific Avenue. To prepare, they’ll spend Wednesday night restriping southbound I-5 between Everett Avenue and 41st Street to create a traffic split around a new construction zone.</description>
    </item>
    <item>
      <title>Shoulder work continues through March 14 on Hood Canal Bridge</title>
      <pubDate>Tue, 04 Mar 2008 00:29:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/HCBshoulder3-14.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/HCBshoulder3-14.htm</guid>
      <description>Shoulder work continues through March 14 on Hood Canal Bridge</description>
    </item>
    <item>
      <title>New SR 202 to SR 520 ramp open in Redmond; Monday a.m. commute to benefit</title>
      <pubDate>Sun, 02 Mar 2008 11:35:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/1_NewSR202Ramp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/1_NewSR202Ramp.htm</guid>
      <description>Crews working for WSDOT successfully connected the westbound SR 202 right lane to the new westbound SR 202 to SR 520 flyover ramp during this weekend's closure of westbound SR 202.  Crews opened all lanes and the new ramp to traffic at 4 p.m. Saturday, March 1.</description>
    </item>
    <item>
      <title>Westbound SR 202 closes in Redmond tonight as crews prepare for weekend opening of new SR 202 to SR 520 ramp</title>
      <pubDate>Sat, 01 Mar 2008 08:40:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/29_SR202FlyoverRamp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/29_SR202FlyoverRamp.htm</guid>
      <description>Crews expect to open the new westbound SR 202 to westbound SR 520 flyover ramp this weekend. If weather cooperates, the ramp could open by 8 a.m. Sunday, March 2.</description>
    </item>
    <item>
      <title>Work Zone Speed Enforcement Cameras Coming Soon</title>
      <pubDate>Sat, 01 Mar 2008 05:41:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/022908BigYphotoenforcement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/022908BigYphotoenforcement.htm</guid>
      <description>A work zone photo enforcement program to slow traffic will be tested when the Peshastin East interchange project begins in April.</description>
    </item>
    <item>
      <title>SR 28 to be Closed for Four Days Beginning March 28th</title>
      <pubDate>Sat, 01 Mar 2008 05:13:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/022908SR28ClosureComing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/022908SR28ClosureComing.htm</guid>
      <description>Drivers will face a 90 minute alternative route when SR 28 is closed at Rock Island Dam for 4 days in about four weeks.</description>
    </item>
    <item>
      <title>Traffic Restrictions Ahead for Sen. George Sellar Bridge Project</title>
      <pubDate>Sat, 01 Mar 2008 04:56:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/022908SellarDrilling.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/022908SellarDrilling.htm</guid>
      <description>A taste of things to come for the Wenatchee Valley - Senator George Sellar Bridge lane closures coming over the next two weeks.</description>
    </item>
    <item>
      <title>Speed Limit Returns to 60 MPH in the I-5, Rush Rd to 13th Construction Zone</title>
      <pubDate>Sat, 01 Mar 2008 01:46:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/29_LewisCountySpeedRevision.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/29_LewisCountySpeedRevision.htm</guid>
      <description>CHEHALIS – Beginning the evening of Friday, February 29, the speed limit returned to 60 mph on I-5 near the Rush Road (milepost 72) to 13th Street (milepost 77) work zone, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>WSDOT posts its Quarterly Performance Report</title>
      <pubDate>Fri, 29 Feb 2008 08:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/28_WSDOT_QPR.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/28_WSDOT_QPR.htm</guid>
      <description>The December 31, 2007 edition of the “Gray Notebook” includes annual performance reports for pavement conditions, highway maintenance, pedestrian and bicycle safety, and environmental programs.</description>
    </item>
    <item>
      <title>WSDOT seeks qualified contractors to design-build SR 519 project</title>
      <pubDate>Fri, 29 Feb 2008 07:18:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/28-SR519contractors.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/28-SR519contractors.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) is seeking qualified contractors to finish the design and build the SR 519 Intermodal Access Project: Phase 2 – Atlantic Corridor. WSDOT has issued a request for qualifications (RFQ) to determine which companies are interested in completing this design-build project.</description>
    </item>
    <item>
      <title>Crews close southbound I-5 near SeaTac again Saturday night for girder repair</title>
      <pubDate>Fri, 29 Feb 2008 00:55:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/28_I-5SeatacClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/28_I-5SeatacClosure.htm</guid>
      <description>For the second weekend in a row Tri-State Construction crews working for the Washington State Department of Transportation will close southbound I-5 between the I-405 interchange and S. 188th Street.</description>
    </item>
    <item>
      <title>Another Step in the Right Direction - Realignment of WSDOT Ferries Division Vessel Engineering and Maintenance Programs</title>
      <pubDate>Thu, 28 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/another-step-in-the-right-direction-realignment-of-wsdot-ferries.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/another-step-in-the-right-direction-realignment-of-wsdot-ferries.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Ferry customers will experience planned temporary service adjustments on Seattle/Bremerton, Fauntleroy/Vashon/Southworth and Anacortes/San Juan Islands routes</title>
      <pubDate>Thu, 28 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/ferry-customers-will-experience-planned-temporary-service-adjust.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/ferry-customers-will-experience-planned-temporary-service-adjust.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Work Zone safety cameras coming in Spring 2008</title>
      <pubDate>Thu, 28 Feb 2008 09:49:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/27_work_zone_cameras.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/27_work_zone_cameras.htm</guid>
      <description>OLYMPIA – WSDOT will begin a six-month pilot project for the 2008 Construction Season to see how new technology can slow drivers to make work zones safer for workers, drivers and passengers.</description>
    </item>
    <item>
      <title>Four-month lane closure on I-90 center roadway between Bellevue and Mercer Island; westbound lane shifts to come next week</title>
      <pubDate>Thu, 28 Feb 2008 08:18:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/27_I90LaneShiftsAndClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/27_I90LaneShiftsAndClosures.htm</guid>
      <description>Last night, crews closed one lane of the I-90 reversible center roadway between Bellevue and Mercer Island as WSDOT and Sound Transit work to improve travel for HOVs and buses. Next week, drivers on westbound I-90 between Bellevue and Mercer Island, will wake up to varying lane striping and alignments.</description>
    </item>
    <item>
      <title>New structures on SR 167 between Renton and Auburn signal HOT lanes coming soon</title>
      <pubDate>Wed, 27 Feb 2008 10:45:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/26_SR167SR167HotLanesComing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/26_SR167SR167HotLanesComing.htm</guid>
      <description>WSDOT crews are installing gantries over SR 167 that soon will support signs and electronic tolling equipment for the SR 167 HOT Lanes Pilot Project.</description>
    </item>
    <item>
      <title>Chuckanut interchange plans focus on roundabouts and park and ride</title>
      <pubDate>Wed, 27 Feb 2008 06:29:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/26_i5sr11openhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/26_i5sr11openhouse.htm</guid>
      <description>Congestion and collisions are a regular occurrence at the I-5, SR 11 interchange in Burlington, and engineers believe roundabouts are part of the solution. Review the Washington State Department of Transportation’s plans and contribute suggestions at a March 4 open house.</description>
    </item>
    <item>
      <title>New bridges open in Tacoma</title>
      <pubDate>Wed, 27 Feb 2008 05:59:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/26_I5_YakimaDelin_reopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/26_I5_YakimaDelin_reopen.htm</guid>
      <description>Yakima and Delin bridges set to open.</description>
    </item>
    <item>
      <title>New cameras available for all four border crossings</title>
      <pubDate>Wed, 27 Feb 2008 05:32:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/26_NewBorderCameras.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/26_NewBorderCameras.htm</guid>
      <description>The next time you're crossing the border into Canada, be sure to check the WSDOT Web site. Eleven new cameras will help make it easier to pick the crossing with the shortest lines.</description>
    </item>
    <item>
      <title>Shoulder work continues on Hood Canal Bridge</title>
      <pubDate>Wed, 27 Feb 2008 02:11:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/02_26HCBshoulder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/02_26HCBshoulder.htm</guid>
      <description>Shoulder work continues on Hood Canal Bridge</description>
    </item>
    <item>
      <title>Open Houses This Week for the US 97A North of Wenatchee Unstable Slopes Project</title>
      <pubDate>Tue, 26 Feb 2008 08:04:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/022508OpenHousesUS97AunstableSlopes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/022508OpenHousesUS97AunstableSlopes.htm</guid>
      <description>Two open houses are scheduled this week to get public input on traffic control plans for a 2009 rock slope stabilization project on US 97A, north of Wenatchee.</description>
    </item>
    <item>
      <title>New traffic cameras on US 101 in Hoquiam</title>
      <pubDate>Tue, 26 Feb 2008 05:07:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/SimpsonTrafficCamera.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/SimpsonTrafficCamera.htm</guid>
      <description>New traffic cameras on US 101 in Hoquiam</description>
    </item>
    <item>
      <title>Anacortes/San Juan Islands ferry route downsizing will begin a day early</title>
      <pubDate>Mon, 25 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/anacortessan-juan-islands-ferry-route-downsizing-will-begin-a-da.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/anacortessan-juan-islands-ferry-route-downsizing-will-begin-a-da.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Speed Limit on US 97A at the North End of Entiat Goes Down</title>
      <pubDate>Sat, 23 Feb 2008 08:39:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/022208EntiatSpeedLimit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/022208EntiatSpeedLimit.htm</guid>
      <description>The speed limit on US 97A at the north end of the City of Entiat will be reduced to 40 mph on Thursday</description>
    </item>
    <item>
      <title>Crews postpone bridge work on SR 9 north of Arlington; crane to be repaired in March</title>
      <pubDate>Sat, 23 Feb 2008 07:28:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/22_SR9BridgeGirder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/22_SR9BridgeGirder.htm</guid>
      <description>WSDOT engineers postponed bridge work until early March to repair a crane that has broken down at the work site.</description>
    </item>
    <item>
      <title>Guide Meridian gets busy this spring; more widening and four roundabouts</title>
      <pubDate>Sat, 23 Feb 2008 04:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/22_sr539GuideWideningProject.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/22_sr539GuideWideningProject.htm</guid>
      <description>Construction work on the Guide Meridian (SR 539) is about to expand from five miles to 10, spanning nearly the entire length of the highway from Bellingham to Lynden.</description>
    </item>
    <item>
      <title>WSDOT Announces Ferries Division Director of Finance and Administration Steps Down</title>
      <pubDate>Fri, 22 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/wsdot-announces-ferries-division-director-of-finance-and-adminis.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/wsdot-announces-ferries-division-director-of-finance-and-adminis.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Ferries Division Prepares for Chilly Hilly Bicyclists</title>
      <pubDate>Fri, 22 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/wsdot-ferries-division-prepares-for-chilly-hilly-bicyclists.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/wsdot-ferries-division-prepares-for-chilly-hilly-bicyclists.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Just three months to go; I-5 Everett HOV crews slalom to the finish line</title>
      <pubDate>Fri, 22 Feb 2008 06:15:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/21_I5EverettSlalom.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/21_I5EverettSlalom.htm</guid>
      <description>The course is in great shape, the crews are on a roll, but the weather can be fickle.  Crews have their work cut out for them as they race against the project clock and traditionally wet springtime weather to open a wider, smoother I-5 in Everett.</description>
    </item>
    <item>
      <title>Clinton paving project awarded, work to begin shortly on SR 525</title>
      <pubDate>Fri, 22 Feb 2008 02:49:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/21_SR525ClintonPaver.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/21_SR525ClintonPaver.htm</guid>
      <description>Krieg Construction Inc. of Oak Harbor will repave about a half a mile of SR 525 on Whidbey Island and make safety improvements from the Clinton ferry terminal to Bob Galbreath Road.</description>
    </item>
    <item>
      <title>Third cycle of Hood Canal Bridge pontoons floated out</title>
      <pubDate>Fri, 22 Feb 2008 02:37:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/21_HCBPontoons3.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/21_HCBPontoons3.htm</guid>
      <description>The third cycle of the Hood Canal Bridge pontoon work was completed this morning when four new pontoons were floated from Tacoma to Seattle.</description>
    </item>
    <item>
      <title>IA Refresher Clinic Offered at Upcoming Northwest Aviation Conference and Trade Show</title>
      <pubDate>Fri, 22 Feb 2008 01:18:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/IARefresherClinic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/IARefresherClinic.htm</guid>
      <description>The Washington Aviation Association is pleased to offer a FAA approved IA refresher clinic to be held at the 2008 Northwest Aviation Conference &amp; Trade Show. The program is FREE with paid admission to the event ($5 for two days).</description>
    </item>
    <item>
      <title>Four nights of I-5 lane, ramp closures in Tacoma</title>
      <pubDate>Thu, 21 Feb 2008 07:14:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/20_I5_signbridges.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/20_I5_signbridges.htm</guid>
      <description>I-5 lane, ramp closures in Tacoma for sign bridge installation.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division Vessel Moves to Impact Bremerton, Vashon, San Juan Islands</title>
      <pubDate>Wed, 20 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/wsdot-ferries-division-vessel-moves-to-impact-bremerton-vashon-s.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/wsdot-ferries-division-vessel-moves-to-impact-bremerton-vashon-s.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Death during WSDOT bridge work underneath I-5 in Everett</title>
      <pubDate>Wed, 20 Feb 2008 11:39:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/19_I5Everettfatality.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/19_I5Everettfatality.htm</guid>
      <description>The Snohomish County Medical Examiner’s Office has determined that head injuries caused the death of a 61-year old man found last Thursday under Interstate 5 in Everett near 36th Street.</description>
    </item>
    <item>
      <title>10-week US 101 Simpson Ave. Bridge closure begins today</title>
      <pubDate>Wed, 20 Feb 2008 07:47:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/19_101_SimpsonClsToday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/19_101_SimpsonClsToday.htm</guid>
      <description>Today the US 101 Simpson Avenue Bridge closed for 10 weeks.</description>
    </item>
    <item>
      <title>Next Aviation Planning Council Meeting: March 6 in Seattle</title>
      <pubDate>Wed, 20 Feb 2008 07:41:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/March6APC.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/March6APC.htm</guid>
      <description>On March 6, 2008 members of the Governor-appointed Aviation Planning Council will meet for the third time to continue work on the final phase of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>Crews begin repairs to S 178th St overpass near Southcenter this weekend: Expect overnight closure of southbound I-5</title>
      <pubDate>Wed, 20 Feb 2008 05:39:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/18_I-5S178thStreetRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/18_I-5S178thStreetRepair.htm</guid>
      <description>This weekend Tri-State Construction crews working for the Washington State Department of Transportation will begin repairs to S. 178th Street over southbound Interstate 5.</description>
    </item>
    <item>
      <title>I-182 bridge inspection restricts lanes near Pasco</title>
      <pubDate>Wed, 20 Feb 2008 05:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/I-182bridgeinspectionPasco.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/I-182bridgeinspectionPasco.htm</guid>
      <description>WSDOT restricts traffic on I-182 for bridge inspection between Richland and Pasco</description>
    </item>
    <item>
      <title>Seattle/Bremerton Ferry Route Returns to Two Car Ferries</title>
      <pubDate>Mon, 18 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/seattlebremerton-ferry-route-returns-to-two-car-ferries.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/seattlebremerton-ferry-route-returns-to-two-car-ferries.htm</guid>
      <description></description>
    </item>
    <item>
      <title>10-Week US 101 Bridge Closure Begins Tuesday</title>
      <pubDate>Sat, 16 Feb 2008 08:07:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/15_SimpsonAveBridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/15_SimpsonAveBridgeClosure.htm</guid>
      <description>10-week US 101 bridge closure begins Tuesday</description>
    </item>
    <item>
      <title>Crews Begin Repair Work on SR 6 near Elk Prairie Road (milepost 20.60) Early Next Week</title>
      <pubDate>Sat, 16 Feb 2008 07:50:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/15_SR6MP20.6Repairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/15_SR6MP20.6Repairs.htm</guid>
      <description>FRANCES – Contractor crews anticipate repair work to begin at an unstable slope on SR 6, this time near Elk Prairie Road (milepost 20.60), as early as Tuesday, Feb. 19, announces the Washington State Department of Transportation (WSDOT). The repair work is scheduled for completion in April 2008.</description>
    </item>
    <item>
      <title>CANCELED: New bridge takes shape on SR 9 north of Arlington; Girders arrive Monday night</title>
      <pubDate>Sat, 16 Feb 2008 05:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/15_SR9SchlomanGirders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/15_SR9SchlomanGirders.htm</guid>
      <description>Next Tuesday crews working to improve State Route 9 between Arlington and Bryant will begin setting girders for a new bridge that will take the highway over Harvey Creek and Harvey Creek Road.</description>
    </item>
    <item>
      <title>SR 20 reopens between Newhalem and Diablo</title>
      <pubDate>Fri, 15 Feb 2008 21:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/15_sr20reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/15_sr20reopens.htm</guid>
      <description>NEWHALEM - WSDOT crews reopened State Route 20 between Newhalem and Diablo Friday after clearing the final snow slide that had been blocking the highway.</description>
    </item>
    <item>
      <title>Crews find body in I-5 Everett HOV work zone</title>
      <pubDate>Fri, 15 Feb 2008 06:50:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/14_I5EverettBody.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/14_I5EverettBody.htm</guid>
      <description>An employee of WSDOT contractor Atkinson-CH2M Hill was moving a piece of construction equipment in a work zone on BNSF property near 36th Street in Everett this morning when he discovered a transient covered with a blanket. The person did not appear to be alive.</description>
    </item>
    <item>
      <title>New lane opens, easier commute for SR 202 drivers in Redmond</title>
      <pubDate>Fri, 15 Feb 2008 06:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/14_SR202NewLanes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/14_SR202NewLanes.htm</guid>
      <description>New lane opens, easier commute for SR 202 drivers in Redmond</description>
    </item>
    <item>
      <title>Better than box of chocolates; Crews open two new miles of carpool lane on southbound I-5 in Everett</title>
      <pubDate>Fri, 15 Feb 2008 03:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/14_EverettNewHOVLanes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/14_EverettNewHOVLanes.htm</guid>
      <description>Mother Nature finally provided the dry weather needed for crews to re-stripe and open two miles of new carpool lane on southbound I-5 between Lowell Road.</description>
    </item>
    <item>
      <title>Shoulder work scheduled for northwest end of Hood Canal Bridge</title>
      <pubDate>Fri, 15 Feb 2008 02:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/14_ShoulderWorkScheduled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/14_ShoulderWorkScheduled.htm</guid>
      <description>JEFFERSON COUNTY – Motorists traveling across the Hood Canal Bridge early next week may notice Washington State Department of Transportation activity along the bridge’s northwest shoulder.</description>
    </item>
    <item>
      <title>You’re invited to a Feb. 20 SR 519 Intermodal Access Project environmental public hearing</title>
      <pubDate>Fri, 15 Feb 2008 01:30:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/14-SR519ea.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/14-SR519ea.htm</guid>
      <description>Please join the Washington State Department of Transportation and Federal Highway Administration at a public hearing to learn about the project and comment on the newly released SR 519 Intermodal Access Project’s Environmental Assessment findings. Project staff will be on-hand to talk about the environmental analysis and proposed construction schedules.</description>
    </item>
    <item>
      <title>Bridge Repair Causes Right Lane Closure on I-5 Southbound in Lewis County</title>
      <pubDate>Thu, 14 Feb 2008 02:57:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/13_RightLaneClosureonI-5.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/13_RightLaneClosureonI-5.htm</guid>
      <description>CHEHALIS – Motorists traveling I-5 southbound in Lewis County over the Cowlitz River Bridge (milepost 59.06) will experience a right lane closure today as crews replace a steel beam underneath the bridge, announces the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>UPDATE: Seattle/Bremerton Route - Hyak Out of Service</title>
      <pubDate>Wed, 13 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/update-seattlebremerton-route-hyak-out-of-service.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/update-seattlebremerton-route-hyak-out-of-service.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Seattle/Bremerton Service Update</title>
      <pubDate>Wed, 13 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/seattlebremerton-service-update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/seattlebremerton-service-update.htm</guid>
      <description></description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Wed, 13 Feb 2008 06:08:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/12_SR520Maintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/12_SR520Maintenance.htm</guid>
      <description>WSDOT bridge crews will conduct monthly maintenance work on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>Progress on SR 6 Allows WSDOT to Lift Nighttime Closures Starting Feb 13</title>
      <pubDate>Wed, 13 Feb 2008 02:35:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/12_SR6LiftNighttimeClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/12_SR6LiftNighttimeClosures.htm</guid>
      <description>CHEHALIS – State Route 6 near Pe Ell will reopen to traffic during night time hours starting on Wednesday evening, February 13, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Mount Baker Highway (SR 542) closed today at 5 p.m. for avalanche control</title>
      <pubDate>Wed, 13 Feb 2008 01:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/12_sr542closedforavalanchecontrol.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/12_sr542closedforavalanchecontrol.htm</guid>
      <description>WSDOT maintenance crews will close Mount Baker Highway (SR 542) today at 5 p.m. near the Mount Baker ski area for avalanche control.</description>
    </item>
    <item>
      <title>Passenger-only Snohomish Resumes Service Following Hard Landing at Bremerton Dock</title>
      <pubDate>Tue, 12 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/passenger-only-snohomish-resumes-service-following-hard-landing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/passenger-only-snohomish-resumes-service-following-hard-landing.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Drivers, freight, and transit riders will benefit from $125 million State, King County, and City of Seattle mobility package for viaduct construction</title>
      <pubDate>Tue, 12 Feb 2008 06:09:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/11-125million.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/11-125million.htm</guid>
      <description>A $125 million package of strategic transit and capital investments to help keep people and goods moving during Alaskan Way Viaduct construction was announced today by the Washington State Department of Transportation (WSDOT), King County, and the City of Seattle. By getting started this year, most of these improvements will be in place before major south end viaduct construction begins in 2011.</description>
    </item>
    <item>
      <title>US 2 Stevens Pass reopens after 54 hour closure</title>
      <pubDate>Mon, 11 Feb 2008 09:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/021008StevensOpens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/021008StevensOpens.htm</guid>
      <description>The third east-west pass over the Cascades that was closed last Friday, US 2 Stevens, finally opened Sunday afternoon.</description>
    </item>
    <item>
      <title>Snoqualmie Pass, White Pass and Stevens Pass open to traffic</title>
      <pubDate>Mon, 11 Feb 2008 07:49:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/10_us2toreopensunday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/10_us2toreopensunday.htm</guid>
      <description>WSDOT crews making progress in the mountains; continue to fight to re-open US 2 Stevens Pass.</description>
    </item>
    <item>
      <title>US 12 near White Pass Reopens Sunday Morning</title>
      <pubDate>Mon, 11 Feb 2008 02:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/10_US12ReopensSundayMorning.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/10_US12ReopensSundayMorning.htm</guid>
      <description>CHEHALIS – After 57 hours of extensive snow removal, Washington State Department of Transportation (WSDOT) crews successfully reopened US 12 in the vicinity of White Pass.</description>
    </item>
    <item>
      <title>Passenger-Only Service Added to Seattle/Bremerton Ferry Route on Monday</title>
      <pubDate>Sat, 09 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/passenger-only-service-added-to-seattlebremerton-ferry-route-on.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/passenger-only-service-added-to-seattlebremerton-ferry-route-on.htm</guid>
      <description></description>
    </item>
    <item>
      <title>New SR 543 interchange ramps open Monday in Blaine</title>
      <pubDate>Sat, 09 Feb 2008 06:41:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/08_sr543rampsopenmonday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/08_sr543rampsopenmonday.htm</guid>
      <description>Crews will open the new D Street on- and off-ramps Monday, Feb. 11 along SR 543 in Blaine.</description>
    </item>
    <item>
      <title>New travel tools in Thurston, Pierce counties</title>
      <pubDate>Sat, 09 Feb 2008 06:17:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/08_I5_cameras_signs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/08_I5_cameras_signs.htm</guid>
      <description>New traffic tools in Pierce, Thurston counties</description>
    </item>
    <item>
      <title>Community invited to attend open house to learn about new plan for Alaskan Way Viaduct central waterfront</title>
      <pubDate>Sat, 09 Feb 2008 05:20:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/8-awvopenhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/8-awvopenhouse.htm</guid>
      <description>What’s happening with the Alaskan Way Viaduct? Transportation departments for the State, King County, and City of Seattle are hosting an open house on Tuesday, February 12 in West Seattle to share information about the recently announced plan for determining a solution for the central waterfront portion of the viaduct. The agencies are looking at the entire system of streets, transit service, and freeways from Lake Washington to Elliott Bay, and from NE 85th Street to the southern city limits, a</description>
    </item>
    <item>
      <title>Avalanche hazard keeps I-90, US 2 and US 12 closed</title>
      <pubDate>Sat, 09 Feb 2008 05:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/8_1pmmountainpassupdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/8_1pmmountainpassupdate.htm</guid>
      <description>Blizzard-like conditions have led the Washington State Department of Transportation to close all three of Washington's primary mountain pass highways at this hour.</description>
    </item>
    <item>
      <title>Wire thefts continue in Pierce County</title>
      <pubDate>Sat, 09 Feb 2008 03:10:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/08_Wiretheftscontinue.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/08_Wiretheftscontinue.htm</guid>
      <description>Wire thefts continue in Pierce County</description>
    </item>
    <item>
      <title>11 a.m. Update: US 2 Stevens Pass and US 12 White Pass closed; Avalanche control at Snoqualmie</title>
      <pubDate>Sat, 09 Feb 2008 02:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/8_11ammountainpassupdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/8_11ammountainpassupdate.htm</guid>
      <description>US 2 Stevens Pass and US 12 White Pass are closed at this hour.</description>
    </item>
    <item>
      <title>Service Changes Affecting Seattle/Bremerton, Port Townsend/Keystone, and Triangle Routes</title>
      <pubDate>Fri, 08 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/service-changes-affecting-seattlebremerton-port-townsendkeystone.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/service-changes-affecting-seattlebremerton-port-townsendkeystone.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Bremerton on One-Boat Schedule after Yakima Damaged</title>
      <pubDate>Fri, 08 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/bremerton-on-one-boat-schedule-after-yakima-damaged.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/bremerton-on-one-boat-schedule-after-yakima-damaged.htm</guid>
      <description></description>
    </item>
    <item>
      <title>I-90 / US 2 open; US 12 closed</title>
      <pubDate>Fri, 08 Feb 2008 08:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/7_mountainpassafternoonupdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/7_mountainpassafternoonupdate.htm</guid>
      <description>Working throughout the day to get roadways safe and open to traffic, WSDOT crews currently have I-90 Snoqualmie Pass and US 2 Stevens Pass open.</description>
    </item>
    <item>
      <title>WSDOT cleaning up after heavy storms overnight; more on the way</title>
      <pubDate>Fri, 08 Feb 2008 03:14:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/07_heavyovernightstorms.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/07_heavyovernightstorms.htm</guid>
      <description>After a very short break in the weather, WSDOT is again fighting snow, wind and avalanche dangers in many parts of the state.</description>
    </item>
    <item>
      <title>US 12 near White Pass closed until further notice due to extreme conditions</title>
      <pubDate>Fri, 08 Feb 2008 01:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/07_US12WhitePassClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/07_US12WhitePassClosed.htm</guid>
      <description>CHEHALIS - The Washington State Department of Transportation (WSDOT) closed approximately 50 miles of US 12 early today, February 7, due to snow slides in multiple areas near White Pass.</description>
    </item>
    <item>
      <title>Avalanche control closes I-90 Snoqualmie Pass. Stevens Pass and White Pass are still closed</title>
      <pubDate>Thu, 07 Feb 2008 22:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/07_snoqualmiereopeninginam.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/07_snoqualmiereopeninginam.htm</guid>
      <description>WSDOT avalanche control crews worked through the night and plan to open Snoqualmie Pass this morning.</description>
    </item>
    <item>
      <title>Steilacoom II to Start Port Townsend/Keystone Vehicle Ferry Service on Saturday, February 9</title>
      <pubDate>Thu, 07 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/steilacoom-ii-to-start-port-townsendkeystone-vehicle-ferry-servi.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/steilacoom-ii-to-start-port-townsendkeystone-vehicle-ferry-servi.htm</guid>
      <description></description>
    </item>
    <item>
      <title>I-90 Snoqualmie Pass may temporarily close for avalanche control; Drivers advised to prepare for possible delays</title>
      <pubDate>Thu, 07 Feb 2008 10:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/06_SnoqualmiePassPM.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/06_SnoqualmiePassPM.htm</guid>
      <description>I-90 Snoqualmie Pass may temporarily close for avalanche control; Drivers advised to prepare for possible delays</description>
    </item>
    <item>
      <title>Rain or shine, crews will be busy in Everett:  Prepare for lane and ramp closures on I-5 and US 2 this weekend</title>
      <pubDate>Thu, 07 Feb 2008 08:56:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/080206_I5andSR2RampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/080206_I5andSR2RampClosures.htm</guid>
      <description>Rain or shine, crews will be busy in Everett:  Prepare for lane and ramp closures on I-5 and US 2 this weekend</description>
    </item>
    <item>
      <title>WSDOT Now Accepting Applications for New Round of Local Airport Aid Grants</title>
      <pubDate>Thu, 07 Feb 2008 05:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/6_NewRoundGrants08.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/6_NewRoundGrants08.htm</guid>
      <description>Washington State Department of Transportation (WSDOT) Aviation is now accepting applications from airport sponsors for a new round of Local Airport Aid grants. This will be WSDOT's second round of airport grants offered during the 2007-2009 biennium. Airport sponsors must submit applications no later than March 28, 2008.</description>
    </item>
    <item>
      <title>WSDOT’s Airport Information System Now Available Online</title>
      <pubDate>Thu, 07 Feb 2008 01:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/6_AirportInformationSystem.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/6_AirportInformationSystem.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) Aviation is pleased to offer customers a new Web resource: the statewide Airport Information System database.</description>
    </item>
    <item>
      <title>I-90 Snoqualmie Pass crews prepare for next round of snow</title>
      <pubDate>Wed, 06 Feb 2008 21:52:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/06_SnoqualmieWedAM.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/06_SnoqualmieWedAM.htm</guid>
      <description>Crews and drivers get a brief respite this morning on I-90 at Snoqualmie Pass with just four inches of snow falling Tuesday night. However, forecasters expect the next round of heavy snow to start this afternoon, with a possible 13 to 19 inches of more snow arriving overnight.</description>
    </item>
    <item>
      <title>Ferry system will reach out to Bainbridge Island as Eagle Harbor Maintenance Facility repairs move ahead</title>
      <pubDate>Wed, 06 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/ferry-system-will-reach-out-to-bainbridge-island-as-eagle-harbor.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/ferry-system-will-reach-out-to-bainbridge-island-as-eagle-harbor.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT announces David Moseley as new Assistant Secretary for Washington State Ferries</title>
      <pubDate>Wed, 06 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/wsdot-announces-david-moseley-as-new-assistant-secretary-for-was.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/wsdot-announces-david-moseley-as-new-assistant-secretary-for-was.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT prepares for winter storm on I-90 Snoqualmie Pass; drivers need to prepare for delays and extreme winter driving conditions</title>
      <pubDate>Wed, 06 Feb 2008 05:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/05_SnoqualmiePassWinterStorm.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/05_SnoqualmiePassWinterStorm.htm</guid>
      <description>Just as one winter storm moves out another one moves in. Forecasters predict another four feet of snow will fall on Snoqualmie Pass in the next 48 hours, which will bring the total snowfall on Snoqualmie Pass to 34 feet.</description>
    </item>
    <item>
      <title>WSDOT announces David Moseley  as new Assistant Secretary for Washington State Ferries</title>
      <pubDate>Wed, 06 Feb 2008 03:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/05_DavidMoseley.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/05_DavidMoseley.htm</guid>
      <description>OLYMPIA – Gov. Chris Gregoire, Sen. Mary Margaret Haugen and Rep. Judy Clibborn joined Transportation Secretary Paula Hammond today as she announced David Moseley as the new Washington State Department of Transportation Assistant Secretary for the Ferries Division.</description>
    </item>
    <item>
      <title>Paul Wolf Joins Aviation Staff on February 1</title>
      <pubDate>Tue, 05 Feb 2008 08:31:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/PaulWolfJoinsAviation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/PaulWolfJoinsAviation.htm</guid>
      <description></description>
    </item>
    <item>
      <title>SR 6 Closure Hours Shorten as Daylight Extends</title>
      <pubDate>Tue, 05 Feb 2008 02:20:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/04_SR6ExtendedOpenings.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/04_SR6ExtendedOpenings.htm</guid>
      <description>CHEHALIS – Drivers will experience expanded open hours on SR 6, near Pe Ell, starting Monday, February 4, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Fauntleroy/Vashon /SouthworthFerry Route Returns to Full Winter Schedule Tuesday, February 5</title>
      <pubDate>Mon, 04 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/fauntleroyvashon-southworth-ferry-route-returns-to-full-winter-s.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/fauntleroyvashon-southworth-ferry-route-returns-to-full-winter-s.htm</guid>
      <description></description>
    </item>
    <item>
      <title>I-90 Snoqualmie Pass reopens after avalanche control work</title>
      <pubDate>Mon, 04 Feb 2008 07:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/I-90SnoqualmiePassopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/I-90SnoqualmiePassopen.htm</guid>
      <description>WSDOT uses brand new method to bring down avalanches near I-90 Snoqualmie Pass
Eastbound traffic opens at 3:21 p.m.
Westbound traffic opens at 3:35 p.m.</description>
    </item>
    <item>
      <title>Roads are open and power back on I-90 Snoqualmie Pass</title>
      <pubDate>Sun, 03 Feb 2008 07:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/02_power_on_snoqualmie.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/02_power_on_snoqualmie.htm</guid>
      <description>OLYMPIA – WSDOT continues monitoring avalanche danger in the Cascades.</description>
    </item>
    <item>
      <title>I-90 Snoqualmie Pass reopens at 4 a.m. Saturday; drivers urged to be prepared</title>
      <pubDate>Sat, 02 Feb 2008 20:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/2_snoqualmiepassopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/2_snoqualmiepassopen.htm</guid>
      <description>Cars, trucks and semis may now cross Snoqualmie Pass on Interstate 90 for the first time since avalanche dangers closed the pass Wednesday afternoon.</description>
    </item>
    <item>
      <title>WSDOT Invites Public to the SR 4, Rock Stabilization Project Open House, Feb. 6</title>
      <pubDate>Sat, 02 Feb 2008 07:40:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/01_SR4OpenHouseReminder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/01_SR4OpenHouseReminder.htm</guid>
      <description>KELSO – An opportunity for the public to learn more about the SR 4, Rock Stabilization project, and the traffic impacts associated with it will take place February 6, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Revised: WSF to provide Passenger-Only Service on Port Townsend/Keystone route February 4-8</title>
      <pubDate>Fri, 01 Feb 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/02/revised-wsf-to-provide-passenger-only-service-on-port-townsendke.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/02/revised-wsf-to-provide-passenger-only-service-on-port-townsendke.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Group concludes roundabout is best for SR 20 at Sharpes Corner</title>
      <pubDate>Fri, 01 Feb 2008 08:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/31_SR20studyrecommendations.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/31_SR20studyrecommendations.htm</guid>
      <description>An independent panel of engineering experts and local officials have concluded that a roundabout is the best option for the Sharpes Corner intersection.</description>
    </item>
    <item>
      <title>Steilacoom II Coming to Port Townsend/Keystone Route for Crew Familiarization and Training</title>
      <pubDate>Thu, 31 Jan 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/steilacoom-ii-coming-to-port-townsendkeystone-route-for-crew-fam.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/steilacoom-ii-coming-to-port-townsendkeystone-route-for-crew-fam.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Crews will close southbound I-5 Saturday night in Everett to set bridge girders</title>
      <pubDate>Thu, 31 Jan 2008 07:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/30_I5SEFSCloseSBLanesFeb2.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/30_I5SEFSCloseSBLanesFeb2.htm</guid>
      <description>Crews will close southbound I-5 in Everett Saturday, Feb. 2 from 11:30 p.m. to 7:30 a.m. to set bridge girders for Sound Transit's South Everett Freeway Station Project.</description>
    </item>
    <item>
      <title>New signals enhance safety on SR 3 near Poulsbo</title>
      <pubDate>Thu, 31 Jan 2008 05:07:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/SR3SignalsnearPoulsbo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/SR3SignalsnearPoulsbo.htm</guid>
      <description>New signals enhance safety on SR 3 near Poulsbo</description>
    </item>
    <item>
      <title>Open house addresses Simpson Avenue Bridge closure</title>
      <pubDate>Thu, 31 Jan 2008 03:54:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/US101SimpsonOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/US101SimpsonOpenHouse.htm</guid>
      <description>Open house addresses Simpson Avenue Bridge closure</description>
    </item>
    <item>
      <title>Hood Canal Bridge Project gets on the bus</title>
      <pubDate>Thu, 31 Jan 2008 01:01:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/30_SR_HCBTransitAgreements.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/30_SR_HCBTransitAgreements.htm</guid>
      <description>WSDOT HCB Transit Agreements</description>
    </item>
    <item>
      <title>Wilder awarded $3.2 million contract for critical I-5 repairs in Bellingham</title>
      <pubDate>Thu, 31 Jan 2008 00:23:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/30_wilderawardI5bellingham.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/30_wilderawardI5bellingham.htm</guid>
      <description>Wilder Construction was awarded a $3.2 million contract to make critical repairs to Interstate 5 in Bellingham. The company's bid was $400,000 less than state engineers' estimates. The project was delayed last year when WSDOT received only one bid that was nearly $1 million over engineers' estimates, exceeding the amount available in the budget to do the work.</description>
    </item>
    <item>
      <title>Traffic delays scheduled for Hood Canal Bridge</title>
      <pubDate>Thu, 31 Jan 2008 00:19:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/30_SR104SurveyClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/30_SR104SurveyClosure.htm</guid>
      <description>Hood Canal Bridge closure Feb. 4 for surveying</description>
    </item>
    <item>
      <title>SR 504 at Bear Creek Closes Temporarily Due to Snow</title>
      <pubDate>Wed, 30 Jan 2008 08:26:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/29_SR504CloseForSnow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/29_SR504CloseForSnow.htm</guid>
      <description>CASTLE ROCK – The Washington State Department of Transportation (WSDOT) closed State Route 504 (Spirit Lake Highway) today, January 29, starting by Bear Creek, at mile post 34, due to heavy snowfall over the last 24 hours.</description>
    </item>
    <item>
      <title>Several highway sections now closed in Whitman, Lincoln, and Adams Counties</title>
      <pubDate>Wed, 30 Jan 2008 08:12:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/29_Easternwashingtonclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/29_Easternwashingtonclosures.htm</guid>
      <description>Several highway sections now closed in Whitman, Lincoln, and Adams Counties.</description>
    </item>
    <item>
      <title>Blowing snow closes Spokane area highways and creates driving challenges</title>
      <pubDate>Wed, 30 Jan 2008 04:23:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/29_spokane_blowing_snow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/29_spokane_blowing_snow.htm</guid>
      <description>SPOKANE – Blowing and drifting snow is the cause for two state highway closures so far today with drifts threatening in other areas as well.</description>
    </item>
    <item>
      <title>WSDOT is ready for more snow and ice, are you?</title>
      <pubDate>Tue, 29 Jan 2008 08:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/28_moresnowandice.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/28_moresnowandice.htm</guid>
      <description>WSDOT is ready for round two of the January snow and ice. Are you? 

Snow blanketed most of the state overnight and forecasters anticipate another round of cold weather and snow accumulations Monday night into Tuesday morning. The hardest hit areas include Stevens and Snoqualmie passes and parts of eastern Washington.</description>
    </item>
    <item>
      <title>WSDOT crews out for Monday morning commute; need drivers help</title>
      <pubDate>Mon, 28 Jan 2008 21:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/28_snowmorningcommute.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/28_snowmorningcommute.htm</guid>
      <description>OLYMPIA – Extra WSDOT crews are out all over Washington this morning, preparing roads for the morning commute. As more cars hit the roadway today, WSDOT is asking drivers to slow down and prepare for winter driving conditions.</description>
    </item>
    <item>
      <title>Snow Expected in Puget Sound this Weekend</title>
      <pubDate>Sat, 26 Jan 2008 08:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/25_PugetSoundWeekendSnow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/25_PugetSoundWeekendSnow.htm</guid>
      <description>Weather forecasts for Western Washington this weekend are great for skiers, not ideal for drivers. Snow, rain and freezing temperatures are on the menu through the weekend as a moist arctic storm front moves into the Pacific Northwest.</description>
    </item>
    <item>
      <title>Sweet symmetry: 1950 Narrows gets fourth lane</title>
      <pubDate>Sat, 26 Jan 2008 08:05:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/25_SR16_TNB_fourthlane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/25_SR16_TNB_fourthlane.htm</guid>
      <description>Fourth lane opens on 1950 bridge.</description>
    </item>
    <item>
      <title>WSDOT to Begin Repair Work on SR 6 West of Pe Ell Next Week</title>
      <pubDate>Sat, 26 Jan 2008 07:03:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/25_SR6SlideRepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/25_SR6SlideRepairs.htm</guid>
      <description>CHEHALIS – Contractor crews will begin repairs to the unstable slope on SR 6, just west of Pe Ell, as early as next week, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>SR 539 Guide Meridian update: Crews make headway, but not without headaches</title>
      <pubDate>Sat, 26 Jan 2008 04:11:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/25_sr539_constructionupdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/25_sr539_constructionupdate.htm</guid>
      <description>Utility work and construction are progressing on a project to widen five miles of State Route 539 (Guide Meridian) north of Bellingham. But the work hasn't come without headaches for drivers, property owners and work crews.</description>
    </item>
    <item>
      <title>One lane restricted on SR 823, N.Wenas Rd. in Selah</title>
      <pubDate>Sat, 26 Jan 2008 03:27:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/OnelanerestrictedonSR823inSelah.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/OnelanerestrictedonSR823inSelah.htm</guid>
      <description>WSDOT closes one northbound lane on SR 823 (North Wenas Road) in Selah 

Drivers should expect delays Monday - Friday</description>
    </item>
    <item>
      <title>Emergency road closure violations can be dangerous and costly</title>
      <pubDate>Sat, 26 Jan 2008 03:26:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/25_erclsouredanger.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/25_erclsouredanger.htm</guid>
      <description>Emergency road closure violations can be dangerous and costly</description>
    </item>
    <item>
      <title>Aviation Planning Council to Meet February 7 in Seattle</title>
      <pubDate>Fri, 25 Jan 2008 06:29:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/AviationPlanningCouncilFebruaryMeeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/AviationPlanningCouncilFebruaryMeeting.htm</guid>
      <description>On February 7, 2008 members of the Governor-appointed Aviation Planning Council will meet for the second time to continue work on the final phase of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>WSDOT receives international attention for communication efforts</title>
      <pubDate>Fri, 25 Jan 2008 01:26:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/TRBAwardsJan08.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/TRBAwardsJan08.htm</guid>
      <description>WSDOT won top honors on Jan. 14 at the 87th annual Transportation Research Board meeting in Washington D.C.</description>
    </item>
    <item>
      <title>Quarterly Inspection Shows Continued Settlement on Alaskan Way Viaduct</title>
      <pubDate>Thu, 24 Jan 2008 11:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/23-viaductsettlement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/23-viaductsettlement.htm</guid>
      <description></description>
    </item>
    <item>
      <title>SR 4, Rock Stabilization Project Open House Scheduled for Feb. 6</title>
      <pubDate>Thu, 24 Jan 2008 08:43:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/23_SR4RockStabilizationProject.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/23_SR4RockStabilizationProject.htm</guid>
      <description>KELSO – An opportunity for the public to learn more about the SR 4, Rock Stabilization project, and the traffic impacts associated with it, will take place February 6, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Wire thieves strike again in Pierce County</title>
      <pubDate>Thu, 24 Jan 2008 05:11:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/23_WiretheivesPierceCounty.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/23_WiretheivesPierceCounty.htm</guid>
      <description>Wire thieves strike again in Pierce County</description>
    </item>
    <item>
      <title>Construction on Biggs Bridge Resumes January 23</title>
      <pubDate>Thu, 24 Jan 2008 02:58:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/23_ConstructionResumesonBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/23_ConstructionResumesonBridge.htm</guid>
      <description>GOLDENDALE – Construction activities have resumed at US 97 Biggs Bridge on January 23, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>New turn lanes, signals ease congestion at SR 522 and NE 195th Street intersection in Woodinville</title>
      <pubDate>Sat, 19 Jan 2008 06:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/18_522NE195thSignal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/18_522NE195thSignal.htm</guid>
      <description>WSDOT signal technicians activated a new signal system at NE 195th Street and SR 522 in Bothell on Thursday afternoon, Jan.17.</description>
    </item>
    <item>
      <title>WSDOT Temporarily Limits Trucks to Left Lane on I-5 During Construction of Rush Road to 13th Widening</title>
      <pubDate>Sat, 19 Jan 2008 03:06:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/18_LimitTrucksLeftLaneRushRdto13thWidening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/18_LimitTrucksLeftLaneRushRdto13thWidening.htm</guid>
      <description>CHEHALIS – Beginning January 23, all vehicles with trailers over 10,000 pounds traveling north and southbound on I-5, between Rush Road (milepost 72) and 13th Street (milepost 76) will be temporarily limited to the left lane, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Final Girder Installations on 502 Interchange, Nighttime Lane Closures Expected Jan 21-24</title>
      <pubDate>Sat, 19 Jan 2008 03:00:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/18_FinalGirderInstallSR502.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/18_FinalGirderInstallSR502.htm</guid>
      <description>VANCOUVER – Final girder installations will take place on the I-5, SR 502 Interchange project, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Two new SR 305 lanes open in Poulsbo</title>
      <pubDate>Sat, 19 Jan 2008 02:39:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/18_SR305_HOV.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/18_SR305_HOV.htm</guid>
      <description>Two new SR 305 lanes open in Poulsbo</description>
    </item>
    <item>
      <title>WSDOT moves forward with construction on SR 522 near UW Bothell/ Cascadia Community College campus in Bothell</title>
      <pubDate>Fri, 18 Jan 2008 08:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/17_SR522_UWBothell.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/17_SR522_UWBothell.htm</guid>
      <description>WSDOT moves forward with construction on SR 522 near UW Bothell/ Cascadia Community College campus in Bothell</description>
    </item>
    <item>
      <title>Manette Bridge closes for maintenance work</title>
      <pubDate>Fri, 18 Jan 2008 05:08:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/17_ManetteBridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/17_ManetteBridgeClosure.htm</guid>
      <description>Manette Bridge closes for maintenance work</description>
    </item>
    <item>
      <title>I-5 flow map now stretches to Fort Lewis/DuPont</title>
      <pubDate>Fri, 18 Jan 2008 04:45:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/17_Fort_Dupont_flowmap.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/17_Fort_Dupont_flowmap.htm</guid>
      <description>I-5 flow map now stretches to Fort Lewis/DuPont</description>
    </item>
    <item>
      <title>I-5 detour, lane closures in Tacoma for striping work</title>
      <pubDate>Fri, 18 Jan 2008 04:15:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/17_I5_tacomastriping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/17_I5_tacomastriping.htm</guid>
      <description>Detour for striping on I-5 in Tacoma.</description>
    </item>
    <item>
      <title>Crews complete repairs to SR 96 near Snohomish on schedule and under budget</title>
      <pubDate>Fri, 18 Jan 2008 03:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/17_SR96Complete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/17_SR96Complete.htm</guid>
      <description>A break in the weather this morning allowed crews working for WSDOT to finish repairs to State Route SR 96 (Seattle Hill Road) right on schedule.</description>
    </item>
    <item>
      <title>2-Boat Schedule effective Friday, January 18</title>
      <pubDate>Thu, 17 Jan 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/2-boat-schedule-effective-friday-january-18.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/2-boat-schedule-effective-friday-january-18.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Crews Ahead of Schedule; Plans to Complete Bridge Girder Installation on 502 Interchange Jan. 17</title>
      <pubDate>Thu, 17 Jan 2008 04:29:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/16_FinalGirderInstallation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/16_FinalGirderInstallation.htm</guid>
      <description>VANCOUVER – Crews are ahead of schedule, as final bridge girder installation is slated for Thursday, January 17, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Clean Up Efforts, Investigation Continues after Biggs Bridge Work Zone Accident</title>
      <pubDate>Thu, 17 Jan 2008 04:24:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/16_BiggsDay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/16_BiggsDay.htm</guid>
      <description>GOLDENDALE – Clean up work and extraction of submerged equipment near the US 97 Biggs Bridge has begun this morning, announces the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>Schedule Adjustments Coming This Week Following Secretary Hammond's Listening Tour</title>
      <pubDate>Wed, 16 Jan 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/schedule-adjustments-coming-this-week-following-secretary-hammon.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/schedule-adjustments-coming-this-week-following-secretary-hammon.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Work Zone Accident on Biggs Bridge Results in Fatality</title>
      <pubDate>Wed, 16 Jan 2008 10:10:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/15_BiggsBridgeFatality.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/15_BiggsBridgeFatality.htm</guid>
      <description>GOLDENDALE – An accident at the US 97 Biggs Bridge Deck Replacement project in Klickitat County has claimed the life of a construction worker.</description>
    </item>
    <item>
      <title>Biggs Bridge Construction Temporarily Shut Down for Investigation of Work Zone Accident</title>
      <pubDate>Wed, 16 Jan 2008 07:38:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/15_BiggsBridgeWorkSuspension.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/15_BiggsBridgeWorkSuspension.htm</guid>
      <description>GOLDENDALE - Work has ceased on the US 97 Biggs Rapids-Sam Hill Bridge Deck Replacement project, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Fingers crossed; Crews need good weather for daytime ramp closures on SR 9 in Woodinville</title>
      <pubDate>Wed, 16 Jan 2008 07:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/15_SR9SR522RampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/15_SR9SR522RampClosures.htm</guid>
      <description>Crews are hoping for warm, dry weather this week as they prepare to close the ramp from southbound SR 9 to westbound SR 522 for paving.</description>
    </item>
    <item>
      <title>Demolition of Labree Bridge Begins Jan 23; Expect Lane Closures, Delays</title>
      <pubDate>Tue, 15 Jan 2008 07:59:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/14_LaBreeDemo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/14_LaBreeDemo.htm</guid>
      <description>CHEHALIS – Beginning January 21, the LaBree Bridge will close to all traffic until construction of the new interchange is complete.</description>
    </item>
    <item>
      <title>Surprise in store Tuesday morning for Puget Sound commuters and mountain travelers</title>
      <pubDate>Tue, 15 Jan 2008 07:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/14_BlackIceAndSnowInPugetSound.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/14_BlackIceAndSnowInPugetSound.htm</guid>
      <description>Early morning commuters north of Seattle could wake up to black ice and snow on the roads.</description>
    </item>
    <item>
      <title>Traffic revision, lower speed limit on US 101 in Mason County</title>
      <pubDate>Sat, 12 Jan 2008 09:15:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/11_TrafficRev101.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/11_TrafficRev101.htm</guid>
      <description>Traffic revision, lower speed limit on US 101 in Mason County</description>
    </item>
    <item>
      <title>Delays expected on US 101 near Olympia</title>
      <pubDate>Sat, 12 Jan 2008 07:00:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/11_DelaysExpectedonUS101.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/11_DelaysExpectedonUS101.htm</guid>
      <description>Delays expected on US 101 near Olympia</description>
    </item>
    <item>
      <title>WSDOT Crews Inspect the Alaskan Way Viaduct This Week without Lane Closures</title>
      <pubDate>Sat, 12 Jan 2008 05:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/11-viaduct_inspection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/11-viaduct_inspection.htm</guid>
      <description>Crews will perform a routine quarterly inspection of the Alaskan Way Viaduct on January 15 and 16, 2008. No lane closures will be required.</description>
    </item>
    <item>
      <title>Tree-removal work slows I-5 traffic in Lacey</title>
      <pubDate>Sat, 12 Jan 2008 02:24:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/01_08_I5_Tree_Removal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/01_08_I5_Tree_Removal.htm</guid>
      <description>Tree-removal work slows I-5 traffic in Lacey</description>
    </item>
    <item>
      <title>WSDOT open house in Touchet a huge success</title>
      <pubDate>Sat, 12 Jan 2008 02:23:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/Phase78OpenHouseJan08.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/Phase78OpenHouseJan08.htm</guid>
      <description>The multipurpose room at the Touchet School was packed with residents from Touchet, Walla Walla and surrounding areas interested in WSDOT’s next steps to four-laning US Highway 12.</description>
    </item>
    <item>
      <title>WASHINGTON STATE FERRIES UPDATE ON SERVICE SCHEDULES</title>
      <pubDate>Fri, 11 Jan 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/washington-state-ferries-update-on-service-schedules.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/washington-state-ferries-update-on-service-schedules.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Hiyu to Operate on San Juan Islands Inter-Island Route Beginning in Early-February</title>
      <pubDate>Fri, 11 Jan 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/hiyu-to-operate-on-san-juan-islands-inter-island-route-beginning.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/hiyu-to-operate-on-san-juan-islands-inter-island-route-beginning.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Avalanche control delays traffic on I-90 Snoqualmie Pass</title>
      <pubDate>Fri, 11 Jan 2008 03:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/10_WetSnowSnoqualmiePass.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/10_WetSnowSnoqualmiePass.htm</guid>
      <description>Wet heavy snow brings delays due to avalanche control on Snoqualmie Pass

WSDOT controlling avalanches in several locations, expect delays throughout the afternoon</description>
    </item>
    <item>
      <title>Prepare for more snow on Central, Eastern Washington and mountain pass highways and into lower elevations</title>
      <pubDate>Thu, 10 Jan 2008 08:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/09_afternoon_update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/09_afternoon_update.htm</guid>
      <description>OLYMPIA – Crews and drivers welcomed today’s break in the weather, with WSDOT maintenance workers using the time to get winter road equipment ready for another winter blast.</description>
    </item>
    <item>
      <title>WSDOT Repairs Parts of US 101 after Storm Damage, Expect Delays</title>
      <pubDate>Thu, 10 Jan 2008 07:14:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/09_US101EmergencyRepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/09_US101EmergencyRepairs.htm</guid>
      <description>VANCOUVER – Repairs to storm-damaged US 101 will begin on Monday, January 14, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Prepare for snow on Central, Eastern Washington and mountain pass highways</title>
      <pubDate>Thu, 10 Jan 2008 01:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/09_morning_snow_update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/09_morning_snow_update.htm</guid>
      <description>OLYMPIA – Challenging driving conditions await all who need to travel across the Cascade Mountains and into Central and Eastern Washington. Snoqualmie Pass received another 3.5 inches overnight and more is expected today.</description>
    </item>
    <item>
      <title>Drivers favor roundabout for SR 20 improvement project in Anacortes</title>
      <pubDate>Wed, 09 Jan 2008 06:14:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/08_sr20sharpescorneroptions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/08_sr20sharpescorneroptions.htm</guid>
      <description>The opinion poll results are in; drivers favor a roundabout at one of Skagit County’s busiest intersections.</description>
    </item>
    <item>
      <title>WSDOT Installs Bridge Girders on 502 Interchange, Expect Single Lane Closures, Slowdowns, Jan. 14, 15, 16 &amp; 18</title>
      <pubDate>Wed, 09 Jan 2008 03:49:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/08_BridgeGirdersSR502Interchange.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/08_BridgeGirdersSR502Interchange.htm</guid>
      <description>VANCOUVER – As crews install bridge girders that will span I-5 for the new SR 502 Interchange, motorists can expect daytime single-lane closures and rolling slowdowns Jan. 14, 15, 16 and 18.</description>
    </item>
    <item>
      <title>Rain in Western Washington, WSDOT crews clearing snow in Eastern Washington and Olympic Peninsula</title>
      <pubDate>Wed, 09 Jan 2008 01:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/08_morningroadupdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/08_morningroadupdate.htm</guid>
      <description>OLYMPIA – Routes in Western Washington remain only wet and slushy, while WSDOT crews are still fighting snow on mountain pass highways, in Central and Eastern Washington and the Olympic Peninsula.</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Wed, 09 Jan 2008 00:31:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/8_SR520MonthlyMaintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/8_SR520MonthlyMaintenance.htm</guid>
      <description>WSDOT bridge crews will conduct monthly maintenance work on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>Mudslide blocks all lanes of SR 20 near Concrete</title>
      <pubDate>Tue, 08 Jan 2008 23:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/08_sr20concretemudslide.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/08_sr20concretemudslide.htm</guid>
      <description>A mudslide is blocking all lanes of State Route 20 east of Concrete in Skagit County.</description>
    </item>
    <item>
      <title>Major storm brings heavy snow, hazardous driving conditions to Olympics, Cascades and central Washington</title>
      <pubDate>Tue, 08 Jan 2008 07:49:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/majorstormheavysnowtocascadesandbeyond.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/majorstormheavysnowtocascadesandbeyond.htm</guid>
      <description>Major storm brings heavy snow and hazardous driving conditions to Olympics, Cascades and central Washington

Expected accumulations will challenge WSDOT and travelers</description>
    </item>
    <item>
      <title>WSDOT Team ready for Seahawk traffic and Mother Nature</title>
      <pubDate>Sat, 05 Jan 2008 08:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/04_game_day_traffic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/04_game_day_traffic.htm</guid>
      <description>OLYMPIA ¬– As the Seattle Seahawks ready for the Washington Redskins, WSDOT crews have their own game plan to get fans to Qwest Field Saturday.</description>
    </item>
    <item>
      <title>TNB Toll Open House</title>
      <pubDate>Fri, 04 Jan 2008 05:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/03_TNBTollOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/03_TNBTollOpenHouse.htm</guid>
      <description>Toll Operations Open House to be held in Gig Harbor</description>
    </item>
    <item>
      <title>US 97 Biggs Bridge closed until Memorial Day weekend</title>
      <pubDate>Fri, 04 Jan 2008 00:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/3_biggsbridgeclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/3_biggsbridgeclosure.htm</guid>
      <description>WSDOT closes US 97 Biggs Rapids Bridge until Memorial Day weekend</description>
    </item>
    <item>
      <title>Crews to close northbound I-5 in South Everett overnight to set bridge girders</title>
      <pubDate>Thu, 03 Jan 2008 07:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/02_i5Everett112thGirders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/02_i5Everett112thGirders.htm</guid>
      <description>Crews will close all lanes of northbound I-5 from 128th Street SE to SR 527 from 11:30 p.m. Saturday, Jan. 5 to 7:30 a.m. Sunday, Jan. 6. The contractor will be placing girders for the new bridge that is part of Sound Transit’s South Everett Freeway Station Project.</description>
    </item>
    <item>
      <title>Winter Ferry Schedule starts January 6</title>
      <pubDate>Wed, 02 Jan 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/01/winter-ferry-schedule-starts-january-6.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2008/01/winter-ferry-schedule-starts-january-6.htm</guid>
      <description></description>
    </item>
  </channel>
</rss>