Date:
Monday, July 07, 2008
Contact:
Robyn Boyd, Project Engineer, (425) 225-8754, cell (425) 471-3386
Patty Michaud, WSDOT Communications, (425) 225-8760 (Everett), cell (206) 786-4079
STANWOOD - The Washington State Department of Transportation is soliciting letters of interest from companies planning to apply to provide design-build services for a project to improve the SR 532 corridor between Camano Island and I-5.
Project work includes:
- Replacing the General Mark W. Clark Memorial bridge
- Improving intersections between Camano Island and I-5, including new left- and right-turn lanes
- Constructing a westbound truck-climbing lane between 12th Ave NW and 28th Ave NW
- Constructing an eastbound truck-climbing lane between Pioneer Highway and 72nd Ave NW
- Repaving the section of road between 270th Street NW and 72nd Ave NW
- Building highway stormwater run-off treatment facilities
The letters of interest will help WSDOT determine who in the design and construction industry may be bidding on the project. They are also non-binding and will provide WSDOT a list of contacts to receive updates on the design-builder selection process.
Companies interested in providing design-build services or participating as a member of a design-build team should send a letter of interest providing the company name, address, phone and e-mail to:
Robyn Boyd, Project Engineer
SR 532 Corridor Improvement Project
9025 El Capitan Way, NB82-139
Everett, WA 98208
e-mail: BoydRL@wsdot.wa.gov
For more information about the design-build method visit www.wsdot.wa.gov/Projects/delivery/designbuild/
WSDOT reserves the right, without incurring any liability, to change any aspect of the proposed procurement described above, including the right to not proceed with the procurement.
The $82.1 million 2005 gas tax funded project will improve safety and reduce congestion on the SR 532 from Camano Island to I-5. Construction will start in summer 2009. For more information, visit www.wsdot.wa.gov/Projects/SR532/CamanoI5/.
< Back to News Home