Skip Top Navigation

August 2008 News Archive


News Archives by Month for 2008 News
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec

News Archives by Year
2009 | 2008 | 2007

09/05/08
Ahead of schedule; contractors finish first phase of work to stabilize SR 169 near Green River

09/04/08
Aurora Bridge Fence advisory committee meets Tuesday in Seattle

09/03/08
Both lanes of Boulder Creek bridge to open near Glacier

09/03/08
Pile driver collapses in WSDOT work zone in Burlington

09/02/08
Two downtown Interstate 5 express lane ramps closing early

08/29/08
Crews on the fast track; first phase of work to stabilize SR 169 near the Green River ahead of schedule

08/29/08
US 101 slope-repair starts next week in Mason County

08/29/08
SR 162 paving project complete

08/29/08
Overnight lane closures planned for I-5 through south Everett

08/29/08
Construction worker injured on I-405 in Renton

08/29/08
WSDOT temporarily limits trucks to center lane of I-5 at the N. Fork Lewis River Bridge

08/28/08
Repair work nears completion at SR 169 bridge over Green River

08/28/08
Wireless Internet access no longer available at rest areas

08/27/08
SR 123 in Mount Rainier National Park to close for roadway and safety repairs

08/27/08
Crews to switch traffic signals at I-5/SR 20 interchange in Burlington

08/26/08
WSDOT seeks public input on SR 19 – SR 20 corridor plan

08/26/08
Rolling slow downs on I-90 near Snoqualmie Pass August 27 and 28

08/26/08
Learn how WSDOT will connect communities across Interstate 90

08/26/08
Northbound I-5 Gee Creek Safety Rest Area in Clark Co. closing Wednesday

08/25/08
US 97, Biggs Rapids – Sam Hill Bridge closes Sep. 8 for final stage of construction

08/25/08
Swanson Lake fire destroys trestle and ties along a four-mile section of a state-owned rail line

08/25/08
Best times to travel for Labor Day Weekend

08/25/08
Rain delays work at I-5 South Thurston County Safety Rest Areas

08/25/08
Reminder: Submit your comments on the draft Aviation Stormwater Manual

08/22/08
I-90 westbound restricted to one lane east of Snoqualmie Pass Aug. 26

08/22/08
WSDOT restricts lanes on US 395 Aug. 25-28 in Kennewick

08/22/08
Striping changes for I-5 in Burlington

08/21/08
Utility work causes lane closure on SR 512 tonight

08/21/08
Repair work to begin on SR 169 bridge over Green River

08/21/08
Closures and construction to affect I-5 and I-90 express lanes schedule this weekend

08/20/08
Paving, signal work for SR 502 Interchange project to impact traffic this weekend

08/20/08
Lift, shift, dig: SR 522 crews heat up work in Bothell

08/20/08
Hood Canal Bridge closes three times Thursday

08/19/08
Construction on South Fork Chehalis River Bridge Replacement to begin Aug. 25

08/19/08
Eastbound lane restriction on I-82 Umatilla Bridge

08/18/08
Rain drops in the forecast delay SR 506 closure, bridge repairs

08/18/08
Noise walls coming to eastbound Tacoma Narrows Bridge

08/18/08
Wilburton Tunnel demolition complete; WSDOT crews in Bellevue open southbound I-405 to traffic

08/17/08
Drivers on I-405 in Bellevue see the light at the end of the Wilburton tunnel one week early

08/16/08
I-405 Wilburton tunnel demolition milestone reached

08/15/08
Traffic Advisory: Sunday morning closure of Interstate 90 reversible center roadway

08/15/08
Overnight and daytime lane closures planned for I-5 through south Everett

08/14/08
WSDOT completes US 12 rumble strip project in Lewis County

08/14/08
Crews continue crunching away on the Wilburton tunnel on I-405 in Bellevue

08/14/08
Pavement repairs to close several ramps in Vancouver

08/14/08
Bridge preservation on US 101 requires openings

08/14/08
Lane closures announced for bridge maintenance and repair work on four Spokane bridges

08/13/08
Tacoma Narrows Bridge Project needs your vote for national People's Choice Award

08/13/08
Night time lane closures begin next week for US 97, Biggs Bridge project, complete closure begins September 3

08/13/08
Weekend paving for SR 502 Interchange to close portions of NE 10th Avenue near Duluth

08/12/08
Travel delays possible: crews to conduct monthly maintenance tests of SR 520 Evergreen Point floating bridge

08/12/08
I-5 Maytown Safety Rest Area closed to all traffic Aug. 18 - 24

08/11/08
Drivers take alternate routes to avoid backups on southbound I-405 near the Wilburton Tunnel in Bellevue

08/11/08
Public comments welcome on draft Aviation Stormwater Manual

08/11/08
WSDOT Crews in Bellevue open southbound I-405 to traffic

08/10/08
WSDOT crews in Renton reopen all southbound I-405 lanes to traffic

08/09/08
Pack your patience for your drive on I-405 this weekend

08/08/08
US 2/97 - School Street intersection safety project to start

08/08/08
SR 155 bridge in Omak will close for two days later this month

08/08/08
SR 16 project to build new interchange kicks off

08/08/08
Overnight lane closures planned for both directions of I-5 through south Everett

08/08/08
Disruption of WSDOT's traffic map and cameras this weekend

08/08/08
Public invited to upcoming SR 99 Aurora Bridge fence meetings in Seattle

08/07/08
It's Crunch Time: Heavy equipment in place to remove the Wilburton Tunnel

08/07/08
On ramp to westbound US 12 closed Aug. 7-9 in Yakima

08/06/08
Plan for a little extra time if you are traveling on I-405 to Renton or Tukwila this weekend

08/05/08
Portion of SR 506 to close for bridge repairs

08/04/08
Aviation Planning Council to Meet August 7 in Vancouver

08/04/08
Overnight lane closures planned for I-5 through south Everett

08/04/08
Guide Meridian to close at night for bridge construction north of Bellingham

08/01/08
Hood Canal Bridge Project floats past 80 percent mark

08/01/08
Intermittent disruption of WSDOT’s south Bellevue area traffic cameras

08/01/08
WSDOT reaches milestone SR 532 project, begins search for design-build contractor

08/01/08
Britton Road intersection closed for paving