﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="wsdot:urlManipulator" xmlns:dateManipulator="wsdot:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - 03</title>
    <link>http://www.wsdot.wa.gov/News/2008/03/</link>
    <copyright>
          Copyright WSDOT 2006. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor></managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Thu, 24 Jul 2008 22:22:21 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - 03</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/News/2008/03/</link>
    </image>
    <item>
      <title>WSDOT opens doors for public to view the I-82/Valley Mall Boulevard Interchange design</title>
      <pubDate>Tue, 01 Apr 2008 00:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/31ValleyMallRoundabouts.htm</link>
      <description>It seems WSDOT has gone round and round when it comes to public opinion about roundabouts. However, at an open house in Union Gap, the public seemed to be ready to embrace the idea that roundabouts will make driving through this interchange much easier.</description>
    </item>
    <item>
      <title>US 101 Chehalis River Bridge lane closures</title>
      <pubDate>Sat, 29 Mar 2008 05:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/0328US101ChehalisRiverlaneclosures.htm</link>
      <description>US 101 Chehalis River Bridge lane closures</description>
    </item>
    <item>
      <title>Crews target noxious weeds on Bainbridge Island</title>
      <pubDate>Fri, 28 Mar 2008 04:23:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/0327SR305Bainbridgeweeds.htm</link>
      <description>Crews target noxious weeds on Bainbridge Island</description>
    </item>
    <item>
      <title>Viaduct continues to sink; Repairs almost complete to halt settlement</title>
      <pubDate>Fri, 28 Mar 2008 01:21:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/27-viaductsinking.htm</link>
      <description>Preliminary results from last weekend’s inspection revealed that the Alaskan Way Viaduct has settled another 3/8ths of an inch, bringing the total amount of settlement to approximately five-and-a-half inches. The columns continue to settle incrementally between Columbia Street and Yesler Way where repairs are nearly complete to strengthen several column foundations. No new structural damage was caused by the additional settlement.</description>
    </item>
    <item>
      <title>Studded tire deadline extended in Washington and Oregon</title>
      <pubDate>Fri, 28 Mar 2008 01:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/27_stud_tire_extension.htm</link>
      <description>OLYMPIA – The studded tire deadline is extended through April 5.</description>
    </item>
    <item>
      <title>Hours and miles of delays possible during I-5 construction in Bellingham</title>
      <pubDate>Thu, 27 Mar 2008 22:52:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/27_i5constructiondrawsnear.htm</link>
      <description>Drivers can avoid big backups in Bellingham this April and May if they plan ahead now. Night lane closures start 11 p.m. Monday, March 31, and weekend-long lane closures will follow soon after.</description>
    </item>
    <item>
      <title>Bids opened for contract to build new 50-car ferry</title>
      <pubDate>Thu, 27 Mar 2008 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/bids-opened-for-contract-to-build-new-50-car-ferry.htm</link>
      <description></description>
    </item>
    <item>
      <title>Aviation Planning Council to Meet April 3 in Seattle</title>
      <pubDate>Wed, 26 Mar 2008 04:14:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/APCApril.htm</link>
      <description>On April 3, 2008 members of the Governor-appointed Aviation Planning Council will meet for the fourth time to continue work on the final phase of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>Work to reduce crossover collisions on US 2 begins this spring</title>
      <pubDate>Wed, 26 Mar 2008 01:31:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/25_CorridorRumbleAward.htm</link>
      <description>As early as May, drivers could see crews working on US 2 on a project that will help reduce serious collisions on the highway between Monroe and Stevens Pass.</description>
    </item>
    <item>
      <title>Hood Canal Bridge shoulder work continues through April</title>
      <pubDate>Tue, 25 Mar 2008 00:48:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/Hood+Canal+Bridge+shoulder+work+continues+through+April.htm</link>
      <description>Hood Canal Bridge shoulder work continues through April</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct Reopened After Semiannual Inspections</title>
      <pubDate>Sun, 23 Mar 2008 23:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/23-viaduct-reopens.htm</link>
      <description>WSDOT maintenance crews re-opened all lanes on the Alaskan Way Viaduct shortly before 3 p.m., three hours ahead of schedule. The viaduct was closed for its semiannual inspections on March 22 and 23.</description>
    </item>
    <item>
      <title>Drivers should expect delays westbound over I-90 Snoqualmie Pass due to avalanche control clean-up work</title>
      <pubDate>Sun, 23 Mar 2008 05:35:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/22avalanchecontrolwork.htm</link>
      <description>Drivers heading westbound over I-90 Snoqualmie Pass should expect delays.</description>
    </item>
    <item>
      <title>I-5 lane closures south of Olympia</title>
      <pubDate>Sat, 22 Mar 2008 05:18:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/ScatterCreeklaneclosures.htm</link>
      <description>I-5 lane closures south of Olympia</description>
    </item>
    <item>
      <title>SR 28 Closed for Four Days Beginning Next Friday</title>
      <pubDate>Sat, 22 Mar 2008 04:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/21SR28RockIslandClosure.htm</link>
      <description>Rock Slope Stabilization across from Rock Island Dam between Wenatchee and Quincy will close SR 28 from Friday night, March 28th through Wednesday morning, April 2nd.</description>
    </item>
    <item>
      <title>Preservation prompts weight restriction on Manette Bridge in Kitsap County</title>
      <pubDate>Sat, 22 Mar 2008 04:08:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/21_SR303_Manette_restriction.htm</link>
      <description>The Manette Bridge, which spans the Port Washington Narrows in Bremerton, will be on “light duty” starting next week when a heavy-load restriction goes into effect.</description>
    </item>
    <item>
      <title>SR 504 to Coldwater Visitor Center Reopens on Thursday, March 20</title>
      <pubDate>Fri, 21 Mar 2008 06:17:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/20_SR504_Reopens.htm</link>
      <description>CASTLE ROCK – Section of State Route 504 (Spirit Lake Highway) from mile post 34 to mile post 43 reopened to traffic Thursday, March 20, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Anacortes/Sidney, BC sailings return with spring ferry schedule on March 30</title>
      <pubDate>Thu, 20 Mar 2008 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/anacortessidney-bc-sailings-return-with-spring-ferry-schedule-on.htm</link>
      <description></description>
    </item>
    <item>
      <title>Easter backups expected at Tacoma Narrows Bridge Toll Plaza</title>
      <pubDate>Wed, 19 Mar 2008 23:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/031908EasterTNBtraffic.htm</link>
      <description>Easter backups expected at Tacoma Narrows Bridge Toll Plaza</description>
    </item>
    <item>
      <title>Sign unveiling marks official launch of US 2 traffic safety corridor project</title>
      <pubDate>Wed, 19 Mar 2008 01:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/18_US2SafetyCorridor.htm</link>
      <description>State and local officials gathered with community members this morning in Sultan to unveil new signs designating US 2 a traffic safety corridor.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division adjusts maintenance schedule to optimize spring service</title>
      <pubDate>Tue, 18 Mar 2008 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-adjusts-maintenance-schedule-to-optimize.htm</link>
      <description></description>
    </item>
    <item>
      <title>Little people, big celebration in Tacoma</title>
      <pubDate>Tue, 18 Mar 2008 04:34:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/48th-Pacificoverpass.htm</link>
      <description>Transportation secretary, 140 students cut ribbon on I-5 construction</description>
    </item>
    <item>
      <title>US 395 restricted for inspection on Blue Bridge in Pasco</title>
      <pubDate>Mon, 17 Mar 2008 19:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/lanesrestrictedonUS395BlueBridge.htm</link>
      <description>US 395: WSDOT restricts traffic on Blue Bridge near Pasco during inspection</description>
    </item>
    <item>
      <title>Crews Close Alaskan Way Viaduct for Semiannual Inspections on March 22 and 23</title>
      <pubDate>Sat, 15 Mar 2008 06:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/14-viaductinspections.htm</link>
      <description>WSDOT maintenance crews will close the Alaskan Way Viaduct for its semiannual inspection on March 22 and March 23. Crews will close both viaduct decks between 6 a.m. and 6 p.m. on Saturday, March 22 and from 6 a.m. to 6 p.m. on Sunday, March 23 between Spokane Street through the Battery Street Tunnel. The Battery Street Tunnel will remain closed overnight on Saturday.</description>
    </item>
    <item>
      <title>Repaired crane puts project back on track; crews set bridge girders on SR 9 north of Arlington next week</title>
      <pubDate>Sat, 15 Mar 2008 01:00:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/14_SR9SchlomanGirder.htm</link>
      <description>Next Monday, crews working to improve State Route 9 between Arlington and Bryant will begin setting girders for a new bridge that will take the highway over Harvey Creek and Harvey Creek Road.</description>
    </item>
    <item>
      <title>US 12 construction closes portion of Dell Ave., Walla Walla</title>
      <pubDate>Fri, 14 Mar 2008 23:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/14_US12Construction.htm</link>
      <description>US 12 construction permanently closes a portion of Dell Avenue in Walla Walla</description>
    </item>
    <item>
      <title>Hood Canal Bridge shoulder work continues</title>
      <pubDate>Fri, 14 Mar 2008 23:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/14_HoodCanalBridge.htm</link>
      <description>Drivers traveling across the Hood Canal Bridge this month may notice WSDOT activity along the bridge’s northwest shoulder.</description>
    </item>
    <item>
      <title>SR 20 North Cascades Highway Reopening Begins March 24th</title>
      <pubDate>Fri, 14 Mar 2008 07:21:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/031308NCHreopening.htm</link>
      <description>The annual spring effort to reopen the North Cascades Highway is scheduled to begin March 24th.</description>
    </item>
    <item>
      <title>I-5 Everett HOV crews have nose to the grindstone, eyes on the finish line</title>
      <pubDate>Fri, 14 Mar 2008 04:51:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/13_I-5EverettLasts.htm</link>
      <description>Crews are making good progress on the Pacific Avenue girder replacement project, but the work hasn’t stopped elsewhere on I-5 in Everett.</description>
    </item>
    <item>
      <title>SR 6 near Pe Ell Reopens Fully as Crews Complete Repairs, March 16</title>
      <pubDate>Fri, 14 Mar 2008 04:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/13_SR6_Reopens.htm</link>
      <description>CHEHALIS – Contractor crews will complete repairs and reopen State Route 6 near Pe Ell (milepost 27) to traffic on Sunday, March 16, announces the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>I-90/Latah Creek Bridge and Lindeke Street Guardrail project starts</title>
      <pubDate>Fri, 14 Mar 2008 01:16:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/13_I90spokanebridgeguardrail.htm</link>
      <description>I-90 bridge guardrail project ready to start</description>
    </item>
    <item>
      <title>I-82 westbound exit ramp to Yakima closed</title>
      <pubDate>Thu, 13 Mar 2008 06:19:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/I82_exit_ramp_closed.htm</link>
      <description>I-82: westbound exit ramp into Yakima closed for guardrail repair</description>
    </item>
    <item>
      <title>Inspection Causes Right Lane Closure on I-5 Southbound at the Cowlitz River Bridge this Weekend</title>
      <pubDate>Thu, 13 Mar 2008 05:27:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/12_I-5LaneClosedonCowlitzRiverBridge.htm</link>
      <description>CHEHALIS – Motorists traveling I-5 southbound over the Cowlitz River Bridge (milepost 59.06) will encounter a right lane closure on Saturday and possibly Sunday for bridge inspection activities, announces the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>I-82 eastbound lane restricted near Union Gap</title>
      <pubDate>Thu, 13 Mar 2008 01:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/I82lanerestricion.htm</link>
      <description>I-82: One eastbound lane restricted for guardrail repair near Union Gap
On Wednesday,</description>
    </item>
    <item>
      <title>I-5 lanes closed April 1 in Bellingham</title>
      <pubDate>Thu, 13 Mar 2008 01:23:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/12_i5lanesclosedinApril.htm</link>
      <description>Fixing I-5 through Bellingham is no joke, even though work does begin on April Fools Day.</description>
    </item>
    <item>
      <title>Traffic-signal work blacks out Waaga Way intersection</title>
      <pubDate>Thu, 13 Mar 2008 00:20:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/12_3_WaagaBlkOut.htm</link>
      <description>WSDOT crews will black out the Waaga Way intersection for signal work Thursday, March 13.</description>
    </item>
    <item>
      <title>Vessel repairs completed early; Hiyu to begin service in San Juan Islands Thursday, March 13</title>
      <pubDate>Wed, 12 Mar 2008 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/vessel-repairs-completed-early-hiyu-to-begin-service-in-san-juan.htm</link>
      <description></description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Tue, 11 Mar 2008 22:57:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/11_SR520MonthlyMaintenance.htm</link>
      <description>WSDOT bridge crews will conduct monthly maintenance work on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>WSDOT receives clean fiscal report from State Auditor's Office</title>
      <pubDate>Tue, 11 Mar 2008 07:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/10_CleanFiscalReport.htm</link>
      <description>OLYMPIA – For the first time in 21 years, the Washington State Department of Transportation annual fiscal audit included no report findings by the State Auditor’s Office.</description>
    </item>
    <item>
      <title>Reducing greenhouse gas emissions one vehicle at a time</title>
      <pubDate>Tue, 11 Mar 2008 03:29:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/10_CTRgreen.htm</link>
      <description>The Governor’s Commute Trip Reduction (CTR) Board approved 58 new local and regional CTR plans that will increase the share of commuters who get to work by ways other than driving alone. These plans set goals to reduce the number of drive-alone commute trips to CTR worksites by 10 percent and to reduce the number of vehicle miles traveled to CTR worksites by 13 percent by 2011.</description>
    </item>
    <item>
      <title>Spring in Paris with the upcoming Wheel Options Campaign</title>
      <pubDate>Tue, 11 Mar 2008 00:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/10_wheelopitionsparis.htm</link>
      <description>"Ohh la la!" That’s what a commuter could be saying if they win the trip for two to Paris, France during this spring’s Wheel Options campaign. When commuters participate in Wheel Options at least twice from March 9 - 22, they will be eligible to win a trip to Paris for two, including airfare, lodging and a Rick Steves' Best of Paris Tour. Anyone who shares the commute to work in the state of Washington may participate. Share your commute by carpool, vanpool, bus or train or do anything other tha</description>
    </item>
    <item>
      <title>WSDOT Ferries Division invites public to meet new assistant secretary and discuss future of the ferry system</title>
      <pubDate>Mon, 10 Mar 2008 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-invites-public-to-meet-new-assistant-secr.htm</link>
      <description></description>
    </item>
    <item>
      <title>Ferry Service Adjustments on Seattle/Bremerton and Anacortes/San Juan Routes Delayed</title>
      <pubDate>Sat, 08 Mar 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/ferry-service-adjustments-on-seattlebremerton-and-anacortessan-j.htm</link>
      <description></description>
    </item>
    <item>
      <title>Crews repair lighting system dimmed by thieves on SR 8</title>
      <pubDate>Sat, 08 Mar 2008 08:12:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/07_CrewsrepairlightingSR8.htm</link>
      <description>Crews repair lighting system dimmed by thieves on SR 8</description>
    </item>
    <item>
      <title>Sinkhole on SR 31 north of Metaline Falls affecting traffic</title>
      <pubDate>Sat, 08 Mar 2008 07:58:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/03_SR31sinkholerepair.htm</link>
      <description>Sinkhole on SR 31 north of Metaline Falls affecting traffic</description>
    </item>
    <item>
      <title>Safety upgrades planned for Skagit, Whatcom highways</title>
      <pubDate>Sat, 08 Mar 2008 06:45:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/07_SR9SafetyImprovementProject.htm</link>
      <description>Numerous safety upgrades are planned for several stretches of rural highway in Skagit and Whatcom counties. Crews will install or replace sections of guardrail, flashing beacons, centerline and shoulder rumble strips, and recessed pavement markers.</description>
    </item>
    <item>
      <title>Amtrak Cascades ridership sets all-time record in 2007</title>
      <pubDate>Sat, 08 Mar 2008 04:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/AmtrakCascadesridershipsetsall-timerecordin2007.htm</link>
      <description>Amtrak Cascades 2007 ridership report</description>
    </item>
    <item>
      <title>New speed sensors shed light on first morning commute through traffic split in Everett</title>
      <pubDate>Fri, 07 Mar 2008 21:32:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/7_TrafficSensors.htm</link>
      <description>Drivers on southbound Interstate 5 navigated around a split in traffic through downtown Everett for the first time this morning.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division launches testing phase of biodiesel fuel project</title>
      <pubDate>Fri, 07 Mar 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-launches-testing-phase-of-biodiesel-fuel.htm</link>
      <description></description>
    </item>
    <item>
      <title>US 395/BNSF tunnel project for North Spokane corridor getting underway</title>
      <pubDate>Fri, 07 Mar 2008 07:00:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/03_US395BNSFtunnel.htm</link>
      <description>BNSF tunnel project for North Spokane corridor getting underway</description>
    </item>
    <item>
      <title>WSDOT Ferries Division announces updated spring and summer service adjustments due to vessel maintenance needs</title>
      <pubDate>Thu, 06 Mar 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-announces-updated-spring-and-summer-servi.htm</link>
      <description></description>
    </item>
    <item>
      <title>Ferry service resumes on Point Defiance/Tahlequah route Thursday, March 6</title>
      <pubDate>Wed, 05 Mar 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/ferry-service-resumes-on-point-defiancetahlequah-route-thursday.htm</link>
      <description></description>
    </item>
    <item>
      <title>Time to split:  Crews build construction zone in the middle of southbound I-5 in Everett</title>
      <pubDate>Wed, 05 Mar 2008 08:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/4_I5EverettTrafficSplit.htm</link>
      <description>Starting 4:30 a.m. Thursday, March 6, drivers in Everett will see something very different: a 1.25-mile traffic split around a construction zone in the middle of southbound I-5. Because the unusual lane configuration will be unfamiliar to drivers, WSDOT is reducing the speed limit to 50 mph from the Snohomish River bridge through the construction zone to keep crews and drivers safe.</description>
    </item>
    <item>
      <title>SR 20 interchange improvements to start this year in Burlington</title>
      <pubDate>Wed, 05 Mar 2008 07:11:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/04_SR20widenedToInterstate.htm</link>
      <description>Relief is on the way for the 22,000 drivers who use the State Route 20 interchange at I-5 in Burlington each day.</description>
    </item>
    <item>
      <title>WSDOT Ferries Division Offers Alternatives During Point Defiance/Tahlequah Ferry Route Closure</title>
      <pubDate>Sun, 02 Mar 2008 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/03/wsdot-ferries-division-offers-alternatives-during-point-defiance.htm</link>
      <description></description>
    </item>
  </channel>
</rss>