﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - 2007 News</title>
    <link>http://www.wsdot.wa.gov/News/2007/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Thu, 26 Nov 2009 05:13:19 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - 2007 News</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/News/2007/</link>
    </image>
    <item>
      <title>US 101 Simpson Avenue Bridge closes Feb. through April</title>
      <pubDate>Thu, 03 Jan 2008 05:09:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/02_101_SimpsonAveBrg.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/02_101_SimpsonAveBrg.htm</guid>
      <description>Beginning in February, US 101 traffic in Grays Harbor will be detoured for a 10-week closure of the Simpson Avenue Bridge.</description>
    </item>
    <item>
      <title>Happy New Year for Snohomish drivers; crews reopen SR 96 ahead of schedule</title>
      <pubDate>Tue, 01 Jan 2008 07:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/31_SR96OpenForNewYear.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/31_SR96OpenForNewYear.htm</guid>
      <description>Less than one month after historic rains destroyed a section of State Route 96 (Seattle Hill Road) near Snohomish, crews have reopened the road to traffic. Late this afternoon, crews finished paving the roadway and removed the barriers that have kept drivers out since Dec. 3.</description>
    </item>
    <item>
      <title>WSDOT and WSP winter crews working overtime to keep I-90 Snoqualmie Pass safe for travel</title>
      <pubDate>Sat, 29 Dec 2007 06:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/28_I90hardworkingcrews.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/28_I90hardworkingcrews.htm</guid>
      <description>Washington State Department of Transportation (WSDOT) and Washington State Patrol (WSP) crews have worked hundreds of hours of overtime already this season to keep I-90 Snoqualmie Pass in a safe driving condition and to enforce the restrictions that prevent ill-equipped vehicles and impaired drivers from causing collisions and delays.</description>
    </item>
    <item>
      <title>Valiant Effort by WSDOT Bridge Crews Delivers a Military Bridge in Record Time</title>
      <pubDate>Fri, 28 Dec 2007 07:52:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/27_ValiantEffortbyWSDOTBridgeCrew.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/27_ValiantEffortbyWSDOTBridgeCrew.htm</guid>
      <description>CHEHALIS – Forty men used little more than their hands and some basic tools to erect a 180-foot bridge in six days.</description>
    </item>
    <item>
      <title>WSDOT to Reopen SR 6 during Daylight Hours, on Limited Basis</title>
      <pubDate>Fri, 28 Dec 2007 06:34:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/27_SR6Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/27_SR6Closure.htm</guid>
      <description>CHEHALIS – Currently closed section of State Route 6 will reopen on a limited basis during daylight hours starting Saturday morning, December 29, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Texting While Driving Against the Law Starting Jan. 1</title>
      <pubDate>Thu, 27 Dec 2007 07:18:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/26_TextMessagingLaw.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/26_TextMessagingLaw.htm</guid>
      <description>The Washington State Patrol plans to vigorously enforce the state’s new law against sending text messages while driving, once that law takes effect on Jan. 1.</description>
    </item>
    <item>
      <title>SR 504 at Cow Creek Closes Temporarily Due to Snow</title>
      <pubDate>Thu, 27 Dec 2007 05:58:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/26_SR504CloseforSnow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/26_SR504CloseforSnow.htm</guid>
      <description>CASTLE ROCK – The Washington State Department of Transportation (WSDOT) closed State Route 504 (Spirit Lake Highway) today, December 26, starting by the Cow Creek, at mile post 28, Mount St. Helens due to heavy snowfall over the last 24 hours.</description>
    </item>
    <item>
      <title>WSDOT Alerts Motorists to Closure of SR 14/Evergreen Blvd Exit, December 27</title>
      <pubDate>Thu, 27 Dec 2007 05:51:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/26_SR14RampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/26_SR14RampClosures.htm</guid>
      <description>VANCOUVER – Motorists traveling westbound on State Route 14 in Vancouver can expect a closure of Exit 3, Evergreen Boulevard, starting at and around 8 a.m., lasting until 3 p.m., on December 27.</description>
    </item>
    <item>
      <title>WSDOT completes three runs of pipe on I-405 culvert repair work in Renton</title>
      <pubDate>Tue, 25 Dec 2007 02:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/24_I405CulvertRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/24_I405CulvertRepair.htm</guid>
      <description>Not wanting to take any chances, WSDOT contractor, Tri-State Construction, worked non-stop over the weekend to complete all three runs of pipe in the new emergency pumping system to protect I-405 from a heavy rainstorm. 

WSDOT now has two pumping systems comprised of three pipes to the south and one pipe to the north to help drain Thunder Hills Creek and prevent the water from going under or over I-405 near Benson Road.</description>
    </item>
    <item>
      <title>WSDOT crews weather the first storm on I-405 in Renton</title>
      <pubDate>Sun, 23 Dec 2007 09:49:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/22_I405RentonCulvert.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/22_I405RentonCulvert.htm</guid>
      <description>WSDOT contractor, Tri-State Construction, continues to make good progress on the water diversion system on I-405 in Renton. Crews report the current north pumping system did a good job of pumping water from Thunder Hills Creek away from the roadway during the Saturday morning storm which dropped less than a half inch of rain.</description>
    </item>
    <item>
      <title>WSDOT completes first run of pipe on I-405 for Renton culvert repair work</title>
      <pubDate>Sat, 22 Dec 2007 09:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/21_I405RentonPipeRunning.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/21_I405RentonPipeRunning.htm</guid>
      <description>WSDOT contractor crews report the first run of pipe is up and running adjacent to the northbound lanes of I-405 in Renton near Benson Road. 

“This is good news,” said Project Engineer Lisa Hodgson. “With that failed culvert under I-405, we need that pumping power and pumping capacity, especially with two storms coming in this weekend.”</description>
    </item>
    <item>
      <title>Seattle/Port Townsend Passenger-only Shuttle Will End Service January 6</title>
      <pubDate>Fri, 21 Dec 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/seattleport-townsend-passenger-only-shuttle-will-end-service-jan.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/seattleport-townsend-passenger-only-shuttle-will-end-service-jan.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Holiday Travel Advisory: Tips and Peak Travel Times</title>
      <pubDate>Fri, 21 Dec 2007 09:54:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/20_holidaytraveladvice.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/20_holidaytraveladvice.htm</guid>
      <description>OLYMPIA – Checking the WSDOT website and knowing the weather conditions on your route could allow drivers more time to spend with friends and family this holiday season.</description>
    </item>
    <item>
      <title>WSDOT makes progress on I-405 culvert repairs in Renton; drivers should plan on more back-ups through the weekend</title>
      <pubDate>Fri, 21 Dec 2007 09:49:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/20_I405PumpsWorkThroughWeekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/20_I405PumpsWorkThroughWeekend.htm</guid>
      <description>WSDOT contractor crews are making good progress on installing a pump and pipe system along the northbound lanes of I-405 at Benson Road. By tonight, crews expect to have the first run of 24-inch pipe up and running 2000 feet along I-405, under Talbot Road and into the drainage system on the west side of the freeway.</description>
    </item>
    <item>
      <title>Hood Canal Bridge draw span pontoons linked like Legos</title>
      <pubDate>Fri, 21 Dec 2007 07:02:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/20_SR104_HCB_pontoons.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/20_SR104_HCB_pontoons.htm</guid>
      <description>WSDOT and Kiewit-General construction crews earlier this week guided the last underwater draw span pontoon beneath seven other new east-half Hood Canal Bridge draw span pontoons.</description>
    </item>
    <item>
      <title>New WSDOT Seattle area traffic computer tests extend into the new year</title>
      <pubDate>Fri, 21 Dec 2007 06:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/20_SeattleAreaComputer.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/20_SeattleAreaComputer.htm</guid>
      <description>As promised, WSDOT traffic engineers rescheduled testing the new traffic computer due to significant weather and emergency roadwork.</description>
    </item>
    <item>
      <title>Report reveals new jobs, more people, slightly longer commute in Puget Sound region</title>
      <pubDate>Fri, 21 Dec 2007 00:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/20_AnnualCongestionReport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/20_AnnualCongestionReport.htm</guid>
      <description>The Puget Sound region’s economy and population continue to grow–and along with them traffic delays–according to the Washington State Department of Transportation’s Annual Congestion Report released today.</description>
    </item>
    <item>
      <title>Weather Conditions and Unstable Slope Prolong Closure of SR 6</title>
      <pubDate>Thu, 20 Dec 2007 07:14:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/19_SR6Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/19_SR6Closure.htm</guid>
      <description>CHEHALIS – State Route 6 will remain closed in Pacific and Lewis Counties from the vicinity of Elk Prairie Road (mile post 19) to the vicinity of Meyer Road (mile post 27) for several weeks, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Emergency repair on I-405 through Renton is on schedule</title>
      <pubDate>Wed, 19 Dec 2007 09:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/18_ThunderHillsOnSchedule.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/18_ThunderHillsOnSchedule.htm</guid>
      <description>Emergency repairs to the Thunder Hills Creek culvert damaged in the December 3 storm are on schedule.  Crews have been working around the clock to build a 6,000-foot pipe system to divert stormwater from the creek around I-405.</description>
    </item>
    <item>
      <title>Crews set final girder for the I-5 Everett HOV project this week</title>
      <pubDate>Wed, 19 Dec 2007 05:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/18_EverettHOVLastGirder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/18_EverettHOVLastGirder.htm</guid>
      <description>By the end of the week, crews working for WSDOT will reach a major milestone on the Interstate 5 Everett HOV expansion: placing the final bridge girder of the project.</description>
    </item>
    <item>
      <title>I-90 Indian John Hill Rest Areas Open Both Directions</title>
      <pubDate>Wed, 19 Dec 2007 01:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/I-90+Indian+John+Hill+Rest+Areas+Open+Both+Directions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/I-90+Indian+John+Hill+Rest+Areas+Open+Both+Directions.htm</guid>
      <description>Relief is now in sight WSDOT opens both I-90 Indian John Hill rest areas near Cle Elum</description>
    </item>
    <item>
      <title>Power restored to west side of SR 520 Bridge in Seattle; monthly maintenance tests rescheduled for Wednesday</title>
      <pubDate>Tue, 18 Dec 2007 06:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/17_SR520Maintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/17_SR520Maintenance.htm</guid>
      <description>WSDOT bridge crews and Seattle City Light restored power to the west half of the SR 520 Bridge at 11 a.m. Saturday, Dec. 15. Bridge crews cancelled monthly maintenance work last week due to the outage, and have rescheduled the work for Wednesday morning, Dec. 19.</description>
    </item>
    <item>
      <title>WSDOT re-opens Easton Bridge on I-90</title>
      <pubDate>Tue, 18 Dec 2007 05:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/17_EastonBridgeReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/17_EastonBridgeReopens.htm</guid>
      <description>WSDOT re-opens Easton Bridge on I-90; community thankful to have bridge back to normal</description>
    </item>
    <item>
      <title>SR 28 at Rock Island Dam Will Be Closed for 4 Days Next Spring</title>
      <pubDate>Tue, 18 Dec 2007 03:28:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/121707RIslSlope.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/121707RIslSlope.htm</guid>
      <description>The winning bid for the third phase of a Rock Slope Stabilization Project between Wenatchee and Quincy that will close SR 28 for 4 days came in way under the estimate.</description>
    </item>
    <item>
      <title>Longer NEXUS hours at I-5 Peace Arch border crossing</title>
      <pubDate>Tue, 18 Dec 2007 00:46:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/17_i5longernexushours.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/17_i5longernexushours.htm</guid>
      <description>The northbound I-5 NEXUS lane will stay open until midnight now at the Blaine Peace Arch border crossing into Canada.</description>
    </item>
    <item>
      <title>Work continues on I-405 and SR 167 in Renton; drivers should prepare for congestion Monday</title>
      <pubDate>Mon, 17 Dec 2007 22:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/16_I-405Update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/16_I-405Update.htm</guid>
      <description>Crews will open all lanes of northbound Interstate 405 between State Route 169 and SR 167 in Renton at 5 a.m. Monday, Dec. 16 for the weekday morning commute. The lanes will remain open until 10 a.m. when crews will close the right hand northbound I-405 lane.</description>
    </item>
    <item>
      <title>Northbound I-405 work in Renton suspended until 6 a.m. Saturday, Dec. 15</title>
      <pubDate>Sat, 15 Dec 2007 10:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/14_405RentonWorkSuspended.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/14_405RentonWorkSuspended.htm</guid>
      <description>Due to an equipment breakdown, at 6 p.m. Friday, crews will stop work and reopen the northbound right lane between SR 167 and SR 169. Crews will close the lane and resume work 6 a.m. Saturday.</description>
    </item>
    <item>
      <title>Saturday ramp closure in Everett cancelled</title>
      <pubDate>Sat, 15 Dec 2007 07:04:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/14_I5EverettRampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/14_I5EverettRampClosure.htm</guid>
      <description>Crews cancelled the Dec. 15 closure on the exit ramp from northbound Interstate 5 to eastbound US 2 in Everett due to a wet weather forecast.</description>
    </item>
    <item>
      <title>WSDOT worker injured in the line of duty</title>
      <pubDate>Sat, 15 Dec 2007 03:51:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/14_5_DavidBallHit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/14_5_DavidBallHit.htm</guid>
      <description>A WSDOT worker is in satisfactory condition today following a fatal collision.</description>
    </item>
    <item>
      <title>I-90 Westbound Indian John Hill Rest Area Open</title>
      <pubDate>Sat, 15 Dec 2007 02:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/I-90+Westbound+Indian+John+Hill+Rest+Area+Open.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/I-90+Westbound+Indian+John+Hill+Rest+Area+Open.htm</guid>
      <description>WSDOT opens westbound I-90 Indian John Hill rest area near Cle Elum ahead of schedule</description>
    </item>
    <item>
      <title>Holiday Passenger-only Ferry Service Connects Seattle with Port Townsend and Coupeville</title>
      <pubDate>Fri, 14 Dec 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/holiday-passenger-only-ferry-service-connects-seattle-with-port.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/holiday-passenger-only-ferry-service-connects-seattle-with-port.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Washington State Ferries Announces Holiday Passenger-Only Ferry Service between Port Townsend and Seattle</title>
      <pubDate>Fri, 14 Dec 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/wsf-announces-holiday-po-service-between-pt-townsend-and-seattle.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/wsf-announces-holiday-po-service-between-pt-townsend-and-seattle.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Ferry Schedule is Easy this Holiday Season</title>
      <pubDate>Fri, 14 Dec 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/ferry-schedule-is-easy-this-holiday-season.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/ferry-schedule-is-easy-this-holiday-season.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Drivers should plan for daytime ramp closure in Everett this Saturday</title>
      <pubDate>Fri, 14 Dec 2007 07:50:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/13_EverettRampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/13_EverettRampClosure.htm</guid>
      <description>From 6 a.m. to 6 p.m. on Saturday, Dec. 15, construction crews working for WSDOT will close the exit ramp from northbound Interstate 5 to eastbound US 2 in Everett. Crews will be finishing work on a new stormwater drainage system for the ramp.</description>
    </item>
    <item>
      <title>Speed Limit on I-5 to Return to 60 MPH in Flood’s Aftermath</title>
      <pubDate>Fri, 14 Dec 2007 06:51:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/13_I-5SpeedRevision.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/13_I-5SpeedRevision.htm</guid>
      <description>CHEHALIS – Starting Friday, December 14, motorists traveling on I-5 in the vicinity of Centralia will notice the speed limit return to 60 MPH, after a brief reduction to 50 MPH in light of the flood events that took place last week, cautions Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Crews begin repairs on SR 96 (Seattle Hill Road) near Snohomish</title>
      <pubDate>Fri, 14 Dec 2007 05:29:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/13_SR96WorkBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/13_SR96WorkBegins.htm</guid>
      <description>Just a week after storms damaged a section of State Route 96 (Seattle Hill Road), work is under way to repair the roadway and reopen it to traffic. On Tuesday, Wilder Construction crews working for WSDOT began working to replace a culvert that failed during last week’s storms, washing out the ground under the roadway.</description>
    </item>
    <item>
      <title>Governor Gregoire invests for safer, more efficient ferry system</title>
      <pubDate>Fri, 14 Dec 2007 04:56:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/13_ferryvesselplan.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/13_ferryvesselplan.htm</guid>
      <description>Gov. Chris Gregoire today proposed investing $100 million in the Washington state ferry system to improve safety and increase capacity.</description>
    </item>
    <item>
      <title>Emergency repair work under way on northbound I-405 in Renton</title>
      <pubDate>Fri, 14 Dec 2007 04:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/13_I405EmergencyRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/13_I405EmergencyRepair.htm</guid>
      <description>Get ready. Emergency repair crews have begun prep work to repair a damaged culvert on northbound Interstate 405 through the city of Renton.</description>
    </item>
    <item>
      <title>SR 241 in Mabton Gets New Railroad Crossing Gates</title>
      <pubDate>Thu, 13 Dec 2007 08:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/SR+241+in+Mabton+Gets+New+Railroad+Crossing+Gates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/SR+241+in+Mabton+Gets+New+Railroad+Crossing+Gates.htm</guid>
      <description>Railroad crossing gates scheduled for installation in Mabton at SR 241</description>
    </item>
    <item>
      <title>Crews working to open US 101 along Hood Canal by Friday</title>
      <pubDate>Thu, 13 Dec 2007 06:36:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/12_US101ReopenFriday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/12_US101ReopenFriday.htm</guid>
      <description>Crews working to open US 101 along Hood Canal by Friday</description>
    </item>
    <item>
      <title>I-90 Indian John Rest Area Closed</title>
      <pubDate>Thu, 13 Dec 2007 05:28:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/I-90+Indian+John+Rest+Area+Closed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/I-90+Indian+John+Rest+Area+Closed.htm</guid>
      <description>WSDOT closes I-90 Indian John Hill rest areas for water and sewer upgrades</description>
    </item>
    <item>
      <title>Searchers Locate Wreckage of Missing Plane Near Puyallup</title>
      <pubDate>Thu, 13 Dec 2007 01:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/PuyallupAirSearch.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/PuyallupAirSearch.htm</guid>
      <description>The air and ground search is resuming today for 78-year old Thomas Maxwell of Black Diamond, Washington, and his Piper Dakota single engine plane.</description>
    </item>
    <item>
      <title>SR 542 lane closed east of Maple Falls by Friday; Repairs delayed for permits</title>
      <pubDate>Thu, 13 Dec 2007 00:06:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/12_sr542emergencyroadrepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/12_sr542emergencyroadrepairs.htm</guid>
      <description>WSDOT will close one lane of State Route 542 east of Maple Falls by the end of the week in advance of emergency repairs to the adjacent riverbank, eroded by high water after recent storms.</description>
    </item>
    <item>
      <title>Emergency repairs planned for SR 530 in Skagit County</title>
      <pubDate>Thu, 13 Dec 2007 00:01:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/12_sr530emergencyroadrepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/12_sr530emergencyroadrepairs.htm</guid>
      <description>Heavy rain last week pushed the Sauk River to near-flood levels, eroding the riverbank and moving the river to within several feet of SR 530 in two locations north of Darrington. Crews will start emergency repairs as early as Friday.</description>
    </item>
    <item>
      <title>Agreement Paves Way for Viaduct Solution</title>
      <pubDate>Wed, 12 Dec 2007 10:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/Viaductsolution-12112007.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/Viaductsolution-12112007.htm</guid>
      <description>Gov. Chris Gregoire, King County Executive Ron Sims and Seattle Mayor Greg Nickels today announced a major step forward in replacing the Alaskan Way Viaduct along Seattle’s central waterfront.</description>
    </item>
    <item>
      <title>Power outage on west end of SR 520 Evergreen Point Bridge in Seattle; drivers urged to drive cautiously in the dark</title>
      <pubDate>Wed, 12 Dec 2007 07:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/11_SR520PowerFailure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/11_SR520PowerFailure.htm</guid>
      <description>Seattle City Light crews shut down power on the west end of the SR 520 Evergreen Point Floating Bridge between the exit to Montlake Boulevard and the west half of the drawspan after discovering a blown fuse at the Foster Island power vault.  They will restore power as soon as crews replace the blown fuse, repair a damaged splice, and inspect the power vault for further electrical flaws.  The outage could last up to three days.</description>
    </item>
    <item>
      <title>WSDOT Engineers announce plans to replace I-405 Culvert; plans include I-405 lane closures in Renton</title>
      <pubDate>Wed, 12 Dec 2007 06:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/11_ThunderCulvertLaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/11_ThunderCulvertLaneClosures.htm</guid>
      <description>WSDOT engineers are working on an emergency plan to replace a failing culvert that runs underneath I-405 in Renton. If the culvert is not repaired, more rain could lead to more significant erosion and possibly undermine I-405 near Benson Road South and Main Avenue South.</description>
    </item>
    <item>
      <title>Flood Debris Clean-Up Closes I-5 Lane Wednesday Night</title>
      <pubDate>Tue, 11 Dec 2007 23:19:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/10_I5LaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/10_I5LaneClosures.htm</guid>
      <description>CHEHALIS – Motorists should expect a lane closure on I-5 northbound in Chehalis, between 9 p.m. on Wednesday evening, Dec 12 and 4 a.m. Thursday morning, Dec 13. The lane closure on I-5 will take place between mile post 79 and mile post 80, in the vicinity of Chamber Way.</description>
    </item>
    <item>
      <title>WSDOT Holds Ribbon Cutting for Travel Washington Grape Line</title>
      <pubDate>Tue, 11 Dec 2007 05:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/10_RibbonCuttingGrapeLine.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/10_RibbonCuttingGrapeLine.htm</guid>
      <description>WSDOT held a ribbon-cutting on Dec. 10 to celebrate the Travel Washington Grape Line bus service from Walla Walla to Pasco. Travel Washington Grape Line is the initial step in establishing the Washington Intercity Rural Bus Program. The Grape Line service will operate daily and offer three scheduled round trips between Walla Walla and Pasco.</description>
    </item>
    <item>
      <title>Don't Miss Tacoma's New Exit 133</title>
      <pubDate>Sun, 09 Dec 2007 04:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/08_I5_CD_opens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/08_I5_CD_opens.htm</guid>
      <description>New I-5 and SR 16 connections open. Part of the 48th to Pacific project in Tacoma.</description>
    </item>
    <item>
      <title>Ongoing Inspections of Aging Steel Electric Ferries Reveal Additional Repair Needs</title>
      <pubDate>Sat, 08 Dec 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/ongoing-inspections-of-aging-steel-electric-ferries-reveal-addit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/ongoing-inspections-of-aging-steel-electric-ferries-reveal-addit.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Westbound TNB Lanes Closed Again Next Week</title>
      <pubDate>Sat, 08 Dec 2007 06:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/07_SR16_wb_lanes_closed_again.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/07_SR16_wb_lanes_closed_again.htm</guid>
      <description>Westbound TNB Lanes Closed Again Next Week</description>
    </item>
    <item>
      <title>Interstate 5 Reopens to All Traffic Through Chehalis, Highways Still Closed Elsewhere in the State</title>
      <pubDate>Sat, 08 Dec 2007 03:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/07_I5_open_Chehalis.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/07_I5_open_Chehalis.htm</guid>
      <description>OLYMPIA – All travelers are back on I-5 through Chehalis at 11:45 a.m., Friday, after WSDOT crews worked around the clock for four days to reopen a 20-mile stretch of I-5 that had been under nearly ten feet of water in places.</description>
    </item>
    <item>
      <title>Semis Trucking Through I-5 in Chehalis</title>
      <pubDate>Fri, 07 Dec 2007 20:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/07_SemisMovethroughChehalis.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/07_SemisMovethroughChehalis.htm</guid>
      <description>Truck drivers rolled slowly along I-5 through Chehalis Thursday night, where flooding had left 10 feet of standing water just three days before.</description>
    </item>
    <item>
      <title>WSDOT Crews Open One Lane in Each Direction on I-5 in Chehalis for Freight Trucks Only Oversize Loads Restricted</title>
      <pubDate>Fri, 07 Dec 2007 09:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/06_5pmUpdateCrewstoOpentoTruckTraffic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/06_5pmUpdateCrewstoOpentoTruckTraffic.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Southbound SR 167 HOV Lane Closed in Renton this Weekend</title>
      <pubDate>Fri, 07 Dec 2007 05:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/06_SR167HOVclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/06_SR167HOVclosure.htm</guid>
      <description>Southbound SR 167 HOV Lane Closed in Renton this Weekend</description>
    </item>
    <item>
      <title>WSDOT Crews Racing to get One Lane Open on I-5 in Chehalis</title>
      <pubDate>Fri, 07 Dec 2007 04:19:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/06_WSDOTCrewsRacetoOpenI-5.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/06_WSDOTCrewsRacetoOpenI-5.htm</guid>
      <description>OLYMPIA – As floodwaters slowly recede, WSDOT crews are out in force fixing the highway surface and replacing barriers to get one lane of I-5 through Chehalis open in each direction for commercial vehicles over 10,000 gross vehicle weight (GVW).</description>
    </item>
    <item>
      <title>Westbound TNB Down to One Lane Two Nights Next Week</title>
      <pubDate>Fri, 07 Dec 2007 01:18:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/6_SR16_tnbonelane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/6_SR16_tnbonelane.htm</guid>
      <description>Westbound TNB Down to One Lane Two Nights Next Week</description>
    </item>
    <item>
      <title>I-90 Easton Bridge Work and Detour Continues</title>
      <pubDate>Thu, 06 Dec 2007 09:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/I-90+Easton+Bridge+Work+and+Detour+Continues.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/I-90+Easton+Bridge+Work+and+Detour+Continues.htm</guid>
      <description>I-90 Easton Bridge Work Continues, Eastbound Lanes Occasionally Restricted</description>
    </item>
    <item>
      <title>Lanes Restricted on US 395 in Tri-Cities</title>
      <pubDate>Thu, 06 Dec 2007 09:23:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/Lanes+Restricted+on+US+395+in+Tri-Cities.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/Lanes+Restricted+on+US+395+in+Tri-Cities.htm</guid>
      <description>WSDOT Repairs Damaged Guardrail on US 395 Near Blue Bridge</description>
    </item>
    <item>
      <title>WSDOT Crews Breaching Airport Dike in Chehalis to Help Drain Floodwaters from I-5</title>
      <pubDate>Thu, 06 Dec 2007 08:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/5_CrewsBeginBreachingDike.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/5_CrewsBeginBreachingDike.htm</guid>
      <description>At approximately 5 p.m. today, WSDOT crews will begin using a trackhoe to dig a trench in Airport Dike in Chehalis. Crews will gradually breach the dike and carefully monitoring water flow as they expand the size of the trench. Flood waters spilled over the dike during recent storms, flooding Interstate 5 and the surrounding area. Breaching the dike allows flood waters to more rapidly drain back to the Chehalis River, though it may still take days for flood waters to fully recede.</description>
    </item>
    <item>
      <title>River Threatening SR 542 East of Maple Falls; WSDOT to Make Emergency Repairs</title>
      <pubDate>Thu, 06 Dec 2007 08:39:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/05_542_emergencyrepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/05_542_emergencyrepair.htm</guid>
      <description>State Route 542 east of Maple Falls is in need of emergency repairs after the north fork of the Nooksack River eroded the riverbank to within 20 feet of the highway.</description>
    </item>
    <item>
      <title>WSDOT Crews Repairing I-5 at Chehalis; Flooded Freeway Closed until This Weekend and Perhaps Longer</title>
      <pubDate>Thu, 06 Dec 2007 08:36:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/05_WSDOTCrewsRepairingI-5atChehalis.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/05_WSDOTCrewsRepairingI-5atChehalis.htm</guid>
      <description>OLYMPIA – WSDOT crews have had their first look at I-5 as flood waters recede. They are seeing more than one hundred feet of pavement damage in the vicinity of the West Street overpass in Chehalis. Additionally, the base beneath that pavement is also damaged. Crews have started repairs and will be paving overnight.</description>
    </item>
    <item>
      <title>Trucks Cross Border Faster with New Lane - Governor, WSDOT celebrate new lanes opening ahead of schedule</title>
      <pubDate>Thu, 06 Dec 2007 06:35:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/05_543trucklaneopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/05_543trucklaneopen.htm</guid>
      <description>Today, WSDOT and First Gentleman Mike Gregoire, on behalf of Governor Gregoire, opened a new designated truck lane on SR 543 that improves freight mobility, and celebrated finishing construction six months ahead of schedule.

Trucks Cross Border Faster with New Lane; 
Governor, WSDOT celebrate new lanes opening ahead of schedule</description>
    </item>
    <item>
      <title>US 101 in Pacific County Reopens, I-5 Remains Closed in Lewis County</title>
      <pubDate>Wed, 05 Dec 2007 23:23:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/05_US10inPacificCountyReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/05_US10inPacificCountyReopens.htm</guid>
      <description>VANCOUVER – While I-5 in Lewis County remains closed in the Chehalis area, some water has receded on US 101 in Pacific County. US Highway 101 is now open throughout Pacific County.</description>
    </item>
    <item>
      <title>Floodwaters Receding in Western Washington, WSDOT Cleaning Up and Reopening Roads</title>
      <pubDate>Wed, 05 Dec 2007 22:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/05_4AMUpdateWatersRecede.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/05_4AMUpdateWatersRecede.htm</guid>
      <description>Weather conditions have improved and water is receding around Western Washington, allowing WSDOT crews to clean up and reopen roads.</description>
    </item>
    <item>
      <title>Vessel Sea Trials cancel International Sailing December 11</title>
      <pubDate>Wed, 05 Dec 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/vessel-sea-trials-cancel-international-sailing-december-11.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/vessel-sea-trials-cancel-international-sailing-december-11.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Crews Continue to Assess Storm Damage; Drivers Urged to Stay Off the Roads</title>
      <pubDate>Wed, 05 Dec 2007 09:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/4_CrewsAssessDamage.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/4_CrewsAssessDamage.htm</guid>
      <description>Over the past 36 hours, WSDOT crews have responded to approximately 60 blocked or damaged highways scattered across Western Washington where a combination of mudslides, water over the roadway, downed trees and power lines have forced road closures.</description>
    </item>
    <item>
      <title>SR 96 (Seattle Hill Road) near Snohomish Remains Closed While Engineers Plan Repairs</title>
      <pubDate>Wed, 05 Dec 2007 07:59:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/4_SR96CulvertRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/4_SR96CulvertRepair.htm</guid>
      <description>WSDOT engineers are working quickly to design repairs for SR 96 (Seattle Hill Road) south of Snohomish after flooding collapsed a culvert and washed out the ground under a section of the road. The road has been closed since Monday, Dec. 3 to keep drivers safe while crews assessed the damage.</description>
    </item>
    <item>
      <title>Drivers Should Prepare for Another Tough Commute on SR 522 Near Woodinville</title>
      <pubDate>Wed, 05 Dec 2007 07:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/04_522Repair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/04_522Repair.htm</guid>
      <description>Crews have been out working since first light assessing and repairing damage to State Route 522 between State Route 202 and NE 195th Street in Woodinville.</description>
    </item>
    <item>
      <title>SR 20, the North Cascades Highway Closes for the Season</title>
      <pubDate>Wed, 05 Dec 2007 04:47:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/120407NCHighwayCloses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/120407NCHighwayCloses.htm</guid>
      <description>Too much snow to reopen the North Cascades Highway.</description>
    </item>
    <item>
      <title>I-5 Remains Closed in Lewis County</title>
      <pubDate>Wed, 05 Dec 2007 01:35:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/04_Media_Update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/04_Media_Update.htm</guid>
      <description>VANCOUVER – Interstate 5 remains closed in Lewis County today. I-5 is closed in the Chehalis area, between Grand Mound (milepost 88) and exit 68. The interstate is currently under approximately 10 feet of water and is expected to remain closed until Thursday or later.</description>
    </item>
    <item>
      <title>WSDOT Crews Busy Assessing Damage after December Storm</title>
      <pubDate>Tue, 04 Dec 2007 21:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/4_5AMUpdateCrewsAssessingDamage.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/4_5AMUpdateCrewsAssessingDamage.htm</guid>
      <description>At daylight, WSDOT crews will be out in full force to asses the damage from the overnight windstorm and check on drainage from the last 48-hour rainstorm. Both storms brought high winds, heavy rains, mudslides and falling trees to most of western Washington.</description>
    </item>
    <item>
      <title>I-5 in Chehalis Closed Due to Flooding; WSDOT Crews Clearing Roads as Wild Weather Continues</title>
      <pubDate>Tue, 04 Dec 2007 08:12:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/03_I-5inChehalisClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/03_I-5inChehalisClosed.htm</guid>
      <description>OLYMPIA – Flooding on I-5 in Chehalis has forced WSDOT to close the freeway to all traffic and forecasted high winds have floating bridge crews on high alert.</description>
    </item>
    <item>
      <title>Mother Nature Hammers Pass Over Weekend; WSDOT Crews Prepare for Next Round of Weather</title>
      <pubDate>Tue, 04 Dec 2007 06:59:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/StormRecapI90Dec07.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/StormRecapI90Dec07.htm</guid>
      <description>In the wake of Mother Nature’s fury, WSDOT crews have their hands full dealing with rain, mudslides, natural avalanches, and standing water on Snoqualmie Pass after temperatures warmed up and rain started to fall.</description>
    </item>
    <item>
      <title>Mother Nature Wreaks Havoc across Western Washington This Morning, WSDOT Crews Work to Battle the Storm</title>
      <pubDate>Tue, 04 Dec 2007 05:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/3_NoonUpdateWesternWA.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/3_NoonUpdateWesternWA.htm</guid>
      <description>Mother Nature Wreaks Havoc across Western Washington This Morning, WSDOT Crews Work to Battle the Storm</description>
    </item>
    <item>
      <title>I-5, SR 502 Interchange Girder Installation Cancelled For This Week</title>
      <pubDate>Tue, 04 Dec 2007 03:34:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/03_SR502GirderCancelled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/03_SR502GirderCancelled.htm</guid>
      <description>VANCOUVER – With water levels rising, crews have cancelled the next three days of girder setting for the new I-5, SR 502 Interchange.</description>
    </item>
    <item>
      <title>WSDOT Establishes Detour Route to Coastal Areas; Flooding Keeping Interstate 5 Closed in Lewis County</title>
      <pubDate>Tue, 04 Dec 2007 01:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/12/04_FloodingI5Closed_LewisCo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/12/04_FloodingI5Closed_LewisCo.htm</guid>
      <description>OLYMPIA – WSDOT crews have been working throughout the day today responding to flooding problems on state highways throughout Western Washington. Both directions of I-5 in Lewis County near Chehalis remains closed and several state highways are still under water.</description>
    </item>
    <item>
      <title>Major Changes on I-5 in Tacoma</title>
      <pubDate>Fri, 07 Dec 2007 09:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/29_I5_Tacoma_CDlanes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/29_I5_Tacoma_CDlanes.htm</guid>
      <description>Major changes on I-5 in Tacoma scheduled for the weekend of Dec. 7-8.</description>
    </item>
    <item>
      <title>Hectic Morning on State Highways</title>
      <pubDate>Mon, 03 Dec 2007 22:23:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/3_101_ORClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/3_101_ORClosures.htm</guid>
      <description>Rains, wind, etc. are wreaking havoc on highways all over the peninsula ...</description>
    </item>
    <item>
      <title>WSDOT Crews Prepare for Snow, Wind and Rain in Puget Sound and the Central Cascade Passes</title>
      <pubDate>Sat, 01 Dec 2007 08:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/30_PugetSoundStormPrep.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/30_PugetSoundStormPrep.htm</guid>
      <description>Forecasters predict snow, high wind and heavy rain this weekend, leading to possible flooding in the lowlands and heavy snow and avalanche danger in the Cascades. WSDOT will be facing big challenges and is putting all the necessary people and equipment in place to be ready.</description>
    </item>
    <item>
      <title>SR 20 - North Cascades Highway Temporarily Closed</title>
      <pubDate>Sat, 01 Dec 2007 02:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/113007NCHTempClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/113007NCHTempClosure.htm</guid>
      <description>Due to forecast heavy snow and winds up to 100 MPH, SR 20 - the North Cascades Highway is being temporarily closed tonight at 7 p.m.</description>
    </item>
    <item>
      <title>Washington State Ferries Increases Steel Hull Inspections and Routine Vessel Maintenance</title>
      <pubDate>Fri, 30 Nov 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/washington-state-ferries-increases-steel-hull-inspections-and-ro.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/washington-state-ferries-increases-steel-hull-inspections-and-ro.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Southwest Washington Maintenance Crews Prepare for Winter Snow Storms</title>
      <pubDate>Fri, 30 Nov 2007 06:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/29__VancSnowPrep.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/29__VancSnowPrep.htm</guid>
      <description>VANCOUVER – As winter weather approaches and forecasts call for snow in parts of Southwest Washington, Washington State Department of Transportation (WSDOT) maintenance crews are preparing for whatever nature plans to deliver.</description>
    </item>
    <item>
      <title>SR 410 Chinook Pass and SR 123 Cayuse Pass Closed Until Spring</title>
      <pubDate>Fri, 30 Nov 2007 06:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/SR+410+Chinook+Pass+and+SR+123+Cayuse+Pass+Closed+Until+Spring.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/SR+410+Chinook+Pass+and+SR+123+Cayuse+Pass+Closed+Until+Spring.htm</guid>
      <description>WSDOT Closes Two Scenic Cascades Routes for the Season
SR 410 (Chinook Pass) and SR 123 (Cayuse Pass) Closed Until Spring</description>
    </item>
    <item>
      <title>SR 504 Near Coldwater Lake Closed for Winter Season, Starting November 29</title>
      <pubDate>Fri, 30 Nov 2007 03:34:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/29_SR504_close_for_winter.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/29_SR504_close_for_winter.htm</guid>
      <description>CASTLE ROCK – The Washington State Department of Transportation (WSDOT) closed State Route 504 (Spirit Lake Highway) today, November 29, starting by the Hummocks Trail east of Coldwater Lake on Mount St. Helens due to heavy snowfall over the last 24 hours.</description>
    </item>
    <item>
      <title>Crews Prepare for Possible Snow in Western Washington; Drivers Can Expect Winter Driving Conditions</title>
      <pubDate>Thu, 29 Nov 2007 08:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/28_SnowInHigherHills.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/28_SnowInHigherHills.htm</guid>
      <description>Crews Prepare for Possible Snow in Western Washington; Drivers Can Expect Winter Driving Conditions</description>
    </item>
    <item>
      <title>WSDOT and Contractor Work against Time and Mother Nature to Repair I-90 Bridge near Easton</title>
      <pubDate>Thu, 29 Nov 2007 04:45:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/EastongirdersNov07.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/EastongirdersNov07.htm</guid>
      <description>WSDOT and contractor Max J. Kuney battled freezing temperatures yesterday, Nov. 27, as they set five bulb-tee girders that will replace a damaged bridge span over I-90 near Easton.</description>
    </item>
    <item>
      <title>WSDOT Closes SR 410 Chinook Pass and SR 123 Cayuse Pass Temporarily</title>
      <pubDate>Wed, 28 Nov 2007 09:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/WSDOT+Closes+SR+410+Chinook+Pass+and+SR+123+Cayuse+Pass+Temporarily.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/WSDOT+Closes+SR+410+Chinook+Pass+and+SR+123+Cayuse+Pass+Temporarily.htm</guid>
      <description>WSDOT Closes SR 410 (Chinook Pass) and SR 123 (Cayuse Pass) Temporarily</description>
    </item>
    <item>
      <title>WSDOT Announces Funding for 36 Transportation Enhancement Projects</title>
      <pubDate>Wed, 28 Nov 2007 08:05:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/27_EnhancementProjects.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/27_EnhancementProjects.htm</guid>
      <description>Transportation Secretary Paula Hammond today announced the selection of 36 projects across the state that will receive a total of almost $15 million in federal transportation enhancement funding.</description>
    </item>
    <item>
      <title>Wire Thieves Strike Again on SR 16, More Lights Out</title>
      <pubDate>Wed, 28 Nov 2007 06:13:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/11_27_ThievesStrikeSR16.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/11_27_ThievesStrikeSR16.htm</guid>
      <description>Wire Thieves Strike Again on SR 16, More Lights Out</description>
    </item>
    <item>
      <title>WSDOT crews on the job with winter road duties</title>
      <pubDate>Wed, 28 Nov 2007 02:09:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/27_EasternRegionWinter.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/27_EasternRegionWinter.htm</guid>
      <description>WSDOT crews on the job with winter road duties</description>
    </item>
    <item>
      <title>SR 302 Public Meetings Scheduled in Gig Harbor and Vaughn</title>
      <pubDate>Wed, 28 Nov 2007 01:25:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/27_302_DecPublicMtgs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/27_302_DecPublicMtgs.htm</guid>
      <description>In December, WSDOT will hold two public meetings regarding the SR 302 study.</description>
    </item>
    <item>
      <title>Expect Daytime Single Lane Closures &amp; Rolling Slowdowns on I-5 Northbound, North of the Vancouver, Dec. 4, 5, 6 &amp; 8</title>
      <pubDate>Wed, 28 Nov 2007 01:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/27_I5SR502Girders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/27_I5SR502Girders.htm</guid>
      <description>VANCOUVER – As crews work to install bridge girders that will span I-5 for the new SR 502 Interchange, motorists can expect daytime single-lane closures and rolling slowdowns Dec. 4, 5, 6 and 8.</description>
    </item>
    <item>
      <title>WSDOT Hosts US 97, Biggs Bridge Open House Dec. 4</title>
      <pubDate>Wed, 28 Nov 2007 01:13:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/27_US97BiggsOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/27_US97BiggsOpenHouse.htm</guid>
      <description>GOLDENDALE – An opportunity to learn more about construction during the US 97, Biggs Bridge Deck Replacement will take place Dec. 4, from 4 p.m. to 7 p.m. at the Rufus Community Center.</description>
    </item>
    <item>
      <title>I-90 Eastbound Detoured at Easton Tue. Nov. 27</title>
      <pubDate>Tue, 27 Nov 2007 08:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/I-90+Eastbound+Detoured+at+Easton+Tue.+Nov.+27.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/I-90+Eastbound+Detoured+at+Easton+Tue.+Nov.+27.htm</guid>
      <description>WSDOT Detours Eastbound I-90 Traffic at Easton Tuesday, Nov. 27th starting at 3:50 p.m.

New I-90 Easton Bridge Girders to be Set Overnight While Traffic is Light</description>
    </item>
    <item>
      <title>Thanksgiving 2007 Urban Roadways Busy While Cross-State Flows on Heaviest Travel Weekend of Year</title>
      <pubDate>Tue, 27 Nov 2007 07:50:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/thanksgiving_2007_recap.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/thanksgiving_2007_recap.htm</guid>
      <description>OLYMPIA – Urban drivers endured their fair share of the holiday stop-and-go while cross-state travel flowed smooth on the busiest travel weekend of the year.</description>
    </item>
    <item>
      <title>WSDOT Strengthens Freight Systems Division Management Team</title>
      <pubDate>Tue, 27 Nov 2007 07:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/26_freightappointments.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/26_freightappointments.htm</guid>
      <description>WSDOT announces its management team is complete for the new Freight Systems Division: Dale A. Tabat, George Xu, and Vickie Sheehan.</description>
    </item>
    <item>
      <title>WSDOT Invites Public Comment on Draft Communication Plan for Long-Term Air Study</title>
      <pubDate>Tue, 27 Nov 2007 01:03:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/PhaseIIICommPlanPublicComment.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/PhaseIIICommPlanPublicComment.htm</guid>
      <description>The Washington State Department Transportation (WSDOT) Aviation wants your input on the Long-Term Air Transportation Study (LATS), Phase III Draft Communication Plan.</description>
    </item>
    <item>
      <title>Port Townsend/Keystone Passenger-Only Schedule Updated to Meet Transit</title>
      <pubDate>Mon, 26 Nov 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/pt-townsendkeystone-passenger-only-schedule.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/pt-townsendkeystone-passenger-only-schedule.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Passenger-Only Ferry Service Begins on Port Townsend/Keystone Route Effective Sunday, Nov 25</title>
      <pubDate>Sun, 25 Nov 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/passenger-only-service-begins-at-port-townsend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/passenger-only-service-begins-at-port-townsend.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Removes Trees on I-5 South of Olympia, Enhances Safety</title>
      <pubDate>Sun, 25 Nov 2007 10:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/24_5_treeremoval.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/24_5_treeremoval.htm</guid>
      <description>WSDOT crews will remove trees on I-5 south of Olympia this week.</description>
    </item>
    <item>
      <title>I-90 Traffic Cameras Near Cle Elum Available Just in Time for Holiday Travel</title>
      <pubDate>Thu, 22 Nov 2007 07:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/EastonTrafficCameraNov07.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/EastonTrafficCameraNov07.htm</guid>
      <description>WSDOT traffic engineers and information technicians worked quickly to put portable traffic cameras on I-90 near Cle Elum where traffic back ups begin during holiday weekends. These camera images will make it easy to see how long back ups are in the Cle Elum area.</description>
    </item>
    <item>
      <title>Paving North of the Border Closes One Lane for U.S. Bound Drivers</title>
      <pubDate>Thu, 22 Nov 2007 06:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/21_99britishcolumbiahighwaypaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/21_99britishcolumbiahighwaypaving.htm</guid>
      <description>British Columbia construction crews are paving just north of the I-5 border crossing. U.S. bound drivers are advised to use alternate southbound border crossings.</description>
    </item>
    <item>
      <title>Thieves Darken Tacoma Freeway</title>
      <pubDate>Thu, 22 Nov 2007 06:33:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/10_21ThievesDarkenTacomaFreeway.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/10_21ThievesDarkenTacomaFreeway.htm</guid>
      <description>Thieves Darken Tacoma Freeway</description>
    </item>
    <item>
      <title>Tacoma Narrows Bridge Citizen Advisory Committee</title>
      <pubDate>Thu, 22 Nov 2007 05:14:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/10_21TNBCitizenAdvsioryMeeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/10_21TNBCitizenAdvsioryMeeting.htm</guid>
      <description>Tacoma Narrows Bridge Citizen Advisory Committee 
Holds Meeting</description>
    </item>
    <item>
      <title>Holiday Shoppers Rush to Puget Sound Roads; WSDOT and WSP Work Together to Keep Drivers Safe and Moving</title>
      <pubDate>Thu, 22 Nov 2007 03:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/21_HolidayShoppingRushFriday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/21_HolidayShoppingRushFriday.htm</guid>
      <description>New stores, favorite holiday hotspots and a stronger Canadian loonie are expected to bring more traffic to the greater Puget Sound region starting at 12:01 a.m. Friday morning when the holiday shopping season begins. WSDOT and WSP remind drivers to pack their patience and plan ahead to ensure they reach their destinations quickly and safely.</description>
    </item>
    <item>
      <title>Port Townsend-Keystone Ferry Route Closed</title>
      <pubDate>Wed, 21 Nov 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/port-townsend-keystone-ferry-route-closed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/port-townsend-keystone-ferry-route-closed.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Steel Electric Ferries Pulled from Service For Port Townsend to Keystone</title>
      <pubDate>Wed, 21 Nov 2007 10:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/20_steelelectricferriesoutofservice.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/20_steelelectricferriesoutofservice.htm</guid>
      <description>Washington State Ferries (WSF) will pull all Steel Electric class vessels out of service after they complete their last run today (Nov. 20). This decision means that the Port Townsend-Keystone car ferry route will be closed beginning tomorrow (Nov. 21) until further notice.</description>
    </item>
    <item>
      <title>SR 123 (Cayuse Pass) in Mount Rainier National Park Reopening Wednesday</title>
      <pubDate>Wed, 21 Nov 2007 08:02:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/20_SR123ReopensWednesday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/20_SR123ReopensWednesday.htm</guid>
      <description>A section of State Route 123 within Mount Rainier National Park will reopen at noon this Wednesday, just in time for the Thanksgiving holiday.  

The highway has been closed from the SR 410/SR 123 junction to Stevens Canyon Road since Tuesday, Nov. 13, after several large rocks fell onto the highway from the hillside above the northbound lane.</description>
    </item>
    <item>
      <title>Steel Electric Ferries Pulled from Service</title>
      <pubDate>Tue, 20 Nov 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/steel-electric-ferries-pulled-from-service.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/steel-electric-ferries-pulled-from-service.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Tally System to Begin November 21 at Edmonds Ferry Terminal</title>
      <pubDate>Tue, 20 Nov 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/tally-system-at-edmonds-ferry-terminal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/tally-system-at-edmonds-ferry-terminal.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Amtrak Cascades adds more equipment for busy Thanksgiving travel week</title>
      <pubDate>Tue, 20 Nov 2007 01:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/19_ATKThanksgivingschedule.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/19_ATKThanksgivingschedule.htm</guid>
      <description>SEATTLE — Anticipating the busiest travel week of the year, Amtrak Cascades is planning ahead for Thanksgiving by adding more cars to its trains and encouraging passengers traveling throughout the Pacific Northwest to make their reservations now.</description>
    </item>
    <item>
      <title>WSDOT Regional Mobility Grants Help Clark County Commuters</title>
      <pubDate>Sat, 17 Nov 2007 04:56:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/16_CTRANMobilityGrant.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/16_CTRANMobilityGrant.htm</guid>
      <description>VANCOUVER– Clark County C-TRAN (Transit System) officials held a ribbon-cutting on Friday, Nov. 16 to celebrate the completion of the new 99th Street Transit Center and expanded bus service. These projects were paid for in part through $1.19 million in WSDOT Regional Mobility Grants.</description>
    </item>
    <item>
      <title>WSDOT Promises to Restore Interstate Access to Easton Families by mid-December</title>
      <pubDate>Sat, 17 Nov 2007 03:03:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/openhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/openhouse.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Releases Final Report on US 2 Corridor Study</title>
      <pubDate>Fri, 16 Nov 2007 05:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/15_US2RDPRelease.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/15_US2RDPRelease.htm</guid>
      <description>Today, WSDOT released the final report on an eighteen-month safety and mobility study of US 2 between Snohomish and Skykomish. The recommendations of the study have been approved by WSDOT planners and executives and adopted by the Corridor Working Group, which represented local agencies and communities along US 2 during the study.</description>
    </item>
    <item>
      <title>Holiday Travel Tips: Enjoy Family Time, Plan Ahead and Check Best Times to Travel</title>
      <pubDate>Fri, 16 Nov 2007 04:54:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/_thanksgiving_travel_tips.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/_thanksgiving_travel_tips.htm</guid>
      <description>OLYMPIA – Enjoy your time with family and friends more by checking the road reports before you go. With expanded information on the WSDOT Website, drivers can find the best time to travel Washington highways over Thanksgiving weekend.</description>
    </item>
    <item>
      <title>Less Congestion Expected at Nation's Fourth Busiest Commercial Border Crossing</title>
      <pubDate>Thu, 15 Nov 2007 05:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/14_sr543newtrucklanesopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/14_sr543newtrucklanesopen.htm</guid>
      <description>New designated truck lanes will help improve freight mobility and relieve congestion on State Route 543, the nation’s fourth busiest commercial crossing on the U.S.-Canada border. The relief comes approximately six months early for more than 700,000 trucks that use the crossing every year.</description>
    </item>
    <item>
      <title>WSDOT Engineers Explain How the Easton Bridge Will Be Restored</title>
      <pubDate>Thu, 15 Nov 2007 00:34:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/I90EastonOpenHouseNov07.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/I90EastonOpenHouseNov07.htm</guid>
      <description>In the early morning of October 31, a truck carrying an over-sized pipe collided with and severely damaged one of only two bridges serving the community of Easton from Interstate 90.</description>
    </item>
    <item>
      <title>I-90 Easton Bridge Work Begins Expect Delays</title>
      <pubDate>Wed, 14 Nov 2007 23:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/I-90lanerestrictionsinEaston.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/I-90lanerestrictionsinEaston.htm</guid>
      <description>I-90 Easton Bridge Repair Work Begins Wednesday, Nov. 14, Expect Delays Eastbound</description>
    </item>
    <item>
      <title>TNB Traffic Revision Scheduled; New Bike Path to Open</title>
      <pubDate>Wed, 14 Nov 2007 08:16:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/13_NewBikePath.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/13_NewBikePath.htm</guid>
      <description>GIG HARBOR – WSDOT announced today that the much-anticipated bicycle and pedestrian path on the south side of the new Tacoma Narrows Bridge will be open for public use on Saturday, Nov. 17.</description>
    </item>
    <item>
      <title>WSDOT Crews are Ready for Afternoon Commute</title>
      <pubDate>Tue, 13 Nov 2007 07:15:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/12_VetDayStorm.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/12_VetDayStorm.htm</guid>
      <description>Winds are beginning to die down in Puget Sound after a morning of big gusts and some sustained winds. WSDOT crews will continue to be out in force into the evening commute ready to clear downed trees, clogged drains, roadway obstructions and, of course, deal with Seahawks traffic.</description>
    </item>
    <item>
      <title>Thieves cause dangerous signal outage at I-5 off-ramp in Pierce County</title>
      <pubDate>Tue, 13 Nov 2007 07:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/11_12_I5DarkSignal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/11_12_I5DarkSignal.htm</guid>
      <description>Thieves cause dangerous signal outage at I-5 off-ramp</description>
    </item>
    <item>
      <title>WSDOT Crews Working Through Wind Storm to Keep Traffic Moving</title>
      <pubDate>Tue, 13 Nov 2007 04:07:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/12_VetDay2007Storm.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/12_VetDay2007Storm.htm</guid>
      <description>WSDOT crews are out in force to keep traffic moving during the Veteran’s Day 2007 storm.  Peak winds are forecasted between 10 a.m. and 1 p.m. today in the Central Puget Sound region and crews are amassed, poised and ready to respond to downed trees and power lines, clogged drains and other roadway obstructions.</description>
    </item>
    <item>
      <title>I-90 Snoqualmie Pass Travel Alert</title>
      <pubDate>Tue, 13 Nov 2007 03:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/I-90veteransdaytravelalert.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/I-90veteransdaytravelalert.htm</guid>
      <description>First Snow on I-90 Snoqualmie Pass Slows Holiday Traffic at the Summit

Restrictions Lifted, Speed Limits restored, Web Pages and Cameras Back to Normal</description>
    </item>
    <item>
      <title>New Signs Being Installed on SR 16 Related to Tolls</title>
      <pubDate>Sat, 10 Nov 2007 05:45:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/09_NewSignsfortolls.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/09_NewSignsfortolls.htm</guid>
      <description>New signs being installed on SR 16 related to tolls.</description>
    </item>
    <item>
      <title>Expect Nighttime Closures of SR 14 Eastbound On-Ramps, near I-5, Nov. 13-14</title>
      <pubDate>Fri, 09 Nov 2007 05:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/08_SR14RampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/08_SR14RampClosure.htm</guid>
      <description>VANCOUVER - Nighttime closures of the State Route 14 eastbound on-ramp from I-5, in both directions, will take place the nights of Nov. 13 and Nov. 14.</description>
    </item>
    <item>
      <title>US 97, Biggs Bridge Project Begins in December, Complete Closure Begins Jan. 2</title>
      <pubDate>Fri, 09 Nov 2007 03:34:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/08_US97Biggs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/08_US97Biggs.htm</guid>
      <description>GOLDENDALE – A project that will replace the US 97, Biggs Bridge concrete deck will begin this December.</description>
    </item>
    <item>
      <title>Washington State Transportation Commission and Opinion Research Northwest Recruits for Group Discussions</title>
      <pubDate>Thu, 08 Nov 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/transportation-commission-and-opinion-research-nw-recruits-for-g.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/transportation-commission-and-opinion-research-nw-recruits-for-g.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Public Meetings to Discuss San Juan Island Scenic Byway Designation</title>
      <pubDate>Thu, 08 Nov 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/public-meetings-to-discuss-san-juan-island-scenic-byway-designat.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/public-meetings-to-discuss-san-juan-island-scenic-byway-designat.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Trail Work Begins on 124th Street Pedestrian Bridge in Everett</title>
      <pubDate>Thu, 08 Nov 2007 09:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/7_I5124thOverpassConstructionStarts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/7_I5124thOverpassConstructionStarts.htm</guid>
      <description>On Nov. 5, WSDOT, Snohomish County and contractor Marshbank Construction Inc. started work to connect the 124th Street bicycle and pedestrian overpass to the Interurban trail in south Everett. Crews plan to work through the winter to have the trail open by spring 2008.</description>
    </item>
    <item>
      <title>Veteran's Day Weekend Highway Advisory: Time to Prepare for Winter Driving</title>
      <pubDate>Thu, 08 Nov 2007 05:49:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/07_veterans_weekend_travel.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/07_veterans_weekend_travel.htm</guid>
      <description>OLYMPIA – The weather may seem mild compared to the heavy rains we faced one year ago, but wintry weather has arrived in Washington and WSDOT crews have shifted to winter operations, ready to respond 24 hours per day, 7 days per week. 

Weather reports indicate rain and lower temperatures across the state as we head into the Veteran’s Day weekend. A rain/snow mix is expected on mountain pass highways throughout the weekend.</description>
    </item>
    <item>
      <title>SR 20 Sharpes Corner Open House Nov. 15 - Options Displayed, Public Invited to Comment</title>
      <pubDate>Thu, 08 Nov 2007 04:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/_7SharpesCornerOpen+House.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/_7SharpesCornerOpen+House.htm</guid>
      <description>WSDOT will host an open house Nov. 15 to discuss options to reduce congestion and collisions on SR 20 at Sharpes Corner.</description>
    </item>
    <item>
      <title>SR 542 Closed East of Glacier for Cutting Hazardous Trees</title>
      <pubDate>Thu, 08 Nov 2007 00:55:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/07_sr542dangeroustreeremoval.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/07_sr542dangeroustreeremoval.htm</guid>
      <description>Crews will close lanes to remove dangerous trees next to Mount Baker Highway.</description>
    </item>
    <item>
      <title>Port Townsend/Keystone November Tide Cancellations</title>
      <pubDate>Wed, 07 Nov 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/port-townsendkeystone-november-tide-cancellations.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/port-townsendkeystone-november-tide-cancellations.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSF announces service plans for November</title>
      <pubDate>Wed, 07 Nov 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/wsf-announces-service-plans-for-november.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/wsf-announces-service-plans-for-november.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Awards Innovative Projects to Reduce Trips</title>
      <pubDate>Wed, 07 Nov 2007 07:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/04_TRPPProjectsReduceTrips.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/04_TRPPProjectsReduceTrips.htm</guid>
      <description>Washington State Department of Transportation (WSDOT) announces 14 new projects for the 2007-2009 Trip Reduction Performance (TRPP) Program. With an additional $1 million provided by the Washington State Legislature in 2007, WSDOT was able to award a second round of projects to improve the transportation system by helping employees get to work using fewer vehicles.</description>
    </item>
    <item>
      <title>WSDOT Lowers Speed Limit on 505 in Vicinity of Winlock</title>
      <pubDate>Wed, 07 Nov 2007 00:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/06_SR505SpeedRevision.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/06_SR505SpeedRevision.htm</guid>
      <description>CHEHALIS – Starting Thursday, November 8, motorists traveling on SR 505 in Winlock will notice a lowered speed limit, cautioned Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Wed, 07 Nov 2007 00:08:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/06_SR520MonthlyMaintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/06_SR520MonthlyMaintenance.htm</guid>
      <description>WSDOT bridge crews will conduct monthly maintenance work on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>Ramps Bring Relief to Kitsap County Drivers</title>
      <pubDate>Tue, 06 Nov 2007 08:33:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/5_3_WaagaRampsOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/5_3_WaagaRampsOpen.htm</guid>
      <description>The SR 3/303 Waaga project will open two ramps in the next few days.</description>
    </item>
    <item>
      <title>Crews Transform SR 9 in Woodinville; Two New Lanes Open</title>
      <pubDate>Mon, 05 Nov 2007 04:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/4_SR9NewLanesOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/4_SR9NewLanesOpen.htm</guid>
      <description>This afternoon, drivers on State Route 9 from Woodinville to Maltby are enjoying a new four-lane divided highway, nearly six months ahead of schedule.</description>
    </item>
    <item>
      <title>I-405 Renton Stage I Widening Project Construction Updates Nov. 3 – Nov. 10</title>
      <pubDate>Sat, 03 Nov 2007 02:45:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/2_RentonUpdatesNov2.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/2_RentonUpdatesNov2.htm</guid>
      <description>Next week, crews working for the Washington State Department of Transportation will restripe the highway on southbound SR 167.</description>
    </item>
    <item>
      <title>Formal Swearing in for Paula Hammond</title>
      <pubDate>Sat, 03 Nov 2007 02:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/Swearingin_11.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/Swearingin_11.htm</guid>
      <description>Gov. Christine Gregoire will formally appoint Paula Hammond as Washington State Transportation Secretary during a brief swearing in ceremony Monday in Olympia.</description>
    </item>
    <item>
      <title>US 12 Back to Normal Evenings and Weekends</title>
      <pubDate>Sat, 03 Nov 2007 00:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/US12backtonormalnov07.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/US12backtonormalnov07.htm</guid>
      <description>WSDOT Returns Evening and Weekend Traffic Back to Normal on US 12 Near White Pass

WHITE PASS – At 3 p.m. today, both lanes of US 12 will be open to traffic and back to normal - at night and on weekends.
WSDOT construction inspectors and the contractor have stabilized the slopes above US 12 in two locations near White Pass to the point where flaggers will no longer be needed 24 hours per day and both lanes will be open on evenings and weekends.</description>
    </item>
    <item>
      <title>New Turn Lanes Open on SR 169 near Maple Valley</title>
      <pubDate>Sat, 03 Nov 2007 00:29:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/2_SR169NewTurnLane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/2_SR169NewTurnLane.htm</guid>
      <description>A safety improvement on State Route 169 will help drivers in southeast King County.  WSDOT crews have opened new turn lanes to and from SE 288th Street near Maple Valley.</description>
    </item>
    <item>
      <title>Fresh Pavement, Bright Stripes on SR 532 Near Stanwood</title>
      <pubDate>Sat, 03 Nov 2007 00:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/2_SR532PavingComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/2_SR532PavingComplete.htm</guid>
      <description>After weeks of waiting for dry weather, crews have finished repairing four miles of SR 532 between 72nd Ave NW and Old SR 99.  Travelers headed on SR 532 just east of Stanwood have a new, safer and smoother driving surface.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Nov. 2 - 9</title>
      <pubDate>Fri, 02 Nov 2007 23:30:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/2_KirklandUpdatesNov2.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/2_KirklandUpdatesNov2.htm</guid>
      <description>Next week crews working for the Washington State Department of Transportation plan to finish striping the roadway and ramps between NE 85th and NE 124th Streets; test pavement; work on the drainage system; clean up the roadway; and pave the southbound I-405 off-ramp to NE 85th Street.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Nov. 2 – 9</title>
      <pubDate>Fri, 02 Nov 2007 23:24:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/2_BellevueUpdatesNov2.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/2_BellevueUpdatesNov2.htm</guid>
      <description>Next week, drivers may notice columns rising out of the ground as crews working for WSDOT build the new I-405 bridge over I-90. Crews will also repair pavement on northbound and southbound I-405 in South Bellevue; work to widen the Coal Creek Parkway bridge; perform electrical work; and plant native plants at the restored wetland at Kelsey Creek Park.</description>
    </item>
    <item>
      <title>I-5 Traffic Plans at Canada Border Delayed for a Month</title>
      <pubDate>Fri, 02 Nov 2007 21:35:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/02_i5peacearchworkdelayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/02_i5peacearchworkdelayed.htm</guid>
      <description>The federal government's major traffic shift planned for Nov. 5 at the I-5 Peace Arch border crossing in Blaine has been delayed up to four weeks.</description>
    </item>
    <item>
      <title>Amtrak Cascades Ridership Continues to Grow</title>
      <pubDate>Fri, 02 Nov 2007 04:56:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/1_AmtrakCascadesRidership.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/1_AmtrakCascadesRidership.htm</guid>
      <description>ANNUAL AMTRAK RIDERSHIP SETS ALL-TIME RECORD; FIFTH STRAIGHT YEAR OF INCREASES
Amtrak Cascades Ridership Continues to Grow</description>
    </item>
    <item>
      <title>WSDOT Opens I-90 Lanes in Easton to Traffic after Successful Overnight Emergency Bridge Demolition</title>
      <pubDate>Fri, 02 Nov 2007 01:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/01_I-90BridgeDemo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/01_I-90BridgeDemo.htm</guid>
      <description>Twenty-four hours after an over-height load raked and ruined the underside of an overpass on eastbound I-90 at Easton, all lanes were reopened to traffic. “We opened the road at the Cabin Creek exit to cars and trucks this morning at 3:45,” said Bob Hooker, WSDOT project Engineer.</description>
    </item>
    <item>
      <title>Gibson Road Paving and Striping Continues in Early November</title>
      <pubDate>Fri, 02 Nov 2007 00:46:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/11/01_I5GibsonRD.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/11/01_I5GibsonRD.htm</guid>
      <description>TENINO – Single lane closures will continue to take place this week and next week, as crews complete paving and striping work on Gibson Road in Thurston County, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>WSDOT Invites Contractors to an Open House in Ellensburg</title>
      <pubDate>Thu, 01 Nov 2007 07:01:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/103107ContractorOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/103107ContractorOpenHouse.htm</guid>
      <description>North and South Central Regions are holding an open house for contractors at CWU in Ellensburg on November 5th.</description>
    </item>
    <item>
      <title>The Iron Goat Interpretive Site Closes for Winter November 1st</title>
      <pubDate>Thu, 01 Nov 2007 06:55:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/103107US2IronGoatInterpretiveSiteCloses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/103107US2IronGoatInterpretiveSiteCloses.htm</guid>
      <description>The US 2 - Iron Goat Trail Interpretive Site near Stevens Pass is closing for the winter November 1st.</description>
    </item>
    <item>
      <title>WSDOT Crews Demolished I-90 Easton Bridge Overnight</title>
      <pubDate>Wed, 31 Oct 2007 23:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/EastonBridgeDamageOctober07.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/EastonBridgeDamageOctober07.htm</guid>
      <description>The turn of events on Interstate 90 eastbound at Easton has gone rather quickly today as WSDOT construction engineers wrestled with the tough decision to shut down I-90 and demolish part of the interchange bridge at Easton (milepost 71) after an oversized load caused significant damage early this morning.</description>
    </item>
    <item>
      <title>A New Traffic Camera for Stevens Pass</title>
      <pubDate>Wed, 31 Oct 2007 06:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/103007WStevensCamera.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/103007WStevensCamera.htm</guid>
      <description>The state's newest traffic camera is at the Stevens Pass summit.</description>
    </item>
    <item>
      <title>WSDOT Joins Multi-agency Group to Take Winter by Storm</title>
      <pubDate>Wed, 31 Oct 2007 02:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/30_TakeWinterByStorm.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/30_TakeWinterByStorm.htm</guid>
      <description>“Preparing for winter and getting through tough storms is a team effort,” said Lorena Eng, WSDOT Regional Administrator. “Agencies must work together and the public must do their part.”</description>
    </item>
    <item>
      <title>Governor, WSDOT and Community Open New I-405 Lanes in Kirkland: On-Time and On-Budget</title>
      <pubDate>Wed, 31 Oct 2007 01:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/30_I-405KirklandLaneOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/30_I-405KirklandLaneOpen.htm</guid>
      <description>Today, Gov. Chris Gregoire, opened new lanes and an improved interchange on I-405 in Kirkland.</description>
    </item>
    <item>
      <title>New Memorial Marker Installed at WSDOT Rest Area</title>
      <pubDate>Tue, 30 Oct 2007 04:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/BlueStarMemorialMarkerOctober2007.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/BlueStarMemorialMarkerOctober2007.htm</guid>
      <description>Dozens attended the dedication of two Blue Star Memorial Highway markers on October 5, 2007 at WSDOT’s Indian John Rest Stop on Interstate 90.</description>
    </item>
    <item>
      <title>Aviation Planning Council Holds First Meeting on November 1</title>
      <pubDate>Tue, 30 Oct 2007 00:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/29_AviationPlanningCouncil1stMtg.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/29_AviationPlanningCouncil1stMtg.htm</guid>
      <description>On November 1, 2007 members of the Governor appointed Aviation Planning Council will meet for the first time to begin the final phase of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>I-405 Renton Stage I Widening Project Construction Updates Oct. 27 – Nov. 3</title>
      <pubDate>Sat, 27 Oct 2007 03:39:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/26_405RentonWidening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/26_405RentonWidening.htm</guid>
      <description></description>
    </item>
    <item>
      <title>New SR 20 Signal at Thompson Road Turned On near Anacortes</title>
      <pubDate>Sat, 27 Oct 2007 01:10:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/23_ThompsonRoadSignal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/23_ThompsonRoadSignal.htm</guid>
      <description>A new signal was installed at the intersection of SR 20 and Thompson Road in Anacortes this summer, and turned on Oct. 23.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Oct. 26- Nov. 2</title>
      <pubDate>Fri, 26 Oct 2007 08:41:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_KirklandUpdatesOct26.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/25_KirklandUpdatesOct26.htm</guid>
      <description>Next week crews working for the Washington State Department of Transportation plan to stripe the roadway and ramps between NE 85th and NE 132nd Streets.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Oct. 26 – Nov. 2</title>
      <pubDate>Fri, 26 Oct 2007 08:36:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_BellevueUpdatesOct26.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/25_BellevueUpdatesOct26.htm</guid>
      <description>Next week, drivers will begin to see the columns begin to rise out of the ground for the new bridge over I-90. Crews will continue repairing pavement on northbound and southbound I-405 in South Bellevue; widening the Coal Creek Parkway bridge; and performing electrical work. Crews will also continue to build retaining walls between 112th Ave SE and Coal Creek Parkway.</description>
    </item>
    <item>
      <title>Water Line Repairs at the SR 401, Dismal Nitch Rest Area Complete</title>
      <pubDate>Fri, 26 Oct 2007 06:48:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_25_SR401DismalNitch.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/10_25_SR401DismalNitch.htm</guid>
      <description>NASELLE – Crews have completed repairs to the water line at the SR 401, Dismal Nitch Rest Area. The rest area facilities have now reopened, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Restriping at Eastbound I-90/SR 18 Exit in Snoqualmie</title>
      <pubDate>Fri, 26 Oct 2007 06:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_I90LaneRestriping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/25_I90LaneRestriping.htm</guid>
      <description>SNOQUALMIE –  Crews working for WSDOT will restripe freeway and ramp lanes at the eastbound Interstate 90 exit to State Route 18 this weekend.  The restriping will address an emerging safety issue and will help keep traffic moving at the exit.  

At 5 a.m. on Saturday, Oct. 27, crews will close the two right lanes of eastbound I-90 at SR 18 to complete this work.  The lanes will reopen at 9 p.m. Saturday.  The eastbound I-90 exit to SR 18 will remain open.  Restriping requires dry weather.  If</description>
    </item>
    <item>
      <title>Saturday Shaping Up to be Busy Day for I-5 Everett HOV Construction Work, Drivers Should Expect Some Delays</title>
      <pubDate>Fri, 26 Oct 2007 06:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_I5EverettSatRampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/25_I5EverettSatRampClosures.htm</guid>
      <description>This Saturday, Oct. 27, construction crews plan to take advantage of the forecasted dry weather to pave most of the I-5 ramps between Everett’s 41st Street and Marine View Dr. This work will be rescheduled if it rains. Drivers should plan extra time for their trips, particularly those heading to US 2.</description>
    </item>
    <item>
      <title>WSDOT Seattle Area Traffic Computer Gets an Upgrade</title>
      <pubDate>Fri, 26 Oct 2007 01:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_SeattleAreaTrafficComputer.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/25_SeattleAreaTrafficComputer.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Major Construction Starts at I-5 Peace Arch Border Crossing</title>
      <pubDate>Thu, 25 Oct 2007 23:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_i5majorborderconstruction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/25_i5majorborderconstruction.htm</guid>
      <description>Major construction starts at the I-5, Peace Arch border crossing Nov. 5 and will last for three years. Drivers should expect delays.</description>
    </item>
    <item>
      <title>WSDOT Hosts Business Open House for Contractors Interested in Upcoming Construction Projects</title>
      <pubDate>Thu, 25 Oct 2007 06:20:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/OpenHouseforContractors.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/OpenHouseforContractors.htm</guid>
      <description>WSDOT Hosts Business Open House for Contractors Interested in Upcoming Construction Projects</description>
    </item>
    <item>
      <title>Routine Inspections Close SR 303’s Manette Bridge Next Week</title>
      <pubDate>Thu, 25 Oct 2007 06:01:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_24_RoutineInspectionManette.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/10_24_RoutineInspectionManette.htm</guid>
      <description>Routine Inspections Close SR 303’s Manette Bridge Next Week</description>
    </item>
    <item>
      <title>Northbound SR 167 Off-Ramp in Kent Closed this Weekend</title>
      <pubDate>Thu, 25 Oct 2007 05:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/24_SR167RampAndLaneClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/24_SR167RampAndLaneClosure.htm</guid>
      <description>Safety upgrade work will close a State Route 167 off-ramp this weekend in downtown Kent.</description>
    </item>
    <item>
      <title>Chains Onboard: WSDOT and WSP Working Together to Keep Mountain Pass Drivers Safe</title>
      <pubDate>Thu, 25 Oct 2007 01:29:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/24_chains_on_mountains.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/24_chains_on_mountains.htm</guid>
      <description>OLYMPIA – If the early dusting of mountain snow doesn’t serve as an important reminder to drivers of passenger cars and heavy trucks to carry chains, a $500 ticket may do the trick.</description>
    </item>
    <item>
      <title>WSF CEO RETIRES AFTER 34 YEARS OF SERVICE</title>
      <pubDate>Wed, 24 Oct 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/wsf-ceo-retires.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/wsf-ceo-retires.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Amtrak Cascades Service Resumes Normal Operations: All Trainsets Repaired and Back in Service</title>
      <pubDate>Wed, 24 Oct 2007 06:48:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_AmtrakCascadesTalgoTrains.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/10_AmtrakCascadesTalgoTrains.htm</guid>
      <description>Amtrak Cascades Service Resumes Normal Operations: All Trainsets Repaired and Back in Service</description>
    </item>
    <item>
      <title>Safety Concerns Close Murray Morgan Bridge</title>
      <pubDate>Wed, 24 Oct 2007 04:54:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/23_MurrayMorganBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/23_MurrayMorganBridge.htm</guid>
      <description>TACOMA – After informing City of Tacoma officials, the Washington State Department of Transportation announced today that the 94-year old Murray Morgan Bridge in Tacoma is closed to all vehicular traffic effective immediately.</description>
    </item>
    <item>
      <title>Reminder:  I-5 Everett Widening Project to Close Northbound I-5 Tonight</title>
      <pubDate>Wed, 24 Oct 2007 03:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/23_NBI5EverettClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/23_NBI5EverettClosure.htm</guid>
      <description>If the weather remains dry tonight, crews working on the I-5 Everett HOV freeway expansion project will close northbound I-5 at the SR 526 interchange.  All traffic will use a short detour by exiting at SR 527 and back to northbound I-5 at the on-ramp from SR 527.  Late night drivers should plan extra time into their trips.</description>
    </item>
    <item>
      <title>Tacoma Narrows Bridge Citizen Advisory Committee to Meet</title>
      <pubDate>Tue, 23 Oct 2007 23:59:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/23_16_TNB_advisory_committee.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/23_16_TNB_advisory_committee.htm</guid>
      <description>Tacoma Narrows Bridge Citizen Advisory Committee to Meet</description>
    </item>
    <item>
      <title>Eastbound SR 16 Lane Closures Scheduled Near Toll Plaza</title>
      <pubDate>Tue, 23 Oct 2007 23:47:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/23_16_Lane_Closures_TollPlaza.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/23_16_Lane_Closures_TollPlaza.htm</guid>
      <description>All traffic on eastbound State Route 16 will be diverted through the toll plaza during night hours this Tuesday and Wednesday for maintenance on the electronic toll equipment.</description>
    </item>
    <item>
      <title>WSDOT is One Step Closer to Completing Four-lane US 12 Corridor</title>
      <pubDate>Tue, 23 Oct 2007 01:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/US12RibbonCuttingOctober07.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/US12RibbonCuttingOctober07.htm</guid>
      <description>WSDOT is one step closer to completing four-lane corridor from Pasco to Walla Walla.</description>
    </item>
    <item>
      <title>Transportation Secretary Paula Hammond Announces Appointments</title>
      <pubDate>Mon, 22 Oct 2007 22:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/19-Appointments.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/19-Appointments.htm</guid>
      <description>Washington State Department of Transportation Secretary Paula Hammond announces organizational changes and appointements.</description>
    </item>
    <item>
      <title>Water Line Repairs at the SR 401, Dismal Nitch Rest Area Begin Next Week</title>
      <pubDate>Sat, 20 Oct 2007 04:33:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/19_SR401Repairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/19_SR401Repairs.htm</guid>
      <description>NASELLE – Repairs to the water line at the State Route 401 Dismal Nitch Rest Area will begin early next week, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Closures on SR 512 Next Week</title>
      <pubDate>Sat, 20 Oct 2007 04:30:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_19_SR512Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/10_19_SR512Closures.htm</guid>
      <description>Closures on SR 512 Next Week</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Oct. 19 – 26</title>
      <pubDate>Sat, 20 Oct 2007 04:15:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/19_BellevueUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/19_BellevueUpdates.htm</guid>
      <description>Next week, crews will continue repairing pavement on northbound and southbound I-405 in South Bellevue; widening the Coal Creek Parkway bridge; preparing to build piers for the new bridge over I-90; and performing electrical work.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Oct. 19-26</title>
      <pubDate>Sat, 20 Oct 2007 04:10:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/19_KirklandUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/19_KirklandUpdates.htm</guid>
      <description>Next week crews working for the Washington State Department of Transportation plan to stripe the roadway and ramps between NE 85th and NE 132nd Streets.</description>
    </item>
    <item>
      <title>I-405 Renton Stage I Widening Project Construction Updates Oct. 20 - Oct. 27</title>
      <pubDate>Sat, 20 Oct 2007 04:06:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/19_RentonUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/19_RentonUpdates.htm</guid>
      <description>Next week, crews working for the Washington State Department of Transportation will grade and pave the highway shoulder on southbound SR 167. Alternatively, if rain does not allow paving, crews will conduct electrical work.</description>
    </item>
    <item>
      <title>No New Settlement Found in Weekend Inspection of Alaskan Way Viaduct</title>
      <pubDate>Fri, 19 Oct 2007 22:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/ViaductResults-10182007.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/ViaductResults-10182007.htm</guid>
      <description>Inspection results released today show no additional settlement of the Alaskan Way Viaduct between Columbia Street and Yesler Way, and no new structural damage. However, the viaduct continues to show signs of aging and deterioration.</description>
    </item>
    <item>
      <title>Narrows Bridge Worker Rescued</title>
      <pubDate>Fri, 19 Oct 2007 02:36:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/18_SR16Narrow_rescue.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/18_SR16Narrow_rescue.htm</guid>
      <description>Narrows Bridge worker rescued from east tower of new bridge.</description>
    </item>
    <item>
      <title>Signal Project at I-5 Southbound 13th Street Off-Ramp in Chehalis Begins Monday, Oct. 22</title>
      <pubDate>Thu, 18 Oct 2007 22:48:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/18_I513thSTSignal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/18_I513thSTSignal.htm</guid>
      <description>CHEHALIS – A project that will add a new signal at the I-5 southbound 13th Street off-ramp will begin Monday, Oct. 22, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>New Signal Green Lights Transit, Pedestrian Improvements on SR 522 in Lake Forest Park</title>
      <pubDate>Thu, 18 Oct 2007 07:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/17_SR522Signal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/17_SR522Signal.htm</guid>
      <description>New Signal Green Lights Transit, Pedestrian Improvements on SR 522 in Lake Forest Park</description>
    </item>
    <item>
      <title>CANCELED: I-5 Everett Widening Project to Close Northbound I-5 Saturday Night</title>
      <pubDate>Thu, 18 Oct 2007 05:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/17_I5EverettClosureDetourRestripe.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/17_I5EverettClosureDetourRestripe.htm</guid>
      <description>Late night drivers heading north on Interstate 5 through Everett this weekend should plan a little extra time in their trips. If the weather is dry, crews working on the I-5 Everett HOV freeway expansion project will close northbound I-5 at SR 526 Friday or Saturday night.</description>
    </item>
    <item>
      <title>WSDOT Readying Roads and Crews for Windy Commute</title>
      <pubDate>Thu, 18 Oct 2007 02:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/17_windprep.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/17_windprep.htm</guid>
      <description>OLYMPIA – WSDOT has its crews out, chainsaws sharpened, generators gassed up and additional crews on standby for what forecasters call the first major winter storm coming to Western Washington.</description>
    </item>
    <item>
      <title>Expect Single Lane Closures on SR 503 near Yale for Bridge Inspection, Nov. 6</title>
      <pubDate>Thu, 18 Oct 2007 00:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/17_SR503YaleInspection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/17_SR503YaleInspection.htm</guid>
      <description>VANCOUVER – Motorists traveling SR 503 near Yale should expect up to 20-minute delays as bridge maintenance crews inspect the SR 503, Yale Bridge November 6, from 8 a.m. to 4 p.m.</description>
    </item>
    <item>
      <title>SR 401 Dismal Nitch Rest Area Remains Open with Portable Facilities</title>
      <pubDate>Wed, 17 Oct 2007 05:35:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/16_SR401RestArea.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/16_SR401RestArea.htm</guid>
      <description>NASELLE – Restroom facilities at the State Route 401 Dismal Nitch Rest Area have closed after a break in the water line, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct Reopened After Semiannual Inspections</title>
      <pubDate>Mon, 15 Oct 2007 23:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/Viaductreopens10142007.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/Viaductreopens10142007.htm</guid>
      <description>Washington State Department of Transportation maintenance crews re-opened all lanes on the Alaskan Way Viaduct at 2:45 p.m., ahead of schedule. With a 5:15 p.m. Seahawks game, crews worked late on Saturday so they could re-open the lanes earlier on Sunday. The viaduct was closed for its semiannual inspections on October 13 and 14.</description>
    </item>
    <item>
      <title>Mother Nature Gives Her Thumbs Up:  Crews Will Close SR 9 Near Arlington This Weekend</title>
      <pubDate>Sat, 13 Oct 2007 04:29:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_SR9SchlomanClosureGreenLight.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/12_SR9SchlomanClosureGreenLight.htm</guid>
      <description>fter reviewing the forecast, WSDOT and contractor Scarsella Brothers have decided to move forward with their plan to close State Route 9 just north of Arlington between 252nd and 268th Streets NE from 5 a.m., Saturday, Oct. 13, through 5 a.m., Monday, Oct, 15. During the closure, crews will fill a dip in the roadway just south of 268th Street NE to improve driver sight distance.</description>
    </item>
    <item>
      <title>I-5 Everett Pavers Finish All Travel Lanes Between Broadway On-ramp and SR 526</title>
      <pubDate>Sat, 13 Oct 2007 03:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_I5EverettPavingDone.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/12_I5EverettPavingDone.htm</guid>
      <description>A break in wet weather allowed paving crews to complete all travel lanes on southbound I-5 in Everett between SR 526 and the Broadway ramps. Crews still need to finish paving the shoulders both south and northbound.</description>
    </item>
    <item>
      <title>Crews Continue Installing HOT Lane Buffer Striping on SR 167; WSDOT Urges Motorcyclists to Use Caution</title>
      <pubDate>Sat, 13 Oct 2007 01:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_SR167HotLanesStriping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/12_SR167HotLanesStriping.htm</guid>
      <description>Crews Continue Installing HOT Lane Buffer Striping on SR 167; WSDOT Urges Motorcyclists to Use Caution</description>
    </item>
    <item>
      <title>Public Service Career Fair in Seattle, Oct. 29</title>
      <pubDate>Sat, 13 Oct 2007 00:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_CareerFair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/12_CareerFair.htm</guid>
      <description>WSDOT is participating in the Public Service Career Fair on Monday, Oct. 29 at the Seattle Center Northwest Rooms.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Oct. 12-19</title>
      <pubDate>Sat, 13 Oct 2007 00:11:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_I405KirklandUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/12_I405KirklandUpdates.htm</guid>
      <description>Next week crews working for the Washington State Department of Transportation plan to stripe the roadway and ramps between NE 85th and NE 124th Streets; and modify the southbound I-405 off-ramp to westbound NE 85th Street.</description>
    </item>
    <item>
      <title>I-405 Renton Stage I Widening Project Construction Updates Oct. 13 - Oct. 20</title>
      <pubDate>Sat, 13 Oct 2007 00:08:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_I405RentonUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/12_I405RentonUpdates.htm</guid>
      <description>Next week, crews working for the Washington State Department of Transportation will perform surveys, electrical work, and excavate and grade the highway shoulder on SR 167; and conduct surveys on I-405.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Oct. 12 – 19</title>
      <pubDate>Fri, 12 Oct 2007 23:36:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_I405BellevueUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/12_I405BellevueUpdates.htm</guid>
      <description>This weekend, crews working for the Washington State Department of Transportation will drive piles in the ground on the east side of I-405 at Coal Creek Parkway to begin building a wider bridge. Sunday through Thursday nights, crews will continue repairing pavement on northbound and southbound I-405 in South Bellevue; work to widen the Coal Creek Parkway bridge; prepare to build piers for the new bridge over I-90; and pave the 112th Ave NE on-ramp to northbound I-405.</description>
    </item>
    <item>
      <title>US 12 Paving Project Continues Friday and Saturday</title>
      <pubDate>Fri, 12 Oct 2007 03:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_11_US12Paving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/10_11_US12Paving.htm</guid>
      <description>US 12 Paving Project Continues Friday and Saturday</description>
    </item>
    <item>
      <title>Crews are Ready to Close SR 9 Near Arlington This Weekend But Mother Nature Will Have the Final Word</title>
      <pubDate>Fri, 12 Oct 2007 00:56:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/11_SR9WeekendClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/11_SR9WeekendClosure.htm</guid>
      <description>If the weather cooperates, WSDOT and contractor Scarsella Brothers will close State Route 9 just north of Arlington between 252nd and 268th Streets NE from 5 a.m., Saturday, Oct. 13, through 5 a.m., Monday, Oct, 15. During the closure, crews will fill a dip in the roadway just south of 268th Street NE to improve driver sight distance.</description>
    </item>
    <item>
      <title>Friday Night Lane Closure on I-5 in Tacoma</title>
      <pubDate>Thu, 11 Oct 2007 23:48:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_11_I5LaneClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/10_11_I5LaneClosure.htm</guid>
      <description>Friday Night Lane Closure on I-5 in Tacoma</description>
    </item>
    <item>
      <title>WSDOT Asks for Drivers’ Help to Avoid Lengthy Back-ups on Northbound I-405 in Bellevue this Weekend</title>
      <pubDate>Thu, 11 Oct 2007 07:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_405BellevueWeekendWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/10_405BellevueWeekendWork.htm</guid>
      <description>Crews working for WSDOT will close two northbound I-405 lanes near Coal Creek Parkway this weekend for pile driving work. Without drivers’ help, engineers expect long back-ups on northbound I-405 between I-90 and Renton, with the worst congestion Saturday and Sunday between 8 a.m. and 2 p.m.</description>
    </item>
    <item>
      <title>WSDOT Begins Viaduct Repairs Following Quarterly Inspection</title>
      <pubDate>Thu, 11 Oct 2007 05:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/Viaductinspection-4thq2007.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/Viaductinspection-4thq2007.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) will kick off construction on the first of several projects to improve safety for drivers on the Alaskan Way Viaduct. Construction will begin next week to strengthen several column foundations between Columbia Street and Yesler Way, where the viaduct has settled approximately five inches since the 2001 Nisqually earthquake.</description>
    </item>
    <item>
      <title>The Ribbon is Cut for the SR 17 Widening Project in Moses Lake</title>
      <pubDate>Wed, 10 Oct 2007 04:57:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/100807SR17WideningRibbonCut.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/100807SR17WideningRibbonCut.htm</guid>
      <description>A ribbon cutting ceremony marked completion of the SR 17 Widening project in Moses Lake</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Wed, 10 Oct 2007 02:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/9_SR520BridgeTest.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/9_SR520BridgeTest.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Governor Gregoire Announces Safety Plans for US 2</title>
      <pubDate>Wed, 10 Oct 2007 00:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/9_US2SafetyCorridor.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/9_US2SafetyCorridor.htm</guid>
      <description>On Monday, Oct. 8, Governor Chris Gregoire announced the designation of US 2 as a safety corridor, and provided details on efforts by the Washington State Patrol and WSDOT to enhance safety on US 2.</description>
    </item>
    <item>
      <title>Wreckage of Missing Plane Found</title>
      <pubDate>Tue, 09 Oct 2007 23:48:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/WreckageFoundWhitePass.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/WreckageFoundWhitePass.htm</guid>
      <description>Yesterday, at around 7:40 p.m., search and rescue teams located the wreckage of a Cessna 208 Caravan aircraft near White Pass. The aircraft, with 10 people on board, had been missing since Sunday night after leaving Boise, Idaho around 7:30 p.m. for Shelton, Washington.</description>
    </item>
    <item>
      <title>Searchers Comb White Pass Area for Missing Plane</title>
      <pubDate>Tue, 09 Oct 2007 06:55:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/WhitePassMissingPlane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/WhitePassMissingPlane.htm</guid>
      <description>The search continues in the White Pass area for a missing Cessna 208 Caravan aircraft with a reported 10 people on board. The plane left Boise, Idaho around 7 p.m. yesterday and was headed to Shelton, Washington. Late yesterday evening, a person in the White Pass area reported seeing a low flying aircraft and hearing a crash. Several hours later, the co-owner of the missing aircraft notified emergency personnel that the plane was overdue and that she was unable to reach the people on board.</description>
    </item>
    <item>
      <title>Intermittent Closures of SR 303 in Silverdale Thursday Night</title>
      <pubDate>Tue, 09 Oct 2007 06:28:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_08_SR303Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/10_08_SR303Closures.htm</guid>
      <description>Intermittent Closures of SR 303 in Silverdale Thursday Night</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Oct. 5-12</title>
      <pubDate>Tue, 09 Oct 2007 01:16:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/08_KirklandUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/08_KirklandUpdates.htm</guid>
      <description>Next week crews working for the Washington State Department of Transportation plan to stripe the roadway and ramps between NE 85th and NE 124th Streets.</description>
    </item>
    <item>
      <title>SR 16 Reopens after WSDOT Engineers Deem Viaduct Safe</title>
      <pubDate>Sun, 07 Oct 2007 20:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_07_SR+16Reopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/10_07_SR+16Reopens.htm</guid>
      <description>SR 16 Reopens after WSDOT Engineers Deem Viaduct Safe</description>
    </item>
    <item>
      <title>Fire Shuts Down SR 16 at Nalley Valley</title>
      <pubDate>Sun, 07 Oct 2007 10:01:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_06_NalleyValleyFire.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/10_06_NalleyValleyFire.htm</guid>
      <description>Fire Shuts Down SR 16 at Nalley Valley</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct Closed for Semiannual Inspections October 13 and 14</title>
      <pubDate>Sat, 06 Oct 2007 05:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/AWVClosureOct2007.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/AWVClosureOct2007.htm</guid>
      <description>WSDOT maintenance crews will close the Alaskan Way Viaduct for its semiannual inspections on the weekend of October 13 and 14. Since the 2001 Nisqually earthquake, WSDOT has conducted a full inspection of the viaduct every six months to closely monitor any settlement or other signs of continuing deterioration.  WSDOT crews also conduct three-month visual inspections as an added safety measure.</description>
    </item>
    <item>
      <title>I-405 Renton Stage I Widening Project Construction Updates Oct. 6 - 13</title>
      <pubDate>Sat, 06 Oct 2007 02:39:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/5_RentonWeeklyUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/5_RentonWeeklyUpdates.htm</guid>
      <description>Next week, crews working for the Washington State Department of Transportation will perform surveys, electrical work, and excavate and grade the highway shoulder on SR 167; and conduct surveys on I-405.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Oct. 5 – 12</title>
      <pubDate>Sat, 06 Oct 2007 01:44:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/5_BellevueWeeklyUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/5_BellevueWeeklyUpdate.htm</guid>
      <description>Next week, crews working for the Washington State Department of Transportation will continue repairing pavement on northbound I-405 in South Bellevue and restoring the Kelsey Creek Park wetland. Crews will also begin constructing piers for the new bridge over I-90, perform survey and electrical work, and work to widen the Coal Creek Parkway bridge.</description>
    </item>
    <item>
      <title>Mother Nature Puts on the Brakes: SR 9 Closure Near Arlington Postponed This Weekend</title>
      <pubDate>Sat, 06 Oct 2007 00:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/5_SR9ClosurePostponed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/5_SR9ClosurePostponed.htm</guid>
      <description>After weeks of rain and more to come, crews decided to postpone this weekend’s closure on State Route 9 just north of Arlington between 252nd and 268th Streets NE.  WSDOT and contractor Scarsella Brothers plan to move the closure to the weekend of Oct. 13, if the rain relents.</description>
    </item>
    <item>
      <title>Expect Delays on Southbound I-5 in Everett Friday Night and Saturday Morning while Paving Work Continues</title>
      <pubDate>Fri, 05 Oct 2007 08:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/4_ExtendedI5EverettWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/4_ExtendedI5EverettWork.htm</guid>
      <description>A long string of wet nights in Everett has paving crews on southbound I-5 looking for a few extra hours to get the job done.  That means if the weather is dry this weekend, crews will close lanes earlier and open them later than normal this Friday night and Saturday morning.  Drivers should expect long delays if they’re heading southbound through Everett during the closures.</description>
    </item>
    <item>
      <title>24 Inches of New Snow Prompts Closure of SR 542 Lower Gate to Artist Point</title>
      <pubDate>Fri, 05 Oct 2007 05:11:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/04_542closeddeepsnow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/04_542closeddeepsnow.htm</guid>
      <description>Snow 24-inches deep prompted crews to close the last 2 1/2 miles of State Route 542 on Oct. 4, blocking access to Artist Point for the winter. The end of Mount Baker Highway closes every year with the first snowfall.</description>
    </item>
    <item>
      <title>WSDOT Traveler Information Systems Unavailable Early Sunday</title>
      <pubDate>Fri, 05 Oct 2007 03:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/04_511_website_down.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/04_511_website_down.htm</guid>
      <description>OLYMPIA – Snow in Washington’s mountains are just the first signs of winter weather. To make sure its website and travel information hotline are ready for the months to come, WSDOT will do computer maintenance tasks for two hours early Sunday.</description>
    </item>
    <item>
      <title>All Lanes Open on I-405 Northbound through Bellevue for Afternoon Commute</title>
      <pubDate>Wed, 03 Oct 2007 05:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/2_BellevueI405Open.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/2_BellevueI405Open.htm</guid>
      <description>Crews have reopened all lanes on northbound I-405 through Bellevue.  Crews closed lanes starting at 10 a.m. this morning to repair a damaged cement panel with quick-setting material.  Once they laid the material, crews estimated that the lanes would reopen by 1 p.m., but the cement took longer to cure than expected.  Crews were able to reopen the lanes by 3 p.m.</description>
    </item>
    <item>
      <title>Problem with New Pavement Causes Delays on I-405</title>
      <pubDate>Wed, 03 Oct 2007 02:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/2_BellevuePavementDelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/2_BellevuePavementDelays.htm</guid>
      <description>Crews working for the Washington State Department of Transportation (WSDOT) opened two northbound lanes on I-405 later than expected this morning due to technical issues involving the concrete mix for panel replacements on the roadway.</description>
    </item>
    <item>
      <title>CANCELLED:  SR 9 Closes Near Arlington This Weekend; Truckers and Travelers Should Plan for a Detour</title>
      <pubDate>Wed, 03 Oct 2007 00:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/2_SR9SchlomanClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/2_SR9SchlomanClosure.htm</guid>
      <description>CANCELLED:  WSDOT and contractor Scarsella Brothers will close State Route 9 just north of Arlington between 252nd and 268th Streets NE from 5 a.m., Saturday, October 6 through 5 a.m. Monday, October 8. Crews will fill a dip in the roadway just south of 268th Street NE to improve driver sight distance.</description>
    </item>
    <item>
      <title>I-90 Flammable Cargo Restriction Announced</title>
      <pubDate>Mon, 01 Oct 2007 22:24:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/1_I-90FlammableRestriction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/10/1_I-90FlammableRestriction.htm</guid>
      <description>WSDOT activated a flammable cargo restriction on Interstate 90 between Interstate 5 in Seattle and Island Crest Way on Mercer Island beginning at 7:00 a.m.on Monday, October 1, 2007. This restriction is expected to conclude on Wednesday, October 10, by 4 p.m.</description>
    </item>
    <item>
      <title>In-depth inspection of Murray Morgan Bridge Continues</title>
      <pubDate>Fri, 05 Oct 2007 06:02:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/10_04_MurrayMorganInspection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/10_04_MurrayMorganInspection.htm</guid>
      <description>In-depth inspection of Murray Morgan Bridge Continues</description>
    </item>
    <item>
      <title>SR 542 to Artist Point Scheduled to Close at Lower Gate Monday; Upper Gate Closed Sept. 27</title>
      <pubDate>Thu, 04 Oct 2007 03:46:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/03_542_ArtistPointClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/03_542_ArtistPointClosed.htm</guid>
      <description>With descending temperatures and snow levels predicted in the mountains, WSDOT will close the lower gate at the end of Mount Baker Highway (SR 542), by Monday. The road to Artist Point in the North Cascades closes every year with the first snowfall. The upper gate closed Sept. 27.</description>
    </item>
    <item>
      <title>Successful Operations on State Route 16 Continue</title>
      <pubDate>Tue, 02 Oct 2007 05:40:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/1_16_EndTowPgm.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/1_16_EndTowPgm.htm</guid>
      <description>WSDOT today announced the suspension of the SR 16 towing contract.</description>
    </item>
    <item>
      <title>State Route 167 Extension project in Pierce County receives final federal approval</title>
      <pubDate>Tue, 02 Oct 2007 03:54:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/1_167_ROD.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/1_167_ROD.htm</guid>
      <description>Oct. 2 the FHWA will sign the record of decision for the SR 167 Extension project in Pierce Co.</description>
    </item>
    <item>
      <title>Ramp Closures Thursday on SR 3 in Silverdale</title>
      <pubDate>Mon, 01 Oct 2007 22:49:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/10_01_SR3RampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/10_01_SR3RampClosures.htm</guid>
      <description>Ramp Closures Thursday on SR 3 in Silverdale</description>
    </item>
    <item>
      <title>Hood Canal Bridge Pontoons Fit to Be Tied</title>
      <pubDate>Mon, 01 Oct 2007 22:11:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/10_01_HoodCanalFit2BTied.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/10_01_HoodCanalFit2BTied.htm</guid>
      <description>Hood Canal Bridge Pontoons Fit to Be Tied
First “new” section of the Hood Canal Bridge arrives in Port Gamble</description>
    </item>
    <item>
      <title>Hood Canal Bridge Pontoons Tow Home</title>
      <pubDate>Sat, 29 Sep 2007 05:54:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/28_HoodCanalPontoonsHome.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/28_HoodCanalPontoonsHome.htm</guid>
      <description>Hood Canal Bridge Pontoons Tow Home
First “new” section of the Hood Canal Bridge move from Seattle to Port Gamble</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Sept. 28 - Oct. 5</title>
      <pubDate>Sat, 29 Sep 2007 05:10:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/28_KirklandUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/28_KirklandUpdates.htm</guid>
      <description>Next week crews working for the Washington State Department of Transportation plan to pave and stripe the roadway and ramps between NE 85th and NE 124th Streets; and rebuild the sidewalk on the north side of NE 116th St. under the I-405 bridge.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Sept. 28 – Oct. 5</title>
      <pubDate>Sat, 29 Sep 2007 02:00:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/28_BellevueUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/28_BellevueUpdates.htm</guid>
      <description>I-405 Construction Updates in Bellevue Sept. 28 – Oct. 5</description>
    </item>
    <item>
      <title>More Routine Inspections Scheduled for Ship Canal Bridge</title>
      <pubDate>Fri, 28 Sep 2007 23:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/28_I-5ShipCanal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/28_I-5ShipCanal.htm</guid>
      <description>Crews from WSDOT’s Bridge Preservation Office will be back out on the I-5 Ship Canal Bridge again this weekend and into next week to continue routine biennial checks of the bridge. Crews are looking for any small cracks, rust, loose bolts or nuts that might lead to more work on the bridge.</description>
    </item>
    <item>
      <title>Public Invited to I-405 Project Public Open House October 4th</title>
      <pubDate>Fri, 28 Sep 2007 07:39:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/27_I405OpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/27_I405OpenHouse.htm</guid>
      <description>The Washington State Department of Transportation invites the public to attend the Tukwila to Renton Improvement Project (I-5 to SR 169 – Phase 2) Discipline Report Open House scheduled for Oct. 4, 2007 from 4-7 p.m. at the Renton Library (100 Mill Ave S, Renton, WA  98057).  The focus of the meeting will be to present the environmental findings drafted for the project’s Environmental Assessment (EA).</description>
    </item>
    <item>
      <title>I-405 Renton Stage I Widening Project Construction Updates Sept. 29 - Oct. 6</title>
      <pubDate>Fri, 28 Sep 2007 07:32:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/27_RentonWeeklyUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/27_RentonWeeklyUpdate.htm</guid>
      <description>Saturday night, crews working for the Washington State Department of Transportation will perform electrical work on southbound SR 167 in Renton. Crews will close two out of three lanes Saturday night, temporarily shifting lanes, to make room for electrical installations on the left side of the highway. During the weeknights, lane closures will allow more electrical work in the HOV lane and grading along the right side of the road.</description>
    </item>
    <item>
      <title>Two-lane Roundabout Open on SR 202 at I-90 in North Bend</title>
      <pubDate>Fri, 28 Sep 2007 07:21:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/27_202RoundaboutOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/27_202RoundaboutOpen.htm</guid>
      <description>Weekday commuters and outlet-store shoppers headed to North Bend on Interstate 90 and State Route 202 are now driving through a freshly striped two-lane roundabout.</description>
    </item>
    <item>
      <title>More Changes Ahead on SR 9 Near Woodinville; Crews Aim to Open New Lanes in November</title>
      <pubDate>Fri, 28 Sep 2007 00:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/27_SR9TrafficShift.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/27_SR9TrafficShift.htm</guid>
      <description>Traffic on State Route 9 between Woodinville and Maltby will be separated by a median for the first time beginning tomorrow morning. Crews widening the highway will shift northbound traffic to the newly paved east side of the road as they finish work on curbing and the raised median.</description>
    </item>
    <item>
      <title>Closure of LaBree Bridge and Temporary Closure of Maurin Road Begins October 1</title>
      <pubDate>Thu, 27 Sep 2007 01:05:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/26_I5RR13Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/26_I5RR13Closures.htm</guid>
      <description>CHEHALIS – Beginning Oct. 1, LaBree Bridge will close until construction of the new interchange is complete.</description>
    </item>
    <item>
      <title>SR 3 Belfair Bypass Connectors Selected</title>
      <pubDate>Wed, 26 Sep 2007 02:07:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/25_3_BelByConnectors.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/25_3_BelByConnectors.htm</guid>
      <description>WSDOT chose two connectors for the SR 3 Belfair Bypass.</description>
    </item>
    <item>
      <title>WSDOT Closes SR 20 and Memorial Highway for 22 days in October</title>
      <pubDate>Tue, 25 Sep 2007 22:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/25_20extendedhighwayclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/25_20extendedhighwayclosure.htm</guid>
      <description>Drivers can expect detours and lane closures for most of October on SR 20 and Memorial Highway (SR 536) west of Burlington. Crews will rebuild the intersection where the two highways meet and open a section of the new eastbound SR 20 lanes.</description>
    </item>
    <item>
      <title>WSDOT calls for capital freight rail projects that advance economic development</title>
      <pubDate>Tue, 25 Sep 2007 06:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/24_callforfreightrailprojects.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/24_callforfreightrailprojects.htm</guid>
      <description>WSDOT is seeking proposals from interested parties committed to promoting economic development through the advancement of freight rail activities.</description>
    </item>
    <item>
      <title>SR 123  Reopens Sept. 28 Following Flood Damage Repairs</title>
      <pubDate>Tue, 25 Sep 2007 04:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/23_SR123Reopening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/23_SR123Reopening.htm</guid>
      <description>Mount Rainier National Park, Western Federal Lands Highway Division, and Washington State Department of Transportation announce that State Route 123 within Mount Rainier National Park will reopen at noon, Friday, Sept 28, 2007, following extensive flood damage repair.</description>
    </item>
    <item>
      <title>Expect Nighttime Lane Closures, Daytime Ramp Closures on I-5 in Everett This Weekend</title>
      <pubDate>Sat, 22 Sep 2007 07:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/21_LaneClosuresInEverett.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/21_LaneClosuresInEverett.htm</guid>
      <description>This weekend, construction crews working for WSDOT will try to take advantage of dry weather conditions to finish repaving the northbound lanes of Interstate 5 between SR 526 and the exit to Broadway in Everett.  Anyone traveling northbound through Everett on I-5 after 9 p.m. should expect delays.</description>
    </item>
    <item>
      <title>I-405 Renton Stage I Widening Project Construction Updates Sept. 23-29</title>
      <pubDate>Sat, 22 Sep 2007 07:23:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/21_RentonUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/21_RentonUpdate.htm</guid>
      <description>Saturday night, crews working for the Washington State Department of Transportation will paint stripes on southbound SR 167 in Renton. Crews will close two out of three lanes overnight to stripe and temporarily shift lanes to the left, to make room for widening work on the right side of the highway.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Sept. 21 – 28</title>
      <pubDate>Sat, 22 Sep 2007 07:16:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/21_BellevueUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/21_BellevueUpdates.htm</guid>
      <description>Next week, crews working for the Washington State Department of Transportation will continue repairing pavement on northbound I-405 in South Bellevue and restoring the Kelsey Creek Park wetland. Crews will also install temporary pilings for the widening of the bridges over I-90 and Coal Creek Parkway, and perform electrical work.</description>
    </item>
    <item>
      <title>Spraying Scheduled for Mid-October on SR 305 in Bainbridge Island</title>
      <pubDate>Sat, 22 Sep 2007 03:55:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/21_SprayingScheduledMidOctoberonSR305.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/21_SprayingScheduledMidOctoberonSR305.htm</guid>
      <description>Spraying Scheduled for Mid-October on SR 305 in Bainbridge Island</description>
    </item>
    <item>
      <title>Public Meeting on SR 302 Study Tuesday in Gig Harbor</title>
      <pubDate>Sat, 22 Sep 2007 03:22:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/21_PublicMeetingSR302.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/21_PublicMeetingSR302.htm</guid>
      <description>Public Meeting on SR 302 Study Tuesday in Gig Harbor</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Sept. 21-28</title>
      <pubDate>Sat, 22 Sep 2007 02:15:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/21_I-405Kirkland.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/21_I-405Kirkland.htm</guid>
      <description>Next week crews working for the WSDOT plan to pave and stripe the roadway and ramps between NE 85th and NE 124th Streets.</description>
    </item>
    <item>
      <title>WSDOT’s South Puget Sound Cameras Go Dark for the Final Time This Friday Night</title>
      <pubDate>Fri, 21 Sep 2007 04:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/20_CameraOutage.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/20_CameraOutage.htm</guid>
      <description>WSDOT traffic engineers have planned a final power outage this weekend while they complete the camera and traffic information systems upgrades.</description>
    </item>
    <item>
      <title>Minor Traffic Delays Expected on Hood Canal Bridge</title>
      <pubDate>Fri, 21 Sep 2007 03:19:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/Sep202007_SR104HCBDelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/Sep202007_SR104HCBDelays.htm</guid>
      <description>Minor Traffic Delays Expected on Hood Canal Bridge</description>
    </item>
    <item>
      <title>Motorcycle Rally Will Draw Thousands to Anacortes Sunday</title>
      <pubDate>Thu, 20 Sep 2007 04:57:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/19_sr20OysterRuninAnacortes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/19_sr20OysterRuninAnacortes.htm</guid>
      <description>As motorcyclists prepare to rendezvous this weekend in downtown Anacortes, the Washington State Department of Transportation is asking motorists to prepare for heavy congestion. Over ten thousand motorcycles are expected in Anacortes on Sunday, Sept. 23 for the 26th annual Oyster Run.</description>
    </item>
    <item>
      <title>Simpson Avenue Bridge Closure Scheduled for Sunday</title>
      <pubDate>Thu, 20 Sep 2007 04:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/19_SimpsonAvenueBridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/19_SimpsonAvenueBridgeClosure.htm</guid>
      <description>Simpson Avenue Bridge Closure Scheduled for Sunday</description>
    </item>
    <item>
      <title>WSDOT Bridge Engineers to Inspect the I-5 Ship Canal Bridge</title>
      <pubDate>Thu, 20 Sep 2007 01:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/19_I-5ShipCanalBridgeInspections.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/19_I-5ShipCanalBridgeInspections.htm</guid>
      <description>The I-5 Ship Canal Bridge is due for its biennial check-up. This weekend, structural engineers and bridge inspectors from the Washington State Department of Transportation will start the process of inspecting the 45 year-old bridge structure, expected to take three weeks.</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Maintenance Tests</title>
      <pubDate>Thu, 20 Sep 2007 00:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/19_SR520BridgeMaintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/19_SR520BridgeMaintenance.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct additional maintenance tests early Thursday morning after the installation of new hydraulic hoses on the State Route 520 Evergreen Point Floating Bridge.</description>
    </item>
    <item>
      <title>Ferry Fall Schedule begins Sunday, September 30</title>
      <pubDate>Wed, 19 Sep 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/fall-schedule-begins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/fall-schedule-begins.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Expect Lane Closures on I-5 Northbound in Vancouver Area Thursday Night, Sep. 20</title>
      <pubDate>Wed, 19 Sep 2007 04:17:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/18_I5LaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/18_I5LaneClosures.htm</guid>
      <description>VANCOUVER – Motorists should expect alternating single and double lane closures on I-5 northbound in Vancouver, between 9 p.m. on Thursday evening, Sep. 20 and 6 a.m. Friday morning, Sep. 21.</description>
    </item>
    <item>
      <title>WSDOT seeks input on potential improvements for SR 202 at September 25th open house in Sammamish</title>
      <pubDate>Wed, 19 Sep 2007 01:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/18_SR202OpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/18_SR202OpenHouse.htm</guid>
      <description>Washington State Department of Transportation, city of Sammamish, King County, and Puget Sound Regional Council have developed a list of potential improvements to enhance safety and improve mobility on the State Route 202 corridor. WSDOT wants to hear the community’s input about the potential improvements.</description>
    </item>
    <item>
      <title>Crews Complete Preservation Work on the SR 9 Pilchuck Bridge</title>
      <pubDate>Wed, 19 Sep 2007 00:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/18_SR9PilchuckBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/18_SR9PilchuckBridge.htm</guid>
      <description>Crews Complete Preservation Work on the SR 9 Pilchuck Bridge</description>
    </item>
    <item>
      <title>Ramp Closures this Week on I-5 in Lacey</title>
      <pubDate>Tue, 18 Sep 2007 06:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/17_I5RampClosuresthisweek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/17_I5RampClosuresthisweek.htm</guid>
      <description>Ramp Closures this Week on I-5 in Lacey</description>
    </item>
    <item>
      <title>No Thrill this Morning at SR 3 and Newberry Hill</title>
      <pubDate>Tue, 18 Sep 2007 05:46:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/17_SR3WireTheft.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/17_SR3WireTheft.htm</guid>
      <description>No Thrill this Morning at SR 3 and Newberry Hill</description>
    </item>
    <item>
      <title>WSDOT Begins Repairs to Stop Viaduct Settlement</title>
      <pubDate>Tue, 18 Sep 2007 05:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/17_ViaductRepairsBegin.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/17_ViaductRepairsBegin.htm</guid>
      <description>The first of six projects to repair or replace more than half of the deteriorating Alaskan Way Viaduct will start next month. C.A. Carey Corporation today was awarded the contract to strengthen the viaduct between Columbia Street and Yesler Way where the structure has settled approximately five inches since the 2001 Nisqually earthquake. C.A. Carey submitted the lowest bid of $3.02 million. Work will begin in mid-October. No work will take place between Nov. 22 and Jan. 1, in order to accommodat</description>
    </item>
    <item>
      <title>Washington Public Safety Groups Working Together to Get Traffic Moving</title>
      <pubDate>Mon, 17 Sep 2007 23:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/17_IRT+management+coalition.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/17_IRT+management+coalition.htm</guid>
      <description>SEATTLE – Washington’s new Traffic Incident Management Coalition is hosting Washington’s first Traffic Incident Management Conference Tuesday and Wednesday in Seattle, bringing together incident responders and traffic safety stakeholders from across Washington.</description>
    </item>
    <item>
      <title>Crews Continue Surveying I-5 in Marysville for Concrete Median Barrier</title>
      <pubDate>Mon, 17 Sep 2007 23:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/17_I-5Marysville.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/17_I-5Marysville.htm</guid>
      <description></description>
    </item>
    <item>
      <title>SR 542, Mount Baker Highway Closed Tuesday for Bridge Repairs East of Glacier</title>
      <pubDate>Mon, 17 Sep 2007 21:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/17_542coalcreekbridgeclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/17_542coalcreekbridgeclosure.htm</guid>
      <description>WSDOT will close the Mount Baker Highway (SR 542) Tuesday, Sept. 18 from 7 a.m. to 7 p.m. at Coal Creek, about 2½ miles east of Glacier.</description>
    </item>
    <item>
      <title>Crews Continue Surveying I-5 in Marysville for Concrete Median Barrier</title>
      <pubDate>Mon, 17 Sep 2007 21:44:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/17_MarysvilleMedianWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/17_MarysvilleMedianWork.htm</guid>
      <description>Drivers will see WSDOT drilling crews in the median of Interstate 5 in Marysville starting today, Sept. 17. This activity is part of ongoing survey work, which will help engineers develop more detailed plans and cost estimates to replace 10 miles of cable median barrier with concrete barrier along the northbound lanes.</description>
    </item>
    <item>
      <title>Nighttime Closure of I-5 Chamber Way Off-Ramp, Sept. 17 and 18</title>
      <pubDate>Sat, 15 Sep 2007 06:03:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/14_I-5RampClosureChamberWay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/14_I-5RampClosureChamberWay.htm</guid>
      <description>CHEHALIS – Motorists can expect a nighttime closure of the Chamber Way northbound I-5 off-ramp, starting next week on Monday, Sept. 17 and possibly Tuesday, Sept. 18 for pavement repair operation, announced the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>I-5 Lanes and Ramps Closed Near Canadian Border</title>
      <pubDate>Sat, 15 Sep 2007 05:04:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/14_i5lanesclosuresnearborder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/14_i5lanesclosuresnearborder.htm</guid>
      <description>Crews will close one lane of I-5 during the day in either direction to install traffic detection systems next week in Blaine.</description>
    </item>
    <item>
      <title>SR 202 Flyover Ramp in Redmond Takes Giant Leap Forward</title>
      <pubDate>Sat, 15 Sep 2007 04:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/14_SR202Flyover.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/14_SR202Flyover.htm</guid>
      <description>Crews working for WSDOT and Tri-State Construction were back out on SR 202 today - day two of a complicated and carefully orchestrated piece of the SR 202 / SR 520 flyover ramp construction project.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Sept. 14 – 21</title>
      <pubDate>Sat, 15 Sep 2007 01:37:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/14_BellevueUPdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/14_BellevueUPdates.htm</guid>
      <description>Next week, crews working for the Washington State Department of Transportation will continue repairing pavement on northbound I-405 in South Bellevue and restoring the Kelsey Creek Park wetland.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Sept. 14-21</title>
      <pubDate>Fri, 14 Sep 2007 21:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/14_I405ConstructionKirkland.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/14_I405ConstructionKirkland.htm</guid>
      <description></description>
    </item>
    <item>
      <title>SR 167 Construction Kicks Off in Renton Sept. 15- 21</title>
      <pubDate>Fri, 14 Sep 2007 21:02:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/14_SR167Kickoff.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/14_SR167Kickoff.htm</guid>
      <description>Next week crews working for the Washington State Department of Transportation will be paving and preparing the shoulders for future widening on southbound SR 167 in Renton.</description>
    </item>
    <item>
      <title>WSDOT and FHWA Gather Input on South End Viaduct Design for Environmental Assessment</title>
      <pubDate>Fri, 14 Sep 2007 20:24:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/14_AlaskanWayScoping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/14_AlaskanWayScoping.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) and the Federal Highway Administration (FHWA) want to hear from the public about what environmental issues should be considered when replacing the south end of the Alaskan Way Viaduct starting in 2009.</description>
    </item>
    <item>
      <title>WSDOT Hosts Public Meeting for SR 302 Study</title>
      <pubDate>Fri, 14 Sep 2007 05:18:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/07_wsdothosts302mtg.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/07_wsdothosts302mtg.htm</guid>
      <description>WSDOT Hosts Public Meeting for SR 302 Study</description>
    </item>
    <item>
      <title>WSDOT Hosts SR 502 Corridor Open House September 26</title>
      <pubDate>Fri, 14 Sep 2007 04:30:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/13_SR502OpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/13_SR502OpenHouse.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) will host a fifth community open house for the SR 502 Corridor Widening Project Wednesday, September 26, from 4-7 p.m.</description>
    </item>
    <item>
      <title>New Signal &amp; Ramps a Go in Kitsap County</title>
      <pubDate>Fri, 14 Sep 2007 04:25:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/07_newsigandramps.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/07_newsigandramps.htm</guid>
      <description>New Signal &amp; Ramps a Go in Kitsap County</description>
    </item>
    <item>
      <title>Historic Guardrail at Deception Pass to Get Safety Makeover</title>
      <pubDate>Fri, 14 Sep 2007 00:36:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/13_DeceptionPassGuardrailmakeover.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/13_DeceptionPassGuardrailmakeover.htm</guid>
      <description>Deception Pass State Park will get new guardrail that looks like the original but meets newer safety standards.</description>
    </item>
    <item>
      <title>Crews Work to Help Fish Passage on Swamp Creek and Catherine Creek</title>
      <pubDate>Thu, 13 Sep 2007 22:43:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/13_FishWeirs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/13_FishWeirs.htm</guid>
      <description>WSDOT and contractor Tri-State Construction have been working through the summer season to eliminate barriers to fish passage on Swamp Creek and Catherine Creek.</description>
    </item>
    <item>
      <title>Service Restored to Puget Sound Area Traffic Cameras</title>
      <pubDate>Thu, 13 Sep 2007 05:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/12_CamerasRestored.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/12_CamerasRestored.htm</guid>
      <description>Most of WSDOT’s Puget Sound area traffic cameras are back up and running after being temporarily out of service this afternoon. The cameras are running on a backup server while the main server is fixed. All but a few of the camera snapshots on the Seattle area traffic flow map are once again showing current traffic conditions.</description>
    </item>
    <item>
      <title>Puget Sound Area Traffic Cameras Out of Service</title>
      <pubDate>Thu, 13 Sep 2007 03:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/12_CameraOutage.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/12_CameraOutage.htm</guid>
      <description>WSDOT’s Puget Sound area traffic cameras are currently out of service due to a server problem. This means that the camera snapshots on the Seattle area traffic flow map will not show current traffic conditions. The outage does not affect the color-coded flow map or online travel times.</description>
    </item>
    <item>
      <title>Fort Lewis Ramps Closing for Ten Weeks</title>
      <pubDate>Thu, 13 Sep 2007 03:18:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/12_5_Ft.LewisRamps.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/12_5_Ft.LewisRamps.htm</guid>
      <description>Starting Sunday WSDOT, in conjunction with the military, will close the Fort Lewis off-ramps in Pierce County.</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Thu, 13 Sep 2007 00:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/12_SR520MonthlyMaintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/12_SR520MonthlyMaintenance.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct monthly maintenance work on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>Washington State Ferries to Hold Ferry Advisory Committee Public Meetings</title>
      <pubDate>Wed, 12 Sep 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/washington-state-ferries-to-hold-ferry-advisory-committee-public.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/washington-state-ferries-to-hold-ferry-advisory-committee-public.htm</guid>
      <description></description>
    </item>
    <item>
      <title>State Transportation Commission to Meet in Wenatchee</title>
      <pubDate>Wed, 12 Sep 2007 05:24:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/091107TransCommMeetsInWenatchee.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/091107TransCommMeetsInWenatchee.htm</guid>
      <description>The Washington State Transportation Commission is meeting in Wenatchee next Tuesday.</description>
    </item>
    <item>
      <title>WSDOT Protects SR 530 from Collapsing into River near Darrington</title>
      <pubDate>Wed, 12 Sep 2007 03:57:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/11_sr530emergencyprotectionproject.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/11_sr530emergencyprotectionproject.htm</guid>
      <description>WSDOT has hired contractor Wilder Construction Inc. of Bellingham to prevent State Route 530 from collapsing into the Sauk River north of Darrington.</description>
    </item>
    <item>
      <title>I-705 Off-Ramp Closure in Tacoma Tomorrow for WSP Investigation</title>
      <pubDate>Tue, 11 Sep 2007 06:23:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/10_SR705rampclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/10_SR705rampclosure.htm</guid>
      <description>I-705 Off-Ramp Closure in Tacoma Tomorrow for WSP Investigation</description>
    </item>
    <item>
      <title>WSDOT Slows Down Traffic in the I-5, Rush Rd to 13th Construction Zone</title>
      <pubDate>Tue, 11 Sep 2007 05:02:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/10_LewisCountySpeedRevisions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/10_LewisCountySpeedRevisions.htm</guid>
      <description>CHEHALIS – Beginning September 11, motorists will notice a speed limit revision on I-5, near Rush Road to 13th Street, work zone, as the speed limit is reduced from 60 mph to 50 mph, announced Washington State Department of Transportation (WSDOT.)</description>
    </item>
    <item>
      <title>Bridge Inspections Reduce Lanes on US 12 near Montesano</title>
      <pubDate>Tue, 11 Sep 2007 03:58:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/07_bridgeinspections.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/07_bridgeinspections.htm</guid>
      <description>Bridge Inspections Reduce Lanes on US 12 near Montesano</description>
    </item>
    <item>
      <title>Expect Lane Closures on I-5 Northbound in Kelso Area, Sept. 11-12</title>
      <pubDate>Tue, 11 Sep 2007 02:27:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/10_I5Kelso.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/10_I5Kelso.htm</guid>
      <description>KELSO – Motorists traveling I-5 northbound near Kelso should expect a single lane closure the morning of Tuesday, Sept. 11 through the afternoon of Wednesday, Sept. 12.</description>
    </item>
    <item>
      <title>Revisions to NE 10th Avenue and NE 219th Street Begin Today</title>
      <pubDate>Mon, 10 Sep 2007 21:55:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/10_SR502TrafRevision.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/10_SR502TrafRevision.htm</guid>
      <description>BATTLE GROUND – Motorists traveling State Route 502, where NE 10th Avenue crosses NE 219th Street, will notice traffic revisions beginning Monday, Sept. 10.</description>
    </item>
    <item>
      <title>New HOV Lanes Now Open on SR 99 in Federal Way</title>
      <pubDate>Sat, 08 Sep 2007 11:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/07_SR99HOV.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/07_SR99HOV.htm</guid>
      <description>New HOV Lanes Now Open on SR 99 in Federal Way</description>
    </item>
    <item>
      <title>US 2/97 Reduced Speed Limit Zone Extended in Orondo</title>
      <pubDate>Sat, 08 Sep 2007 06:05:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/090707OrondoSpeedLimit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/090707OrondoSpeedLimit.htm</guid>
      <description>The reduced speed zone approaching the town of Orondo in eastern Douglas County is being extended 3/4 of a mile next week.</description>
    </item>
    <item>
      <title>WSDOT Plans Major Camera and Electronic Sign Upgrades for King County</title>
      <pubDate>Sat, 08 Sep 2007 05:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/7_WeekendCameraOutage.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/7_WeekendCameraOutage.htm</guid>
      <description>Many popular cameras and signs go dark intermittently Saturday through Monday morning</description>
    </item>
    <item>
      <title>I-5 Lanes and Ramps Closed Near Canadian Border</title>
      <pubDate>Sat, 08 Sep 2007 05:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/07_i5laneandrampsclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/07_i5laneandrampsclosures.htm</guid>
      <description>I-5 Lanes and Ramps Closed Near Canadian Border</description>
    </item>
    <item>
      <title>Opening of SR 548 Near Birch Bay Delayed for Guardrail Installation</title>
      <pubDate>Sat, 08 Sep 2007 04:12:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/07_548openingdelayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/07_548openingdelayed.htm</guid>
      <description>Crews finished installing a new culvert and rebuilding a section of Blaine Road (SR 548) near Birch Bay. They finished ahead of schedule, but they can't reopen the road until the guardrail and final layer of asphalt arrive. Even with the delay, the new opening day, Sept. 14, is still about two weeks ahead of schedule.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Sept. 7 – 14</title>
      <pubDate>Sat, 08 Sep 2007 00:29:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/7_I-405BellevueUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/7_I-405BellevueUpdates.htm</guid>
      <description>Next week, crews working for the Washington State Department of Transportation will continue repairing pavement on northbound I-405 in South Bellevue and work to restore the Kelsey Creek Park wetland.</description>
    </item>
    <item>
      <title>Two Weeks of I-5 Lane/Ramp Closures in Tacoma</title>
      <pubDate>Sat, 08 Sep 2007 00:27:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/07_I5_lane_rampclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/07_I5_lane_rampclosures.htm</guid>
      <description>Placing deck forms for the new overpasses near the T-Dome requires two weeks of lane and ramp closures.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Sept. 7 - 14</title>
      <pubDate>Sat, 08 Sep 2007 00:25:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/7_I405Updates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/7_I405Updates.htm</guid>
      <description>Next week crews working for the Washington State Department of Transportation will install signs and pave sections of the roadway.</description>
    </item>
    <item>
      <title>Busy Biker Weekend Throughout Western Washington</title>
      <pubDate>Fri, 07 Sep 2007 23:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/07bikerweekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/07bikerweekend.htm</guid>
      <description>Drivers in Western Washington may think they’re in Hog Heaven this weekend as hundreds of motorcycle riders participate in their annual Remembrance Run, their charity to raise education money for children of war veterans.</description>
    </item>
    <item>
      <title>Association for Commuter Transportation holds International Conference in Seattle</title>
      <pubDate>Fri, 07 Sep 2007 23:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/07_ACTConferenceSeattle.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/07_ACTConferenceSeattle.htm</guid>
      <description>The Washington State Department of Transportation is pleased to be a part of the 2007 Association for Commuter Transportation (ACT) International Conference being hosted at the Seattle Sheraton Hotel on September 9 -12. Interim Secretary of Transportation Paula Hammond will join local elected officials to kick-off the conference on Monday, September 10, 2007 at the opening session from 8:30 a.m. – 9:45 a.m.</description>
    </item>
    <item>
      <title>September is a Busy Work Month for SR 202 / SR 520 Interchange in Redmond</title>
      <pubDate>Fri, 07 Sep 2007 22:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/7_BusyWorkForFlyOverRamp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/7_BusyWorkForFlyOverRamp.htm</guid>
      <description>The next four weeks will be busy ones for crews working on the new westbound SR 202 flyover ramp to SR 520 in Redmond. Crews for Tri-State Construction and WSDOT will be working nights, days, and weekends. Drivers will notice big changes as the actual ramp starts to take shape.</description>
    </item>
    <item>
      <title>SR 542 Closed Sunday Morning from Glacier to Artist Point for Bike Race</title>
      <pubDate>Fri, 07 Sep 2007 05:15:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/6_SR542ClosedForBikeRace.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/6_SR542ClosedForBikeRace.htm</guid>
      <description>State Route 542 will close Sunday morning east of Glacier for the RIDE 542 Mount Baker Hill Climb bike race.</description>
    </item>
    <item>
      <title>US 2 Ramp to Northbound I-5 in Everett to Close All Weekend</title>
      <pubDate>Fri, 07 Sep 2007 05:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/6_EverettRampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/6_EverettRampClosures.htm</guid>
      <description>Construction crews working for WSDOT will close the Highway 2 ramp to northbound I-5 for the entire weekend to realign the ramp and make room for the new HOV lane on the freeway.</description>
    </item>
    <item>
      <title>Southbound SR 167 Lane and Ramp Closures this Weekend in Kent</title>
      <pubDate>Fri, 07 Sep 2007 03:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/6_167WeekendRampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/6_167WeekendRampClosure.htm</guid>
      <description>The southbound State Route 167 off-ramp to S. 277th Street in Kent will be closed for a safety upgrade this weekend.</description>
    </item>
    <item>
      <title>SR 16 Eastbound and Westbound Lane Closures Scheduled at TNBs</title>
      <pubDate>Thu, 06 Sep 2007 00:16:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/07_SR16EBandWBLaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/07_SR16EBandWBLaneClosures.htm</guid>
      <description>SR 16 Eastbound and Westbound Lane Closures Scheduled at TNBs</description>
    </item>
    <item>
      <title>Port Townsend-Keystone Route on a One-Boat Schedule Starting September 10th</title>
      <pubDate>Wed, 05 Sep 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/pt-townsendkeystone-on-one-boat-schedule.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/pt-townsendkeystone-on-one-boat-schedule.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Lane Closures on SR 18 This Week between Maple Valley and I-90</title>
      <pubDate>Tue, 04 Sep 2007 21:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/09/4_SR18LaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/09/4_SR18LaneClosures.htm</guid>
      <description>Drivers will encounter lane closures next week on State Route 18 while crews work on two WSDOT projects between Maple Valley and Interstate 90.</description>
    </item>
    <item>
      <title>HOT lanes open this month on SR 167 between Renton and</title>
      <pubDate>Thu, 03 Apr 2008 04:13:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/2-HOTLanes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/2-HOTLanes.htm</guid>
      <description>On April 26, Washington’s first ever high occupancy toll (HOT) lanes will begin
offering solo drivers a new choice for their commute on State Route 167. The SR 167 HOT
Lanes Pilot Project will assess how variable tolling can help make the state’s roadways
more efficient and less congested.</description>
    </item>
    <item>
      <title>Weekday Delays on I-90 Snoqualmie Pass Extended</title>
      <pubDate>Wed, 19 Sep 2007 01:40:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/delaysextended.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/delaysextended.htm</guid>
      <description>Weekday Delays on I-90 Snoqualmie Pass Extended</description>
    </item>
    <item>
      <title>Expect Nighttime Closures of SR 14 near I-5, Sept. 11- Sept. 19</title>
      <pubDate>Fri, 07 Sep 2007 21:54:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/07_SR14Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/07_SR14Closures.htm</guid>
      <description>VANCOUVER – Nighttime of closures State Route 14 near I-5 are scheduled to take place between Sept. 11 and Sept. 19.</description>
    </item>
    <item>
      <title>Schedule Change for Murray Morgan Bridge Closure</title>
      <pubDate>Wed, 05 Sep 2007 05:43:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/04_MurrayMorganBridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/04_MurrayMorganBridgeClosure.htm</guid>
      <description>Schedule Change for Murray Morgan Bridge Closure</description>
    </item>
    <item>
      <title>Low Violation Rate for Tacoma Narrows Bridge Toll</title>
      <pubDate>Wed, 05 Sep 2007 00:13:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/04_LowViolationRateforTNBToll.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/04_LowViolationRateforTNBToll.htm</guid>
      <description>Low Violation Rate for Tacoma Narrows Bridge Toll</description>
    </item>
    <item>
      <title>US 101 Improvements Reduce Lanes Near Artic</title>
      <pubDate>Sat, 01 Sep 2007 05:32:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/31_US101Improvements.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/31_US101Improvements.htm</guid>
      <description>US 101 Improvements Reduce Lanes Near Artic</description>
    </item>
    <item>
      <title>Daily Closures Start Tuesday on Murray Morgan Bridge in Tacoma</title>
      <pubDate>Sat, 01 Sep 2007 04:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/31_MurrayMorganClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/31_MurrayMorganClosures.htm</guid>
      <description>Daily Closures Start Tuesday on Murray Morgan Bridge in Tacoma</description>
    </item>
    <item>
      <title>US 12 Paving Reduces Lanes over the Wynoochee River Bridge in Montesano</title>
      <pubDate>Sat, 01 Sep 2007 03:14:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/31_US12PavingReduces.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/31_US12PavingReduces.htm</guid>
      <description>US 12 Paving Reduces Lanes over the Wynoochee River Bridge in Montesano</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Aug. 31 – Sept. 7</title>
      <pubDate>Sat, 01 Sep 2007 00:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/31_I405BellevueUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/31_I405BellevueUpdate.htm</guid>
      <description>I-405 Construction Updates in Bellevue Aug. 31 – Sept. 7</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Aug. 31 – Sept. 7</title>
      <pubDate>Sat, 01 Sep 2007 00:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/31_I405KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/31_I405KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland Aug. 31 – Sept. 7</description>
    </item>
    <item>
      <title>WSDOT Alerts Motorists to Nighttime Closures of SR 14 near I-5, Beginning Sept. 11</title>
      <pubDate>Fri, 31 Aug 2007 02:45:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/30_SR14Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/30_SR14Closures.htm</guid>
      <description>VANCOUVER – Motorists traveling State Route 14 near I-5 can expect nighttime closures of the highway and ramps, between Sept. 11 and Sept. 19. A signed detour will be available during those hours</description>
    </item>
    <item>
      <title>SR 103 Parking and Speed Limit Revisions Begin this September in Ocean Park</title>
      <pubDate>Fri, 31 Aug 2007 02:42:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/30_SR103Revisions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/30_SR103Revisions.htm</guid>
      <description>OCEAN PARK – Motorists driving State Route 103 between Vernon Avenue and U Street in Ocean Park will notice new signs being installed in early September.</description>
    </item>
    <item>
      <title>WSDOT’s New Cameras Bring a Clearer Picture of Vancouver Area Traffic</title>
      <pubDate>Thu, 30 Aug 2007 22:15:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/30_I5VancouverCamera.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/30_I5VancouverCamera.htm</guid>
      <description>VANCOUVER – WSDOT (Washington State Department of Transportation) engineers have added 4 new cameras to the popular traffic maps at www.wsdot.wa.gov/traffic/vancouver.</description>
    </item>
    <item>
      <title>Mount Baker Highway Closed East of Glacier Sept. 18 for Erosion Control</title>
      <pubDate>Thu, 30 Aug 2007 06:21:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/29_542closederosioncontrol.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/29_542closederosioncontrol.htm</guid>
      <description>WSDOT will close the Mount Baker Highway (SR 542) all day Sept. 18 at Coal Creek, about 2½ miles east of Glacier, while crews reinforce the eroding stream bank and bridge footings with large boulders.</description>
    </item>
    <item>
      <title>Major Freeway Connection in Olympia Closes Thursday Night</title>
      <pubDate>Thu, 30 Aug 2007 06:21:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/29_US101_bridgejoints.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/29_US101_bridgejoints.htm</guid>
      <description>US 101 ramp to southbound I-5 closed Thursday night.</description>
    </item>
    <item>
      <title>Good To Go! Ends Promotional Period</title>
      <pubDate>Wed, 29 Aug 2007 23:32:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/29_good2goendspromoperiod.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/29_good2goendspromoperiod.htm</guid>
      <description>Good To Go! Ends Promotional Period</description>
    </item>
    <item>
      <title>Paving on Northbound and Southbound I-405 in Kirkland</title>
      <pubDate>Wed, 29 Aug 2007 04:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/28_I405KirklandPaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/28_I405KirklandPaving.htm</guid>
      <description>Today, crews closed two northbound lanes between NE 116th Street and NE 124th Street to slow drivers down to prevent them from hitting two consecutive bumps in the road too hard. WSDOT plans to reopen the lanes for this afternoon’s peak commute when speeds are slower.</description>
    </item>
    <item>
      <title>Smoother Road Ahead for SR 166 in Port Orchard</title>
      <pubDate>Wed, 29 Aug 2007 04:13:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/28_SmootherRoadAheadforSR166.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/28_SmootherRoadAheadforSR166.htm</guid>
      <description>Smoother Road Ahead for SR 166 in Port Orchard</description>
    </item>
    <item>
      <title>WSDOT Driver Tips: I-90 travel could set records, check your route and best times to travel</title>
      <pubDate>Wed, 29 Aug 2007 00:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/23_LaborDayTraffic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/23_LaborDayTraffic.htm</guid>
      <description>OLYMPIA – WSDOT advises travelers to plan, check, prepare, and repeat for Labor Day weekend. Traffic managers say 2006 winter storm leftovers have more drivers heading to I-90 and US 2 for Labor Day.</description>
    </item>
    <item>
      <title>Hiyu to Operate on the Point Defiance-Tahlequah Ferry Route Through mid-September</title>
      <pubDate>Tue, 28 Aug 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/hiyu-to-continue-at-pt-defiance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/hiyu-to-continue-at-pt-defiance.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Crews Continue to Pave Tonight on Southbound I-5 in Tacoma</title>
      <pubDate>Tue, 28 Aug 2007 03:57:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/27_CrewsContinuetoPaveTonightonSBI5inTacoma.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/27_CrewsContinuetoPaveTonightonSBI5inTacoma.htm</guid>
      <description>Crews Continue to Pave Tonight on Southbound I-5 in Tacoma</description>
    </item>
    <item>
      <title>WSDOT and WSP Coordinate for Presidential Visit This Afternoon</title>
      <pubDate>Mon, 27 Aug 2007 23:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/27_PresidentialVisit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/27_PresidentialVisit.htm</guid>
      <description>President George Bush is scheduled to visit Bellevue this afternoon. WSDOT traffic engineers, Incident Response teams, Washington State Patrol troopers will work together to make sure both the President and Puget Sound drivers get to their destinations smoothly and safely.</description>
    </item>
    <item>
      <title>WSDOT Opens Lanes on Northbound I-5 in Seattle, Drivers Get Smoother and Safer Ride: WSDOT thanks drivers for making tough traffic project a lot better</title>
      <pubDate>Sat, 25 Aug 2007 19:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/25_I-5ConstructionComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/25_I-5ConstructionComplete.htm</guid>
      <description>At 5:45 a.m., WSDOT contractor, Concrete Barrier Inc., pulled the last barrels on northbound I-5 through downtown Seattle opening lanes and ending the 14-day around-the-clock lane closures. Drivers now have a smoother and safer ride.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Aug. 24-31</title>
      <pubDate>Sat, 25 Aug 2007 13:11:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/24_BellevueUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/24_BellevueUpdate.htm</guid>
      <description>Next week, crews working for the Washington State Department of Transportation will repair pavement on southbound I-405 in South Bellevue. Repairs to the concrete roadway in both directions of I-405 will occur through late fall or early winter. Other work next week will include painting stripes on the roadway, installing temporary barriers, and restoring a wetland at Kelsey Creek Park.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Aug. 24 - 31</title>
      <pubDate>Sat, 25 Aug 2007 13:05:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/24_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/24_KirklandUpdate.htm</guid>
      <description>Next week crews working for the Washington State Department of Transportation will install signs and pave sections of the roadway.</description>
    </item>
    <item>
      <title>WSDOT and Drivers Counting the Hours on I-5 Seattle Project</title>
      <pubDate>Sat, 25 Aug 2007 09:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/24_I5SeattleEvening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/24_I5SeattleEvening.htm</guid>
      <description>The expansion joints are done. The paving is done. Tonight, crews will re-stripe the freeway, put down reflective markers and move barrier and barrels. And then, the I-5 downtown Seattle round-the-clock lane closures will be done.</description>
    </item>
    <item>
      <title>Crews Pave Tonight on Southbound I-5 in Tacoma</title>
      <pubDate>Sat, 25 Aug 2007 06:04:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/24_CrewsPaveTonightonSouthboundI-5inTacoma.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/24_CrewsPaveTonightonSouthboundI-5inTacoma.htm</guid>
      <description>Crews Pave Tonight on Southbound I-5 in Tacoma</description>
    </item>
    <item>
      <title>Crews Make Temporary Repairs to I-5 in Bellingham at Night</title>
      <pubDate>Sat, 25 Aug 2007 05:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/24_i5closedatnight.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/24_i5closedatnight.htm</guid>
      <description>Crews will repair cracked and broken I-5 concrete panels at night next week in Bellingham.</description>
    </item>
    <item>
      <title>Bridge Crew's Hard Work Reopens SR 7 Early</title>
      <pubDate>Sat, 25 Aug 2007 03:30:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/24_BridgeCrewsHardWorkReopensSR7Early.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/24_BridgeCrewsHardWorkReopensSR7Early.htm</guid>
      <description>Bridge Crew’s Hard Work Reopens SR 7 Early</description>
    </item>
    <item>
      <title>Ramp Closures Next Week in Tacoma</title>
      <pubDate>Sat, 25 Aug 2007 03:22:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/24_38thRampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/24_38thRampClosure.htm</guid>
      <description>Ramp Closures Next Week in Tacoma</description>
    </item>
    <item>
      <title>Crews Race to Finish Construction Work on Northbound I-5 in Seattle; Drivers Should Expect Varied Lane and Ramp Closures Overnight</title>
      <pubDate>Sat, 25 Aug 2007 01:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/24_I-5CrewsRacetoFinish.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/24_I-5CrewsRacetoFinish.htm</guid>
      <description>Drivers are experiencing 20 minute plus delays as we work through the last workday of closures on northbound I-5 in Seattle.</description>
    </item>
    <item>
      <title>I-5 to close in both directions at Interstate Bridges</title>
      <pubDate>Sat, 25 Aug 2007 00:39:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/24_I5BridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/24_I5BridgeClosure.htm</guid>
      <description>Oregon Department of Transportation maintenance crews will close northbound and southbound Interstate 5 to ALL traffic at the Interstate Bridges on Saturday night, Sept. 8, from 11 p.m. to Sunday morning, Sept. 9 at 8 a.m.</description>
    </item>
    <item>
      <title>Good News for I-5 Seattle Drivers: WSDOT is 36 Hours Away from Done</title>
      <pubDate>Fri, 24 Aug 2007 09:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/23_I5SeattleEveningUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/23_I5SeattleEveningUpdate.htm</guid>
      <description>Drivers are about 36 hours away from wide-open lanes on northbound I-5 through Seattle. Tonight, crews will continue paving the mainline of I-5 and then move to the shoulders Friday.</description>
    </item>
    <item>
      <title>I-5 Construction in Seattle Heads into Home Stretch</title>
      <pubDate>Fri, 24 Aug 2007 00:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/23_I5MorningUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/23_I5MorningUpdate.htm</guid>
      <description>I-5 Construction in Seattle Heads into Home Stretch</description>
    </item>
    <item>
      <title>Travelers Warned to Expect Delays on the Point Defiance-Tahlequah Ferry Route</title>
      <pubDate>Thu, 23 Aug 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/pt-defiance-route-delays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/pt-defiance-route-delays.htm</guid>
      <description></description>
    </item>
    <item>
      <title>I-5 Construction in Seattle Moves into Final Phase Tonight</title>
      <pubDate>Thu, 23 Aug 2007 10:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/22-I-5MovesFinalPhase.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/22-I-5MovesFinalPhase.htm</guid>
      <description>Thursday morning, drivers on northbound Interstate 5 will notice something a bit different as they pass through the construction zone just south of downtown Seattle. Overnight, crews will remove over 1,900 feet of concrete barrier on the northern end of the project as the largest construction closure in Washington State history moves into its final phase.</description>
    </item>
    <item>
      <title>Four Day Highway Closure at Lake Wenatchee Coming in September</title>
      <pubDate>Thu, 23 Aug 2007 06:09:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/082207SR207Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/082207SR207Closure.htm</guid>
      <description>SR 207 will be closed from US 2 to Lake Wenatchee State Park from September 10th through the 13th by the Chelan County Natural Resources Department which will be installing two culverts to reconnect historic fish spawning channels with Nason Creek.</description>
    </item>
    <item>
      <title>Overnight Closures of Northbound I-5 in South Everett As Crews Finish Removing Bridge</title>
      <pubDate>Thu, 23 Aug 2007 06:06:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/22_I5SouthEverett112thBridgeDemo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/22_I5SouthEverett112thBridgeDemo.htm</guid>
      <description>Saturday, Sunday and Monday nights (Aug. 25, 26 and 27) crews will close all lanes of northbound I-5 between 128th Street SE and SR 527 to demolish the old east 112th Street SE bridge. Traffic will be detoured to SR 527 to bypass the closure. Crews will also close 112th Street SE where it crosses over I-5 each of these nights.</description>
    </item>
    <item>
      <title>Crews Hit the Pavement Running: Improved Weather Helps Progress on Northbound I-5 in Seattle</title>
      <pubDate>Thu, 23 Aug 2007 00:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/22_MorningUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/22_MorningUpdate.htm</guid>
      <description>Crews rushed to work when the weather cleared yesterday and completed paving more than 10,000 linear feet on the mainline and shoulders by late last night. Their hard work is paying off; despite the weather challenges of the past few days, crews are optimistic that they can have the northbound I-5 lanes through downtown Seattle open by 5 a.m. Saturday morning.</description>
    </item>
    <item>
      <title>Northbound I-5 Seattle Paving Back on Track After Rain Delays</title>
      <pubDate>Wed, 22 Aug 2007 10:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/21-I5-Pavingbackontrack.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/21-I5-Pavingbackontrack.htm</guid>
      <description>Crews hope Wednesday is nothing like Tuesday. They are hoping for, and counting on, clear, rain-free skies to finish the paving on I-5 through downtown Seattle by Saturday morning.</description>
    </item>
    <item>
      <title>Rain Delays Paving Closures on US 12/SR 107 Ramps</title>
      <pubDate>Wed, 22 Aug 2007 04:37:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/21_US12RainDelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/21_US12RainDelays.htm</guid>
      <description>Rain Delays Paving Closures on US 12/SR 107 Ramps</description>
    </item>
    <item>
      <title>WSDOT Detours US 12 onto Tieton Road While Blasting Unstable Slope August 22</title>
      <pubDate>Wed, 22 Aug 2007 02:12:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/21_US12TietonDetour.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/21_US12TietonDetour.htm</guid>
      <description>WHITE PASS – On Wednesday August 22 only, traffic will be detoured onto Tieton Road from 7 a.m. to 7 p.m. while the contractor does controlled blasting near the Rimrock Tunnel (15 miles east of White Pass).</description>
    </item>
    <item>
      <title>Traffic and Paving Delays on I-5 in Seattle</title>
      <pubDate>Wed, 22 Aug 2007 01:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/21_RainAndPavingDelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/21_RainAndPavingDelays.htm</guid>
      <description>Traffic and Paving Delays on I-5 in Seattle</description>
    </item>
    <item>
      <title>Crews Complete Work on All 34 Expansion Joints on I-5 Seattle Project</title>
      <pubDate>Tue, 21 Aug 2007 09:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/20_Crewsfinishjoints.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/20_Crewsfinishjoints.htm</guid>
      <description>One part of the two-part project on northbound I-5 through downtown Seattle is complete. Today at 3 p.m., crews finished replacing 34 old, worn-out expansion joints. Now the contractor, Concrete Barrier Inc., will focus his attention on paving the 1.13 mile section of freeway.</description>
    </item>
    <item>
      <title>New Signal on SR 502 at NE 199th Street Begins Operating Tomorrow</title>
      <pubDate>Tue, 21 Aug 2007 04:12:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/20_SR502Signal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/20_SR502Signal.htm</guid>
      <description>BATTLE GROUND – Motorists driving State Route 502, also known as 10th Avenue, will notice a new signal in operation Tuesday, August 21.</description>
    </item>
    <item>
      <title>I-5 Closures in Lacey as Crews Polish Off Pedestrian Bridge</title>
      <pubDate>Tue, 21 Aug 2007 03:40:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/20_I5closureslacey.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/20_I5closureslacey.htm</guid>
      <description>I-5 Closures in Lacey as Crews Polish Off Pedestrian Bridge</description>
    </item>
    <item>
      <title>Rain Complicates Morning Commute and Paving Progress on I-5 in Seattle</title>
      <pubDate>Tue, 21 Aug 2007 00:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/20_I5MorningUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/20_I5MorningUpdate.htm</guid>
      <description>Rain Complicates Morning Commute and Paving Progress on I-5 in Seattle</description>
    </item>
    <item>
      <title>US 12 Paving Closes SR 107 Ramps</title>
      <pubDate>Mon, 20 Aug 2007 23:46:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/20_US12PAVING.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/20_US12PAVING.htm</guid>
      <description>US 12 Paving Closes SR 107 Ramps</description>
    </item>
    <item>
      <title>Labor Day Weekend Ferry Travel</title>
      <pubDate>Mon, 20 Aug 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/labor-day-travel.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/labor-day-travel.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Mother Nature Slows Construction on I-5 in Seattle, But Crews Press On</title>
      <pubDate>Mon, 20 Aug 2007 01:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/19_I-5MorningUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/19_I-5MorningUpdate.htm</guid>
      <description>Mother Nature Slows Construction on I-5 in Seattle, But Crews Press On</description>
    </item>
    <item>
      <title>Northbound I-5 in Seattle Still Reduced to Two Lanes; WSDOT Asks Drivers to Plan Ahead</title>
      <pubDate>Sun, 19 Aug 2007 19:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/20_DriversShouldPlanAhead.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/20_DriversShouldPlanAhead.htm</guid>
      <description>Northbound I-5 in Seattle Still Reduced to Two Lanes; WSDOT Asks Drivers to Plan Ahead
 
Spokane Street on-ramp reopens for daytime traffic tomorrow morning</description>
    </item>
    <item>
      <title>I-5 Seattle Construction Crews Looking for Mother Nature's Help Sunday</title>
      <pubDate>Sun, 19 Aug 2007 19:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/19_CrewsLookForMotherNature.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/19_CrewsLookForMotherNature.htm</guid>
      <description>I-5 Seattle Construction Crews Looking for Mother Nature's Help Sunday</description>
    </item>
    <item>
      <title>Coming Soon to Stanwood:  A Smoother, Safer Surface for SR 532</title>
      <pubDate>Sun, 19 Aug 2007 02:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/18_SR532Stanwood.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/18_SR532Stanwood.htm</guid>
      <description>Coming Soon to Stanwood:  A Smoother, Safer Surface for SR 532</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Aug. 17-24</title>
      <pubDate>Sun, 19 Aug 2007 02:21:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/18_BellevueUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/18_BellevueUpdates.htm</guid>
      <description>I-405 Construction Updates in Bellevue Aug. 17-24</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Aug. 17-24</title>
      <pubDate>Sun, 19 Aug 2007 02:16:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/18_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/18_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland Aug. 17-24</description>
    </item>
    <item>
      <title>Crews Build a Better Intersection at SR 9 and Lauck Road in Just 10 Weeks</title>
      <pubDate>Sun, 19 Aug 2007 02:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/18_LauckRoadFinished.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/18_LauckRoadFinished.htm</guid>
      <description>Crews Build a Better Intersection at SR 9 and Lauck Road in Just 10 Weeks</description>
    </item>
    <item>
      <title>WSDOT Continues to Modify Signs to Help Drivers on Northbound I-5 in Seattle</title>
      <pubDate>Sun, 19 Aug 2007 01:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/18_I5SignChange.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/18_I5SignChange.htm</guid>
      <description>WSDOT Continues to Modify Signs to Help Drivers on Northbound I-5 in Seattle</description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to Changes in Ramps and Signs Overnight on I-5 Seattle Construction Project</title>
      <pubDate>Sat, 18 Aug 2007 10:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/17_I5FridayUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/17_I5FridayUpdate.htm</guid>
      <description>WSDOT Alerts Drivers to Changes in Ramps and Signs Overnight on I-5 Seattle Construction Project</description>
    </item>
    <item>
      <title>Improvements Coming to I-5 Marvin Road Ramp</title>
      <pubDate>Sat, 18 Aug 2007 06:21:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/17_5_MarvinRdRamp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/17_5_MarvinRdRamp.htm</guid>
      <description>Next week work begins to improve the I-5 Marvin Road southbound off ramp in Lacey.</description>
    </item>
    <item>
      <title>WSDOT Hosts Public Transportation Conference in Vancouver August 19-21</title>
      <pubDate>Sat, 18 Aug 2007 02:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/17_PublicTransportationInVancouver.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/17_PublicTransportationInVancouver.htm</guid>
      <description>VANCOUVER – With major road construction and high gas prices, transit agencies are seeing growth in bus ridership and a record high in vanpool ridership.</description>
    </item>
    <item>
      <title>WSDOT Hosts Public Transportation Conference in Vancouver</title>
      <pubDate>Sat, 18 Aug 2007 01:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/PublicTransportationConference.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/PublicTransportationConference.htm</guid>
      <description>WSDOT hosts the 2007 Public Transportation Conference and Expo on August 19-21 in Vancouver.</description>
    </item>
    <item>
      <title>Northbound I-5 Slow-Going Through Seattle Construction Zone, Drivers Should Expect Weekend Delays</title>
      <pubDate>Sat, 18 Aug 2007 00:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/18_I5SeattleMorningUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/18_I5SeattleMorningUpdate.htm</guid>
      <description>This morning, commuters experienced the first big back-ups on northbound I-5 since WSDOT's expansion joint replacement project began in downtown Seattle. Last night, construction crews squeezed the northbound lanes down to two, one of which is a collector-distributor lane that veers away then rejoins the mainline. What's ahead? More of the same until the project is finished.</description>
    </item>
    <item>
      <title>WSDOT Asks Drivers to Be Ready for New Northbound I-5 Configuration in Seattle Friday Morning</title>
      <pubDate>Fri, 17 Aug 2007 08:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/16_I5TrafficSwitch.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/16_I5TrafficSwitch.htm</guid>
      <description>WSDOT Asks Drivers to Be Ready for New Northbound I-5 Configuration in Seattle Friday Morning</description>
    </item>
    <item>
      <title>Good Golly Nisqually</title>
      <pubDate>Fri, 17 Aug 2007 07:02:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/16_GoodGollyNisqually.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/16_GoodGollyNisqually.htm</guid>
      <description>Good Golly Nisqually</description>
    </item>
    <item>
      <title>SR 401 Dismal Nitch Safety Rest Area Now Fully Operational</title>
      <pubDate>Fri, 17 Aug 2007 06:48:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/16_SR401DismalNitchRestArea.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/16_SR401DismalNitchRestArea.htm</guid>
      <description>NASELLE – The Dismal Nitch Safety Area on State Route 401, formerly known as Megler Safety Rest Area, one mile east of the US 101 Astoria-Megler Bridge, is now fully operational with a newly installed water system announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Northbound I-5 in Seattle to Be Reduced to Two Lanes by Friday Morning</title>
      <pubDate>Fri, 17 Aug 2007 02:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/16_I5SeattleConstruction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/16_I5SeattleConstruction.htm</guid>
      <description>Today, crews working on the I-5 construction in Seattle are completing final touches to switch the northbound traffic from the three left lanes to two right lanes tonight.</description>
    </item>
    <item>
      <title>Bridge Demolition Requires Total Closures of Southbound I-5 in South Everett</title>
      <pubDate>Thu, 16 Aug 2007 23:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/15_I5SouthEverett112thBridgeDemo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/15_I5SouthEverett112thBridgeDemo.htm</guid>
      <description>Saturday, Sunday and Monday nights (Aug. 18, 19 and 20) crews will close all lanes of southbound I-5 between 128th Street SE and SR 527 to demolish one of the old 112th Street SE bridges. Traffic will be detoured to SR 527 to bypass the closure. Crews will also close 112th Street SE where it crosses over I-5 each of these nights.</description>
    </item>
    <item>
      <title>I-5 Seattle Construction Hits Bump in the Road - Traffic Switch Postponed to Thursday Night</title>
      <pubDate>Thu, 16 Aug 2007 12:44:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/I5constructionswitch.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/I5constructionswitch.htm</guid>
      <description>I-5 Seattle Construction Hits Bump in the Road - Traffic Switch Postponed to Thursday Night</description>
    </item>
    <item>
      <title>Eastbound SR 16 Lane and Ramp Closures Scheduled Tonight and Tomorrow Near Toll Plaza</title>
      <pubDate>Thu, 16 Aug 2007 06:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/15_EastboundSR16LaneClosuresScheduledNearTollPlaza.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/15_EastboundSR16LaneClosuresScheduledNearTollPlaza.htm</guid>
      <description>Eastbound SR 16 Lane and Ramp Closures Scheduled Tonight and Tomorrow Near Toll Plaza</description>
    </item>
    <item>
      <title>Work Continues on Hoquiam's Simpson Avenue Bridge</title>
      <pubDate>Thu, 16 Aug 2007 05:51:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/15_WorkContinuesonHoquiamsSimsponAvenueBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/15_WorkContinuesonHoquiamsSimsponAvenueBridge.htm</guid>
      <description>Work Continues on Hoquiam’s Simpson Avenue Bridge</description>
    </item>
    <item>
      <title>Two New Alternatives on the Table for SR 3's Belfair Bypass</title>
      <pubDate>Thu, 16 Aug 2007 04:45:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/15_TwoNewAlternativesfor+SR3Belfair+Bypass.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/15_TwoNewAlternativesfor+SR3Belfair+Bypass.htm</guid>
      <description>Two New Alternatives on the Table for SR 3’s Belfair Bypass</description>
    </item>
    <item>
      <title>Everett’s Northbound I-5 Exit to 41st Street to Close Thursday Night and Through the Weekend</title>
      <pubDate>Thu, 16 Aug 2007 04:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/15_I5Everett41stRampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/15_I5Everett41stRampClosure.htm</guid>
      <description>Construction crews working for WSDOT will close the northbound I-5 exit to 41st Street starting 10 p.m. Thursday night and will keep it closed as late as 6 a.m. Monday morning. Crews will also need to close the northbound I-5 exit to Broadway overnight starting tonight and throughout the weekend.</description>
    </item>
    <item>
      <title>I-5 Seattle Construction Project Currently Five Days Ahead of Schedule</title>
      <pubDate>Thu, 16 Aug 2007 00:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/15_I5Spokane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/15_I5Spokane.htm</guid>
      <description>WSDOT announced that Concrete Barrier Inc. crews have made excellent progress, are now five days ahead of schedule and will complete this project by 5 a.m., Saturday, Aug. 25 or faster, barring unforeseen problems.</description>
    </item>
    <item>
      <title>Drivers Keep Helping, but More are Back on the Road as I-5 Seattle Construction Steams Ahead</title>
      <pubDate>Wed, 15 Aug 2007 11:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/14_I-5MoreBackOnRoad.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/14_I-5MoreBackOnRoad.htm</guid>
      <description>Traffic volumes on I-5 and two key alternate routes increased over Monday’s afternoon and early evening commute.</description>
    </item>
    <item>
      <title>Smooth Sailing for I-5 Seattle Construction and Traffic This Morning; WSDOT Urges Drivers to Stay the Course</title>
      <pubDate>Wed, 15 Aug 2007 04:39:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/8_14I5PressRelease.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/8_14I5PressRelease.htm</guid>
      <description>Smooth Sailing for I-5 Seattle Construction and Traffic This Morning; WSDOT Urges Drivers to Stay the Course</description>
    </item>
    <item>
      <title>US Department of Transportation Names SR 520 Bridge Replacement A Federal Priority</title>
      <pubDate>Wed, 15 Aug 2007 01:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/14_SR520UPA.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/14_SR520UPA.htm</guid>
      <description>SEATTLE -- The US Department of Transportation today selected the SR 520 Bridge replacement as a priority project to receive grant funding and additional federal support under an innovative grant program designed to improve traffic through the combined implementation of advanced transit, technology, telecommuting and tolling. The USDOT announcement could eventually provide an additional $127 million in federal funding for projects related to the SR 520 bridge replacement.</description>
    </item>
    <item>
      <title>WSDOT Calls for Projects that Reduce Drive-Alone Commuting</title>
      <pubDate>Wed, 15 Aug 2007 00:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/14_TripReductionRoundII.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/14_TripReductionRoundII.htm</guid>
      <description>WSDOT’s Trip Reduction Performance Program (TRPP) is looking for new and innovative programs that help get people out of their cars and into buses, trains, vanpool, or other commute options.</description>
    </item>
    <item>
      <title>Crews Lower SR 20 South of Oak Harbor Starting Sunday</title>
      <pubDate>Tue, 14 Aug 2007 23:57:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/14_sr20lowerOakHarborHill.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/14_sr20lowerOakHarborHill.htm</guid>
      <description>For the second time this month, crews will lower another hill along SR 20 in south Oak Harbor to improve sight distance for drivers turning on and off the highway. Drivers should be prepared for lane closures and delays all week.</description>
    </item>
    <item>
      <title>Drivers should expect delays over I-90 Snoqualmie Pass on Tuesday, Aug. 14</title>
      <pubDate>Tue, 14 Aug 2007 23:33:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/SnoqualmiePassDrillingWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/SnoqualmiePassDrillingWork.htm</guid>
      <description>Drivers should expect 20-25 minute delays over I-90 Snoqualmie Pass about nine miles east of the summit near the snow shed on Tuesday, August 14 from 6 a.m. to 6 p.m.</description>
    </item>
    <item>
      <title>I-5 Construction Progress 9:00 p.m. – Crews Pick up the Paving Pace; WSDOT Asks Drivers to Keep up the Good Work</title>
      <pubDate>Tue, 14 Aug 2007 11:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/13_9pmUpdateI5.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/13_9pmUpdateI5.htm</guid>
      <description>Crews working to repave northbound Interstate 5 between I-90 and Spokane Street are still on schedule and are planning to set the bar higher. Tonight, they hope to increase their paving rate from 15 cubic feet per hour to 20 cubic feet per hour. At this rate they hope to shift traffic and begin stage 3 by Thursday.</description>
    </item>
    <item>
      <title>I-5 Seattle Construction Project Off to a Great Start; WSDOT Thanks Drivers for their Help</title>
      <pubDate>Tue, 14 Aug 2007 05:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/13_I-5Seattle.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/13_I-5Seattle.htm</guid>
      <description>I-5 Seattle Construction Project Off to a Great Start; WSDOT Thanks Drivers for their Help</description>
    </item>
    <item>
      <title>Weekend Road Closure Planned in Poulsbo</title>
      <pubDate>Tue, 14 Aug 2007 04:43:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/08_13_SR307closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/08_13_SR307closure.htm</guid>
      <description>Weekend Road Closure Planned in Poulsbo</description>
    </item>
    <item>
      <title>Bridge Openings Mean Delays on Simpson Avenue Bridge</title>
      <pubDate>Tue, 14 Aug 2007 02:50:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/13_BridgeOpeningsMeanDelaysonSimpsonAveBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/13_BridgeOpeningsMeanDelaysonSimpsonAveBridge.htm</guid>
      <description>Bridge Openings Mean Delays on Simpson Avenue Bridge</description>
    </item>
    <item>
      <title>Half the Number of Drivers Seen on I-5 in Seattle During Monday Morning Commute; WSDOT Asks Drivers to Stay the Course</title>
      <pubDate>Tue, 14 Aug 2007 01:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/13amI5Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/13amI5Closure.htm</guid>
      <description>Thanks to drivers, the Monday morning commute went smoothly on northbound I-5 and alternate routes.</description>
    </item>
    <item>
      <title>Weekend Road Closure Planned in Poulsbo</title>
      <pubDate>Mon, 13 Aug 2007 22:49:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/13_WeekendRoadClosurePlannedinPouslbo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/13_WeekendRoadClosurePlannedinPouslbo.htm</guid>
      <description>Weekend Road Closure Planned in Poulsbo</description>
    </item>
    <item>
      <title>I-5 Construction Progress 8:30 p.m. – Crews On Schedule Despite Threat of Rain; Driver’s Help Needed for Weekday Commute</title>
      <pubDate>Mon, 13 Aug 2007 10:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/12_I5SpokaneSt_PM.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/12_I5SpokaneSt_PM.htm</guid>
      <description>I-5 Construction Progress 8:30 p.m. – Crews On Schedule Despite Threat of Rain; Driver’s Help Needed for Weekday Commute</description>
    </item>
    <item>
      <title>I-5 Construction Progress 10:30 a.m. – Crews Gearing Up for Afternoon Showers</title>
      <pubDate>Mon, 13 Aug 2007 02:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/12_I5SpokanetoI90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/12_I5SpokanetoI90.htm</guid>
      <description>A 20-foot-long by 10-foot-wide blow dryer is sitting on a flat bed truck in the north end of our work zone, poised and ready for action.  Crews are gearing up for light showers after a conversation with WSDOT's weather consultant forecasted a possibility of light precipitation dampening roadway surfaces sometime this afternoon.</description>
    </item>
    <item>
      <title>I-5 Construction Progress 7:30 p.m. – So Far, So Good, but Showers Loom Sunday for I-5 Construction in Downtown Seattle</title>
      <pubDate>Sun, 12 Aug 2007 10:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/11_I5SeattleClosures8PM.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/11_I5SeattleClosures8PM.htm</guid>
      <description>Crews are on schedule and traffic is moving, but a wet Sunday could throw WSDOT’s northbound I-5 construction near downtown Seattle off track.</description>
    </item>
    <item>
      <title>I-5 Construction Progress 10 a.m.– Crews On-Schedule As Paving Begins on the Spokane Street On-Ramp</title>
      <pubDate>Sun, 12 Aug 2007 00:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/11_10amI5Update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/11_10amI5Update.htm</guid>
      <description>I-5 Construction Progress 10 a.m.– Crews On-Schedule As Paving Begins on the Spokane Street On-Ramp</description>
    </item>
    <item>
      <title>WSDOT’s Northbound I-5 Downtown Seattle Work Starts</title>
      <pubDate>Sat, 11 Aug 2007 07:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/10_I5ConstructionClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/10_I5ConstructionClosures.htm</guid>
      <description>After months of planning, preparation and outreach, the northbound I-5 closures through downtown Seattle start tonight. Drivers will notice lane closures beginning at 7 p.m.</description>
    </item>
    <item>
      <title>WSDOT Revises I-405 Traffic in Bellevue Work Zone to Relieve Anticipated Congestion During Round-the-Clock Construction Closures on Northbound I-5</title>
      <pubDate>Sat, 11 Aug 2007 07:19:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/10_I405SouthBelleuve.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/10_I405SouthBelleuve.htm</guid>
      <description>Crews working for the Washington State Department of Transportation will close the eastbound and westbound I-90 ramps to northbound I-405 tonight to remove concrete barriers that were causing long back-ups on westbound I-90.</description>
    </item>
    <item>
      <title>Toll Evaders Issued Citations</title>
      <pubDate>Sat, 11 Aug 2007 07:07:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/10_TollEvadersIssuedCitations.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/10_TollEvadersIssuedCitations.htm</guid>
      <description>Toll Evaders Issued Citations</description>
    </item>
    <item>
      <title>Finishing Touches on Pedestrian Bridge Means I-5 Closures in Olympia</title>
      <pubDate>Sat, 11 Aug 2007 06:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/10_FinishingtouchesonPedBridgeMeansI5ClosureinOly.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/10_FinishingtouchesonPedBridgeMeansI5ClosureinOly.htm</guid>
      <description>Finishing Touches on Pedestrian Bridge Means I-5 Closures in Olympia</description>
    </item>
    <item>
      <title>Busy Week on I-5 through Pierce County</title>
      <pubDate>Sat, 11 Aug 2007 04:03:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/10_BusyWeekonI5throughPierceCounty.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/10_BusyWeekonI5throughPierceCounty.htm</guid>
      <description>Busy Week on I-5 through Pierce County</description>
    </item>
    <item>
      <title>I-405 Construction in Bellevue Aug. 10-17</title>
      <pubDate>Fri, 10 Aug 2007 06:52:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/9_I405Bellevue.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/9_I405Bellevue.htm</guid>
      <description>Construction closures affecting I-405 traffic in Bellevue the week of August 10-17.</description>
    </item>
    <item>
      <title>I-405 Construction in Kirkland August 10-17</title>
      <pubDate>Fri, 10 Aug 2007 06:46:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/9_I405Kirkland.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/9_I405Kirkland.htm</guid>
      <description>Construction closures affecting I-405 traffic in Kirkland the week of August 10-17.</description>
    </item>
    <item>
      <title>SR 7 Maintenance Work Closes Mashel Bridge</title>
      <pubDate>Fri, 10 Aug 2007 04:05:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/09_SR7MaintenenanceWorkClosesMashelRiverBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/09_SR7MaintenenanceWorkClosesMashelRiverBridge.htm</guid>
      <description>SR 7 Maintenance Work Closes Mashel Bridge</description>
    </item>
    <item>
      <title>I-5 Lane Closures This Weekend in Tacoma</title>
      <pubDate>Fri, 10 Aug 2007 01:45:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/09_I5_laneclosures_tacoma.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/09_I5_laneclosures_tacoma.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Drivers Switch to New SR 543 Lanes in Blaine Next Week</title>
      <pubDate>Thu, 09 Aug 2007 22:22:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/09_sr543northboundlanesopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/09_sr543northboundlanesopen.htm</guid>
      <description>Drivers will switch to the new northbound lanes of SR 543 in Blaine as early as Tuesday to make room for construction on the D Street interchange and future southbound lanes.</description>
    </item>
    <item>
      <title>Round-the-Clock Weekend Closure of Westbound SR 520 Off-Ramp to NE 51st Street Begins Friday Night in Redmond</title>
      <pubDate>Thu, 09 Aug 2007 07:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/8_520RampsClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/8_520RampsClosed.htm</guid>
      <description>Crews working for the Washington State Department of Transportation will close the westbound SR 520 off-ramp to NE 51st Street beginning at 7 p.m. Friday, Aug. 10 until 5 a.m. Monday, Aug. 13, to repair failing pavement.</description>
    </item>
    <item>
      <title>Two Days to Major Lane Closures in Seattle</title>
      <pubDate>Thu, 09 Aug 2007 06:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/8_48hourCountdown.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/8_48hourCountdown.htm</guid>
      <description>The countdown is on. Only 48 hours until WSDOT contractor crews close multiple lanes and ramps on northbound I-5 in downtown Seattle around the clock for up to 19 days.</description>
    </item>
    <item>
      <title>Crews Begin Construction on Kelsey Creek Wetland; I-405 Project Includes Other Environmental Benefits</title>
      <pubDate>Thu, 09 Aug 2007 06:03:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/8_KelseyCreek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/8_KelseyCreek.htm</guid>
      <description>This summer, crews working for WSDOT are restoring a wetland at Kelsey Creek Park to provide environmental mitigation for projects along the I-405 corridor.</description>
    </item>
    <item>
      <title>Essential Maintenance Requires Ferry Vessel Changes</title>
      <pubDate>Wed, 08 Aug 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/ferry-vessel-changes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/ferry-vessel-changes.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Crews Switching Traffic to New 112th Street Bridges Over I-5 in South Everett</title>
      <pubDate>Wed, 08 Aug 2007 03:58:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/07_i5SouthEverett112thBridges.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/07_i5SouthEverett112thBridges.htm</guid>
      <description>Crews are switching traffic off of the old 112th Street SE bridges over I-5 and onto the new bridges just north of the old overpass, as part of Sound Transit’s I-5 South Everett Freeway Station Project.</description>
    </item>
    <item>
      <title>Hood Canal Bridge Routine Inspections May Cause Minor Traffic Delays</title>
      <pubDate>Wed, 08 Aug 2007 00:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/SR104HCBInspections.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/SR104HCBInspections.htm</guid>
      <description>Hood Canal Bridge Routine Inspections May Cause Minor Traffic Delays</description>
    </item>
    <item>
      <title>WSDOT to Fund $1.3 Million in 2007 Airport Improvement Projects</title>
      <pubDate>Tue, 07 Aug 2007 23:51:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/2007GrantAwards.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/2007GrantAwards.htm</guid>
      <description>WSDOT to Fund $1.3 Million in 2007 Airport Improvement Projects

The 2007-2009 biennium is off to a good start with the Washington State Department of Transportation (WSDOT) Aviation awarding $1.3 million in state grants to 44 airports for 88 different projects. Even better - of that $1.3 million, WSDOT is using approximately $219,000 to leverage $8.4 million in federal funds. Airports also contribute a required 2.5% local match to federal funds for their specific projects. Therefore, the comb</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Tue, 07 Aug 2007 23:40:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/7_SR520MonthlyMaintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/7_SR520MonthlyMaintenance.htm</guid>
      <description>Washington State Department of Transportation bridge crews will test the opening of the drawspan on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>WSF Increases Passenger-Only Sailings During I-5 Construction</title>
      <pubDate>Tue, 07 Aug 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/wsf-increases-passenger-only-sailings-during-i-5-construction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/wsf-increases-passenger-only-sailings-during-i-5-construction.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Northbound I-5 Seattle Lane Closures are only Days Away; WSDOT Releases Closure Diagrams and Opens Public Hotline</title>
      <pubDate>Tue, 07 Aug 2007 03:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/6_I5PublicHotline.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/6_I5PublicHotline.htm</guid>
      <description>Are you ready? At 10 p.m. this Friday, August 10, WSDOT crews will begin closing up to three northbound lanes on I-5 between the West Seattle Bridge and I-90 for 19 days. Crews will replace worn expansion joints and repave this vital section of freeway.</description>
    </item>
    <item>
      <title>Construction Starts on 88th Street Overpass Improvements in Marysville</title>
      <pubDate>Tue, 07 Aug 2007 02:52:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/6_88thStreetImprovementsStart.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/6_88thStreetImprovementsStart.htm</guid>
      <description>Although signs of construction are dreaded in other parts of the region, in Marysville they are a welcome sight for commuters and shoppers at the I-5 and 88th Street interchange. The Tulalip Tribe, WSDOT and contractor Wilder Construction began work last week on the latest round of improvements to ease congestion and increase safety on the busy overpass.</description>
    </item>
    <item>
      <title>SR 501, 45th Ave. Roundabout Opens August 16</title>
      <pubDate>Tue, 07 Aug 2007 01:22:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/06_SR501Roundabouts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/06_SR501Roundabouts.htm</guid>
      <description>RIDGEFIELD – Those traveling SR 501, also known as Pioneer Street, near Ridgefield will notice the completion of a new roundabout at 45th Avenue beginning Aug. 16.</description>
    </item>
    <item>
      <title>I-5 - Everett Paving Operation Will Require Driver’s Patience</title>
      <pubDate>Sat, 04 Aug 2007 03:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/03_I5EverettPaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/03_I5EverettPaving.htm</guid>
      <description>Starting Monday, August 6, construction crews working on WSDOT’s I-5 – Everett HOV freeway expansion project will begin work to resurface about three miles of the freeway in south Everett.</description>
    </item>
    <item>
      <title>WSDOT Takes Closer Look At Steel Truss Bridges</title>
      <pubDate>Sat, 04 Aug 2007 02:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/03_steelbridges.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/03_steelbridges.htm</guid>
      <description>OLYMPIA – The Washington State Department of Transportation is following through on several actions in response to this week’s tragic Minnesota bridge collapse.

Interim Transportation Secretary Paula Hammond directed this morning that WSDOT bridge engineers follow a technical advisory letter from FHWA recommending that WSDOT and all bridge owners should “review inspection reports, including those for routine, in-depth, fracture critical, and underwater, to determine whether more detailed</description>
    </item>
    <item>
      <title>I-5 Downtown Seattle Construction Closures: Choose Your Way into Seattle</title>
      <pubDate>Fri, 03 Aug 2007 21:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/3_TransitOptionsForI5Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/3_TransitOptionsForI5Closures.htm</guid>
      <description>In eight days WSDOT begins the biggest construction closures ever in downtown Seattle. Aug. 10 – Aug. 29, WSDOT contractor crews will close up to three lanes on northbound Interstate 5 and multiple ramps around the clock as workers remove and replace old expansion joints and repave the entire 1.1 mile section between Spokane Street and I-90.</description>
    </item>
    <item>
      <title>WSDOT Delays SR 20 Work Two Weeks in South Oak Harbor</title>
      <pubDate>Fri, 03 Aug 2007 02:17:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/02_sr20hillworkdelayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/02_sr20hillworkdelayed.htm</guid>
      <description>WSDOT will delay plans to flatten a second hill along SR 20 in south Oak Harbor for two weeks to pave a quarter-mile stretch of highway near Monroe Landing first.</description>
    </item>
    <item>
      <title>I-5, Rut Repair Work in Cowlitz County Begins August 9</title>
      <pubDate>Fri, 03 Aug 2007 00:21:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/02_I5CowlitzRutRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/02_I5CowlitzRutRepair.htm</guid>
      <description>KELSO – A project that will result in a safer, smoother driving surface on I-5 in Cowlitz County begins August 9, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Seattle Celebrates Summer with</title>
      <pubDate>Thu, 02 Aug 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/picnic-at-the-pier.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/picnic-at-the-pier.htm</guid>
      <description></description>
    </item>
    <item>
      <title>SR 20 Paving Begins Next Monday near Lyman</title>
      <pubDate>Thu, 02 Aug 2007 04:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/01_sr20Lymanpavingbegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/01_sr20Lymanpavingbegins.htm</guid>
      <description>WSDOT will close lanes during the day on State Route 20 near Lyman to pave 11 miles of the highway and make safety improvements.</description>
    </item>
    <item>
      <title>WSDOT Secretary Statement on Minnesota Bridge Collapse</title>
      <pubDate>Thu, 02 Aug 2007 04:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/08/01_bridgestatement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/08/01_bridgestatement.htm</guid>
      <description>OLYMPIA - Washington Interim Transportation Secretary Paula Hammond tonight offered condolences and encouragement to Minnesotans in response to a bridge collapse in Minneapolis.</description>
    </item>
    <item>
      <title>Prep Work Begins on Simpson Avenue Bridge</title>
      <pubDate>Fri, 03 Aug 2007 00:57:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/2_101_SimpsonAveBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/2_101_SimpsonAveBridge.htm</guid>
      <description>This week crews began work on the US 101 Simpson Ave. Bridge in Grays Harbor County.</description>
    </item>
    <item>
      <title>Crews Begin Stabilizing Slope on Monday</title>
      <pubDate>Thu, 02 Aug 2007 06:22:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/01_CrewsBeginStablilizing+SlopeMonday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/01_CrewsBeginStablilizing+SlopeMonday.htm</guid>
      <description>Crews Begin Stabilizing Slope Monday</description>
    </item>
    <item>
      <title>Month-long Paving Project on US 12 Starts Sunday</title>
      <pubDate>Wed, 01 Aug 2007 23:05:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/01_MonthPavingProjectonUS12.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/01_MonthPavingProjectonUS12.htm</guid>
      <description>Month-long Paving Project on US 12 Starts Sunday</description>
    </item>
    <item>
      <title>Nighttime Lane Closures Start Earlier on Guide Meridian in Bellingham</title>
      <pubDate>Wed, 01 Aug 2007 05:47:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/31_sr539extendednighthours.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/31_sr539extendednighthours.htm</guid>
      <description>Crews will start closing lanes on Guide Meridian (SR 539) one hour earlier in the evenings north of Bellingham to do more work during daylight hours.</description>
    </item>
    <item>
      <title>WSDOT Reduces SR 109 Speed Limit in Hoquiam</title>
      <pubDate>Wed, 01 Aug 2007 05:37:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/31_WSDOT+Reduces+SR+109+Speed+Limit+in+Hoquim.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/31_WSDOT+Reduces+SR+109+Speed+Limit+in+Hoquim.htm</guid>
      <description>WSDOT Reduces SR 109 Speed Limit in Hoquiam</description>
    </item>
    <item>
      <title>Paving Continues This Weekend on 1950 Tacoma Narrows Bridge</title>
      <pubDate>Wed, 01 Aug 2007 04:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/31_sr16_paving_continues.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/31_sr16_paving_continues.htm</guid>
      <description>Paving Continues This Weekend on 1950 Tacoma Narrows Bridge</description>
    </item>
    <item>
      <title>Full Service to Continue of Port Townsend-Keystone Route</title>
      <pubDate>Tue, 31 Jul 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/full-service-to-continue-on-port-townsend-keystone-route.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/full-service-to-continue-on-port-townsend-keystone-route.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Expect 50-Minute Delays on I-405 and I-90 in Bellevue Monday through Wednesday Nights</title>
      <pubDate>Tue, 31 Jul 2007 07:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/30_I405Delays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/30_I405Delays.htm</guid>
      <description>Traffic delays were longer than expected on I-90 and I-405 last night during WSDOT’s scheduled rolling slowdown. Seattle City Light crews raised power lines near the I-90/I-405 interchange and drivers experienced fifty minute delays in both directions of I-90 and I-405 between midnight and 4 a.m.</description>
    </item>
    <item>
      <title>Crews Close I-90 Bridge for Annual Seafair Blue Angels Shows</title>
      <pubDate>Tue, 31 Jul 2007 03:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/30_I90BlueAngelsClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/30_I90BlueAngelsClosures.htm</guid>
      <description>Drivers should plan ahead for this week’s annual closures of Interstate 90 across Lake Washington during the U.S. Navy’s Blue Angels’ Seafair air shows. WSDOT crews will close all lanes of I-90 between I-5 and Island Crest Way several times between Thursday, Aug. 2 and Sunday, Aug. 5 to keep drivers and pilots safe while the Blue Angels practice and perform during Seafair.</description>
    </item>
    <item>
      <title>WSDOT Crews Perform Emergency Repair Work on I-90 East of Preston Tonight</title>
      <pubDate>Tue, 31 Jul 2007 02:21:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/30_I90EmergencyLaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/30_I90EmergencyLaneClosures.htm</guid>
      <description>WSDOT Crews Perform Emergency Repair Work on I-90 East of Preston Tonight</description>
    </item>
    <item>
      <title>South Everett Bridge Work Requires Nightly I-5 Lane Closures, Day and Night Lane Closures on 112th Street SE</title>
      <pubDate>Mon, 30 Jul 2007 22:38:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/30_i5SouthEverettFreewayStation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/30_i5SouthEverettFreewayStation.htm</guid>
      <description>South Everett drivers should expect multiple nighttime lane closures on Interstate 5 and day and nighttime lane closures on the 112th Street SE bridge over the freeway over the next couple of weeks.</description>
    </item>
    <item>
      <title>Crews Begin Surveying I-5 in Marysville for Concrete Median Barrier</title>
      <pubDate>Mon, 30 Jul 2007 21:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/30CrewsSurveyI5Median.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/30CrewsSurveyI5Median.htm</guid>
      <description>Starting this morning, crews will begin taking measurements in the median of Interstate 5, one of the first steps toward replacing 10 miles of cable median barrier adjacent to the northbound lanes with concrete barrier. The cable median barrier adjacent to the southbound lanes will remain in place.</description>
    </item>
    <item>
      <title>Mukilteo Dock/Cathlamet Investigation Report Finalized</title>
      <pubDate>Mon, 30 Jul 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/mukilteo-dockcathlamet-investigation-report-finalized.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/mukilteo-dockcathlamet-investigation-report-finalized.htm</guid>
      <description></description>
    </item>
    <item>
      <title>US 12 Opens One Lane of Alternating Traffic</title>
      <pubDate>Mon, 30 Jul 2007 09:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/US+12+Opens+One+Lane+of+Alternating+Traffic+Sunday+Night+at+8+p.m.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/US+12+Opens+One+Lane+of+Alternating+Traffic+Sunday+Night+at+8+p.m.htm</guid>
      <description>WHITE PASS – WSDOT maintenance, construction and geological experts agree that the most unstable rocks located on the slope above the highway have been removed and the highway is safe to have one lane open by 8 p.m. tonight.</description>
    </item>
    <item>
      <title>SR 508 at Bear Canyon Reopens Today, Emergency Repairs Complete</title>
      <pubDate>Sat, 28 Jul 2007 04:45:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/27_SR508RepairsComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/27_SR508RepairsComplete.htm</guid>
      <description>CHEHALIS – State Route 508 at Bear Canyon reopened at 2:30 p.m. today, after major reconstruction efforts over the last few months.</description>
    </item>
    <item>
      <title>I-90 Drivers and Eastside Residents are Talking; WSDOT is Listening</title>
      <pubDate>Sat, 28 Jul 2007 04:12:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/27_I90BellevuetoNorthBendStudy.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/27_I90BellevuetoNorthBendStudy.htm</guid>
      <description>SEATTLE-The Washington State Department of Transportation has heard from many residents and Interstate 90 drivers about current and future transportation needs on I-90. Over the next few weeks, WSDOT planners will visit Eastside communities to learn more.</description>
    </item>
    <item>
      <title>New Roundabout Open to Traffic East of Mount Vernon</title>
      <pubDate>Sat, 28 Jul 2007 04:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/27_sr538roundaboutopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/27_sr538roundaboutopen.htm</guid>
      <description>Skagit County’s first roundabout on a state highway, at the intersection of State Route 9 and SR 538, opened to traffic today. The new roundabout will help relieve congestion at the intersection and improve safety.</description>
    </item>
    <item>
      <title>Expect Heavy Traffic Across All State Passes During US 12 Rock Work</title>
      <pubDate>Sat, 28 Jul 2007 04:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/27_SR12boulders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/27_SR12boulders.htm</guid>
      <description>WHITE PASS – Due to a US 12 closure approximately five miles west of White Pass, drivers can expect heavy traffic on eastbound I-90 today and westbound I-90 Sunday.</description>
    </item>
    <item>
      <title>Artist Point Opens Saturday</title>
      <pubDate>Sat, 28 Jul 2007 01:56:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/27_542artistpointopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/27_542artistpointopens.htm</guid>
      <description>Artist Point opens Saturday after crews finish clearing snow from the upper parking lot that marks the east end of Mount Baker Highway.</description>
    </item>
    <item>
      <title>Ramp Widening Project at Port of Tacoma Road Begins</title>
      <pubDate>Sat, 28 Jul 2007 01:16:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/27_i5_ramp_widening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/27_i5_ramp_widening.htm</guid>
      <description>Ramp Widening Project at Port of Tacoma Road Begins</description>
    </item>
    <item>
      <title>Improvements transform SR 7</title>
      <pubDate>Sat, 28 Jul 2007 00:47:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/27_sr7_ribbon.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/27_sr7_ribbon.htm</guid>
      <description>Improvements transform SR 7</description>
    </item>
    <item>
      <title>Eyesore Becomes Sight for Sore Eyes in Marysville: WSDOT and Tulalip tribe work together to clean graffiti over I-5</title>
      <pubDate>Fri, 27 Jul 2007 21:17:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/27_MarysvilleGraffiti.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/27_MarysvilleGraffiti.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Southbound Swerve Straightened, Northbound Next</title>
      <pubDate>Fri, 27 Jul 2007 21:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/27_i5_swerve_straightened.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/27_i5_swerve_straightened.htm</guid>
      <description>Southbound Swerve Straightened, Northbound Next</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland July 27 - August 3</title>
      <pubDate>Fri, 27 Jul 2007 07:27:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/26_KirklandUpdatesJuly27.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/26_KirklandUpdatesJuly27.htm</guid>
      <description>I-405 Construction Updates in Kirkland July 27 - August 3</description>
    </item>
    <item>
      <title>Southbound SR 167 On-Ramp in Renton to Close for the Weekend</title>
      <pubDate>Fri, 27 Jul 2007 04:43:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/26_SR167Ramp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/26_SR167Ramp.htm</guid>
      <description>Southbound SR 167 On-Ramp in Renton to Close for the Weekend</description>
    </item>
    <item>
      <title>Paving Resumes Monday West of Burlington; Expect Long Delays</title>
      <pubDate>Fri, 27 Jul 2007 03:44:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/26_SR20brentsontobestpaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/26_SR20brentsontobestpaving.htm</guid>
      <description>Paving work continues between Anacortes and Burlington on SR 20.</description>
    </item>
    <item>
      <title>Expect Delays in South Oak Harbor Sunday Evening</title>
      <pubDate>Fri, 27 Jul 2007 02:28:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/26_sr20loweringhills.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/26_sr20loweringhills.htm</guid>
      <description>Weekend travelers combined with construction will mean backups for SR 20 drivers Sunday evening in south Oak Harbor. WSDOT will dig into a hill along SR 20 to level the highway and improve visibility for drivers. WSDOT advises drivers to alter their schedules and find alternate routes through town because there will be delays Sunday evening.</description>
    </item>
    <item>
      <title>WSDOT will wrap up two major Spokane area I-90 projects ahead of schedule</title>
      <pubDate>Fri, 27 Jul 2007 02:18:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/26_i90spokanejobs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/26_i90spokanejobs.htm</guid>
      <description>Interstate 90 Downtown Spokane and Interstate 90 Sullivan Road Interchange project to finish early.</description>
    </item>
    <item>
      <title>New Northbound I-5 Lane is Open in Everett</title>
      <pubDate>Fri, 27 Jul 2007 01:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/26_NewNorthboundLaneEverett.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/26_NewNorthboundLaneEverett.htm</guid>
      <description>New Northbound I-5 Lane is Open in Everett</description>
    </item>
    <item>
      <title>Concurrent Rolling Slowdowns on I-405 and I-90 in Bellevue on Sunday through Wednesday Nights</title>
      <pubDate>Fri, 27 Jul 2007 01:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/26_I405RollingSlowdowns.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/26_I405RollingSlowdowns.htm</guid>
      <description>Concurrent Rolling Slowdowns on I-405 and I-90 in Bellevue on Sunday through Wednesday Nights</description>
    </item>
    <item>
      <title>Four Months of Paving Improvements Start on I-5 in Pierce County</title>
      <pubDate>Fri, 27 Jul 2007 00:46:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/26_4monthsofpavingimprovementstartonI-5inPierceCo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/26_4monthsofpavingimprovementstartonI-5inPierceCo.htm</guid>
      <description>Four Months of Paving Improvements Start on I-5 in Pierce County</description>
    </item>
    <item>
      <title>Westbound Lane Closures on TNB for Paving Begin Tonight</title>
      <pubDate>Thu, 26 Jul 2007 23:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/26_correction_tnb_paving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/26_correction_tnb_paving.htm</guid>
      <description>Westbound Lane Closures on TNB for Paving Begin Tonight</description>
    </item>
    <item>
      <title>Crews to Close Southbound I-5 in South Everett Saturday Night</title>
      <pubDate>Thu, 26 Jul 2007 22:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/26_I5SouthEverettFreewayStation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/26_I5SouthEverettFreewayStation.htm</guid>
      <description>Crews will close all lanes of southbound I-5 from SR 527 to 128th Street SE in south Everett from 11:59 p.m. Saturday to 7 a.m. Sunday.</description>
    </item>
    <item>
      <title>Northbound I-405 Paving Work in Kirkland Re-Scheduled for this Weekend</title>
      <pubDate>Thu, 26 Jul 2007 05:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/25_I405PavingRescheduled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/25_I405PavingRescheduled.htm</guid>
      <description>Northbound I-405 Paving Work in Kirkland Re-Scheduled for this Weekend</description>
    </item>
    <item>
      <title>SR 28 at Rock Island Dam to be Closed for Up to Four Days</title>
      <pubDate>Wed, 25 Jul 2007 06:54:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/072407RISlopesOpen+Hs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/072407RISlopesOpen+Hs.htm</guid>
      <description>Two open houses are scheduled to help WSDOT determine how best to close SR 28 at Rock Island Dam next year for a Rock Slope Stabilization project.</description>
    </item>
    <item>
      <title>Critical I-5 Repairs Delayed Indefinitely in Bellingham; Contractors Bid Too High</title>
      <pubDate>Wed, 25 Jul 2007 04:44:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/24_i5criticalworkdelayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/24_i5criticalworkdelayed.htm</guid>
      <description>Critical repairs to Interstate 5 through Bellingham slated for this summer are on hold indefinitely after WSDOT received only one bid on the project that came in nearly $1 million more than estimates.</description>
    </item>
    <item>
      <title>The Ribbon is Cut for the new US 2 Dryden Signal</title>
      <pubDate>Tue, 24 Jul 2007 07:10:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/072307US2_97DrydenSignal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/072307US2_97DrydenSignal.htm</guid>
      <description>A ribbon cutting ceremony for a new signal system on US 2/97 in Chelan County was held Friday night, July 20th, in conjunction with the community of Dryden's 100th anniversary.</description>
    </item>
    <item>
      <title>S-Curve Removal, Take Two</title>
      <pubDate>Tue, 24 Jul 2007 06:55:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/23_I5_sbswitch_resched.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/23_I5_sbswitch_resched.htm</guid>
      <description>I-5 southbound switchback rescheduled.</description>
    </item>
    <item>
      <title>New I-5 Lane in Everett Will Help Reduce One of the State’s Worst Daily Backups</title>
      <pubDate>Tue, 24 Jul 2007 03:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/23_I-5EverettAuxiliaryLaneOpening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/23_I-5EverettAuxiliaryLaneOpening.htm</guid>
      <description>One of the worst daily back-ups in our state is about to get better.  Construction crews working for WSDOT plan to open a new lane of traffic on northbound I-5 in Everett.</description>
    </item>
    <item>
      <title>Inspection Work Means Two Weekends of Lane Closures for Agate Pass Bridge</title>
      <pubDate>Tue, 24 Jul 2007 02:06:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/23_InspectionWorkMeansTwoWeekendsofLaneClosuresforAgatePassBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/23_InspectionWorkMeansTwoWeekendsofLaneClosuresforAgatePassBridge.htm</guid>
      <description>Inspection Work Means Two Weekends of Lane Closures for Agate Pass Bridge</description>
    </item>
    <item>
      <title>Crews Close Lanes on Southbound I-5 for Expansion Joint Repairs in Downtown Seattle</title>
      <pubDate>Sun, 22 Jul 2007 23:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/22_I5JointRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/22_I5JointRepair.htm</guid>
      <description>Crews Close Lanes on Southbound I-5 for Expansion Joint Repairs in Downtown Seattle</description>
    </item>
    <item>
      <title>Postponed: I-5 Shift Work in Tacoma</title>
      <pubDate>Sun, 22 Jul 2007 08:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/21_5_shiftcancelled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/21_5_shiftcancelled.htm</guid>
      <description>I-5 lane-shift work previously scheduled tonight and Sunday is cancelled due to rain.</description>
    </item>
    <item>
      <title>SR 548 Closed 43 Days Starting Wednesday in Birch Bay</title>
      <pubDate>Sat, 21 Jul 2007 07:04:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/20_548extended+closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/20_548extended+closure.htm</guid>
      <description>WSDOT will close Blaine Road (SR 548) for 43 days starting Wednesday, July 25 to replace a rusting culvert under the highway at Terrell Creek.</description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound July 20 - 30</title>
      <pubDate>Sat, 21 Jul 2007 02:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/20_BusyWeekJuly20.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/20_BusyWeekJuly20.htm</guid>
      <description>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound July 20 - 30</description>
    </item>
    <item>
      <title>Motorists Should Plan Ahead for Delays on US 12 Next  Week</title>
      <pubDate>Sat, 21 Jul 2007 01:40:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/20_Motorists_should_Plan_ahead_for_delays_on_US12.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/20_Motorists_should_Plan_ahead_for_delays_on_US12.htm</guid>
      <description>Motorists Should Plan Ahead for Delays on US 12 Next Week</description>
    </item>
    <item>
      <title>SR 20 Paving Resumes Week of July 30 West of Burlington</title>
      <pubDate>Sat, 21 Jul 2007 01:29:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/20_SR20WorkResumes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/20_SR20WorkResumes.htm</guid>
      <description>SR 20 Paving Resumes Week of July 30 West of Burlington</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue July 20 - 27</title>
      <pubDate>Fri, 20 Jul 2007 23:08:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/20_BellevueUpdateJuly20.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/20_BellevueUpdateJuly20.htm</guid>
      <description>I-405 Construction Updates in Bellevue July 20 - 27</description>
    </item>
    <item>
      <title>Gov. Chris Gregoire announces Paula Hammond as interim Secretary of Transportation</title>
      <pubDate>Fri, 20 Jul 2007 23:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/20_paulahammondasinterimsecretary.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/20_paulahammondasinterimsecretary.htm</guid>
      <description>From the road crew to the big chair, Paula J. Hammond has surveyed it, designed it and built it. 

This week, Gov. Chris Gregoire announced Paula had earned it.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland July 20 - 27</title>
      <pubDate>Fri, 20 Jul 2007 22:55:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/20_KirklandUpdateJuly20.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/20_KirklandUpdateJuly20.htm</guid>
      <description>I-405 Construction Updates in Kirkland July 20 - 27</description>
    </item>
    <item>
      <title>WSDOT Removes Hills along SR 20 South of Oak Harbor</title>
      <pubDate>Fri, 20 Jul 2007 03:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/19_SR20Whidbeyhillreduction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/19_SR20Whidbeyhillreduction.htm</guid>
      <description>Crews prepare to shave to hills south of Oak Harbor to increase sight distance and reduce collisions</description>
    </item>
    <item>
      <title>WSDOT Bridge Crews Perform Annual Maintenance Work on I-5 Ship Canal Bridge Deck This Weekend</title>
      <pubDate>Fri, 20 Jul 2007 03:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/18_ShipCanal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/18_ShipCanal.htm</guid>
      <description>This weekend, WSDOT bridge crews will close lanes to perform annual maintenance on the ship canal bridge deck on Interstate 5. The work starts early and is noisy.</description>
    </item>
    <item>
      <title>Inspections Close SR 167 Puyallup River Bridge this Weekend</title>
      <pubDate>Fri, 20 Jul 2007 01:20:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/19_Inspections+Close+SR+167_Puyallup+River+Bridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/19_Inspections+Close+SR+167_Puyallup+River+Bridge.htm</guid>
      <description>Inspections Close SR 167 Puyallup River Bridge this Weekend</description>
    </item>
    <item>
      <title>I-5 Weekend Lane Closure in Nisqually</title>
      <pubDate>Fri, 20 Jul 2007 00:43:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/19_I5+Weekend+Lane+Closure+in+Nisqually.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/19_I5+Weekend+Lane+Closure+in+Nisqually.htm</guid>
      <description>I-5 Weekend Lane Closure in Nisqually</description>
    </item>
    <item>
      <title>Further Speed Limit Revisions in SR 502 Interchange Construction Zone Begin July 23</title>
      <pubDate>Thu, 19 Jul 2007 22:57:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/19_SR502SpeedRevisions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/19_SR502SpeedRevisions.htm</guid>
      <description>BATTLE GROUND – Motorists traveling I-5 and SR 502 in Clark County will notice speed limit revisions in the I-5, SR 502 Interchange work zone, announced Washington State Department of Transportation (WSDOT.)</description>
    </item>
    <item>
      <title>Washout Prompts Emergency Repair on SR 20 East of Rockport; WSDOT Seeks Long-Term Solution to Erosion on SR 20, SR 530</title>
      <pubDate>Thu, 19 Jul 2007 06:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/18_20rockportemergencyrepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/18_20rockportemergencyrepairs.htm</guid>
      <description>WSDOT is taking emergency action to repair a section of State Route 20 east of Rockport after a washout Monday left the highway only four feet from the Skagit River.</description>
    </item>
    <item>
      <title>Tacoma Loses its Curves</title>
      <pubDate>Thu, 19 Jul 2007 03:56:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/17_I5_s_curves.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/17_I5_s_curves.htm</guid>
      <description>S-curve removal begins this weekend, July 21-22.</description>
    </item>
    <item>
      <title>WSDOT Postpones Biggs Bridge Closure until Early ‘08</title>
      <pubDate>Thu, 19 Jul 2007 03:35:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/18_US97BiggsClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/18_US97BiggsClosure.htm</guid>
      <description>GOLDENDALE – The Washington State Department of Transportation (WSDOT) has adjusted the closure schedule for the US 97, Biggs Bridge Deck Replacement.</description>
    </item>
    <item>
      <title>First Day of Tolling Goes Smoothly on Tacoma Narrows Bridge</title>
      <pubDate>Thu, 19 Jul 2007 00:45:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/18_18_First_day_tolling_smooth.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/18_18_First_day_tolling_smooth.htm</guid>
      <description>First Day of Tolling Goes Smoothly
on Tacoma Narrows Bridge</description>
    </item>
    <item>
      <title>WSDOT and WSP Keep Drivers Safe with Expanded Tow-Away Zone in Puget Sound Region</title>
      <pubDate>Wed, 18 Jul 2007 23:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/18_TowAwayZone.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/18_TowAwayZone.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Crews Begin SR 20 Construction East of Deception Pass Next Week</title>
      <pubDate>Wed, 18 Jul 2007 06:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/17_20deceptionpassworkstarts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/17_20deceptionpassworkstarts.htm</guid>
      <description>Starting Monday, WSDOT will make safety improvements along SR 20 between Meadow Creek and South Lake Campbell Road near Deception Pass to reduce collisions and improve safety.</description>
    </item>
    <item>
      <title>4.5 Miles of New Black Top on SR 202 from Fall City to North Bend</title>
      <pubDate>Wed, 18 Jul 2007 05:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/17_SR202FinishedEarly.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/17_SR202FinishedEarly.htm</guid>
      <description>4.5 Miles of New Black Top on SR 202 from Fall City to North Bend</description>
    </item>
    <item>
      <title>SR 3 Ramp Closure in Silverdale</title>
      <pubDate>Wed, 18 Jul 2007 04:39:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/07_17_07%28141%29SR3RampClosureinSilverdale.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/07_17_07%28141%29SR3RampClosureinSilverdale.htm</guid>
      <description>SR 3 Ramp Closure in Silverdale</description>
    </item>
    <item>
      <title>Engineers Expect Lengthy Back-Ups on Northbound I-405 in Kirkland this Weekend if Drivers Don't Help</title>
      <pubDate>Wed, 18 Jul 2007 04:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/17_WeekendKirklandClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/17_WeekendKirklandClosures.htm</guid>
      <description>Engineers Expect Lengthy Back-Ups on Northbound I-405 in Kirkland this Weekend if Drivers Don't Help</description>
    </item>
    <item>
      <title>SR 20 Open East of Tonasket</title>
      <pubDate>Wed, 18 Jul 2007 02:15:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/071707SR20TunkFireOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/071707SR20TunkFireOpen.htm</guid>
      <description>SR 20 is open east of Tonasket in Okanogan County</description>
    </item>
    <item>
      <title>Tunk Grade Fire Closes SR 20 in Okanogan County</title>
      <pubDate>Wed, 18 Jul 2007 00:59:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/071707SR20TunkFireClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/071707SR20TunkFireClosure.htm</guid>
      <description>Tunk Grade Fire in Okanogan County closes SR 20 just east of Tonasket.</description>
    </item>
    <item>
      <title>New Hood Canal Bridge Pontoons Begin Their Journey</title>
      <pubDate>Tue, 17 Jul 2007 23:20:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/SR104HCBSecondPontoonFloat-out.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/SR104HCBSecondPontoonFloat-out.htm</guid>
      <description>New Hood Canal Bridge Pontoons Begin Their Journey</description>
    </item>
    <item>
      <title>Burwell Street on SR 304 Closes in Bremerton</title>
      <pubDate>Tue, 17 Jul 2007 04:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/16_BurwellStreetonSR304ClosesinBremerton.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/16_BurwellStreetonSR304ClosesinBremerton.htm</guid>
      <description>Burwell Street on SR 304 Closes in Bremerton</description>
    </item>
    <item>
      <title>Drivers Put Roundabout to the Test</title>
      <pubDate>Tue, 17 Jul 2007 03:50:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/roundabout_testdrive.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/roundabout_testdrive.htm</guid>
      <description>Drivers from Union Gap went round and round on July 11th during a roundabout test drive in the Sears Parking lot at the Valley Mall.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland July 13 –20</title>
      <pubDate>Tue, 17 Jul 2007 00:05:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/16_KirklandUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/16_KirklandUpdates.htm</guid>
      <description>I-405 Construction Updates in Kirkland July 13 –20</description>
    </item>
    <item>
      <title>Win Some, Lose Some with WSDOT Project in Federal Way : I-5 drivers gain carpool lane, lose annoying bumpy ride</title>
      <pubDate>Mon, 16 Jul 2007 22:38:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/16_I-5PierceCountyLine.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/16_I-5PierceCountyLine.htm</guid>
      <description></description>
    </item>
    <item>
      <title>New Narrows Bridge Open, Tolling Begins</title>
      <pubDate>Mon, 16 Jul 2007 20:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/16_16_BridgeOpenTollBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/16_16_BridgeOpenTollBegins.htm</guid>
      <description>The new Narrows Bridge opened to vehicle traffic today and tolling began at 4:10 a.m.</description>
    </item>
    <item>
      <title>SR 20 Paving Work Near Burlington Postponed for One Week After Construction Zone Fatality</title>
      <pubDate>Sat, 14 Jul 2007 05:06:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/13_PavingPostponed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/13_PavingPostponed.htm</guid>
      <description>Work postponed after construction worker killed</description>
    </item>
    <item>
      <title>Expect Lane Closures on I-405 Tonight as Crews Repair Pavement</title>
      <pubDate>Sat, 14 Jul 2007 00:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/16_I405ClosureForRepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/16_I405ClosureForRepairs.htm</guid>
      <description>Expect Lane Closures on I-405 Tonight as Crews Repair Pavement</description>
    </item>
    <item>
      <title>Crews Complete Paving of Over Four Miles on Two Major Roads in South Snohomish County</title>
      <pubDate>Fri, 13 Jul 2007 04:45:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/12_SR104SR99Paving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/12_SR104SR99Paving.htm</guid>
      <description>Placement of temporary markings on over four miles of pavement signals the end of rough rides for drivers on SR 104 in Edmonds and SR 99 in Everett. In just over a month, crews have completed work to replace worn, damaged paving with new smoother, safer pavement on both roads.</description>
    </item>
    <item>
      <title>Worker Killed in WSDOT Work Zone West of Burlington</title>
      <pubDate>Fri, 13 Jul 2007 01:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/SR20Workzone.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/SR20Workzone.htm</guid>
      <description>A contract worker was killed in a WSDOT work zone west of Burlington this morning when a sweeper backed over him.

The man, an employee of Rinker Materials of Everett, was working on a paving project on eastbound State Route 20.</description>
    </item>
    <item>
      <title>Toll Transponders Top 100,000 Mark</title>
      <pubDate>Fri, 13 Jul 2007 01:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/12_16_Transponders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/12_16_Transponders.htm</guid>
      <description>More people bought transponders that WSDOT predicted.</description>
    </item>
    <item>
      <title>Road Closures this Weekend in Poulsbo</title>
      <pubDate>Fri, 13 Jul 2007 00:24:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/07_11_07%28137%29SR305Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/07_11_07%28137%29SR305Closures.htm</guid>
      <description>Road Closures this Weekend in Poulsbo</description>
    </item>
    <item>
      <title>All Hands on Bridge Deck; SR 520 Evergreen Point Floating Bridge Closes For Annual Maintenance This Weekend</title>
      <pubDate>Fri, 13 Jul 2007 00:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/12_SR520Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/12_SR520Closure.htm</guid>
      <description>After reviewing the weather forecast, Washington State Department of Transportation (WSDOT) engineers and Wilder Construction crews confirmed that they will close the SR 520 Evergreen Point Floating Bridge this weekend for annual maintenance and inspections in addition to placing a test section of quieter pavement east of the bridge.</description>
    </item>
    <item>
      <title>HIYU to Return to Islands for Six Days</title>
      <pubDate>Thu, 12 Jul 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/hiyu-returns-to-islands.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/hiyu-returns-to-islands.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Temporary Hang-over in Tacoma</title>
      <pubDate>Thu, 12 Jul 2007 05:54:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/11_I5_girdersetting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/11_I5_girdersetting.htm</guid>
      <description>First night of girder setting a success.</description>
    </item>
    <item>
      <title>What SR 16 Motorists Will See Before, During and After TNB Opening</title>
      <pubDate>Thu, 12 Jul 2007 05:48:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/11_16_TNBOpeningTrafficInfo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/11_16_TNBOpeningTrafficInfo.htm</guid>
      <description>GIG HARBOR – Opening the new Narrows Bridge to traffic July 16 is not the only change motorists will experience along the SR 16 corridor in the upcoming weeks.  Several changes will take place simultaneously as WSDOT coordinates traffic operations along four projects built on SR 16 between Union Avenue in Tacoma and Olympic Drive in Gig Harbor.</description>
    </item>
    <item>
      <title>Section of I-90 Bike Path in Bellevue Closes for Ten Days Beginning July 16</title>
      <pubDate>Thu, 12 Jul 2007 05:38:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/11_i90bikepathdetour.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/11_i90bikepathdetour.htm</guid>
      <description>Crews will close a section of the I-90 bicycle/pedestrian pathway on Monday, July 16 for up to ten days. Path users will follow a signed detour.</description>
    </item>
    <item>
      <title>WSDOT Alerts Motorists to Nighttime Closure of NE 179th ST Southbound I-5 On-Ramp, July 13</title>
      <pubDate>Wed, 11 Jul 2007 22:49:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/11_NighttimeRampClosureI-5NE179thSt.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/11_NighttimeRampClosureI-5NE179thSt.htm</guid>
      <description>VANCOUVER – The traveling public can expect a nighttime closure of the NE 179th Street southbound I-5 on-ramp this coming Friday, July 13 for concrete panel repair.</description>
    </item>
    <item>
      <title>Coal Creek Parkway Closed under I-405 Thursday Night; Additional Closures Planned</title>
      <pubDate>Wed, 11 Jul 2007 21:43:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/11_CoalCreekClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/11_CoalCreekClosed.htm</guid>
      <description>Coal Creek Parkway Closed under I-405 Thursday Night; Additional Closures Planned</description>
    </item>
    <item>
      <title>WSF and USCG Address Essential Maintenance for 80-year-old Vessels; San Juan Inter-Island Run Gets Temporary Ferry</title>
      <pubDate>Wed, 11 Jul 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/essential-maintenance-for-80-year-old-vessels.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/essential-maintenance-for-80-year-old-vessels.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Link Light Rail Construction across SR-518 near International Boulevard Continues</title>
      <pubDate>Wed, 11 Jul 2007 05:58:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/10_518closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/10_518closures.htm</guid>
      <description>Sound Transit’s construction of a new light rail bridge across SR-518 just west of International Boulevard near Sea-Tac International Airport continues this week after a brief shutdown during the July 4 holidays.</description>
    </item>
    <item>
      <title>Expect Slow Rolling on Northbound I-405 in Bellevue Tuesday Through Thursday Night</title>
      <pubDate>Wed, 11 Jul 2007 04:49:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/10_SlowdownsInBellevue.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/10_SlowdownsInBellevue.htm</guid>
      <description>Expect Slow Rolling on Northbound I-405 in Bellevue Tuesday Through Thursday Night</description>
    </item>
    <item>
      <title>The Clock is Ticking on WSDOT’s I-5 Downtown Seattle Construction; Extensive I-5 Closures Are Only One Month Away</title>
      <pubDate>Wed, 11 Jul 2007 03:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/10_OneMonthToMajorClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/10_OneMonthToMajorClosures.htm</guid>
      <description>The Clock is Ticking on WSDOT’s I-5 Downtown Seattle Construction; Extensive I-5 Closures Are Only One Month Away</description>
    </item>
    <item>
      <title>July 14 - 16 Closure of SR 520 Evergreen Point Floating Bridge Hinges on Weather</title>
      <pubDate>Wed, 11 Jul 2007 02:39:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/10_520WeekendClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/10_520WeekendClosure.htm</guid>
      <description>July 14 - 16 Closure of SR 520 Evergreen Point Floating Bridge Hinges on Weather</description>
    </item>
    <item>
      <title>Media Advisory for new Narrows Bridge Opening Celebration</title>
      <pubDate>Tue, 10 Jul 2007 08:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/09_16_MediaAdvOpening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/09_16_MediaAdvOpening.htm</guid>
      <description>WSDOT invites the media to the New Narrows Bridge Opening Celebration.</description>
    </item>
    <item>
      <title>Public Trial Period Ending for Tacoma Narrows Electronic Toll System</title>
      <pubDate>Tue, 10 Jul 2007 06:37:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/07_09_07+%28134%29GoodtoGoTestingEnds.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/07_09_07+%28134%29GoodtoGoTestingEnds.htm</guid>
      <description>Public Trial Period Ending for
Tacoma Narrows Electronic Toll System</description>
    </item>
    <item>
      <title>Crews Start Paving North Whatcom County Highways Today</title>
      <pubDate>Tue, 10 Jul 2007 04:02:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/09_542.539.546paving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/09_542.539.546paving.htm</guid>
      <description>WSDOT will pave sections of Guide Meridian (SR 539), Badger Road (SR 546) and Blaine Road (SR 548) in north Whatcom County starting today. Drivers should prepare for lane closures and should expect delays of up to 10 minutes.</description>
    </item>
    <item>
      <title>SR 16 Road Work in Full Gear as Bridge Opening Approaches</title>
      <pubDate>Sat, 07 Jul 2007 05:19:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/06_TNB_SR16roadwork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/06_TNB_SR16roadwork.htm</guid>
      <description>SR 16 Road Work in Full Gear as Bridge Opening Approaches</description>
    </item>
    <item>
      <title>Ramp-meter Testing Next Week on SR 16</title>
      <pubDate>Sat, 07 Jul 2007 04:49:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/6_16_rampmeter.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/6_16_rampmeter.htm</guid>
      <description>Motorists on SR 16 should be aware that ramp-meter testing will occur next week.</description>
    </item>
    <item>
      <title>SR 20 Paving Starts Next Week Near Anacortes</title>
      <pubDate>Sat, 07 Jul 2007 02:33:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/06_sr20pavingstartsnextweek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/06_sr20pavingstartsnextweek.htm</guid>
      <description>WSDOT will pave sections of State Route 20 between the Spur and Memorial Highway starting next week.</description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound July 6 – July 16</title>
      <pubDate>Sat, 07 Jul 2007 00:08:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/6_BusyWeekJuly6.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/6_BusyWeekJuly6.htm</guid>
      <description>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound July 6 – July 16</description>
    </item>
    <item>
      <title>Tacoma’s Next Big Thing: Bridge Construction Near the T- Dome</title>
      <pubDate>Fri, 06 Jul 2007 22:49:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/06_I-5girdersetting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/06_I-5girdersetting.htm</guid>
      <description>Bridge construction begins over I-5 near the Tacoma Dome.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland July 6 - 13</title>
      <pubDate>Fri, 06 Jul 2007 21:34:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/6_KirklandUpdateJuly6.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/6_KirklandUpdateJuly6.htm</guid>
      <description>I-405 Construction Updates in Kirkland July 6 - 13</description>
    </item>
    <item>
      <title>Crews Begin Construction on the I-405 South Bellevue Widening Project</title>
      <pubDate>Fri, 06 Jul 2007 21:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/6_SouthBellevueStarts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/6_SouthBellevueStarts.htm</guid>
      <description>Crews Begin Construction on the I-405 South Bellevue Widening Project</description>
    </item>
    <item>
      <title>Overnight Lane, Ramp Closures on I-5 in Olympia</title>
      <pubDate>Fri, 06 Jul 2007 05:59:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/05_I_5LaneRampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/05_I_5LaneRampClosures.htm</guid>
      <description>Overnight Lane, Ramp Closures on I-5 in Olympia</description>
    </item>
    <item>
      <title>Heads Up: Lauck Road will be Closed for Four Weeks Starting in July</title>
      <pubDate>Tue, 03 Jul 2007 02:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/2_SR9LauckClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/2_SR9LauckClosure.htm</guid>
      <description>As early as next week, WSDOT and contractor Pacific Road and Bridge will close Lauck Road/108th Street NE just west of State Route 9 for up to four weeks.</description>
    </item>
    <item>
      <title>WSDOT, TIB and Yakima County Team Up to Open New Lanes</title>
      <pubDate>Tue, 03 Jul 2007 00:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/SR24RibbonCutting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/SR24RibbonCutting.htm</guid>
      <description>Five months ahead of schedule and anticipated to be on budget, improvements on SR 24 are now open to traffic.</description>
    </item>
    <item>
      <title>Join WSDOT and Scarsella Brothers, Inc. to Celebrate the Start of the I-5 Widening in Lewis County, July 3</title>
      <pubDate>Tue, 03 Jul 2007 00:23:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/02_I5BridgeBreaking.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/02_I5BridgeBreaking.htm</guid>
      <description>CHEHALIS – A “Bridge Breaking” event celebrating the start of widening I-5, from Rush Road to 13th Street in Lewis County marks the beginning of several projects to widen I-5.</description>
    </item>
    <item>
      <title>WSDOT and WSP Release Report on Effectiveness of Cable Median Barrier in Washington State</title>
      <pubDate>Mon, 02 Jul 2007 22:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/07/2_CableBarrierReport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/07/2_CableBarrierReport.htm</guid>
      <description>WSDOT and WSP Release Report on Effectiveness of Cable Median Barrier in Washington State</description>
    </item>
    <item>
      <title>Near Record Traffic Volumes Labor Day Weekend Across I-90 Snoqualmie Pass</title>
      <pubDate>Thu, 06 Sep 2007 06:53:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/LaborDayWeekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/LaborDayWeekend.htm</guid>
      <description>Near record traffic volumes Labor Day weekend across I-90 Snoqualmie Pass. What are WSDOT’s plans to avoid these delays in the future?</description>
    </item>
    <item>
      <title>Unexpected Sightings Over I-90 Snoqualmie Pass</title>
      <pubDate>Thu, 19 Jul 2007 22:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/GeoTech.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/GeoTech.htm</guid>
      <description>Washington State Department of Transportation (WSDOT) and contractor resumed field activities on I-90 Snoqualmie Pass this week as part of the project design.</description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound June 29 – July 9</title>
      <pubDate>Sat, 30 Jun 2007 04:40:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/29_BusyWeekJune29.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/29_BusyWeekJune29.htm</guid>
      <description>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound June 29 – July 9</description>
    </item>
    <item>
      <title>Crews Clear Snow off Road to Scenic Artist Point near Mount Baker</title>
      <pubDate>Sat, 30 Jun 2007 04:36:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/29_542artistpointwork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/29_542artistpointwork.htm</guid>
      <description>Starting next week WSDOT crews will dig through snow 20 feet deep to open the last 2 ½ miles of Mount Baker Highway leading to Artist Point.</description>
    </item>
    <item>
      <title>Bremerton Tunnel Project Breaks Ground</title>
      <pubDate>Sat, 30 Jun 2007 04:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/29_303_TunnelBrksGrd.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/29_303_TunnelBrksGrd.htm</guid>
      <description>July 6 state and local officials will break ground on the Bremerton Tunnel project.</description>
    </item>
    <item>
      <title>State Route 4 Slope Stabilization Repairs West of Cathlamet Begin July 5</title>
      <pubDate>Sat, 30 Jun 2007 00:43:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/29_SR4Cathlamet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/29_SR4Cathlamet.htm</guid>
      <description>CATHLAMET – Repairs to stabilize a slope above State Route 4 west of Cathlamet will begin July 5, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Quarterly Inspection Shows Alaskan Way Viaduct Continues to Settle - WSDOT to Reinforce Sinking Foundations this Fall</title>
      <pubDate>Fri, 29 Jun 2007 23:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/AWVSettlement-607.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/AWVSettlement-607.htm</guid>
      <description>Initial results from last week’s inspection revealed that a section of the Alaskan Way Viaduct has settled an additional ¼ of an inch to a total of approximately five inches.</description>
    </item>
    <item>
      <title>Upcoming Total Closure of Southbound I-5 in Federal Way</title>
      <pubDate>Fri, 29 Jun 2007 21:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/29_I5FederalWayClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/29_I5FederalWayClosure.htm</guid>
      <description>Upcoming Total Closure of Southbound I-5 in Federal Way</description>
    </item>
    <item>
      <title>Crews Resume Work on I-405 in Kirkland</title>
      <pubDate>Fri, 29 Jun 2007 05:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/28_WorkResumesOn405.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/28_WorkResumesOn405.htm</guid>
      <description>Crews Resume Work on I-405 in Kirkland</description>
    </item>
    <item>
      <title>Cancelled:  Weekend Closure of Northbound I-5 Ramp to US 2 in Everett</title>
      <pubDate>Fri, 29 Jun 2007 01:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/28_EverettClosureCancelled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/28_EverettClosureCancelled.htm</guid>
      <description>Cancelled:  Weekend Closure of Northbound I-5 Ramp to US 2 in Everett</description>
    </item>
    <item>
      <title>Traffic Backups Expected on Both Ends of July 4 Holiday Know Before you Go; Check WSDOT website, call 511</title>
      <pubDate>Fri, 29 Jun 2007 00:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/28_july407travel.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/28_july407travel.htm</guid>
      <description>OLYMPIA – A weekday holiday combined with warmer weather could mean traffic backups for travelers Friday, Sunday and next weekend, Saturday, July 7 and Sunday, July 8.</description>
    </item>
    <item>
      <title>Seattle to Portland Bicycle Ride Traffic Control Ready; Drivers Encouraged to Leave Extra Time July 14 and 15</title>
      <pubDate>Fri, 29 Jun 2007 00:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/28_STPbikerace.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/28_STPbikerace.htm</guid>
      <description>OLYMPIA – Close to 9,000 bicyclists plus support vehicles will be on the road July 14 and 15 and WSDOT advises local drivers to be prepared for possible traffic delays.</description>
    </item>
    <item>
      <title>I-5 and SR 14 Ramp Closures Scheduled for Vancouver Fourth of July Fireworks Display</title>
      <pubDate>Fri, 29 Jun 2007 00:06:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/28_I5SR14RampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/28_I5SR14RampClosures.htm</guid>
      <description>VANCOUVER – In a cooperative effort by the Washington State Department of Transportation (WSDOT), the Washington State Patrol (WSP) and the city of Vancouver, several on and off ramps on I-5 and State Route 14 will be closed between 6 p.m. and midnight on the Fourth of July to help control traffic flow around the fireworks display area.</description>
    </item>
    <item>
      <title>A Little Slice of Summer at Pier 52: Afternoon Music Series Returns to Ferry Dock</title>
      <pubDate>Thu, 28 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/afternoon-music-series-returns-to-ferry-dock.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/afternoon-music-series-returns-to-ferry-dock.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Closes 2 Lanes Westbound on I-182 Thursday for Road Surface Patching</title>
      <pubDate>Thu, 28 Jun 2007 06:47:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/WSDOT+Closes+2+Lanes+Westbound+on+I-182+Thursday+for+Road+Surface+Patching.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/WSDOT+Closes+2+Lanes+Westbound+on+I-182+Thursday+for+Road+Surface+Patching.htm</guid>
      <description>WSDOT Closes 2 Lanes Westbound on I-182 Thursday, June 28 for Road Surface Patching

Drivers Should Consider Alternate Routes</description>
    </item>
    <item>
      <title>Ribbon Cutting Makes it Official: WSDOT, Yakima County and the Transportation Improvement Board Open Lanes to Traffic on Two Major Yakima Projects</title>
      <pubDate>Thu, 28 Jun 2007 03:42:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/SR24and33rdstreetribboncutting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/SR24and33rdstreetribboncutting.htm</guid>
      <description>Whether they are headed to work, school or running errands, motorists driving along SR 24 or 33rd Street will be happy to know that they will spend less time waiting in traffic now that the projects are complete.</description>
    </item>
    <item>
      <title>Join WSDOT and Scarsella Brothers, Inc. at the I-5, Rush Rd. to 13th Street “Bridge Breaking”</title>
      <pubDate>Thu, 28 Jun 2007 03:08:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/27_I5BridgeBreaking.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/27_I5BridgeBreaking.htm</guid>
      <description>CHEHALIS – Join the Washington State Department of Transportation (WSDOT) and Scarsella Brothers, Inc. at a “Bridge Breaking” celebration scheduled for 2 p.m. July 3.</description>
    </item>
    <item>
      <title>SR 119 Work Rescheduled</title>
      <pubDate>Wed, 27 Jun 2007 06:35:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/06_26_07+%28127%29+SR+119+Rescheduled+Chip+Seal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/06_26_07+%28127%29+SR+119+Rescheduled+Chip+Seal.htm</guid>
      <description>SR 119 Work Rescheduled</description>
    </item>
    <item>
      <title>WSDOT Outlines Path Forward to Open New SR 520 Bridge to Drivers by 2018</title>
      <pubDate>Wed, 27 Jun 2007 02:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/26_SR520Mediation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/26_SR520Mediation.htm</guid>
      <description>WSDOT Outlines Path Forward to Open New SR 520 Bridge to Drivers by 2018</description>
    </item>
    <item>
      <title>Join WSDOT June 28 for the I-5, Rush Road to 13th Street Widening Project Open House</title>
      <pubDate>Tue, 26 Jun 2007 23:23:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/26_I5RushRdOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/26_I5RushRdOpenHouse.htm</guid>
      <description>CHEHALIS – An open house for the upcoming I-5, Rush Road to 13th Street Project will take place June 28, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Northbound I-5 Ramp to US 2 in Everett Will Close This Weekend</title>
      <pubDate>Tue, 26 Jun 2007 06:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/25_NBI-5toUS2Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/25_NBI-5toUS2Closure.htm</guid>
      <description>This weekend, crews working for WSDOT plan to close the ramp from northbound I-5 to US 2 Saturday and into Sunday morning. Crews need to pave the section of I-5 next to the US 2 exit. The weekend closure is necessary because the concrete pour will take more time than a weeknight closure allows.</description>
    </item>
    <item>
      <title>Three Days of Manette Bridge Closures</title>
      <pubDate>Tue, 26 Jun 2007 05:36:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/06_25_07+%28125%29+Manette+Bridge+Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/06_25_07+%28125%29+Manette+Bridge+Closures.htm</guid>
      <description>Three Days of Manette Bridge Closures</description>
    </item>
    <item>
      <title>SR 106 Closes Tuesday Morning</title>
      <pubDate>Tue, 26 Jun 2007 04:48:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/25_106_TreeRemoval.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/25_106_TreeRemoval.htm</guid>
      <description>Removing a tree requires a total closure of SR 106 Tuesday morning.</description>
    </item>
    <item>
      <title>WSDOT Urges Drivers to use Caution in Construction Work Zones after I-405 Fatality</title>
      <pubDate>Sat, 23 Jun 2007 07:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/22_i405closurecancelled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/22_i405closurecancelled.htm</guid>
      <description>WSDOT launched our busiest construction season in 2007 with hundreds of projects under construction in the greater Puget Sound area. “We can have the best design and well-planned work zones, but we can’t control drivers. We need drivers' attention and help to keep both themselves and our workers safe,” said Linea Laird State Construction Engineer.</description>
    </item>
    <item>
      <title>TNB Tower Cranes Coming Down, More Lanes Closing</title>
      <pubDate>Sat, 23 Jun 2007 06:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/22_TNBCranes_Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/22_TNBCranes_Closures.htm</guid>
      <description>TNB Tower Cranes Coming Down, More Lanes Closing</description>
    </item>
    <item>
      <title>SR 161 Widening Subject of June 28 Open House</title>
      <pubDate>Sat, 23 Jun 2007 01:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/06_22_07%28120%29SR161.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/06_22_07%28120%29SR161.htm</guid>
      <description>SR 161 Widening Subject of June 28 Open House</description>
    </item>
    <item>
      <title>Weekend Road Closures Planned in Poulsbo</title>
      <pubDate>Sat, 23 Jun 2007 01:11:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/22_SR305_weekendclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/22_SR305_weekendclosures.htm</guid>
      <description>Weekend closures on SR 305 widening project in Poulsbo.</description>
    </item>
    <item>
      <title>WSDOT Maintenance Crews Fix Small Sinkhole on US 2 East of Index and Reopen Westbound Lane</title>
      <pubDate>Fri, 22 Jun 2007 21:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/22_SinkholeFixed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/22_SinkholeFixed.htm</guid>
      <description>WSDOT Maintenance Crews Fix Small Sinkhole on US 2 East of Index and Reopen Westbound Lane</description>
    </item>
    <item>
      <title>Fatality in WSDOT Construction Work Zone Overnight in Kirkland</title>
      <pubDate>Fri, 22 Jun 2007 21:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/22_I-405Kirkland.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/22_I-405Kirkland.htm</guid>
      <description></description>
    </item>
    <item>
      <title>US 12 Painting Requires Lane Restrictions</title>
      <pubDate>Fri, 22 Jun 2007 08:56:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/21_12_Roseburgrestripe.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/21_12_Roseburgrestripe.htm</guid>
      <description>WSDOT will rearrange the traffic on US12 at the Roseburg intersection for restriping beginning Sunday.</description>
    </item>
    <item>
      <title>WSDOT Maintenance Crews Discover Small Sinkhole on US 2 East of Index</title>
      <pubDate>Fri, 22 Jun 2007 06:19:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/21_US2NewSinkhole.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/21_US2NewSinkhole.htm</guid>
      <description>WSDOT Maintenance Crews Discover Small Sinkhole on US 2 East of Index</description>
    </item>
    <item>
      <title>Flood Damage Repair Begins on SR 123 in Mount Rainier National Park</title>
      <pubDate>Fri, 22 Jun 2007 06:14:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/21_SR123RepairsBegin.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/21_SR123RepairsBegin.htm</guid>
      <description>Mount Rainier National Park, Western Federal Lands Highway Division, and Washington State Department of Transportation announce that repair of State Route (SR) 123, damaged during the November 2006 floods, is now under way. 

The repair contract was awarded to Saybr Contractors Inc. of Tacoma for $4,937,800 on June 5, 2007.  The contractor began work June 18 and is scheduled to complete repairs and reopen SR 123 in early October 2007.</description>
    </item>
    <item>
      <title>Quieter Pavement Debuts on SR 520 Later This Summer; Drivers Should Expect Nighttime Lane Closures As Crews Begin Preparations</title>
      <pubDate>Fri, 22 Jun 2007 06:06:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/21_SR520QuieterPavement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/21_SR520QuieterPavement.htm</guid>
      <description>Quieter Pavement Debuts on SR 520 Later This Summer; Drivers Should Expect Nighttime Lane Closures As Crews Begin Preparations</description>
    </item>
    <item>
      <title>Update on SR 520 Bridge Replacement and HOV Project at Events Next Week</title>
      <pubDate>Fri, 22 Jun 2007 05:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/21_SR520Updates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/21_SR520Updates.htm</guid>
      <description>Update on SR 520 Bridge Replacement and HOV Project at Events Next Week</description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound June 22 – July 2</title>
      <pubDate>Fri, 22 Jun 2007 05:16:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/21_BusyWeekJune22.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/21_BusyWeekJune22.htm</guid>
      <description>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound June 22 – July 2</description>
    </item>
    <item>
      <title>WSDOT Completes First Regional Mobility Grant Project</title>
      <pubDate>Fri, 22 Jun 2007 03:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/21_SR240RegionalMobility.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/21_SR240RegionalMobility.htm</guid>
      <description>WSDOT Completes First Regional Mobility Grant Project City of West Richland Celebrates Park and Ride Lot Expansion</description>
    </item>
    <item>
      <title>WSDOT Asks for Drivers' Help to Avoid Lengthy Back-Ups on Northbound I-405 in Kirkland this Weekend</title>
      <pubDate>Thu, 21 Jun 2007 07:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/20_I405KirklandClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/20_I405KirklandClosures.htm</guid>
      <description>Crews working for WSDOT will close two northbound I-405 lanes at 11:59 p.m. on Friday, June 22 to reconstruct the freeway. Without drivers’ help, engineers expect two-mile backups on northbound I-405 throughout the weekend, with the worst congestion between noon and 6 p.m.</description>
    </item>
    <item>
      <title>All Lanes of SR 518 Closed Wednesday Night near Sea-Tac Airport</title>
      <pubDate>Thu, 21 Jun 2007 06:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/20_SR518Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/20_SR518Closures.htm</guid>
      <description>A contractor working for the Federal Aviation Administration will close all lanes of State Route 518 Wednesday night.</description>
    </item>
    <item>
      <title>Expanded Traveler Information at Border Gives Drivers More Options</title>
      <pubDate>Thu, 21 Jun 2007 01:27:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/20_expandedbordertravelinfo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/20_expandedbordertravelinfo.htm</guid>
      <description>WSDOT will install 10 new cameras and traffic detecting equipment at Blaine, Lynden and Sumas, three of Whatcom County's four busy border crossings. The new equipment will allow WSDOT to broadcast more border information and wait times on roadside signs, radios and the Web, taking the guesswork out of choosing the quickest border crossing.</description>
    </item>
    <item>
      <title>Final Hood Canal Bridge Anchors Launched</title>
      <pubDate>Wed, 20 Jun 2007 22:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/SR104_HCBAnchorLaunch_June202007.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/SR104_HCBAnchorLaunch_June202007.htm</guid>
      <description>Final Hood Canal Bridge Anchors Launched</description>
    </item>
    <item>
      <title>Ferries Plan for Busy Fourth of July</title>
      <pubDate>Wed, 20 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/july-4th.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/july-4th.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Complicated Paving in Everett Requires Extra Time for Ramp Closures on I-5 and US 2</title>
      <pubDate>Wed, 20 Jun 2007 04:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/19_US2I5RampEarlyClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/19_US2I5RampEarlyClosure.htm</guid>
      <description>This week, construction crews working for WSDOT plan to close the US 2 ramp to southbound Interstate 5 several hours earlier than normal. Crews will also close the 41st St SE ramp to northbound I-5 all weekend. The additional hours and weekend closure are necessary for crews to complete paving operations at those locations. This work is weather dependant and could be rescheduled.</description>
    </item>
    <item>
      <title>All Lanes Reopened on US 2 East of Index</title>
      <pubDate>Wed, 20 Jun 2007 04:38:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/19_US2NowOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/19_US2NowOpen.htm</guid>
      <description>All Lanes Reopened on US 2 East of Index</description>
    </item>
    <item>
      <title>Bridging Futures:  Young Artists Honored for Depiction</title>
      <pubDate>Wed, 20 Jun 2007 03:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/BridgingFutures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/BridgingFutures.htm</guid>
      <description>WSDOT and I-90 Wildlife Bridges Coalition selected two winners from students around the state who participated in the third annual Bridging Futures Contest.</description>
    </item>
    <item>
      <title>One Lane of US 2 Reopens, One Lane Remains Closed While Crews Repair Guardrail</title>
      <pubDate>Wed, 20 Jun 2007 03:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/19_US2OneLaneOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/19_US2OneLaneOpen.htm</guid>
      <description>One Lane of US 2 Reopens, One Lane Remains Closed While Crews Repair Guardrail</description>
    </item>
    <item>
      <title>US 12 Paving Closes SR 107 Ramps</title>
      <pubDate>Wed, 20 Jun 2007 03:08:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/19_US12_SR107ramps.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/19_US12_SR107ramps.htm</guid>
      <description>Ramp closures in Montesano this week.</description>
    </item>
    <item>
      <title>Collision Closes US 2 West of Stevens Pass Through Tuesday Afternoon</title>
      <pubDate>Tue, 19 Jun 2007 22:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/19_us2closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/19_us2closure.htm</guid>
      <description>At 10:30 last night, a semi-truck loaded with apples left the road at milepost 39, between Index and Baring roughly 25 miles of the Stevens Pass summit. The vehicle went up and over the concrete barrier and dropped 150 feet down a steep embankment and came to rest in the Skykomish River.</description>
    </item>
    <item>
      <title>WSDOT Working to Reduce South King County Congestion</title>
      <pubDate>Tue, 19 Jun 2007 21:43:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/19_SouthKingCongestion.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/19_SouthKingCongestion.htm</guid>
      <description>WSDOT Working to Reduce South King County Congestion</description>
    </item>
    <item>
      <title>Serious Collision Blocking All Lanes of US 2 Near Index</title>
      <pubDate>Tue, 19 Jun 2007 17:14:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/Serious+Collision+Blocking+All+Lanes+of+US+2+Near+Index.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/Serious+Collision+Blocking+All+Lanes+of+US+2+Near+Index.htm</guid>
      <description>Serious Collision Involving a Semi Blocking All Lanes of US 2 Near Index</description>
    </item>
    <item>
      <title>Next Steps for the Mukilteo Multi-Modal Ferry Terminal Project</title>
      <pubDate>Tue, 19 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/mukilteo-multi-modal-project.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/mukilteo-multi-modal-project.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Bainbridge Island Project Requires SR 305 Restrictions</title>
      <pubDate>Tue, 19 Jun 2007 06:05:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/18_SR305_Pedtrail.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/18_SR305_Pedtrail.htm</guid>
      <description>Bainbridge Island Project Requires SR 305 Restrictions</description>
    </item>
    <item>
      <title>Public Input, Business and Environmental Issues Drive Decision to Widen SR 502 on the Existing Alignment</title>
      <pubDate>Tue, 19 Jun 2007 06:00:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/18_SR502Widening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/18_SR502Widening.htm</guid>
      <description>BATTLE GROUND – After looking at several options to create a wider, safer State Route 502 from I-5 to Battle Ground, the Washington State Department of Transportation (WSDOT) has made the decision to widen on the existing corridor.</description>
    </item>
    <item>
      <title>WSDOT Returning to Snohomish with Updated SR 9 Plans; Open House on Wednesday</title>
      <pubDate>Tue, 19 Jun 2007 05:10:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/18_SR9OpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/18_SR9OpenHouse.htm</guid>
      <description>WSDOT is ready to share the latest design plans to relieve congestion and improve safety on SR 9 between 176th Street SE and Marsh Road.</description>
    </item>
    <item>
      <title>Plan Ahead: Westbound US 2 Trestle Closures Begin June 18</title>
      <pubDate>Tue, 19 Jun 2007 04:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/_18_07US2TrestleClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/_18_07US2TrestleClosures.htm</guid>
      <description>Drivers should plan ahead as nightly closures of the westbound US 2 Ebey Island trestle and bridge begin tonight and continue through early October.</description>
    </item>
    <item>
      <title>I-5, Rush Road to 13th Street Widening Project Open House Scheduled for June 28</title>
      <pubDate>Tue, 19 Jun 2007 01:38:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/18_I5RushRdOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/18_I5RushRdOpenHouse.htm</guid>
      <description>CHEHALIS – An opportunity for the public to learn more about the soon-to-begin I-5, Rush Road to 13th Street Project will take place June 28, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>WSDOT Slows Down Traffic on I-5, in SR 502 Interchange Construction Zone</title>
      <pubDate>Mon, 18 Jun 2007 22:45:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/18_SlowDownTrafficI-5_SR502Interchange.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/18_SlowDownTrafficI-5_SR502Interchange.htm</guid>
      <description>BATTLE GROUND – Beginning June 22, motorists will notice a speed limit revision in the I-5, SR 502 Interchange work zone, as the speed limit is reduced from 70 mph to 60 mph on I-5, announced Washington State Department of Transportation (WSDOT.)</description>
    </item>
    <item>
      <title>Limited Opening of SR 508 at Bear Canyon Begins June 25</title>
      <pubDate>Mon, 18 Jun 2007 22:24:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/18_OpeningSR508BearCanyon.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/18_OpeningSR508BearCanyon.htm</guid>
      <description>CHEHALIS – Limited openings of State Route 508 at Bear Canyon begin June 25, announced the Washington State Department of Transportation (WSDOT.)</description>
    </item>
    <item>
      <title>WSDOT Crews Inspect the Alaskan Way Viaduct Next Week without Lane Closures</title>
      <pubDate>Sat, 16 Jun 2007 05:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/15_ViaductInspection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/15_ViaductInspection.htm</guid>
      <description>WSDOT Crews Inspect the Alaskan Way Viaduct Next Week without Lane Closures</description>
    </item>
    <item>
      <title>Ground-Penetrating Radar Reveals No More Potential for Sinkholes on US 2 near Index</title>
      <pubDate>Sat, 16 Jun 2007 04:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/15_US2RadarResults.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/15_US2RadarResults.htm</guid>
      <description>Ground-Penetrating Radar Reveals No More Potential for Sinkholes on US 2 near Index</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland June 15 – 22</title>
      <pubDate>Sat, 16 Jun 2007 02:00:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/15_KirklandUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/15_KirklandUpdates.htm</guid>
      <description>I-405 Construction Updates in Kirkland June 15 – 22</description>
    </item>
    <item>
      <title>I-5 Lanes Closed at Night Next Week in Mount Vernon</title>
      <pubDate>Sat, 16 Jun 2007 01:37:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/15_i5mountvernonlaneclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/15_i5mountvernonlaneclosures.htm</guid>
      <description>Crews will close lanes at night along I-5 in Mount Vernon.</description>
    </item>
    <item>
      <title>Community Advisory Group for the Bainbridge Island Ferry Terminal Project Will Meet on June 20</title>
      <pubDate>Fri, 15 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/bainbridge-cag-to-meet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/bainbridge-cag-to-meet.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound June 15 - 25</title>
      <pubDate>Fri, 15 Jun 2007 06:04:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/14_BusyWeekJune15.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/14_BusyWeekJune15.htm</guid>
      <description>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound June 15 - 25</description>
    </item>
    <item>
      <title>SR 16 Lane Closures June 17-27</title>
      <pubDate>Fri, 15 Jun 2007 03:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/14_sr16hovlanes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/14_sr16hovlanes.htm</guid>
      <description>SR 16 HOV Lanes – Not Just for Eastbound Anymore</description>
    </item>
    <item>
      <title>Less Waiting, More Driving:  Stanwood and Camano Island Commuters Enjoying Newly Coordinated Signals</title>
      <pubDate>Fri, 15 Jun 2007 01:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/14_SR532SignalTiming.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/14_SR532SignalTiming.htm</guid>
      <description>Less Waiting, More Driving:  Stanwood and Camano Island Commuters Enjoying Newly Coordinated Signals</description>
    </item>
    <item>
      <title>WSDOT Prepares to Award I-405/I-5 to SR 169 Stage 1 – Widening Project to Apparent Best Value Bidder</title>
      <pubDate>Thu, 14 Jun 2007 21:22:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/14_I405Stage1Award.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/14_I405Stage1Award.htm</guid>
      <description>WSDOT Prepares to Award I-405/I-5 to SR 169 Stage 1 – Widening Project to Apparent Best Value Bidder</description>
    </item>
    <item>
      <title>Extreme TIde Cancellations June 14-July 3</title>
      <pubDate>Thu, 14 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/extreme-tide-cancellations.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/extreme-tide-cancellations.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT/WSF Receives Joint Proposal from Puget Sound Shipyards</title>
      <pubDate>Thu, 14 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/shipyards-share-proposal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/shipyards-share-proposal.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Selects Contractor to Construct State’s First HOT Lanes</title>
      <pubDate>Thu, 14 Jun 2007 05:19:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/13_HOTLanesAwarded.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/13_HOTLanesAwarded.htm</guid>
      <description>WSDOT Selects Contractor to Construct State’s First HOT Lanes</description>
    </item>
    <item>
      <title>WSDOT Celebrates Completion of Major Project in the Tri-Cities</title>
      <pubDate>Thu, 14 Jun 2007 02:44:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/SR240ribboncutting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/SR240ribboncutting.htm</guid>
      <description>Every day more than 55,000 motorists use SR 240 to travel to their jobs, retail centers and other destinations. With the completion of additional lanes and a new roundabout at the Richland Wye Interchange, the roadway will be safer and less congested for drivers.</description>
    </item>
    <item>
      <title>Total Northbound I-5 Closure in Everett for Bridge Work</title>
      <pubDate>Thu, 14 Jun 2007 01:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/13_I5SouthEverettNBClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/13_I5SouthEverettNBClosure.htm</guid>
      <description>Crews will close all lanes of northbound I-5 from 128th Street SE to SR 527 in south Everett from midnight to 7 a.m. Sunday, June 17.</description>
    </item>
    <item>
      <title>Tacoma Off-ramp Closes Friday Night</title>
      <pubDate>Wed, 13 Jun 2007 23:24:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/13_I-5_38th+rampclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/13_I-5_38th+rampclosure.htm</guid>
      <description>Crews close 38th Street East ramp from northbound I-5 for noise-wall work.</description>
    </item>
    <item>
      <title>Load Restrictions for Low Clearance Vehicles Due to Extreme Low Tides</title>
      <pubDate>Wed, 13 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/extreme-low-tides.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/extreme-low-tides.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Seattle Ferry Terminal Project's Community Advisory Group to Meet June 21 at Colman Dock</title>
      <pubDate>Wed, 13 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/colman-dock-cag-to-meet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/colman-dock-cag-to-meet.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Lane Closures on SR 161 in Puyallup</title>
      <pubDate>Wed, 13 Jun 2007 06:35:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/12_SR161puyallupwork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/12_SR161puyallupwork.htm</guid>
      <description>Lane Closures on SR 161 in Puyallup</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Wed, 13 Jun 2007 02:35:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/12_SR520Bridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/12_SR520Bridge.htm</guid>
      <description></description>
    </item>
    <item>
      <title>HISTORIC EVENT TAKES PLACE AS DEEP RESERVE FERRY REPLACES RHODODENDRON</title>
      <pubDate>Tue, 12 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/hiyu-sails-again.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/hiyu-sails-again.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Rain Delays SR 119 Work</title>
      <pubDate>Tue, 12 Jun 2007 05:30:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/11_SR119_chipseal_delay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/11_SR119_chipseal_delay.htm</guid>
      <description>Chip-seal work on SR 119 postponed.</description>
    </item>
    <item>
      <title>US 395 Division Street/Hastings Road Intersection project in Spokane ready to start</title>
      <pubDate>Tue, 12 Jun 2007 05:14:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/11_US395_hastingsintersectionconcrete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/11_US395_hastingsintersectionconcrete.htm</guid>
      <description>US 395 Division Street/Hastings Road Intersection project in Spokane ready to start</description>
    </item>
    <item>
      <title>Lane and Ramp Closures for SR 167 Paving in Auburn</title>
      <pubDate>Mon, 11 Jun 2007 21:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/11_SR167Paving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/11_SR167Paving.htm</guid>
      <description>Lane and Ramp Closures for SR 167 Paving in Auburn</description>
    </item>
    <item>
      <title>Lane Closures Continue on SR 8 after Tanker Fire</title>
      <pubDate>Mon, 11 Jun 2007 06:54:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/10_LaneClosureContinuesonSR8.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/10_LaneClosureContinuesonSR8.htm</guid>
      <description>Lane Closure Continues on SR 8 after Tanker Fire</description>
    </item>
    <item>
      <title>Three Nights of Lane Restrictions in Tacoma</title>
      <pubDate>Sat, 09 Jun 2007 07:34:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/08_I5_3nights_closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/08_I5_3nights_closures.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Wreckage of Missing Aircraft Located Near Quilcene</title>
      <pubDate>Sat, 09 Jun 2007 06:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/WreckageAircraftQuilcene.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/WreckageAircraftQuilcene.htm</guid>
      <description>The wreckage of a missing Cessna 210 aircraft was located today around 2 p.m. near Quilcene, WA.  Two people were on board the aircraft, which left yesterday from Lopez Island and was headed to California.  Family members in California reported the pilot and passenger missing, thus igniting the search effort early this morning.

Searchers from the King County Sheriff’s Office and Washington State Department of Transportation spotted the wreckage while combing the area in the King County helico</description>
    </item>
    <item>
      <title>Paving in Poulsbo: SR 305 Project on a Roll</title>
      <pubDate>Sat, 09 Jun 2007 05:23:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/08_SR305_pavingbegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/08_SR305_pavingbegins.htm</guid>
      <description>Paving begins on SR 305 project in Poulsbo.</description>
    </item>
    <item>
      <title>Public Trial Period for Tacoma Narrows Electronic Toll System</title>
      <pubDate>Sat, 09 Jun 2007 05:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/08_GTG_trialperiod.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/08_GTG_trialperiod.htm</guid>
      <description>Public Trial Period for Tacoma Narrows Electronic Toll System</description>
    </item>
    <item>
      <title>Lane Closures and Paving Continue on TNB</title>
      <pubDate>Sat, 09 Jun 2007 05:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/08_TNBpavingcontinues.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/08_TNBpavingcontinues.htm</guid>
      <description>Lane Closures and Paving Continue on TNB</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland June 8 – 15</title>
      <pubDate>Fri, 08 Jun 2007 22:08:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/8_KirklandUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/8_KirklandUpdates.htm</guid>
      <description>I-405 Construction Updates in Kirkland June 8 – 15</description>
    </item>
    <item>
      <title>WSDOT Completes SR 240 Project, Relieves Congestion and Creates Better Connections Through the Tri-Cities</title>
      <pubDate>Fri, 08 Jun 2007 22:04:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/NR/exeres/1BE342AF-C48E-4ABF-A045-1BB87843C313.htm</link>
      <guid>http://www.wsdot.wa.gov/NR/exeres/1BE342AF-C48E-4ABF-A045-1BB87843C313.htm</guid>
      <description>For the past two years, SR 240 has been lined with orange cones and barrels, but motorists will be happy to see that those cones and barrels will no longer be an annoyance.</description>
    </item>
    <item>
      <title>WSF begins Summer Schedule June 24</title>
      <pubDate>Fri, 08 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/wsf-begins-summer-schedule-june-24.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/wsf-begins-summer-schedule-june-24.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Cathlamet to Return to Mukilteo for Weekend</title>
      <pubDate>Fri, 08 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/cathlamet-to-return-to-mukilteo-for-weekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/cathlamet-to-return-to-mukilteo-for-weekend.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Eastern Region Chip Seal to resurface over 130 miles of highway</title>
      <pubDate>Fri, 08 Jun 2007 05:43:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/07_EasternRegionChipSeal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/07_EasternRegionChipSeal.htm</guid>
      <description>Eastern Region chip seal project will resurface about 130 miles of highways.</description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound June 8 – June 18</title>
      <pubDate>Fri, 08 Jun 2007 05:40:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/7_BusyWeek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/7_BusyWeek.htm</guid>
      <description>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound June 8 – June 18</description>
    </item>
    <item>
      <title>Sound Transit and WSDOT Advise Airport Travelers of Nighttime Traffic Impacts for Light Rail Construction over SR 518</title>
      <pubDate>Fri, 08 Jun 2007 04:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/7_SR518LightRailClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/7_SR518LightRailClosures.htm</guid>
      <description>Starting Wednesday, June 13, commuters will see a new light rail overpass taking shape across SR518 near Sea-Tac International Airport. Sound Transit contractors will build the overpass over the highway just west of International Boulevard. Crews will employ a construction method and schedule that keeps the freeway open during the day, limiting lane closures and traffic impacts to nighttime hours.</description>
    </item>
    <item>
      <title>Installation of Safety Warning Lights at US 12 and Jackson Highway Intersection Begins Next Week</title>
      <pubDate>Fri, 08 Jun 2007 03:54:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/07_US12SafetyLights.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/07_US12SafetyLights.htm</guid>
      <description>CHEHALIS – On June 17, motorists in Lewis County will notice new “Prepare to Stop When Flashing” signs on US 12 at Jackson Highway.</description>
    </item>
    <item>
      <title>Local Agencies Move Closer to Major Federal Investment in New Strategies to Fight Highway Congestion</title>
      <pubDate>Fri, 08 Jun 2007 02:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/07_urbanparntership.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/07_urbanparntership.htm</guid>
      <description>SEATTLE – Today a joint proposal by the Puget Sound Regional Council, King County and the Washington State Department of Transportation was named by US Transportation Secretary Mary Peters as one of nine metropolitan areas selected as Preliminary Urban Partners as part a new $1.1 billion federal initiative to reduce traffic congestion on big-city freeways.</description>
    </item>
    <item>
      <title>I-5 Ramp, Lane Closures in Tacoma this Weekend</title>
      <pubDate>Fri, 08 Jun 2007 01:29:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/07_I-5WorkZone.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/07_I-5WorkZone.htm</guid>
      <description>Lane closures and ramp closures on I-5 Tacoma this weekend for maintenance work.</description>
    </item>
    <item>
      <title>WSDOT Awards $1.5 Million for Commute Trip Reduction</title>
      <pubDate>Fri, 08 Jun 2007 00:37:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/7_AwardsComuteTripReduction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/7_AwardsComuteTripReduction.htm</guid>
      <description>WSDOT selects 22 projects for the 2007-2009 Trip Reduction Performance Program (TRPP). WSDOT will pay contractors up to $1.5 million as part of the TRP Program to reduce the number of drive alone commute trips.</description>
    </item>
    <item>
      <title>I-5 Peace Arch Border Crossing Closed Sunday for Celebration</title>
      <pubDate>Thu, 07 Jun 2007 01:00:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/06_i5peacearchcelebration.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/06_i5peacearchcelebration.htm</guid>
      <description>I-5, Peace Arch border crossing in Blaine closed Sunday to all traffic.</description>
    </item>
    <item>
      <title>WSDOT’s New Cameras Bring a Clearer Picture of Puget Sound Traffic</title>
      <pubDate>Wed, 06 Jun 2007 22:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/6_NewTrafficCameras.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/6_NewTrafficCameras.htm</guid>
      <description>WSDOT’s New Cameras Bring a Clearer Picture of Puget Sound Traffic</description>
    </item>
    <item>
      <title>Death during WSDOT Contractor’s Brush-Clearing Operation underneath I-5 in South Seattle</title>
      <pubDate>Wed, 06 Jun 2007 02:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/5_I-5BrushClearing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/5_I-5BrushClearing.htm</guid>
      <description>Death during WSDOT Contractor’s Brush-Clearing Operation underneath I-5 in South Seattle</description>
    </item>
    <item>
      <title>Two Days of Delays on Lake Cushman Road</title>
      <pubDate>Wed, 06 Jun 2007 02:19:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/05_SR119_ChipSeal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/05_SR119_ChipSeal.htm</guid>
      <description>Chip seal work causes delays on SR 119 near Lake Cushman, Mason County.</description>
    </item>
    <item>
      <title>Hood Canal Bridge Project Reaches Halfway Point</title>
      <pubDate>Tue, 05 Jun 2007 06:46:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/06042007_SR104_HCBHalfwayPoint.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/06042007_SR104_HCBHalfwayPoint.htm</guid>
      <description>Hood Canal Bridge Project reaches halfway point</description>
    </item>
    <item>
      <title>Cashmere Area US 2 Safety Projects Open House is Wednesday</title>
      <pubDate>Tue, 05 Jun 2007 05:00:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/060407CashmereOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/060407CashmereOpenHouse.htm</guid>
      <description>WSDOT holds an Open House on 2008 US 2/97 Safety Improvement projects in Cashmere Wednesday night.</description>
    </item>
    <item>
      <title>Increased Incident Response Service Helps More Drivers, Keeps Traffic Moving in Skagit, Whatcom Counties</title>
      <pubDate>Tue, 05 Jun 2007 00:27:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/04_IRTbakerareanews.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/04_IRTbakerareanews.htm</guid>
      <description>WSDOT Incident Response crews are helping more drivers more often and keeping traffic flowing more smoothly in Skagit and Whatcom counties.</description>
    </item>
    <item>
      <title>Good To Go! Opens Customer Service Center in Tacoma</title>
      <pubDate>Mon, 04 Jun 2007 22:22:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/go2go_csc.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/go2go_csc.htm</guid>
      <description>Good To Go! Opens Customer Service Center in Tacoma</description>
    </item>
    <item>
      <title>I-90 Tunnels Flammable Cargo Restriction in Effect Through June 13</title>
      <pubDate>Mon, 04 Jun 2007 21:36:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/4_FlammableRestrictionI-90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/4_FlammableRestrictionI-90.htm</guid>
      <description>I-90 Tunnels Flammable Cargo Restriction in Effect Through June 13</description>
    </item>
    <item>
      <title>Lane and Ramp Closures This Week on SR 167 in Auburn</title>
      <pubDate>Sat, 02 Jun 2007 06:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/1_SR167Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/1_SR167Closures.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Construction Buzzing on SR 9; Crews Start Work on Two New Projects North of Marysville</title>
      <pubDate>Sat, 02 Jun 2007 04:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/1_SR9ConstructionStarts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/1_SR9ConstructionStarts.htm</guid>
      <description>Construction Buzzing on SR 9; Crews Start Work on Two New Projects North of Marysville</description>
    </item>
    <item>
      <title>Roundabout Construction Begins near Mount Vernon</title>
      <pubDate>Sat, 02 Jun 2007 04:25:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/1_MtVernonRoundabout.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/1_MtVernonRoundabout.htm</guid>
      <description>Roundabout Construction Begins near Mount Vernon</description>
    </item>
    <item>
      <title>SR 202 Lane Closures Start Monday on North Bend Roundabout Project</title>
      <pubDate>Sat, 02 Jun 2007 04:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/1_SR202ClosuresStart.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/1_SR202ClosuresStart.htm</guid>
      <description>SR 202 Lane Closures Start Monday on North Bend Roundabout Project</description>
    </item>
    <item>
      <title>Senator and Mayor Break Through Ribbon To Celebrate Completion of Interchange Improvements Project</title>
      <pubDate>Fri, 01 Jun 2007 23:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/40thAvenueRibbonCutting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/40thAvenueRibbonCutting.htm</guid>
      <description>Within budget and ahead of schedule, these are goals WSDOT tries to achieve on every project. On May 30th we joined the City of Yakima to celebrate this achievement for the US 12 – 40th Avenue Interchange Improvements project.</description>
    </item>
    <item>
      <title>Bremerton Tunnel Open House June 11</title>
      <pubDate>Fri, 01 Jun 2007 22:53:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/1_304_TunnelOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/1_304_TunnelOpenHouse.htm</guid>
      <description>June 11 WSDOT will host an Open House at the Norm Dicks Government Center to provide information about the Bremerton Tunnel.</description>
    </item>
    <item>
      <title>Join WSDOT June 14 at the Fourth SR 502 Corridor Widening Project Open House</title>
      <pubDate>Fri, 01 Jun 2007 22:40:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/01_SR502OpenHouse4.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/01_SR502OpenHouse4.htm</guid>
      <description>BATTLE GROUND - The Washington State Department of Transportation (WSDOT) will host a fourth community open house for the SR 502 Corridor Widening Project Thursday, June 14, from 4-7 p.m.</description>
    </item>
    <item>
      <title>Friday Harbor Paving may cause delays for travelers</title>
      <pubDate>Fri, 01 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/paving-at-friday-harbor.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/paving-at-friday-harbor.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Service Resumes on Mukilteo-Clinton Route</title>
      <pubDate>Fri, 01 Jun 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/06/mukilteoclinton-service-resumes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/06/mukilteoclinton-service-resumes.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Wants to Hear From Drivers on I-90, SR 202 and SR 9 in King and Snohomish County</title>
      <pubDate>Fri, 01 Jun 2007 06:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/31_RDPNews.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/31_RDPNews.htm</guid>
      <description>WSDOT Wants to Hear From Drivers on I-90, SR 202 and SR 9 in King and Snohomish County</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland June 1 – 8</title>
      <pubDate>Fri, 01 Jun 2007 06:35:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/31_KirklandUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/31_KirklandUpdates.htm</guid>
      <description>I-405 Construction Updates in Kirkland June 1 – 8</description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound June 1 – June 11</title>
      <pubDate>Fri, 01 Jun 2007 05:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/31_BusyWeek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/31_BusyWeek.htm</guid>
      <description>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound June 1 – June 11</description>
    </item>
    <item>
      <title>Crews Restrict Lane Near South Hill Mall</title>
      <pubDate>Fri, 01 Jun 2007 05:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/31_Crews+Restrict_Lane_NearSouthHillMall.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/31_Crews+Restrict_Lane_NearSouthHillMall.htm</guid>
      <description>Crews Restrict Lane Near South Hill Mall</description>
    </item>
    <item>
      <title>SR 519 Intermodal Access Project Public Meeting On June 6 in Seattle</title>
      <pubDate>Fri, 01 Jun 2007 03:55:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/SR519MeetingJune62007.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/SR519MeetingJune62007.htm</guid>
      <description>The Washington State Department of Transportation will hold a public meeting for the SR 519 Intermodal Access Project on Wednesday, June 6 from 5 p.m. to 7 p.m. The meeting will be held at Union Station’s Sound Transit Boardroom located at 401 South Jackson Street, Seattle, WA.</description>
    </item>
    <item>
      <title>New Narrows Bridge Opens July 15 for Public Celebration</title>
      <pubDate>Fri, 01 Jun 2007 02:41:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/30_new_narrows_open_july.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/30_new_narrows_open_july.htm</guid>
      <description>Save the date—New Narrows Bridge opening and public event—Sunday, July 15, 2007</description>
    </item>
    <item>
      <title>A Better Traffic Signal at Interchange Improves Safety for Motorists</title>
      <pubDate>Fri, 01 Jun 2007 00:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/FlashingYellowArrow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/FlashingYellowArrow.htm</guid>
      <description>Just one day after WSDOT and the City of Yakima celebrate the completion of the US 12 – 40th Avenue Interchange Improvements project, motorists will see the first flashing yellow left-turn arrows in Yakima.</description>
    </item>
    <item>
      <title>I-5 Cable Median Barrier Stops Vehicle in Marysville</title>
      <pubDate>Thu, 31 May 2007 06:06:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/30_CableBarrierStopsVehicle.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/30_CableBarrierStopsVehicle.htm</guid>
      <description>It appears that cable barrier successfully stopped a vehicle that swerved into the median this morning after avoiding a wrong-way driver on northbound I-5 in Marysville. Though his car was damaged, the driver who collided with the cable barrier walked away with no injuries.</description>
    </item>
    <item>
      <title>Safety Improvements for SR 20 – WSDOT Breaks Ground on Five-Mile Widening Project in Burlington</title>
      <pubDate>Thu, 31 May 2007 04:50:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/30_sr20groundbreakingceremony.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/30_sr20groundbreakingceremony.htm</guid>
      <description>Citizens, business leaders, local officials and legislators met today for an official groundbreaking on WSDOT’s already-started $110 million widening project on SR 20 west of Burlington. The project will turn a five-mile highway stretch that is notorious for backups and collisions into a wider and safer highway. The work will be complete in 2009.</description>
    </item>
    <item>
      <title>WSDOT Celebrates Completion of Intersection Improvements at Ribbon Cutting Ceremony</title>
      <pubDate>Thu, 31 May 2007 03:51:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/40thavenueribboncutting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/40thavenueribboncutting.htm</guid>
      <description>Just two months ago we were breaking ground on the US 12 – 40th Avenue Interchange Improvements project. Now we are celebrating the completion of the project at a ribbon cutting ceremony.</description>
    </item>
    <item>
      <title>Smart Drivers Avoided Worst Travel Times During Memorial Day Weekend</title>
      <pubDate>Thu, 31 May 2007 02:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/30_MemorialDayWrapUp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/30_MemorialDayWrapUp.htm</guid>
      <description>Smart Drivers Avoided Worst Travel Times During Memorial Day Weekend</description>
    </item>
    <item>
      <title>More than 50 Double Fines in Cowlitz County I-5 Work Zone</title>
      <pubDate>Wed, 30 May 2007 01:08:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/29_I-5Workzone.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/29_I-5Workzone.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Lane Closures This Week on SR 516 on the border of Covington and Maple Valley</title>
      <pubDate>Sat, 26 May 2007 06:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/25_SR516Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/25_SR516Closures.htm</guid>
      <description>Starting next Tuesday morning drivers may encounter daytime delays on State Route 516 as crews prep and pave a section of the highway on the border of Covington and Maple Valley.</description>
    </item>
    <item>
      <title>Striping Work Continues along SR 14 near Cape Horn, May 29-30</title>
      <pubDate>Sat, 26 May 2007 05:44:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/25_CapeHornStripingContinues.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/25_CapeHornStripingContinues.htm</guid>
      <description>PRINDLE – Motorists traveling on State Route 14 near Cape Horn should expect continued daytime delays from May 29-30 while crews work to finish striping the nine mile stretch along the highway, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>US 12 Paving Preparation Work Under Way</title>
      <pubDate>Fri, 25 May 2007 22:41:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/25_US12_paving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/25_US12_paving.htm</guid>
      <description>Preparation work for US 12 paving project begins.</description>
    </item>
    <item>
      <title>Crews Wrap-up Work on a New, Improved SR 532/I-5 Interchange</title>
      <pubDate>Fri, 25 May 2007 06:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/24_StanwoodInterchange.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/24_StanwoodInterchange.htm</guid>
      <description>Crews Wrap-up Work on a New, Improved SR 532/I-5 Interchange</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland May 25 – June 1</title>
      <pubDate>Fri, 25 May 2007 06:18:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/24_KirklandUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/24_KirklandUpdates.htm</guid>
      <description>I-405 Construction Updates in Kirkland May 25 – June 1</description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound May 25 – June 4</title>
      <pubDate>Fri, 25 May 2007 05:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/24_DriverAlert.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/24_DriverAlert.htm</guid>
      <description>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound May 25 – June 4</description>
    </item>
    <item>
      <title>WSDOT Driver Tips: US 2, Snoqualmie Pass, I-5 busy on Memorial Day Weekend</title>
      <pubDate>Fri, 25 May 2007 00:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/22_MemorialDayTraffic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/22_MemorialDayTraffic.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Driver Tips: Find the best times to travel on US 2, I-5, and I-90 Snoqualmie Pass during Memorial Day Weekend</title>
      <pubDate>Fri, 25 May 2007 00:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/22_MemorialDayTrafficCharts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/22_MemorialDayTrafficCharts.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Chinook Pass Opening</title>
      <pubDate>Thu, 24 May 2007 04:32:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/Chinook+Pass+Opening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/Chinook+Pass+Opening.htm</guid>
      <description>Chinook Pass Opens at noon May 24, 2007</description>
    </item>
    <item>
      <title>Harvey Airfield Noise Abatement Procedure</title>
      <pubDate>Thu, 24 May 2007 03:27:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/HarveyNoise05_17.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/HarveyNoise05_17.htm</guid>
      <description>HARVEY AIRFIELD NOISE ABATEMENT PROCEDURE 

The following notice is from Harvey Field regarding the Noise Abatement Procedure. More information is on our Web site at: 

The work of the Harvey Airfield Noise Program Committee regarding the 
Northerly 290 Degree Noise Abatement Procedure is an effort to diminish noise complaints from citizen's living north of the airport and in the Fobes Hill, Riverview Road area. Airport management is moving forward to implement recommendations by addressing</description>
    </item>
    <item>
      <title>Search Underway for Missing Aircraft Near Chinook Pass</title>
      <pubDate>Thu, 24 May 2007 02:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/23_MissingAircraftChinook.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/23_MissingAircraftChinook.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Paving Begins on New Narrows</title>
      <pubDate>Thu, 24 May 2007 01:28:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/23_PavingbeginsonNewNarrows.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/23_PavingbeginsonNewNarrows.htm</guid>
      <description>Paving Begins on New Narrows</description>
    </item>
    <item>
      <title>I-5, Rush Road to 13th Street Project Construction Begins this Summer, Contractor Selected</title>
      <pubDate>Wed, 23 May 2007 21:50:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/23_I-5RushRoad.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/23_I-5RushRoad.htm</guid>
      <description>CHEHALIS – A project that will widen four miles of I-5 near Chehalis and construct a new interchange on I-5 at LaBree Road begins this summer.</description>
    </item>
    <item>
      <title>Safety and Security is Coming to a LCD Monitor Near You</title>
      <pubDate>Wed, 23 May 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/safety-and-security-lcd-monitors.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/safety-and-security-lcd-monitors.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Sound Transit Completes Structural Work on I-5 Light Rail Bridge this Week</title>
      <pubDate>Wed, 23 May 2007 06:38:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/22_I5LightRailClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/22_I5LightRailClosures.htm</guid>
      <description>Major construction of Sound Transit’s new light rail overpass across I-5 just south of the Boeing Access Road near Seattle’s southern border substantially wraps up this week as contractor crews fill the final bridge gap.  

Partial nighttime closures of I-5 north and southbound lanes are scheduled Tuesday through Thursday as crews prepare and pour the final concrete into a gap between the north and south segments of the bridge.</description>
    </item>
    <item>
      <title>WSDOT Bridge Crews Start Montlake Bridge Repairs</title>
      <pubDate>Wed, 23 May 2007 00:49:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/22_MontlakeBridgeRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/22_MontlakeBridgeRepair.htm</guid>
      <description></description>
    </item>
    <item>
      <title>I-5, Fourth Plain Blvd. Overpass to Close for Striping Work Night of May 23-24</title>
      <pubDate>Wed, 23 May 2007 00:11:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/22_I5FourthPlainClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/22_I5FourthPlainClosure.htm</guid>
      <description>VANCOUVER – The I-5, Fourth Plain Blvd. overpass will close at 9 p.m. the night of May 23 for striping work which will modify the westbound lane configuration.</description>
    </item>
    <item>
      <title>US 2 Iron Goat Interpretive Site Opens for the Season</title>
      <pubDate>Tue, 22 May 2007 09:26:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/052107IronGoatOpens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/052107IronGoatOpens.htm</guid>
      <description>US 2 Iron Goat Interpretive Site, near Stevens Pass, reopens in time for Memorial Day travelers.</description>
    </item>
    <item>
      <title>Crews Will Complete Storage Tank Installation Ahead of Schedule on SR 99 in Federal Way</title>
      <pubDate>Tue, 22 May 2007 08:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/21_SR99AheadSchedule.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/21_SR99AheadSchedule.htm</guid>
      <description>Drivers who travel on SR 99 in Federal Way will have an easier commute Tuesday morning than they expected.</description>
    </item>
    <item>
      <title>Grading and bridge project for North Spokane corridor getting underway</title>
      <pubDate>Tue, 22 May 2007 05:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/21_US395NSCgrading.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/21_US395NSCgrading.htm</guid>
      <description>Grading and bridge project for North Spokane corridor getting underway</description>
    </item>
    <item>
      <title>WSDOT Crews Successfully Band New Peregrine Chicks on Ship Canal Bridge</title>
      <pubDate>Tue, 22 May 2007 05:26:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/21_FalconsOnShipCanal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/21_FalconsOnShipCanal.htm</guid>
      <description>WSDOT Crews Successfully Band New Peregrine Chicks on Ship Canal Bridge</description>
    </item>
    <item>
      <title>WSDOT and WSP Enforcing Double Fines on I-5 in Southwest Washington</title>
      <pubDate>Tue, 22 May 2007 01:01:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/21_WSPEnforcmentOnI5CastleRock.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/21_WSPEnforcmentOnI5CastleRock.htm</guid>
      <description>CASTLE ROCK – Drivers traveling on I-5 through Castle Rock will have a few extra eyes on them May 23.</description>
    </item>
    <item>
      <title>New Signal at Old Highway 99 Running; Temporary Signal Still in Place at I-5 Off-Ramp to SR 532</title>
      <pubDate>Sat, 19 May 2007 08:48:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/18_I5SR532TempSignal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/18_I5SR532TempSignal.htm</guid>
      <description>Last Tuesday, crews activated a new signal at the intersection of Old Highway 99 and State Route 532.  However, drivers will need to wait a bit longer before the new signal at the northbound I-5 exit to SR 532 is ready.</description>
    </item>
    <item>
      <title>WSDOT Closes SR 821 Between Ellensburg and Yakima for Bike Tour</title>
      <pubDate>Sat, 19 May 2007 06:09:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/biketour.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/biketour.htm</guid>
      <description>Sunday May 20, between 8 a.m. and 4 p.m., WSDOT and Yakima County Crime Stoppers are closing SR 821 (Canyon Road) to through traffic to make a safe place for the fifth annual “Your Canyon for a Day Bike Tour."</description>
    </item>
    <item>
      <title>Ramps and Roadways near Montlake Bridge to Close for Foot Race</title>
      <pubDate>Sat, 19 May 2007 04:40:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/18_MontlakeBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/18_MontlakeBridge.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Click it or Ticket: Nighttime Patrol in May and June</title>
      <pubDate>Sat, 19 May 2007 04:39:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/18_nightseatbeltpatrol.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/18_nightseatbeltpatrol.htm</guid>
      <description>OLYMPIA - Law enforcement all over Washington will be out looking for those who don’t click it at night. From Monday, May 21 through Sunday, June 3, police patrols will take their “Click It or Ticket” campaign into overnight hours.</description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound May 18 – May 28</title>
      <pubDate>Sat, 19 May 2007 03:04:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/18_Busyweek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/18_Busyweek.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Salmon Creek Interchange Project Access Hearing Scheduled for May 23</title>
      <pubDate>Sat, 19 May 2007 02:07:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/18_SCIPAccessHearing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/18_SCIPAccessHearing.htm</guid>
      <description>VANCOUVER – The Washington State Department of Transportation (WSDOT) will hold an Access Hearing and brief for the I-5, NE 134th Street Salmon Creek Interchange Project on May 23 at 6 p.m.</description>
    </item>
    <item>
      <title>SR 507 Safety Improvements at Yew Street in Centralia Scheduled for Thursday, May 24</title>
      <pubDate>Sat, 19 May 2007 01:08:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/18_SR507Safety.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/18_SR507Safety.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Awards $3.7 Million Contract to Replace SR 542 Bridge near Maple Falls</title>
      <pubDate>Fri, 18 May 2007 23:55:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/18_sr542bouldercreekbridgereplacement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/18_sr542bouldercreekbridgereplacement.htm</guid>
      <description>WSDOT awarded a $3.7 million construction contract this week to replace the Boulder Creek Bridge on Mount Baker Highway near Maple Falls. The new wider, higher SR 542 bridge should reduce flooding problems and resulting highway closures, reduce maintenance, improve fish habitat and improve safety for pedestrians and cyclists.</description>
    </item>
    <item>
      <title>WSDOT Selects Highway Construction Projects for End-of-Season Evaluation</title>
      <pubDate>Fri, 18 May 2007 23:43:30 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/18_2007ConstructionHighlights.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/18_2007ConstructionHighlights.htm</guid>
      <description>WSDOT recently selected 25 highway construction projects for a performance evaluation in its end-of-season Construction Highlights Report.</description>
    </item>
    <item>
      <title>Kitsap Way Paving Project Starts Next Week</title>
      <pubDate>Fri, 18 May 2007 22:30:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/18_310_Pavebegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/18_310_Pavebegins.htm</guid>
      <description>A project to pave Kitsap Way in Bremerton begins next week.</description>
    </item>
    <item>
      <title>Memorial Day Marks Start of Summer Season for Washington State Ferries</title>
      <pubDate>Fri, 18 May 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/memorial-day-marks-start-of-summer-season-for-washington-state-f.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/memorial-day-marks-start-of-summer-season-for-washington-state-f.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Surveying Requires SR 512 Lane Closures</title>
      <pubDate>Fri, 18 May 2007 06:22:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/17_SR512_laneclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/17_SR512_laneclosures.htm</guid>
      <description>Survey work requires lane closures on SR 512.</description>
    </item>
    <item>
      <title>SR 20 paving work set to start on Sherman Pass</title>
      <pubDate>Fri, 18 May 2007 05:39:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/17_SR20ShermanPassPaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/17_SR20ShermanPassPaving.htm</guid>
      <description>Contractor crews will begin work on Monday, May 21st on a section of State Route 20 in Ferry County.</description>
    </item>
    <item>
      <title>Flaggers Signal Start of Resurfacing on SR 104</title>
      <pubDate>Fri, 18 May 2007 04:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/17_SR104LakeForestParkLaneClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/17_SR104LakeForestParkLaneClosure.htm</guid>
      <description>Next Tuesday, May 22, WSDOT and contractor Rinker Materials will begin resurfacing SR 104 from 244th Street SW to NE 190th Street.</description>
    </item>
    <item>
      <title>Proposed EPA Clean Vehicle Criteria Won’t Affect HOV Rules Yet</title>
      <pubDate>Fri, 18 May 2007 01:56:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/17_HOVEPAProposal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/17_HOVEPAProposal.htm</guid>
      <description>Federal Environmental Protection Agency announced today that it is proposing new criteria for certifying energy efficient or clean vehicles to help states that permit those vehicles to use high occupancy vehicle lanes with a single driver.</description>
    </item>
    <item>
      <title>I-90 Travel Advisory to Help Plan Your Trip Over Snoqualmie Pass this Memorial Day Weekend</title>
      <pubDate>Thu, 17 May 2007 22:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/15_snoqualmietraveladvisory.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/15_snoqualmietraveladvisory.htm</guid>
      <description>It's no surprise, holiday travelers using Snoqualmie Pass will see heavier traffic eastbound Friday and Saturday, May 25 and 26 for memorial day weekend.</description>
    </item>
    <item>
      <title>Tacoma Driver Wins a Year of Free Tolls</title>
      <pubDate>Thu, 17 May 2007 22:30:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/16_TNB_tollwinner.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/16_TNB_tollwinner.htm</guid>
      <description>Tacoma man wins year of free TNB tolls.</description>
    </item>
    <item>
      <title>Corn Syrup Spill Causes a Sticky Mess on US 97 in Toppenish</title>
      <pubDate>Thu, 17 May 2007 22:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/syrupspill.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/syrupspill.htm</guid>
      <description>At about 8:30 a.m. on Friday, May 11, a pick up truck hauling a container of corn syrup turned left too quickly and tipped the container over, out of the truck and onto US 97 in Toppenish where it broke open and spilled.</description>
    </item>
    <item>
      <title>WSDOT Alerts Motorists to Striping Work along SR 14 near Cape Horn, May 21-23</title>
      <pubDate>Thu, 17 May 2007 22:08:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/17_SR14Striping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/17_SR14Striping.htm</guid>
      <description>PRINDLE – Motorists traveling State Route 14 near Cape Horn should expect daytime delays from May 21-23 while crews work to stripe nine miles of the highway, announced the Washington State Department of Transportation (WSDOT.)</description>
    </item>
    <item>
      <title>WSDOT Alerts Motorists to Daytime I-5, NE 78th Street Ramp Closures, May 19</title>
      <pubDate>Thu, 17 May 2007 06:00:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/15_I5NE78RampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/15_I5NE78RampClosures.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Gov. Chris Gregoire Joins WSDOT and Breaks Ground on One of the Largest Construction Contracts This Year: South Bellevue Project Widens I-405, Providing Critical Congestion Relief</title>
      <pubDate>Thu, 17 May 2007 04:06:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/16_I-405SouthBellevue.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/16_I-405SouthBellevue.htm</guid>
      <description></description>
    </item>
    <item>
      <title>US 101 Lane Closure in Aberdeen Set for Sunday Night</title>
      <pubDate>Thu, 17 May 2007 03:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/16_US101laneclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/16_US101laneclosure.htm</guid>
      <description>Lane closure planned for US 101 in Aberdeen</description>
    </item>
    <item>
      <title>New SR 20 Signal Gets Green Light Near Anacortes</title>
      <pubDate>Thu, 17 May 2007 02:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/16_SR20.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/16_SR20.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Crews Close Ramp and Bike Path as US 2 Trestle Work Begins</title>
      <pubDate>Tue, 15 May 2007 06:47:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/14_US2WorkBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/14_US2WorkBegins.htm</guid>
      <description>Crews begin work this week on a $10.8 million project to repair the underside of the Ebey Island Viaduct and Ebey Slough Bridge on westbound U.S. 2.</description>
    </item>
    <item>
      <title>WSDOT Crews Close Westbound SR 520 Exit to NE 51st Street for Overnight Drilling in Redmond</title>
      <pubDate>Tue, 15 May 2007 06:08:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/14_SR520RampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/14_SR520RampClosure.htm</guid>
      <description>WSDOT Crews Close Westbound SR 520 Exit to NE 51st Street for Overnight Drilling in Redmond</description>
    </item>
    <item>
      <title>UPDATE: WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound May 10 – May 21</title>
      <pubDate>Tue, 15 May 2007 01:40:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/14_BusyWeekUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/14_BusyWeekUpdate.htm</guid>
      <description>UPDATE: WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound May 10 – May 21</description>
    </item>
    <item>
      <title>First Drawing for a Year of Free Tolls</title>
      <pubDate>Tue, 15 May 2007 01:39:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/14_SR16_goodtogo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/14_SR16_goodtogo.htm</guid>
      <description>Good to Go sweepstakes starts Tuesday.</description>
    </item>
    <item>
      <title>SR 3 Lane Closure Moves to May 21</title>
      <pubDate>Tue, 15 May 2007 01:00:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/14_SR303_Revisedagain.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/14_SR303_Revisedagain.htm</guid>
      <description>SR 303 Waaga Way closures revised for girder setting.</description>
    </item>
    <item>
      <title>Closure on Northbound SR 167 Ramp in Renton Off-Ramp to S. 180th (IKEA) Extended Through Weekend</title>
      <pubDate>Mon, 14 May 2007 21:19:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/14_RampClosureExtended.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/14_RampClosureExtended.htm</guid>
      <description>Closure on Northbound SR 167 Ramp in Renton Off-Ramp to S. 180th (IKEA) Extended Through Weekend</description>
    </item>
    <item>
      <title>Partial Weekend Closure Starts Tonight at Northbound SR 167 Off-Ramp to S. 180th Street in Renton</title>
      <pubDate>Sat, 12 May 2007 08:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/11_SR167RampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/11_SR167RampClosure.htm</guid>
      <description>Drivers will face detours and delays this weekend if they were planning to use the northbound State Route 167 off-ramp to S. 180th Street in Renton.</description>
    </item>
    <item>
      <title>Paving Project Set to Start on US 12</title>
      <pubDate>Sat, 12 May 2007 06:44:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/11_US12_Wynoocheepaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/11_US12_Wynoocheepaving.htm</guid>
      <description>US 12 Wynoochee to Brady paving project gets started this month (May 07).</description>
    </item>
    <item>
      <title>Heron Street Bridge Closures Monday, Tuesday</title>
      <pubDate>Sat, 12 May 2007 06:41:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/11_US12_Heronclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/11_US12_Heronclosures.htm</guid>
      <description>Heron Street Bridge closes for two nights.</description>
    </item>
    <item>
      <title>Delays Expected During Belfair Signal Testing</title>
      <pubDate>Sat, 12 May 2007 06:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/11_SR3-SR106_signaltest.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/11_SR3-SR106_signaltest.htm</guid>
      <description>Signal testing will delay traffic on SR 3 and SR 106, Wednesday, May 16.</description>
    </item>
    <item>
      <title>Paving Continues at Tacoma Narrows Bridge</title>
      <pubDate>Sat, 12 May 2007 05:19:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/11_SR16_TNBpaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/11_SR16_TNBpaving.htm</guid>
      <description>Paving on Narrows Bridge.</description>
    </item>
    <item>
      <title>WSDOT Purchases Eastern Washington Rail Lines</title>
      <pubDate>Sat, 12 May 2007 04:02:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/PCC_Purchase.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/PCC_Purchase.htm</guid>
      <description>WSDOT Purchases Eastern Washington Rail Lines:  CW Branch of the Palouse River and Coulee City Railroad (PCC).</description>
    </item>
    <item>
      <title>Superload Sleepover Closes Part of the Northbound I-5 Smokey Point Rest Area This Weekend</title>
      <pubDate>Sat, 12 May 2007 00:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/11_SmokeyPointRestAreaClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/11_SmokeyPointRestAreaClosed.htm</guid>
      <description>Superload Sleepover Closes Part of the Northbound I-5 Smokey Point Rest Area This Weekend</description>
    </item>
    <item>
      <title>Weeklong Lane Closures on SR 99 in Federal Way for Football Field-Long Storage Tank Installation</title>
      <pubDate>Sat, 12 May 2007 00:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/11_SR99LaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/11_SR99LaneClosures.htm</guid>
      <description>Weeklong Lane Closures on SR 99 in Federal Way for Football Field-Long Storage Tank Installation</description>
    </item>
    <item>
      <title>Hood Canal Bridge Project Earns National Partnership for Highway Quality Public Communications Award</title>
      <pubDate>Sat, 12 May 2007 00:40:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/May112007_SR104HCBPartnershipAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/May112007_SR104HCBPartnershipAward.htm</guid>
      <description>Hood Canal Bridge Project Earns National Partnership for Highway Quality Public Communications Award</description>
    </item>
    <item>
      <title>New Signals, New Turn Lanes for Drivers at the SR 532/I-5 Interchange</title>
      <pubDate>Fri, 11 May 2007 23:27:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/11_StanwoodSignals.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/11_StanwoodSignals.htm</guid>
      <description>New Signals, New Turn Lanes for Drivers at the SR 532/I-5 Interchange</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland May 11 - 18</title>
      <pubDate>Fri, 11 May 2007 23:26:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/11_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/11_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland May 11 - 18</description>
    </item>
    <item>
      <title>Fish, Drivers to Benefit from SR 548 Project at Terrell Creek</title>
      <pubDate>Fri, 11 May 2007 06:31:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/10_SR548TerrellCreekCulvert.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/10_SR548TerrellCreekCulvert.htm</guid>
      <description>WSDOT awarded a $1.3 million contract this week to Ferndale-based Callen Construction to replace a rusting culvert under Blaine Road (SR 548) -- an environmental project that also will improve sight distances for drivers by removing a significant dip in the road.</description>
    </item>
    <item>
      <title>Total Closure of Westbound I-90 between Bellevue and Seattle as Crews Shift Lanes</title>
      <pubDate>Fri, 11 May 2007 05:30:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/10_I90TwoWayTransit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/10_I90TwoWayTransit.htm</guid>
      <description>Crews will close all westbound I-90 lanes across Lake Washington Monday night, and multiple lanes will be closed nightly the rest of the week as crews gear up to build a new HOV lane and ramp.</description>
    </item>
    <item>
      <title>WSDOT Celebrates Anniversary on SR 527 with New, Lower Collision Rates</title>
      <pubDate>Fri, 11 May 2007 05:26:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/10_SR527Anniversary.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/10_SR527Anniversary.htm</guid>
      <description>WSDOT Celebrates Anniversary on SR 527 with New, Lower Collision Rates</description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound May 10 – May 21</title>
      <pubDate>Fri, 11 May 2007 05:23:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/10_BusyWeekMay10.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/10_BusyWeekMay10.htm</guid>
      <description>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound May 10 – May 21</description>
    </item>
    <item>
      <title>Suspend the Dates: New Narrows Bridge Celebration Set for July 7 or 15</title>
      <pubDate>Fri, 11 May 2007 04:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/07_save_the_date.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/07_save_the_date.htm</guid>
      <description>Save the Dates: New Narrows Bridge Celebration Set for July 7 or 15</description>
    </item>
    <item>
      <title>Upcoming Lane Closures on Southbound I-5 through Federal Way</title>
      <pubDate>Fri, 11 May 2007 03:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/10_FederalWayLaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/10_FederalWayLaneClosures.htm</guid>
      <description>Upcoming Lane Closures on Southbound I-5 through Federal Way</description>
    </item>
    <item>
      <title>Chelan Returns May 11 to Resume International Service</title>
      <pubDate>Thu, 10 May 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/chelan-returns-may-11-to-resume-international-service.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/chelan-returns-may-11-to-resume-international-service.htm</guid>
      <description></description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Thu, 10 May 2007 05:16:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/9_520MonthlyClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/9_520MonthlyClosure.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct monthly maintenance work and follow-up tests on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>State Transportation Commission to Hold Meeting in Stevenson</title>
      <pubDate>Thu, 10 May 2007 02:49:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/09_StateTranspCommissionMtg.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/09_StateTranspCommissionMtg.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Nighttime Closures of SR 14 Westbound near I-5 Continue May 10-11</title>
      <pubDate>Thu, 10 May 2007 02:41:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/09_SR14Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/09_SR14Closures.htm</guid>
      <description>VANCOUVER – Motorists can expect nighttime closures of SR 14 westbound near I-5 the nights of May 10 and May 11, while crews continue to work over the highway to construct the Confluence Project Land Bridge.</description>
    </item>
    <item>
      <title>SR 20 Closed Sunday Morning in Burlington for Oversize Load</title>
      <pubDate>Wed, 09 May 2007 05:05:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/08_sr20burlingtonoversizeload.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/08_sr20burlingtonoversizeload.htm</guid>
      <description>WSDOT will close SR 20 lanes, intersections and driveways between Burlington and Anacortes early Sunday, from 2 a.m. to 4 a.m., while the Tesoro refinery moves a 225,000 pound piece of equipment to Anacortes.</description>
    </item>
    <item>
      <title>Crews Target Noxious Weeds on Bainbridge Island</title>
      <pubDate>Tue, 08 May 2007 04:47:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/07_SR305_weedspray.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/07_SR305_weedspray.htm</guid>
      <description>Maintenance crew spraying herbicide on Bainbridge Island.</description>
    </item>
    <item>
      <title>WSDOT Hires Contractor for Major I-5 Repairs this August South of Downtown Seattle and Encourages Drivers to Plan for Lane and Ramp Closures</title>
      <pubDate>Tue, 08 May 2007 02:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/7_I-5RehabContractor.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/7_I-5RehabContractor.htm</guid>
      <description>WSDOT Hires Contractor for Major I-5 Repairs this August South of Downtown Seattle and Encourages Drivers to Plan for Lane and Ramp Closures</description>
    </item>
    <item>
      <title>Bridge Construction to Reduce Southbound I-5 to One Lane Overnight in Everett</title>
      <pubDate>Mon, 07 May 2007 22:54:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/07_I5112thSt.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/07_I5112thSt.htm</guid>
      <description>Crews will reduce southbound I-5 to one lane Wednesday and Thursday nights (May 9 and 10) to work on the new 112th Street SE bridge. There will also be a complete closure of the 112th Street SE bridge Thursday night.</description>
    </item>
    <item>
      <title>Revised Schedule for Three Nights of Closures on SR 3</title>
      <pubDate>Mon, 07 May 2007 22:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/04_SR3_Waagagirders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/04_SR3_Waagagirders.htm</guid>
      <description>Drivers on State Route 3 will detour around construction work overnight May 14,15, and 16.</description>
    </item>
    <item>
      <title>WSF Cancels International Sailings May 9-12</title>
      <pubDate>Sat, 05 May 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/wsf-cancels-international-sailings-may-9-12.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/wsf-cancels-international-sailings-may-9-12.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Alerts Motorists to Nighttime Closures of SR 14 near I-5, May 4, May 7</title>
      <pubDate>Sat, 05 May 2007 04:12:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/04_SR14Closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/04_SR14Closures.htm</guid>
      <description>VANCOUVER – As crews continue construction of the Confluence Project Land Bridge over State Route 14, motorists can expect nighttime closures of SR 14 near I-5 the nights of May 4 and May 7.</description>
    </item>
    <item>
      <title>Crews Begin Paving SR 99 in South Everett Monday Night</title>
      <pubDate>Fri, 04 May 2007 22:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/4_SR99PavingStarts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/4_SR99PavingStarts.htm</guid>
      <description>Crews Begin Paving SR 99 in South Everett Monday Night</description>
    </item>
    <item>
      <title>WSDOT Selects Operators for Eastern Washington Railroad</title>
      <pubDate>Fri, 04 May 2007 22:42:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/PCC_Operators_Selected.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/PCC_Operators_Selected.htm</guid>
      <description>WSDOT selected US Rail Partners Ltd. and the Washington and Idaho Railway Inc. as the operators of two branches of the Palouse River Coulee City (PCC) railroad.</description>
    </item>
    <item>
      <title>Salmon Creek Interchange Project Access Hearing Scheduled for May 23</title>
      <pubDate>Fri, 04 May 2007 22:30:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/04_SCIPAccessHearing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/04_SCIPAccessHearing.htm</guid>
      <description>VANCOUVER – The Washington State Department of Transportation (WSDOT) will hold an Access Hearing for the I-5, NE 134th Street Salmon Creek Interchange Project on May 23 at 6 p.m.</description>
    </item>
    <item>
      <title>SR 9 Lane Closed Saturday for Skagit River Bridge Inspection</title>
      <pubDate>Fri, 04 May 2007 22:18:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/04_sr9bridgeinspectionwork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/04_sr9bridgeinspectionwork.htm</guid>
      <description>One SR 9 lane closed Saturday (May 5) for a Skagit River Bridge inspection in Sedro-Woolley.</description>
    </item>
    <item>
      <title>More Night Work Scheduled Next Week at TNB</title>
      <pubDate>Fri, 04 May 2007 21:49:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/04_tnb_night_lane_closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/04_tnb_night_lane_closures.htm</guid>
      <description>More Night Work Scheduled Next Week at TNB</description>
    </item>
    <item>
      <title>Marysville Drivers Notice Signal Changes on 88th Street</title>
      <pubDate>Fri, 04 May 2007 07:06:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/3_88thStreetSignal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/3_88thStreetSignal.htm</guid>
      <description>Marysville Drivers Notice Signal Changes on 88th Street</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland May 4 - 11</title>
      <pubDate>Fri, 04 May 2007 07:03:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/3_I-405UpdatesMay4.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/3_I-405UpdatesMay4.htm</guid>
      <description>I-405 Construction Updates in Kirkland May 4 - 11</description>
    </item>
    <item>
      <title>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound May 4 – May 14</title>
      <pubDate>Fri, 04 May 2007 06:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/3_BusyWeekMay4.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/3_BusyWeekMay4.htm</guid>
      <description>WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound May 4 – May 14</description>
    </item>
    <item>
      <title>State Employee Recognition Event Scheduled for May 8</title>
      <pubDate>Fri, 04 May 2007 06:08:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/03_PSRW+Event.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/03_PSRW+Event.htm</guid>
      <description></description>
    </item>
    <item>
      <title>I 90 Downtown Spokane resurfacing coming up</title>
      <pubDate>Thu, 03 May 2007 06:05:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/02_I90DowntownSpokaneRebuild.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/02_I90DowntownSpokaneRebuild.htm</guid>
      <description>I-90 Downtown Spokane resurfacing job starts in May.</description>
    </item>
    <item>
      <title>US 195 Pavement Rehabilitation job starts Monday</title>
      <pubDate>Thu, 03 May 2007 05:53:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/02_US195PavementRehab.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/02_US195PavementRehab.htm</guid>
      <description>US 195 pavement rehab project getting started.</description>
    </item>
    <item>
      <title>SR 231 Spokane River Bridge work underway</title>
      <pubDate>Thu, 03 May 2007 05:44:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/02_SR231SpokaneRiverBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/02_SR231SpokaneRiverBridge.htm</guid>
      <description>Contractor crews have started work on the resurfacing of the State Route 231/Spokane River Bridge north of Reardan.</description>
    </item>
    <item>
      <title>WSDOT Joins Local Leaders to Kick off New SR 202 / SR 520 Flyover Ramp</title>
      <pubDate>Thu, 03 May 2007 05:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/2_SR202Flyover.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/2_SR202Flyover.htm</guid>
      <description>Today WSDOT officials and engineers joined local leaders and Microsoft representatives to kick off what is shaping up to be the most dramatic decrease in congestion in the SR 202 / SR 520 commute corridor.</description>
    </item>
    <item>
      <title>Nighttime Ramp Closures of SR 14 near I-5 Continue, May 2-10</title>
      <pubDate>Thu, 03 May 2007 03:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/02_SR14nearI-5RampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/02_SR14nearI-5RampClosures.htm</guid>
      <description>As crews continue construction of the Land Bridge over SR 14, motorists can expect nighttime ramp closures of SR 14 near I-5 in Vancouver.</description>
    </item>
    <item>
      <title>I-5 Ramp Closed Thursday North of Burlington</title>
      <pubDate>Wed, 02 May 2007 05:19:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/01_i5cookroadrampclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/01_i5cookroadrampclosure.htm</guid>
      <description>Crews will close the Cook Road on ramp to northbound I-5 Thursday, May 3, from 7 a.m. to 4 p.m. to repair and replace damaged guardrail.</description>
    </item>
    <item>
      <title>Interim Safety Improvements Planned for Bainbridge Island Ferry Terminal</title>
      <pubDate>Tue, 01 May 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/05/safety-improvements-at-bainbridge-terminal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/05/safety-improvements-at-bainbridge-terminal.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Crews Begin Paving SR 99 in South Everett Monday Night</title>
      <pubDate>Fri, 04 May 2007 22:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/4_SR99PaverStarting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/4_SR99PaverStarting.htm</guid>
      <description>Crews Begin Paving SR 99 in South Everett Monday Night</description>
    </item>
    <item>
      <title>New "Welcome to Yakima" Signs Signify Pride and Economic Vitality for Community</title>
      <pubDate>Fri, 04 May 2007 01:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/groupunveilsartwork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/groupunveilsartwork.htm</guid>
      <description>A new addition to the Nob Hill interchange is “Welcoming” current residents, new residents and tourists to Yakima.</description>
    </item>
    <item>
      <title>Scott Pierson Trail Ribbon-cutting, Bike Ride Set for May 12</title>
      <pubDate>Thu, 03 May 2007 05:23:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/02_SR16_PiersonTrail.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/02_SR16_PiersonTrail.htm</guid>
      <description>Scott Pierson Trail ribbon cutting set for May 12.</description>
    </item>
    <item>
      <title>Month of SR 512 Repair Work Begins May 7</title>
      <pubDate>Thu, 03 May 2007 00:27:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/02_SR512_bridgerepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/02_SR512_bridgerepairs.htm</guid>
      <description>Month of SR 512 bridge repairs will impact Pierce County road.</description>
    </item>
    <item>
      <title>WSDOT Crews Close Lanes on I-5 in Downtown Seattle at Night This Week</title>
      <pubDate>Sat, 28 Apr 2007 05:52:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/27_15SeattleLaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/27_15SeattleLaneClosures.htm</guid>
      <description>WSDOT crews will close several lanes on northbound and southbound I-5 at night over the next week to install spot heat detectors in the Convention Center tunnel.</description>
    </item>
    <item>
      <title>Night Lane Closures on TNB Project</title>
      <pubDate>Sat, 28 Apr 2007 03:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/27_tnb_night_lane_closures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/27_tnb_night_lane_closures.htm</guid>
      <description>Night Lane Closures on TNB Project</description>
    </item>
    <item>
      <title>WSDOT Engineers Ready to Share Plans to Save SR 410; Open House Next Monday</title>
      <pubDate>Fri, 27 Apr 2007 21:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/27_SaveSR410.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/27_SaveSR410.htm</guid>
      <description>WSDOT Engineers Ready to Share Plans to Save SR 410; Open House Next Monday</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland April 27 – May 4</title>
      <pubDate>Fri, 27 Apr 2007 21:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/27_KirklandUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/27_KirklandUpdates.htm</guid>
      <description>I-405 Construction Updates in Kirkland April 27 – May 4</description>
    </item>
    <item>
      <title>SR 20 - North Cascades Highway Opens Early</title>
      <pubDate>Fri, 27 Apr 2007 05:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/042607NCHighwayOpens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/042607NCHighwayOpens.htm</guid>
      <description>The North Cascades Highway opened at 2 p.m. today (Thursday, April 26th)</description>
    </item>
    <item>
      <title>Public Demand for Tacoma Narrows Electronic Toll System Maxes Out Website</title>
      <pubDate>Fri, 27 Apr 2007 05:09:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/26_TNBWebsiteMaxesOut.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/26_TNBWebsiteMaxesOut.htm</guid>
      <description>WSDOT is asking commuters to keep trying to sign-up online for Good To Go!, the state’s first electronic toll collection system for the new Tacoma Narrows Bridge, after a surge of visitors pushed computer servers over capacity this morning.</description>
    </item>
    <item>
      <title>WSDOT Alerts Puget Sound Drivers to a Busy Construction Week April 27 – May 7</title>
      <pubDate>Fri, 27 Apr 2007 05:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/26_BusyWeekApril27May7.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/26_BusyWeekApril27May7.htm</guid>
      <description>WSDOT Alerts Puget Sound Drivers to a Busy Construction Week April 27 – May 7</description>
    </item>
    <item>
      <title>Highway Improvements in Pacific and Wahkiakum Counties Begin this Summer, Contractor Selected</title>
      <pubDate>Fri, 27 Apr 2007 03:19:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/26_US101HighwayPaving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/26_US101HighwayPaving.htm</guid>
      <description>VANCOUVER – A project to pave and provide safety improvements to US Highway 101, State Route 4 and State Route 401 in Pacific and Wahkiakum counties will begin this summer, announced the Washington State Department of Transportation (WSDOT.)</description>
    </item>
    <item>
      <title>SR 20 - North Cascades Highway Opens Thursday</title>
      <pubDate>Thu, 26 Apr 2007 02:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/042507NCHOpens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/042507NCHOpens.htm</guid>
      <description>The North Cascades Highway (SR 20) reopens between Newhalem and Mazama at 2 p.m. on Thursday, April 26th.</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Maintenance Tests</title>
      <pubDate>Thu, 26 Apr 2007 01:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/25_SR520BridgeMaintenanceClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/25_SR520BridgeMaintenanceClosure.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Guide Meridian Widening Project Moves Forward in Bellingham</title>
      <pubDate>Wed, 25 Apr 2007 23:12:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/25_sr539guideprojectawarded.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/25_sr539guideprojectawarded.htm</guid>
      <description>WSDOT received an additional $3.6 million from the state Legislature to cover the rising cost of widening Guide Meridian (SR 539) north of Bellingham.  With the extra money WSDOT awarded the project contract to IMCO General Construction of Bellingham yesterday, April 24.</description>
    </item>
    <item>
      <title>Join WSDOT May 9 at the Third SR 502 Corridor Widening Project Open House</title>
      <pubDate>Wed, 25 Apr 2007 06:38:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/24_SR502OpenHouse3.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/24_SR502OpenHouse3.htm</guid>
      <description>VANCOUVER - The Washington State Department of Transportation (WSDOT) will host a third community open house for the SR 502 Corridor Widening Project Wednesday, May 9, from 4-7 p.m.</description>
    </item>
    <item>
      <title>WSDOT Alerts Motorists to Nighttime Closures of SR 14 near I-5, April 26 – May 5</title>
      <pubDate>Wed, 25 Apr 2007 06:23:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/24_SR14NightimeClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/24_SR14NightimeClosures.htm</guid>
      <description>VANCOUVER – Motorists traveling State Route 14 near I-5 can expect nighttime closures of the highway and ramps, between April 26 and May 5. The nights of April 26-28, the off-ramp from I-5 southbound to SR 14 eastbound will be closed between the hours of 10 p.m. and 6 a.m. A signed detour will be available during those hours. Closures are necessary for the installation of support beams over the highway, as part of the Confluence Project’s Land Bridge construction.</description>
    </item>
    <item>
      <title>Work Springs Forward on Hood Canal Bridge Project</title>
      <pubDate>Wed, 25 Apr 2007 05:57:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/04242007_SR104HCBSummerConstruction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/04242007_SR104HCBSummerConstruction.htm</guid>
      <description>Work Springs Forward on Hood Canal Bridge Project</description>
    </item>
    <item>
      <title>Second TNB Expansion Joint Scheduled for Delivery Early Tomorrow</title>
      <pubDate>Wed, 25 Apr 2007 05:03:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/24_TNBej2scheduled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/24_TNBej2scheduled.htm</guid>
      <description>Second TNB Expansion Joint Scheduled for Delivery Early Tomorrow</description>
    </item>
    <item>
      <title>Fresh paint guides drivers on Mount Baker Highway</title>
      <pubDate>Wed, 25 Apr 2007 04:15:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/24_SR542Deminglanepaint.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/24_SR542Deminglanepaint.htm</guid>
      <description>Lane lines got a fresh coat of paint on the Mount Baker Highway (SR 542) April 20. Markings were nearly erased by sand and snowplows this winter.</description>
    </item>
    <item>
      <title>Truckers Gearing up to Test Roundabout near Enumclaw</title>
      <pubDate>Wed, 25 Apr 2007 00:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/24_EnumclawRoundaboutRodeo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/24_EnumclawRoundaboutRodeo.htm</guid>
      <description>Truckers Gearing up to Test Roundabout near Enumclaw</description>
    </item>
    <item>
      <title>Ferry Peak Season Begins May 1</title>
      <pubDate>Tue, 24 Apr 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/peak-season-begins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/peak-season-begins.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Wave2Go sails into Fauntleroy, Vashon, Southworth and Port Defiance Terminals</title>
      <pubDate>Tue, 24 Apr 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/wave2go-sails-into-south-sound.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/wave2go-sails-into-south-sound.htm</guid>
      <description></description>
    </item>
    <item>
      <title>A Busy Night for Crews on the I-5 Widening Project in Everett; Long Detour for Drivers</title>
      <pubDate>Tue, 24 Apr 2007 07:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/23_I5PacAveRampOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/23_I5PacAveRampOpen.htm</guid>
      <description>Tonight, crews working to expand I-5 through Everett will close three lanes of northbound I-5 while they work to complete three critical tasks.</description>
    </item>
    <item>
      <title>WSDOT Restricts Traffic on I-82 in Yakima to Install Temporary Concrete Median Barriers</title>
      <pubDate>Tue, 24 Apr 2007 06:51:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/I82+Traffic+Restricted+to+One+Lane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/I82+Traffic+Restricted+to+One+Lane.htm</guid>
      <description>WSDOT Restricts Traffic on I-82 in Yakima to Install Temporary Concrete Median Barriers 

Drivers Should Expect Delays as Traffic Moves Into One Lane</description>
    </item>
    <item>
      <title>Sinkhole Creates Another Challenge for Crews Working to Stabilize Hillside on US 2 East of Index</title>
      <pubDate>Tue, 24 Apr 2007 04:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/23_US2Sinkhole.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/23_US2Sinkhole.htm</guid>
      <description>Sinkhole Creates Another Challenge for Crews Working to Stabilize Hillside on US 2 East of Index</description>
    </item>
    <item>
      <title>Second TNB Expansion Joint Hits the Road</title>
      <pubDate>Tue, 24 Apr 2007 03:30:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/23_TNBej2_leaves.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/23_TNBej2_leaves.htm</guid>
      <description>Second TNB Expansion Joint Hits the Road</description>
    </item>
    <item>
      <title>I-90/SR 18 Exit Ramp Reopens Early near Snoqualmie</title>
      <pubDate>Tue, 24 Apr 2007 00:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/23_SR18RampOpenEarly.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/23_SR18RampOpenEarly.htm</guid>
      <description>I-90/SR 18 Exit Ramp Reopens Early near Snoqualmie</description>
    </item>
    <item>
      <title>Slower Speed Set for Pole Road in Whatcom County</title>
      <pubDate>Sat, 21 Apr 2007 06:06:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/20_SR544PoleRoad.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/20_SR544PoleRoad.htm</guid>
      <description>WSDOT will lower the speed limit on Pole Road (SR 544) Tuesday, April 24, from 50 to 35 mph near the Hannegan Road intersection to help improve safety for drivers.</description>
    </item>
    <item>
      <title>Lane Closures Scheduled Next Week on Tacoma Narrows Bridge Project</title>
      <pubDate>Sat, 21 Apr 2007 05:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/20_sr16_tnblaneclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/20_sr16_tnblaneclosures.htm</guid>
      <description>Lane Closures Scheduled Next Week on TNB Project</description>
    </item>
    <item>
      <title>Adopt A Highway Litter Crews Will be Out in Full Force for Earth Day</title>
      <pubDate>Fri, 20 Apr 2007 23:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/4_AdoptAHighway.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/4_AdoptAHighway.htm</guid>
      <description>Volunteer crews around the state will be out along highways this weekend picking up litter in honor of Earth Day, a celebration to raise awareness and promote conservation of natural resources.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland April 20 – 27</title>
      <pubDate>Fri, 20 Apr 2007 06:48:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/19_405ConstructionUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/19_405ConstructionUpdates.htm</guid>
      <description>I-405 Construction Updates in Kirkland April 20 – 27</description>
    </item>
    <item>
      <title>WSDOT Bridge Crew Saves Millions</title>
      <pubDate>Fri, 20 Apr 2007 05:53:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/19_WSDOTBridgeCrewSavesMillions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/19_WSDOTBridgeCrewSavesMillions.htm</guid>
      <description>WSDOT Bridge Crew Saves Millions</description>
    </item>
    <item>
      <title>Delays on SR 3, Waaga Way Next Week</title>
      <pubDate>Fri, 20 Apr 2007 05:17:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/19_3_WaagaDetours.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/19_3_WaagaDetours.htm</guid>
      <description>Next week motorists who travel SR 3 near Waaga Way will be detoured during the late evening and early morning hours.</description>
    </item>
    <item>
      <title>Ramp Closure Tentatively Scheduled this Weekend at I-90/SR 18 Interchange near Snoqualmie</title>
      <pubDate>Fri, 20 Apr 2007 05:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/19_I90SR18Ramp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/19_I90SR18Ramp.htm</guid>
      <description>Drivers should plan for a weekend closure of the eastbound Interstate 90 exit to Snoqualmie Parkway and State Route 18.</description>
    </item>
    <item>
      <title>WSDOT Alerts Puget Sound Drivers to a Busy Construction Week April 20 - 30</title>
      <pubDate>Fri, 20 Apr 2007 05:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/19_BusyWeek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/19_BusyWeek.htm</guid>
      <description>WSDOT Alerts Puget Sound Drivers to a Busy Construction Week April 20 - 30</description>
    </item>
    <item>
      <title>Second TNB Expansion Joint Arrives in Washington</title>
      <pubDate>Fri, 20 Apr 2007 03:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/19_TNB_secondjoint.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/19_TNB_secondjoint.htm</guid>
      <description>Second expansion joint for TNB enters Washington.</description>
    </item>
    <item>
      <title>Spokane web cam service to be interrupted on Saturday</title>
      <pubDate>Fri, 20 Apr 2007 03:18:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/19_SpokaneWebCams.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/19_SpokaneWebCams.htm</guid>
      <description>Spokane area web cam service interrupted on Saturday</description>
    </item>
    <item>
      <title>I-90 Flammable Cargo Restriction in Effect Today</title>
      <pubDate>Fri, 20 Apr 2007 01:58:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/April19_I90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/April19_I90.htm</guid>
      <description>The Washington State Department of Transportation will activate a flammable cargo restriction today starting at 9 a.m. on Interstate 90 between Interstate 5 in Seattle and Island Crest Way on Mercer Island.</description>
    </item>
    <item>
      <title>Brief Service Interruption to Internet Web Site This Weekend</title>
      <pubDate>Fri, 20 Apr 2007 01:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/4_WebServiceDisruption.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/4_WebServiceDisruption.htm</guid>
      <description>WSDOT's Office of Information Technology is planning a brief service interruption to its external web site during the early morning hours of Sunday, April 22.</description>
    </item>
    <item>
      <title>Early I-5 Express Lane Reversal Friday Night</title>
      <pubDate>Fri, 20 Apr 2007 00:52:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/19_EarlyExpressLane.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/19_EarlyExpressLane.htm</guid>
      <description>On Friday night, April 20, WSDOT crews will reverse the I-5 express lanes to the southbound direction at 11:59 p.m. This will allow crews from Seattle City Light to cut power to the area while they upgrade electrical systems.</description>
    </item>
    <item>
      <title>Crews to Shift Southbound I-405 HOV Lane Back to Normal Alignment in Kirkland</title>
      <pubDate>Thu, 19 Apr 2007 06:50:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/18_I-405HOVShift.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/18_I-405HOVShift.htm</guid>
      <description>By 5 a.m. Thursday, April 19, southbound HOV drivers will no longer travel in a barrier-separated lane while traveling through Kirkland. If weather permits, WSDOT crews plan to work through the night to return the southbound HOV lane between NE 126th Street and NE 100th Street to its normal alignment. Once the switch is made, drivers in the southbound HOV lane will once again be able to exit at NE 85th Street.</description>
    </item>
    <item>
      <title>SR 3 Belfair Bypass Open House April 25</title>
      <pubDate>Thu, 19 Apr 2007 05:07:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/18_SR3BelfairBypassOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/18_SR3BelfairBypassOpenHouse.htm</guid>
      <description>SR 3 Belfair Bypass Open House April 25</description>
    </item>
    <item>
      <title>Lane Closure Required to Fix Damage Phone Line</title>
      <pubDate>Thu, 19 Apr 2007 04:59:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/18_LaneClosureRequiredtofixPhoneLine.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/18_LaneClosureRequiredtofixPhoneLine.htm</guid>
      <description>Lane Closure Required to Fix Damaged Phone Line</description>
    </item>
    <item>
      <title>Crews Will Close Southbound I-5 Saturday Night in Everett to Set Bridge Girders</title>
      <pubDate>Thu, 19 Apr 2007 04:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/18_I5SouthEverettGirders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/18_I5SouthEverettGirders.htm</guid>
      <description>Crews will close all southbound I-5 lanes at 112th Street SE in south Everett Saturday night to set ten girders for a portion of the new 112th Street SE bridge.</description>
    </item>
    <item>
      <title>SR 31 Pend Oreille River Bridge Work to Start</title>
      <pubDate>Wed, 18 Apr 2007 23:12:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/18_SR31BridgeWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/18_SR31BridgeWork.htm</guid>
      <description>Contractor crews will begin work on Monday, April 23rd on the resurfacing of the State Route 31/Pend Oreille River Bridge just west of Metaline Falls.</description>
    </item>
    <item>
      <title>WSDOT and WSP handing out double fines on the Moscow Pullman Highway</title>
      <pubDate>Wed, 18 Apr 2007 22:31:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/17_sr270workzonepatrol.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/17_sr270workzonepatrol.htm</guid>
      <description>PULLMAN – Drivers traveling between Pullman and Moscow on SR 270 will have a few extra eyes on them April 25.

The WSDOT and Washington State Patrol will have a special emphasis on work zone safety, looking for speeding and other traffic violations through the widening project construction from 10 a.m. to 4 p.m. Wednesday, April 25.</description>
    </item>
    <item>
      <title>WSDOT Restricts Traffic on US 12 and 40th Avenue</title>
      <pubDate>Wed, 18 Apr 2007 21:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/18_US12and40thAvenueRestriction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/18_US12and40thAvenueRestriction.htm</guid>
      <description>WSDOT Restricts Traffic to Remove Railroad Tracks at the US 12/40th Ave. Interchange in Yakima 

Drivers Should Expect Delays and Consider Alternate Routes</description>
    </item>
    <item>
      <title>Homeland Security Institute's Ferry Security Training Grant</title>
      <pubDate>Wed, 18 Apr 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/ferry-security-training-grant.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/ferry-security-training-grant.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Marine Work Starts at Hood Canal Bridge</title>
      <pubDate>Tue, 17 Apr 2007 05:43:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/041607-SR104HCBCanalWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/041607-SR104HCBCanalWork.htm</guid>
      <description>Marine Work Starts at Hood Canal Bridge</description>
    </item>
    <item>
      <title>SR 4, Coal Creek to I-5 Paving Begins this Summer, Contractor Selected</title>
      <pubDate>Tue, 17 Apr 2007 01:41:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/16_SR4PavingContractAwarded.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/16_SR4PavingContractAwarded.htm</guid>
      <description>KELSO – A project to pave and provide safety improvements to SR 4, from Coal Creek to I-5 will begin early this summer, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>WSDOT Awards SR 503 Resurfacing Contract, Construction Begins in Late Spring</title>
      <pubDate>Mon, 16 Apr 2007 22:36:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/16_SR503ChipSealProjectAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/16_SR503ChipSealProjectAward.htm</guid>
      <description>VANCOUVER – The contract for a project to resurface eight miles of State Route 503 from the Spur in Yale to the Skamania County line was awarded March 19, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Crews Unloading TNB Expansion Joint Today</title>
      <pubDate>Sun, 15 Apr 2007 02:09:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/14_TNB_expjointarrives.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/14_TNB_expjointarrives.htm</guid>
      <description>TNB expansion joint number one will be picked from its trailer on the Gig Harbor side of the project this afternoon.</description>
    </item>
    <item>
      <title>Chinook Pass Will Open this Spring but Cayuse Pass Will Not</title>
      <pubDate>Sun, 15 Apr 2007 01:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/Chinook+and+Cayuse+Passes+2007.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/Chinook+and+Cayuse+Passes+2007.htm</guid>
      <description>Chinook Pass Will Open this Spring but SR 123 on the South Side of Cayuse Pass Will Not</description>
    </item>
    <item>
      <title>Work Begins Monday on South Belfair Signal</title>
      <pubDate>Sat, 14 Apr 2007 03:24:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/13_WorkBeginsMondayonSouthBelfairSignal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/13_WorkBeginsMondayonSouthBelfairSignal.htm</guid>
      <description>Work Begins Monday on South Belfair Signal</description>
    </item>
    <item>
      <title>SR 9 Border Project Wins Award of Excellence</title>
      <pubDate>Sat, 14 Apr 2007 03:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/13_SR9projectwinsaward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/13_SR9projectwinsaward.htm</guid>
      <description>Recently completed State Route 9 highway border project wins award of excellence for its design.</description>
    </item>
    <item>
      <title>Rainy Forecast Postpones I-90/SR 18 Exit Closure near Snoqualmie</title>
      <pubDate>Sat, 14 Apr 2007 01:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/13_SnoqualmieClosurePostponed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/13_SnoqualmieClosurePostponed.htm</guid>
      <description>Rainy Forecast Postpones I-90/SR 18 Exit Closure near Snoqualmie</description>
    </item>
    <item>
      <title>Three Tacoma Ramps Closed for Demolition Work</title>
      <pubDate>Sat, 14 Apr 2007 00:44:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/13_I5_demo_rampclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/13_I5_demo_rampclosures.htm</guid>
      <description>Downtown Tacoma on-ramps to I-5 closed for bridge demolition this weekend.</description>
    </item>
    <item>
      <title>Overnight Closure on Heron Street Bridge</title>
      <pubDate>Sat, 14 Apr 2007 00:41:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/13_OvernightClosuresonHeronStBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/13_OvernightClosuresonHeronStBridge.htm</guid>
      <description>Overnight Closures on Heron Street Bridge</description>
    </item>
    <item>
      <title>SR 542 Lane Stripes Will Get Fresh Paint Monday Near Deming</title>
      <pubDate>Fri, 13 Apr 2007 23:37:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/13_SR542newlanestripes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/13_SR542newlanestripes.htm</guid>
      <description>The Mount Baker Highway will be wearing new stripes after crews repaint faded lane lines in the Deming area Monday, April 16.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland April 13 – 20</title>
      <pubDate>Fri, 13 Apr 2007 21:32:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/13_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/13_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland April 13 – 20</description>
    </item>
    <item>
      <title>Tahlequah Demolition Work Scheduled</title>
      <pubDate>Fri, 13 Apr 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/tahlequah-demolition-work.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/tahlequah-demolition-work.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Orcas Island Terminal Work Cancels Last Sailings, April 23-24</title>
      <pubDate>Fri, 13 Apr 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/orcas-sailings-canceled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/orcas-sailings-canceled.htm</guid>
      <description></description>
    </item>
    <item>
      <title>TNB Expansion Joint Reaches North Bend</title>
      <pubDate>Fri, 13 Apr 2007 07:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/12_TNBExpansionJointReachesNB.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/12_TNBExpansionJointReachesNB.htm</guid>
      <description>TNB Expansion Joint Reaches North Bend</description>
    </item>
    <item>
      <title>Closure of US 2 from Leavenworth to Lake Wenatchee Starts Monday</title>
      <pubDate>Fri, 13 Apr 2007 06:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/041207US2TumwaterClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/041207US2TumwaterClosure.htm</guid>
      <description>US 2 through Tumwater Canyon, west of Leavenworth will be closed during daylight hours next week for emergency riverbank and rockslope repairs.</description>
    </item>
    <item>
      <title>Contractor Selected, Emergency Repairs to SR 508 at Bear Canyon begin April 23</title>
      <pubDate>Fri, 13 Apr 2007 06:04:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/12_SR508Repairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/12_SR508Repairs.htm</guid>
      <description>CHEHALIS – Emergency repairs to stabilize SR 508 near Bear Canyon will begin April 23, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>WSDOT Alerts Puget Sound Drivers to a Busy Construction Week April 13 – April 23</title>
      <pubDate>Fri, 13 Apr 2007 05:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/12_BusyWeek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/12_BusyWeek.htm</guid>
      <description>A large piece of equipment for the Tacoma Narrows Bridge project moves across the state and into the Puget Sound region this week. It will travel at night so as not to disrupt traffic. It’s just one of several big construction projects on the road this week.</description>
    </item>
    <item>
      <title>TNB Expansion Joint Moving Toward Snoqualmie Pass</title>
      <pubDate>Fri, 13 Apr 2007 00:31:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/12_TNBEJmovingtowardsnoqualmie.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/12_TNBEJmovingtowardsnoqualmie.htm</guid>
      <description>TNB Expansion Joint Nearing Snoqualmie Pass</description>
    </item>
    <item>
      <title>I-5 Toutle River Rest Areas in Cowlitz Co. Closing for Maintenance</title>
      <pubDate>Thu, 12 Apr 2007 22:17:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/12_I-5ToutleRestAreaClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/12_I-5ToutleRestAreaClosed.htm</guid>
      <description>CASTLE ROCK – The Toutle River Safety Rest Areas on I-5 in Cowlitz County will be closed Monday, April 16 through Tuesday, April 17, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Crews Shift Traffic on SR 522 in Lake Forest Park; New Sidewalks Open Westbound</title>
      <pubDate>Thu, 12 Apr 2007 21:22:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/12_LakeForestTrafficShift.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/12_LakeForestTrafficShift.htm</guid>
      <description>Crews Shift Traffic on SR 522 in Lake Forest Park; New Sidewalks Open Westbound</description>
    </item>
    <item>
      <title>Center Street Off-Ramp Closed Tomorrow</title>
      <pubDate>Thu, 12 Apr 2007 06:37:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/11_centerSt_offramp_closed_tomorrow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/11_centerSt_offramp_closed_tomorrow.htm</guid>
      <description>Center Drive Off-Ramp Closed Tomorrow</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Thu, 12 Apr 2007 05:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/11_SR520Maintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/11_SR520Maintenance.htm</guid>
      <description>Washington State Department of Transportation bridge crews will conduct monthly maintenance work and follow-up tests on the State Route 520 Evergreen Point Floating Bridge early Thursday morning.</description>
    </item>
    <item>
      <title>Weekend Ramp Closure at I-90/SR 18 Interchange near Snoqualmie</title>
      <pubDate>Thu, 12 Apr 2007 04:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/11_SnoqualimeRampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/11_SnoqualimeRampClosure.htm</guid>
      <description>Weekend Ramp Closure at I-90/SR 18 Interchange near Snoqualmie</description>
    </item>
    <item>
      <title>TNB Expansion Joint on the Move</title>
      <pubDate>Thu, 12 Apr 2007 01:56:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/11_expjoint_moving.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/11_expjoint_moving.htm</guid>
      <description>TNB expansion joint moving after being stalled for more than three weeks due to failure to meet state weight-to-axle ratio standards.</description>
    </item>
    <item>
      <title>Join WSDOT, Kerr Contractors, Inc. and the Community Break Ground on the I-5, SR 502 Interchange Project</title>
      <pubDate>Thu, 12 Apr 2007 01:00:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/11_I5SR502ICGroundbreaking.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/11_I5SR502ICGroundbreaking.htm</guid>
      <description>BATTLE GROUND – The Washington State Department of Transportation (WSDOT), Kerr Contractors, Inc., and the community will break ground tomorrow, April 12 at 1:30 p.m. on the new I-5, SR 502 Interchange Project.</description>
    </item>
    <item>
      <title>SR 20 Lanes to Close for Bridge Inspection at Swinomish Slough, Skagit County</title>
      <pubDate>Thu, 12 Apr 2007 00:22:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/11_sr20swinomishsloughbridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/11_sr20swinomishsloughbridge.htm</guid>
      <description>Crews will close State Route 20 lanes daily to inspect the Berentson Bridges over Swinomish Slough in Skagit County. Drivers should be prepared for minor delays.</description>
    </item>
    <item>
      <title>State Route 4 Slope Stabilization Repairs near Stella Continue</title>
      <pubDate>Thu, 12 Apr 2007 00:07:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/11_SR4Repairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/11_SR4Repairs.htm</guid>
      <description>KELSO – Repairs to stabilize the slope above State Route 4 near Stella continue, as contractors work to scale loose rock.</description>
    </item>
    <item>
      <title>Whidbey Island Marathon Sunday; Expect Delays, Watch for Runners on SR 20</title>
      <pubDate>Wed, 11 Apr 2007 00:02:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/10_SR20whidbeyislandmarathon.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/10_SR20whidbeyislandmarathon.htm</guid>
      <description>WSDOT will close the bridges at Deception Pass for 15 minutes, and runners will race along sections of SR 20 as far south as Madrona Way during the Whidbey Island Marathon on Sunday.</description>
    </item>
    <item>
      <title>Work Begins Next Week on South Belfair Signal</title>
      <pubDate>Tue, 10 Apr 2007 06:45:09 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/09_WorktobeginonSBelfairSignal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/09_WorktobeginonSBelfairSignal.htm</guid>
      <description>Work Begins Next Week on South Belfair Signal</description>
    </item>
    <item>
      <title>Overnight Closures on Heron Street Bridge Start Tonight</title>
      <pubDate>Tue, 10 Apr 2007 06:17:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/09_NightimeClosureonHeronStBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/09_NightimeClosureonHeronStBridge.htm</guid>
      <description>Overnight Closures on Heron Street Bridge Start Tonight</description>
    </item>
    <item>
      <title>New Hauler Takes on TNB Expansion Joint</title>
      <pubDate>Tue, 10 Apr 2007 02:25:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/09_TNB_EJ_newhauler.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/09_TNB_EJ_newhauler.htm</guid>
      <description>New hauler hired to move TNB expansion joint across the state.</description>
    </item>
    <item>
      <title>Emergency Riverbank Repairs Force a Week –Long Closure of US 2 from Leavenworth to Lake Wenatchee</title>
      <pubDate>Sat, 07 Apr 2007 06:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/040607TumwaterCanyonEmergencyRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/040607TumwaterCanyonEmergencyRepair.htm</guid>
      <description>April 16th through the 20th, US 2 will be closed from 7 a.m. to 7 p.m. daily from Leavenworth, 15 miles west to Lake Wenatchee for emergency riverbank repairs in Tumwater Canyon.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland April 6 – 13</title>
      <pubDate>Sat, 07 Apr 2007 01:51:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/6_KirklandUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/6_KirklandUpdates.htm</guid>
      <description>I-405 Construction Updates in Kirkland April 6 – 13</description>
    </item>
    <item>
      <title>WSDOT Alerts Puget Sound Drivers to Closures and Events: April 6 – April 16</title>
      <pubDate>Sat, 07 Apr 2007 01:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/6_BusyWeek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/6_BusyWeek.htm</guid>
      <description>WSDOT Alerts Puget Sound Drivers to Closures and Events: April 6 – April 16</description>
    </item>
    <item>
      <title>Harsh Winter Weather Adds Days to TNB Contract</title>
      <pubDate>Fri, 06 Apr 2007 08:18:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/5_16_ForceMajeure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/5_16_ForceMajeure.htm</guid>
      <description>Due to the harsh winter weather, WSDOT is granting TNC a force majeure extention to its schedule of working days to complete the TNB project.</description>
    </item>
    <item>
      <title>TNB Expansion Joint Stays in Spokane over the Weekend</title>
      <pubDate>Fri, 06 Apr 2007 06:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/5_TNB+ExpansionJoint.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/5_TNB+ExpansionJoint.htm</guid>
      <description>SPOKANE – Due to expected high traffic volumes over the holiday weekend, the soonest the Tacoma Narrows Bridge (TNB) expansion joint will be back on the road is Monday, April 9.</description>
    </item>
    <item>
      <title>View Video Simulations of How the SR 520 Bridge Could Sink during a Catastrophic Windstorm or Earthquake</title>
      <pubDate>Fri, 06 Apr 2007 02:13:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/sr520simulations.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/sr520simulations.htm</guid>
      <description>Two new video simulations illustrating how the SR 520 Evergreen Point floating bridge could fail during a catastrophic windstorm or earthquake are now available on YouTube.com.</description>
    </item>
    <item>
      <title>Over-height Load Hits I-5 Bridge in Everett, Damages Girder</title>
      <pubDate>Thu, 05 Apr 2007 10:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/04_I5EverettAveGirderHit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/04_I5EverettAveGirderHit.htm</guid>
      <description>Just before 4 p.m. this afternoon, a truck driver hauling an excavator on a flat bed truck drove his over-height load into the southbound I-5 bridge over Everett Avenue in Everett.  The impact damaged the western most girder over Everett Avenue’s eastbound right lane.</description>
    </item>
    <item>
      <title>Repairs Close SR 167 Puyallup River Bridge</title>
      <pubDate>Thu, 05 Apr 2007 02:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/4_167_NBbridgecls.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/4_167_NBbridgecls.htm</guid>
      <description>The northbound Puyallup River Bridge on SR 167 will close nights next week for repairs.</description>
    </item>
    <item>
      <title>WSDOT, Kerr Contractors, Inc. and the Community Break Ground on the I-5, SR 502 Interchange Project</title>
      <pubDate>Wed, 04 Apr 2007 22:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/04_SR502Groundbreaking.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/04_SR502Groundbreaking.htm</guid>
      <description>BATTLE GROUND – The Washington State Department of Transportation (WSDOT), Kerr Contractors, Inc., and the community will celebrate the start of construction on the new I-5, SR 502 Interchange Project at a groundbreaking event Thursday, April 12 at 1:30 p.m.</description>
    </item>
    <item>
      <title>WSDOT Reminds Campaigners of Rules for Posting Signs</title>
      <pubDate>Wed, 04 Apr 2007 06:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/03_outdooradvertising.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/03_outdooradvertising.htm</guid>
      <description>OLYMPIA – As candidates and their supporters gear up for future elections, Washington State Department of Transportation (WSDOT) officials remind campaigners that it’s illegal to post campaign signs on the state highway right-of-way. Signs (other than those used for traffic control) within the right-of-way are prohibited and will be removed by WSDOT crews.</description>
    </item>
    <item>
      <title>Construction Crews Determine Cause of Overnight Washout Next to Interstate 5 in Everett</title>
      <pubDate>Tue, 03 Apr 2007 06:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/02_I5EverettWashout.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/02_I5EverettWashout.htm</guid>
      <description>This afternoon, the contractor building the I-5, Everett HOV freeway expansion project determined that a failed drain pipe caused last night’s washout alongside northbound I-5 just north of the Broadway exit in Everett.</description>
    </item>
    <item>
      <title>Wet Paint: WSDOT Reminds Drivers to Watch for Striping Crews in the Greater Puget Sound Area</title>
      <pubDate>Tue, 03 Apr 2007 05:51:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/02Striping.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/02Striping.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Major Debris Clean-Up Complete, SR 504 East of Kid Valley Opens to Traffic</title>
      <pubDate>Tue, 03 Apr 2007 04:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/02_SR504Debris.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/02_SR504Debris.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Give em a Brake: WSDOT Honors Roadway Workers April 2-6</title>
      <pubDate>Tue, 03 Apr 2007 03:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/02_workzoneawareness07.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/02_workzoneawareness07.htm</guid>
      <description>OLYMPIA – The men and women who maintain and improve more than 7,000 miles of Washington's state highways ask you to slow down and pay extra attention to road construction signs this summer. 

National Work Zone Awareness Week 2007 will culminate with WSDOT’s annual Work Zone Memorial, scheduled for Thursday, April 5 from 11 a.m. to 1 p.m. at WSDOT Headquarters 310 Maple Park Avenue SE in Olympia</description>
    </item>
    <item>
      <title>Weekend Closure of SR 524 Wraps Up Early</title>
      <pubDate>Mon, 02 Apr 2007 23:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/2_SR524WeekendClosureCompleted.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/2_SR524WeekendClosureCompleted.htm</guid>
      <description>Weekend Closure of SR 524 Wraps Up Early</description>
    </item>
    <item>
      <title>Truckers Drive Circles Around WSDOT Engineers</title>
      <pubDate>Mon, 02 Apr 2007 23:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/04/2_RoundaboutTest.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/04/2_RoundaboutTest.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Work Zone Jeopardized in Tacoma</title>
      <pubDate>Sat, 31 Mar 2007 05:58:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/30_WZ_Olympic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/30_WZ_Olympic.htm</guid>
      <description>It's only days before National Work Zone Awareness Week begins but already, a work zone in Tacoma took a hit last night.</description>
    </item>
    <item>
      <title>WSDOT to Send E-mail Updates About Whatcom County Highway Projects</title>
      <pubDate>Sat, 31 Mar 2007 05:09:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/30_whatcomcountyemailupdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/30_whatcomcountyemailupdates.htm</guid>
      <description>Sign up to receive e-mail updates for Whatcom County highway construction projects.</description>
    </item>
    <item>
      <title>TNB Electronic Toll Gantry Lights to be Tested for 48 Hours</title>
      <pubDate>Sat, 31 Mar 2007 04:55:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/30_SR16TestLightsTolls.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/30_SR16TestLightsTolls.htm</guid>
      <description>GIG HARBOR – From noon on Monday, April 2, to noon on Wednesday, April 4, the Washington State Department of Transportation will test lights that are mounted on the electronic toll gantries that span eastbound State Route 16 at the new toll plaza.</description>
    </item>
    <item>
      <title>Construction Prep Work Closes I-5 Lane Sunday Morning in Seattle</title>
      <pubDate>Sat, 31 Mar 2007 01:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/30_I-5PrepClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/30_I-5PrepClosure.htm</guid>
      <description>Construction Prep Work Closes I-5 Lane Sunday Morning in Seattle</description>
    </item>
    <item>
      <title>WSDOT Alerts Puget Sound Drivers to Busy Construction Week – March 30 – April 9</title>
      <pubDate>Fri, 30 Mar 2007 23:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/30_BusyWeek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/30_BusyWeek.htm</guid>
      <description>WSDOT Alerts Puget Sound Drivers to Busy Construction Week – March 30 – April 9</description>
    </item>
    <item>
      <title>Agate Pass Bridge Opens Ahead of Schedule</title>
      <pubDate>Fri, 30 Mar 2007 05:52:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/29_AgatePassAhead.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/29_AgatePassAhead.htm</guid>
      <description>Agate Pass Bridge Opens Ahead of Schedule</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland March 30 – April 6</title>
      <pubDate>Fri, 30 Mar 2007 05:41:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/29_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/29_KirklandUpdate.htm</guid>
      <description>Next week crews will work on reconstructing the I-405 median and city streets near the freeway, install new drains and landscaping, and continue repairs on the HOV ramps.</description>
    </item>
    <item>
      <title>Work to Remove Debris from State Route 504, East of Kid Valley, Begins March 29</title>
      <pubDate>Fri, 30 Mar 2007 05:36:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/29_SR504DebrisRemovalBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/29_SR504DebrisRemovalBegins.htm</guid>
      <description>CASTLE ROCK – Work to remove trees and debris that are covering SR 504, about 19 miles east of Castle Rock, began today, March 29.</description>
    </item>
    <item>
      <title>SR 14 Chamberlain Safety Rest Area Restrooms Reopen in Klickitat Co.; Maintenance Work Still Ahead</title>
      <pubDate>Fri, 30 Mar 2007 03:30:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/29_ChamberlainReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/29_ChamberlainReopens.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Weekend Closure of SR 524 Through Maltby Gets the Green Light from Mother Nature</title>
      <pubDate>Fri, 30 Mar 2007 03:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/29_SR524Closure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/29_SR524Closure.htm</guid>
      <description>After steady rains delayed work by a week, WSDOT and contractor Wilder Construction are set to close SR 524 this weekend. Breaks in the rain this week allowed crews to complete prep work for the total closure of SR 524 from SR 9 to SR 522.</description>
    </item>
    <item>
      <title>Weekend Inspection Shows No Change in Alaskan Way Viaduct Pier Settlement: WSDOT Moves Forward to Reinforce Two Piers</title>
      <pubDate>Fri, 30 Mar 2007 03:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/viaductinspection_march2007.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/viaductinspection_march2007.htm</guid>
      <description>Inspection results released today show no additional settlement of the Alaskan Way Viaduct between Columbia Street and Yesler Way. However, due to half an inch of settlement at two piers found during previous inspections over the last year, WSDOT will move forward with repairs in this area.</description>
    </item>
    <item>
      <title>No Foolin’: Southbound Traffic Shifts to Northbound Lanes</title>
      <pubDate>Thu, 29 Mar 2007 06:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/27_5_SBShift.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/27_5_SBShift.htm</guid>
      <description>Drivers in the Tacoma area will need to pay extra attention beginning this weekend as WSDOT crews shift the southbound I-5 lanes.</description>
    </item>
    <item>
      <title>Southbound Traffic on I-5 in Tacoma Shifts to Northbound Lanes</title>
      <pubDate>Thu, 29 Mar 2007 06:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/28_5_SBlaneshift.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/28_5_SBlaneshift.htm</guid>
      <description>This weekend motorists traveling southbound on I-5 in Tacoma will be shifted into the northbound lanes.</description>
    </item>
    <item>
      <title>WSDOT Reminds Drivers Studded Tire Deadline Saturday</title>
      <pubDate>Thu, 29 Mar 2007 05:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/28_studdedtiredeadline.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/28_studdedtiredeadline.htm</guid>
      <description>OLYMPIA – Long-range weather forecasts and coordination with neighboring states do not indicate a need to extend the studded tire deadline, WSDOT said today. 

The last day to legally use studded tires this season is Saturday, March 31. Motorists caught by law enforcement using studded tires after the March 31 deadline will receive a $101 ticket.</description>
    </item>
    <item>
      <title>Everett’s Southbound I-5 Ramp to 41st Street Will Be Closed All Weekend</title>
      <pubDate>Thu, 29 Mar 2007 05:34:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/28_EverettI5to41stRampClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/28_EverettI5to41stRampClosure.htm</guid>
      <description>Starting this Friday night, crews working for WSDOT will close the southbound I-5 exit to 41st Street in Everett.</description>
    </item>
    <item>
      <title>SR 401 Dismal Nitch Safety Rest Area Reopening on March 28</title>
      <pubDate>Thu, 29 Mar 2007 02:13:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/28_DismalNitchReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/28_DismalNitchReopens.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Repairs Flood Damage on US 12, One Westbound Lane Restricted 24 Hours Per Day Until Further Notice</title>
      <pubDate>Wed, 28 Mar 2007 02:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/27_nachesflooding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/27_nachesflooding.htm</guid>
      <description>WSDOT maintenance crews and construction engineers are proceeding with an emergency contract to save the highway from the swollen Naches River that is devouring the foundation of US 12 in Yakima near the 16th Avenue exit and two locations near Naches.</description>
    </item>
    <item>
      <title>TNB North Sidewalk to Close April 1 for Second of Five Summers</title>
      <pubDate>Tue, 27 Mar 2007 22:58:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/27_16_TNBSidewalks.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/27_16_TNBSidewalks.htm</guid>
      <description>It's that time of year for maintenance crews to close the north sidewalks on the existing Tacoma Narrows Bridge.</description>
    </item>
    <item>
      <title>Complete Closure, State Route 504 East of Kid Valley Due to an Unstable Slope</title>
      <pubDate>Tue, 27 Mar 2007 07:20:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/26_SR504CompleteClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/26_SR504CompleteClosure.htm</guid>
      <description>KELSO – Complete closure of SR 504 east of Kid Valley in Cowlitz County remains in place, after heavy rains caused an unstable slope at milepost 19.9, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>WSDOT Launches Biggest Construction Season Ever</title>
      <pubDate>Tue, 27 Mar 2007 01:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/2007Construction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/2007Construction.htm</guid>
      <description>“More projects, more construction, moving more drivers everywhere,” said Washington Transportation Secretary Doug MacDonald. “Today we kick off WSDOT’s biggest construction season in history.”</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct Closed for Semiannual Inspections March 24 and 25</title>
      <pubDate>Sat, 24 Mar 2007 05:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/23_ViaductClosedReminder.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/23_ViaductClosedReminder.htm</guid>
      <description>Alaskan Way Viaduct Closed for Semiannual Inspections March 24 and 25</description>
    </item>
    <item>
      <title>SR 14 Chamberlain Safety Rest Area in Klickitat Co. Undergoes Maintenance</title>
      <pubDate>Sat, 24 Mar 2007 01:51:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/23_ChamberlainRestAreaClosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/23_ChamberlainRestAreaClosed.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Manette Bridge Design Subject of Open House</title>
      <pubDate>Sat, 24 Mar 2007 01:25:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/23_SR303_Manetteopenhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/23_SR303_Manetteopenhouse.htm</guid>
      <description>Manette Bridge Design Subject of Open House</description>
    </item>
    <item>
      <title>One Week Left for Agate Pass Bridge Closures</title>
      <pubDate>Sat, 24 Mar 2007 00:37:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/23_AgatePassBridgeOneWeek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/23_AgatePassBridgeOneWeek.htm</guid>
      <description>One Week Left for Agate Pass Bridge Closures</description>
    </item>
    <item>
      <title>US 12 - 40th Avenue Groundbreaking a Success</title>
      <pubDate>Fri, 23 Mar 2007 23:25:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/groundbreakingsuccess.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/groundbreakingsuccess.htm</guid>
      <description>One of the most congested intersections in Yakima is one step closer to becoming less congested. WSDOT and the City of Yakima broke ground on March 21, 2007 to celebrate the start of the US 12 – 40th Avenue Interchange Improvements project at the Lakeside Business Center in Yakima.</description>
    </item>
    <item>
      <title>Crews to Finish I-5 Tree Removal Sunday in Mount Vernon; Drivers Should Expect Significant Delays</title>
      <pubDate>Fri, 23 Mar 2007 21:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/23_I5mtvernontreeremoval.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/23_I5mtvernontreeremoval.htm</guid>
      <description>Crews will finish removing hazardous trees along southbound Interstate 5 in Mount Vernon on March 25, closing a lane and ramp for the second Sunday in a row. Drivers should expect significant delays.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland March 23 – 30</title>
      <pubDate>Fri, 23 Mar 2007 21:34:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/23_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/23_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland March 23 – 30</description>
    </item>
    <item>
      <title>State Ferry Returns to BC April 1, A Day of Celebration</title>
      <pubDate>Fri, 23 Mar 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/sailing-to-sidney-bc.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/sailing-to-sidney-bc.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Transportation Commission Approves 25% Ferry Fares Increase</title>
      <pubDate>Fri, 23 Mar 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/ferry-fares-approved.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/ferry-fares-approved.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Columbia River Crossing Task Force meets in Washington to consider findings of Fourth Alternative Subcommittee</title>
      <pubDate>Fri, 23 Mar 2007 07:03:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/22_CRCTaskForceMeeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/22_CRCTaskForceMeeting.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Design Complete, Repairs to SR 508 at Bear Canyon Begin this Spring</title>
      <pubDate>Fri, 23 Mar 2007 06:28:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/22_SR508BearCanyon.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/22_SR508BearCanyon.htm</guid>
      <description>CHEHALIS – Washington State Department of Transportation (WSDOT) Engineers have completed the design to repair SR 508 at Bear Canyon in Lewis County.</description>
    </item>
    <item>
      <title>Minor traffic delays on the Hood Canal Bridge April 2-5</title>
      <pubDate>Fri, 23 Mar 2007 05:39:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/22_104_AnnualInspect.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/22_104_AnnualInspect.htm</guid>
      <description>The Hood Canal Bridge will be reduced to single-lane alternating traffic April 2-5 for WSDOT crews to peform annual inspections.</description>
    </item>
    <item>
      <title>WSDOT Alerts Puget Sound Drivers to Busy Construction Week – March 23 – April 2</title>
      <pubDate>Fri, 23 Mar 2007 05:11:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/22_BusyWeekMarch23.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/22_BusyWeekMarch23.htm</guid>
      <description>WSDOT Alerts Puget Sound Drivers to Busy Construction Week – March 23 – April 2</description>
    </item>
    <item>
      <title>Weekend Closure of Southbound I-5 Ramp to 41st Street in Everett Postponed</title>
      <pubDate>Thu, 22 Mar 2007 04:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/21_WeekedRampClosurePostponed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/21_WeekedRampClosurePostponed.htm</guid>
      <description>Weekend Closure of Southbound I-5 Ramp to 41st Street in Everett Postponed</description>
    </item>
    <item>
      <title>Weekend Closure of SR 524 East of SR 9 Delayed by Mother Nature</title>
      <pubDate>Tue, 20 Mar 2007 23:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/20_SR524ClosureDelayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/20_SR524ClosureDelayed.htm</guid>
      <description>Weekend Closure of SR 524 East of SR 9 Delayed by Mother Nature</description>
    </item>
    <item>
      <title>Sidney sailings return with Spring Schedule</title>
      <pubDate>Tue, 20 Mar 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/spring-schedule.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/spring-schedule.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Asks for Community Input, SR 502 Corridor Widening Open House Scheduled for March 27</title>
      <pubDate>Tue, 20 Mar 2007 06:07:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/19_SR502WideningOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/19_SR502WideningOpenHouse.htm</guid>
      <description>BATTLE GROUND - The Washington State Department of Transportation (WSDOT) will host a second community open house on Tuesday, March 27, from 4-7 p.m. to solicit input on the SR 502 Corridor Widening Project.</description>
    </item>
    <item>
      <title>WSDOT and the City of Yakima Break Ground to Relieve Congestion at Busy Intersection</title>
      <pubDate>Mon, 19 Mar 2007 21:52:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/US1240thAvenue.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/US1240thAvenue.htm</guid>
      <description>WSDOT and the City of Yakima will celebrate the start of the US 12 – 40th Avenue Interchange Improvements project at a groundbreaking ceremony on March 21, 2007, 1 p.m. at the Lakeside Business Center in Yakima.</description>
    </item>
    <item>
      <title>Washington State Ferries Shares Public Comments on the Proposed Plans for the Bainbridge Island Ferry Terminal</title>
      <pubDate>Mon, 19 Mar 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/public-comments-on-bi-terminal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/public-comments-on-bi-terminal.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Crews Begin Replacing Faulty Vault Hatches on SR 525 Next Week</title>
      <pubDate>Sat, 17 Mar 2007 07:01:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/16_SR525Hatches.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/16_SR525Hatches.htm</guid>
      <description>Beginning Monday, WSDOT and contractor KLB Construction, Inc. will spend the next two months replacing 18 faulty vault hatches on SR 525 that were mistakenly installed as part of the SR 525 widening project two years ago.  The vault hatches provide access for crews to storm water systems below the freeway.</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct To Be Closed For Semiannual Inspections March 24 and 25</title>
      <pubDate>Sat, 17 Mar 2007 04:06:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/16_ViaductInspections.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/16_ViaductInspections.htm</guid>
      <description>Alaskan Way Viaduct To Be Closed For Semiannual Inspections March 24 and 25</description>
    </item>
    <item>
      <title>Crews Repair Sinkhole at Bridge on SR 542 Near Maple Falls; New bridge to be built this summer will prevent future damage</title>
      <pubDate>Sat, 17 Mar 2007 02:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/16_SR542sinkholeatbridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/16_SR542sinkholeatbridge.htm</guid>
      <description>Crews discovered and repaired a sinkhole in the Mount Baker Highway at Boulder Creek near Maple Falls. Construction of a new bridge this summer will remedy frequent flooding and erosion problems that create hazards such as sinkholes.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland March 16 – 23</title>
      <pubDate>Fri, 16 Mar 2007 22:04:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/16_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/16_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland March 16 – 23</description>
    </item>
    <item>
      <title>State Transportation Commission to Hold Public Hearing on Ferry Fares</title>
      <pubDate>Fri, 16 Mar 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/state-transportation-commission-to-hold-public-hearing-on-ferry.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/state-transportation-commission-to-hold-public-hearing-on-ferry.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Alerts Puget Sound Drivers to Busy Construction Week – March 16 – March 25</title>
      <pubDate>Fri, 16 Mar 2007 06:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/15_BusyWeekMarch16.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/15_BusyWeekMarch16.htm</guid>
      <description>WSDOT Alerts Puget Sound Drivers to Busy Construction Week – March 16 – March 25</description>
    </item>
    <item>
      <title>First of Two TNB Expansion Joints to Arrive</title>
      <pubDate>Fri, 16 Mar 2007 05:56:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/15_SR16TNBexpansionjoints.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/15_SR16TNBexpansionjoints.htm</guid>
      <description>TACOMA – During evening hours on Monday, March 19, the first of two expansion joints will arrive at the new Tacoma Narrows Bridge construction site. The process of delivering the joint to the west anchorage may require a little patience from westbound State Route 16 drivers.</description>
    </item>
    <item>
      <title>Heron Street Bridge Closure Scheduled</title>
      <pubDate>Fri, 16 Mar 2007 00:24:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/15_12_HeronClosureScheduled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/15_12_HeronClosureScheduled.htm</guid>
      <description>Beginning March 24 WSDOT will completely close the Heron Street Bridge in Aberdeen for 13 days.</description>
    </item>
    <item>
      <title>I-5 Tree Removal in Mount Vernon Rescheduled</title>
      <pubDate>Thu, 15 Mar 2007 22:25:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/15_i5mtvernontrees.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/15_i5mtvernontrees.htm</guid>
      <description>One lane of I-5 south will be closed Sunday, March 18, and Sunday, March 25, while crews remove 23 poplar trees from the side of the freeway in Mount Vernon.</description>
    </item>
    <item>
      <title>Weekend Closure Planned for SR 524 East of SR 9</title>
      <pubDate>Thu, 15 Mar 2007 05:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/14_SR524WeekendClosurePlanned.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/14_SR524WeekendClosurePlanned.htm</guid>
      <description>Weekend Closure Planned for SR 524 East of SR 9</description>
    </item>
    <item>
      <title>WSDOT Slows Down Traffic on US 105 through the Shoalwater Indian Reservation Area</title>
      <pubDate>Thu, 15 Mar 2007 05:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/14_ShoalwaterIndianReservationArea.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/14_ShoalwaterIndianReservationArea.htm</guid>
      <description>TOKELAND – Starting Monday, March 26, the Washington State Department of Transportation (WSDOT) will reduce the posted speed limit on State Route 105 through the Shoalwater Indian Reservation area.</description>
    </item>
    <item>
      <title>Klickitat Returned Quickly to Port Townsend/Keystone Route</title>
      <pubDate>Wed, 14 Mar 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/klickitat-returns.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/klickitat-returns.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Ferries to Introduce New Fare Collection System at Seattle, Bainbridge and Bremerton Terminals March 27-28</title>
      <pubDate>Wed, 14 Mar 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/wave2go-on-seattle-routes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/wave2go-on-seattle-routes.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Community Advisory Group for the Seattle Ferry Terminal Project to Meet on March 15</title>
      <pubDate>Wed, 14 Mar 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/seattle-cag-to-meet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/seattle-cag-to-meet.htm</guid>
      <description></description>
    </item>
    <item>
      <title>State Route 505 in Downtown Winlock closes Wednesday for Railroad Work</title>
      <pubDate>Wed, 14 Mar 2007 05:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/13_SR505ClosesforRRWork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/13_SR505ClosesforRRWork.htm</guid>
      <description>WINLOCK– State Route 505 in downtown Winlock will close Wednesday, March 14 between 7 a.m. and 4 p.m. for work at the railroad crossing announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Eight New Girders Set Over I-5 in South Everett</title>
      <pubDate>Wed, 14 Mar 2007 04:13:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/13_SouthEverettGirdersSet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/13_SouthEverettGirdersSet.htm</guid>
      <description>Eight New Girders Set Over I-5 in South Everett</description>
    </item>
    <item>
      <title>Todd Shipyard Gives Klickitat Early Drydock for Repair</title>
      <pubDate>Tue, 13 Mar 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/klickitat-goes-to-todd-shipyard.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/klickitat-goes-to-todd-shipyard.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Bridge Demolition to Close Northbound I-5 in Everett</title>
      <pubDate>Tue, 13 Mar 2007 06:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/12_I-5EverettBridgeDemolition.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/12_I-5EverettBridgeDemolition.htm</guid>
      <description>Nighttime drivers on Interstate 5 through Everett will need to plan a little extra time in their trips on the nights of March 19 – 23.  Crews working for WSDOT will be demolishing the Cascade View Bridge in Everett over I-5 for up to five nights in a row.  The Cascade View Bridge is located just south of 41st Street in Everett.</description>
    </item>
    <item>
      <title>Weather Delays Reopening of 204th Place NE, SR 202 Traffic Switch Near Redmond</title>
      <pubDate>Tue, 13 Mar 2007 06:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/12_SR202WeatherDelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/12_SR202WeatherDelays.htm</guid>
      <description>Mother Nature has forced WSDOT to keep 204th Place NE at SR 202 closed longer than expected.  Crews hoped to put SR 202 drivers onto the new, elevated SR 202 roadway and reopen 204th Place NE on March 9, but cold temperatures, snow and rain delayed that timeline.</description>
    </item>
    <item>
      <title>Heron Street Bridge Closure Coming Soon</title>
      <pubDate>Tue, 13 Mar 2007 05:20:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/12_HeronStBridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/12_HeronStBridgeClosure.htm</guid>
      <description>Heron Street Bridge Closure Coming Soon</description>
    </item>
    <item>
      <title>Crews Will Start Plowing North Cascades Highway this Month</title>
      <pubDate>Tue, 13 Mar 2007 00:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/031207NCascadesAssessment.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/031207NCascadesAssessment.htm</guid>
      <description>Crews Will Start Plowing North Cascades Highway this Month</description>
    </item>
    <item>
      <title>Port Townsend-Keystone Route Closed For Vessel Repair</title>
      <pubDate>Mon, 12 Mar 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/port-townsend-keystone-route-closed-for-vessel-repair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/port-townsend-keystone-route-closed-for-vessel-repair.htm</guid>
      <description></description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland March 9-16</title>
      <pubDate>Sat, 10 Mar 2007 08:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/9_I405Kirkland.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/9_I405Kirkland.htm</guid>
      <description>Next week crews working for the Washington State Department of Transportation will work on the NE 128th Street bridge and HOV ramps, and install signs and new drains near NE 116th Street.</description>
    </item>
    <item>
      <title>Total Northbound I-5 Closure Saturday Night in South Everett</title>
      <pubDate>Thu, 08 Mar 2007 07:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/07_I-5NorthboundClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/07_I-5NorthboundClosure.htm</guid>
      <description>Total Northbound I-5 Closure Saturday Night in South Everett</description>
    </item>
    <item>
      <title>State Route 4 Slope Stabilization Repairs near Stella Begin March 19</title>
      <pubDate>Thu, 08 Mar 2007 06:49:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/07_SR4SlopeStabilizationRepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/07_SR4SlopeStabilizationRepairs.htm</guid>
      <description>KELSO – Repairs to stabilize the slope above State Route 4 near Stella will begin March 19, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>I-5 Lane Closure Next Two Sundays in Mount Vernon</title>
      <pubDate>Thu, 08 Mar 2007 06:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/7_I-5TreeClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/7_I-5TreeClosures.htm</guid>
      <description>I-5 Lane Closure Next Two Sundays in Mount Vernon
Drivers should expect significant delays</description>
    </item>
    <item>
      <title>State Transportation Commission to Hold Meeting in Longview</title>
      <pubDate>Tue, 06 Mar 2007 06:52:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/05_TransportationCommissionMtg.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/05_TransportationCommissionMtg.htm</guid>
      <description>OLYMPIA – As part of the Washington State Transportation Commission’s community outreach efforts, Transportation Commissioners will join with city, county, and state officials in Longview to discuss local and regional transportation needs in Cowlitz County and Southwest Washington.</description>
    </item>
    <item>
      <title>Drivers Enjoying a Smoother Commute on I-5 through Federal Way</title>
      <pubDate>Sat, 03 Mar 2007 04:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/02_I5FederalWayUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/02_I5FederalWayUpdate.htm</guid>
      <description>Drivers Enjoying a Smoother Commute on I-5 through Federal Way</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland March 2-9</title>
      <pubDate>Sat, 03 Mar 2007 01:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/2_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/2_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland March 2-9</description>
    </item>
    <item>
      <title>WSDOT Crews Continue to Clear Roads into the Morning Commute</title>
      <pubDate>Thu, 01 Mar 2007 22:33:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/03/01_WeatherDrivingConditions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/03/01_WeatherDrivingConditions.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Agate Pass Bridge Repair on Schedule</title>
      <pubDate>Sat, 10 Mar 2007 04:44:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/09_AgatePassBridgeUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/09_AgatePassBridgeUpdate.htm</guid>
      <description>Agate Pass Bridge Repair on Schedule</description>
    </item>
    <item>
      <title>New camera images in Eastern Washington added to WSDOT website</title>
      <pubDate>Sat, 10 Mar 2007 00:27:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/09_neweasterncams.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/09_neweasterncams.htm</guid>
      <description>New eastern Washington camera images have been added to the WSDOT website.</description>
    </item>
    <item>
      <title>Speed Reduction Approved in Buckley</title>
      <pubDate>Thu, 08 Mar 2007 06:46:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/07_SpeedReductioninBuckley.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/07_SpeedReductioninBuckley.htm</guid>
      <description>Speed Reduction Approved in Buckley</description>
    </item>
    <item>
      <title>Expect Delays on SR 3 near Shelton</title>
      <pubDate>Thu, 08 Mar 2007 01:17:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/07_SR+3+Delays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/07_SR+3+Delays.htm</guid>
      <description>SHELTON – Drivers should expect delays next week on a stretch of SR 3 east of the city limits where crews will be cutting and trimming trees that are in danger of falling on power lines and the roadway.</description>
    </item>
    <item>
      <title>Lane Closures Will Slow Poulsbo Drivers</title>
      <pubDate>Thu, 08 Mar 2007 00:57:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/07_SR307_lanerestrictions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/07_SR307_lanerestrictions.htm</guid>
      <description>Traffic delays expected next week in Poulsbo. Tree-clearing work requires alternating traffic on SR 307.</description>
    </item>
    <item>
      <title>Murray Morgan Bridge Closures Next Week</title>
      <pubDate>Wed, 07 Mar 2007 05:33:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/06_MurrayMorganBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/06_MurrayMorganBridge.htm</guid>
      <description>Murray Morgan Bridge Closures Next Week</description>
    </item>
    <item>
      <title>Second Liberty Lake Pedestrian Bridge work set to start</title>
      <pubDate>Wed, 07 Mar 2007 00:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/06i90ramppedbridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/06i90ramppedbridge.htm</guid>
      <description>Work is getting underway on a new pedestrian overpass in Liberty Lake near Spokane.</description>
    </item>
    <item>
      <title>I-5 Lane Restrictions for Overnight Bridge Demolition</title>
      <pubDate>Tue, 06 Mar 2007 04:58:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/05_I5_demo_laneclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/05_I5_demo_laneclosures.htm</guid>
      <description>Lane closures planned the week of March 5 for downtown Tacoma bridge demolition work.</description>
    </item>
    <item>
      <title>SR 304 Bremerton Tunnel Project Bids Rejected</title>
      <pubDate>Sat, 03 Mar 2007 09:17:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/2_304_BidsRejected.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/2_304_BidsRejected.htm</guid>
      <description>WSDOT is rejecting all the bids received for the Bremerton Tunnel project.</description>
    </item>
    <item>
      <title>New Northbound I-5 Exit to Everett’s 41st Street Now Open to Traffic</title>
      <pubDate>Fri, 02 Mar 2007 21:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/28_I5Everett41st.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/28_I5Everett41st.htm</guid>
      <description>Interstate 5 drivers heading to 41st Street in Everett have a brand new and faster way to get there. Late last night crews working for WSDOT opened the new northbound exit to 41st St. at 11:24 p.m. Now, drivers no longer have to exit at Broadway and take the loop ramp to 41st St.</description>
    </item>
    <item>
      <title>Agate Pass Bridge Closures Begin Sunday</title>
      <pubDate>Fri, 02 Mar 2007 08:18:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/1_3-5_Agate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/1_3-5_Agate.htm</guid>
      <description>WSDOT reminds motorists using the Agate Pass Bridge lane closures will begin March 4.</description>
    </item>
    <item>
      <title>Traffic Tightens in Tacoma</title>
      <pubDate>Fri, 02 Mar 2007 00:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/28_I5_Bridge+Demo+SB.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/28_I5_Bridge+Demo+SB.htm</guid>
      <description>Southbound revision on I-5 gets traffic around temporary suppport beam and bridge demolition.</description>
    </item>
    <item>
      <title>WSDOT Prepares for Evening Snow and Morning Ice</title>
      <pubDate>Thu, 01 Mar 2007 08:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/28_SnowPreparations.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/28_SnowPreparations.htm</guid>
      <description>The forecast calls for snow and slush accumulation totals of up to six inches before midnight tonight and black ice after midnight in parts of King and Snohomish counties. Snoqualmie Pass is expecting up to 10 inches of snow. WSDOT is getting ready and advises drivers to prepare as well.</description>
    </item>
    <item>
      <title>City and State Partners Request Public Opinion for Olympia's West Side</title>
      <pubDate>Thu, 01 Mar 2007 07:58:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/28_101_WOAS_Wkshp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/28_101_WOAS_Wkshp.htm</guid>
      <description>WSDOT and the City of Olympia are teaming up to resolve congestion issues on Olympia's west side. We need to hear from you.</description>
    </item>
    <item>
      <title>WSDOT Cautions Drivers of Predicted Winter Weather Driving Conditions on Snoqualmie Pass</title>
      <pubDate>Thu, 01 Mar 2007 05:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/28_SnoqualmieSnow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/28_SnoqualmieSnow.htm</guid>
      <description>WSDOT Cautions Drivers of Predicted Winter Weather Driving Conditions on Snoqualmie Pass</description>
    </item>
    <item>
      <title>Southworth Parking Fees to Go Up April 1</title>
      <pubDate>Wed, 28 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/revised-southworth-parking-fees.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/revised-southworth-parking-fees.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Hood Canal Bridge Inspections Scheduled for Saturday</title>
      <pubDate>Wed, 28 Feb 2007 05:54:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/27_HoodCanalBridgeInspectionsScheduledforSaturday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/27_HoodCanalBridgeInspectionsScheduledforSaturday.htm</guid>
      <description>Hood Canal Bridge Inspections Scheduled for Saturday</description>
    </item>
    <item>
      <title>WSDOT Closes One Lane of Westbound I-82 between Yakima and Selah Tuesday and Wednesday, Expect Minor Delays</title>
      <pubDate>Wed, 28 Feb 2007 01:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/Mike+Westbay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/Mike+Westbay.htm</guid>
      <description>WSDOT Closes One Lane of Westbound I-82 between Yakima and Selah Tuesday and Wednesday, Expect Minor Delays</description>
    </item>
    <item>
      <title>Roboflagger Takes a Stand for Work Zone Safety on US 2</title>
      <pubDate>Tue, 27 Feb 2007 23:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/27_Roboflagger.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/27_Roboflagger.htm</guid>
      <description>Roboflagger Takes a Stand for Work Zone Safety on US 2</description>
    </item>
    <item>
      <title>Opening of Northbound I-5 Exit to Everett’s 41st Street Delayed</title>
      <pubDate>Tue, 27 Feb 2007 22:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/27_41stRampDelay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/27_41stRampDelay.htm</guid>
      <description>Opening of Northbound I-5 Exit to Everett’s 41st Street Delayed</description>
    </item>
    <item>
      <title>10 Anchors Away – 10 to Go</title>
      <pubDate>Tue, 27 Feb 2007 04:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/2_26_SR104HCBAnchorLaunch.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/2_26_SR104HCBAnchorLaunch.htm</guid>
      <description>10 Anchors Away – 10 to Go</description>
    </item>
    <item>
      <title>WSDOT calls for projects that reduce drive-alone commuting</title>
      <pubDate>Tue, 27 Feb 2007 03:17:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/02_TRPP_call_for_proposals.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/02_TRPP_call_for_proposals.htm</guid>
      <description>WSDOT calls for proposals for the 2007-2009 Trip Reduction Performance Program.</description>
    </item>
    <item>
      <title>I-5 Cable Median Barrier in Marysville Stops Two Vehicles</title>
      <pubDate>Sat, 24 Feb 2007 07:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/23_CableBarrierRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/23_CableBarrierRepair.htm</guid>
      <description>I-5 Cable Median Barrier in Marysville Stops Two Vehicles</description>
    </item>
    <item>
      <title>Snow Continues to Fall in East Whatcom County</title>
      <pubDate>Sat, 24 Feb 2007 06:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/23_WhatcomSnowContinues.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/23_WhatcomSnowContinues.htm</guid>
      <description>Snow continues in Whatcom County this afternoon</description>
    </item>
    <item>
      <title>Columbia River Crossing Task Force meets in Portland to discuss recommendation on bridge and transit alternatives for I-5</title>
      <pubDate>Sat, 24 Feb 2007 06:17:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/23_CRCTaskForceMeeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/23_CRCTaskForceMeeting.htm</guid>
      <description>The Columbia River Crossing Task Force will meet Tuesday, February 27, in Portland to discuss proposed bridge and transit options to improve safety and congestion on I-5 between Oregon and Washington.</description>
    </item>
    <item>
      <title>WSDOT Prepares for Wintry Weather Weekend in the Higher Elevations and on Mountain Passes</title>
      <pubDate>Sat, 24 Feb 2007 04:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/2_SnowinPassesthisWeekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/2_SnowinPassesthisWeekend.htm</guid>
      <description>WSDOT crews have been busy today clearing the snow not only on mountain passes, but also in Skagit and Whatcom counties. WSDOT crews are preparing anti-icing programs for wintry weather conditions expected all over the state this weekend.</description>
    </item>
    <item>
      <title>Heavy Snow falling in South Whatcom County and Skagit County</title>
      <pubDate>Sat, 24 Feb 2007 02:28:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/23_SnowingWhatcomandSkagit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/23_SnowingWhatcomandSkagit.htm</guid>
      <description>Heavy snow falling in Whatcom and Skagit County today</description>
    </item>
    <item>
      <title>Opening of Northbound I-5 Exit to Everett’s 41st Street Delayed by Weather, US 2 to Southbound I-5 Ramp to Close for Weekend</title>
      <pubDate>Fri, 23 Feb 2007 23:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/23_EverettDelay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/23_EverettDelay.htm</guid>
      <description>Opening of Northbound I-5 Exit to Everett’s 41st Street Delayed by Weather, US 2 to Southbound I-5 Ramp to Close for Weekend</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Feb. 23 – March 2</title>
      <pubDate>Fri, 23 Feb 2007 23:36:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/23_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/23_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland Feb. 23 – March 2</description>
    </item>
    <item>
      <title>Agate Pass Bridge Repairs for Bainbridge Customers</title>
      <pubDate>Fri, 23 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/agate-pass-bridge-repairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/agate-pass-bridge-repairs.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Reduces U.S. 101 Speed Limit in Clallam Co.</title>
      <pubDate>Fri, 23 Feb 2007 08:22:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/22_101_Lowerspeed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/22_101_Lowerspeed.htm</guid>
      <description>WSDOT to reduce the speed limit on a one-mile stretch of U.S. 101 near the Seven Cedars Casino.</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close Tonight for Emergency Maintenance</title>
      <pubDate>Fri, 23 Feb 2007 08:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/22_SR520EmergencyMaintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/22_SR520EmergencyMaintenance.htm</guid>
      <description>Washington State Department of Transportation bridge crews will perform emergency maintenance work on the State Route 520 Evergreen Point Floating Bridge early Friday morning.</description>
    </item>
    <item>
      <title>Expect Double Lane Closures on I-5 Southbound in Vancouver Area Sunday Morning, Feb. 25</title>
      <pubDate>Fri, 23 Feb 2007 05:41:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/22_I5VancouverLaneClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/22_I5VancouverLaneClosures.htm</guid>
      <description>VANCOUVER – Motorists should expect double lane closures on I-5 southbound in Vancouver, between 5 a.m. and 11 a.m. Sunday morning, Feb. 25.</description>
    </item>
    <item>
      <title>WSDOT Asks Seattle-Area Drivers to Get Ready for Intense I-5 Closures This August</title>
      <pubDate>Fri, 23 Feb 2007 02:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/21_I5BridgeRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/21_I5BridgeRepair.htm</guid>
      <description>WSDOT’s  message is clear:  Start thinking now about your Seattle–area commute this August.

WSDOT announced Wednesday it will pave more than one mile of northbound Interstate 5 and replace failing bridge expansion joints between Spokane Street and I-90.  These repairs will significantly affect traffic, particularly during 19 continuous days of intense construction from Aug. 10 to Aug. 29 when crews will close several lanes of northbound I-5 at all times, leaving only two or three lanes open t</description>
    </item>
    <item>
      <title>Vancouver Rail Bypass – West 39th Street Bridge Project Open House Scheduled for February 27</title>
      <pubDate>Fri, 23 Feb 2007 01:47:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/22_VancouverRailOH.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/22_VancouverRailOH.htm</guid>
      <description>An opportunity for the public to learn more about the Vancouver Rail Bypass – West 39th Street Bridge Project will take place February 27, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>I-5, SR 502 Interchange Project Construction Begins this Spring, Contractor Selected</title>
      <pubDate>Thu, 22 Feb 2007 23:52:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/22_I5SR502Interchange.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/22_I5SR502Interchange.htm</guid>
      <description>BATTLE GROUND – A project that will construct a new interchange at I-5 and State Route 502 will begin this spring.</description>
    </item>
    <item>
      <title>WSDOT Awards SR 20 Project Near Interstate 5</title>
      <pubDate>Thu, 22 Feb 2007 23:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/22_SR20FredoniaAwarded.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/22_SR20FredoniaAwarded.htm</guid>
      <description>WSDOT awards Fredonia project to Scarsella Brothers</description>
    </item>
    <item>
      <title>Tariff Meeting Planned for Kingston</title>
      <pubDate>Thu, 22 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/kingston-tariff-meeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/kingston-tariff-meeting.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSF 2007 Fare Proposal</title>
      <pubDate>Thu, 22 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/wsf-2007-fare-proposal.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/wsf-2007-fare-proposal.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Tariff Meeting Planned for Whidbey Island</title>
      <pubDate>Thu, 22 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/whidbey-island-tariff-meeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/whidbey-island-tariff-meeting.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Ferry System Plans Meeting to Discuss Tariff and Summer Reservation System with Port Townsend Community</title>
      <pubDate>Thu, 22 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/port-townsend-tariff-meeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/port-townsend-tariff-meeting.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Washington State Ferries unveils 2007 Poster by local artist</title>
      <pubDate>Thu, 22 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/2007-poster-by-alex-young.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/2007-poster-by-alex-young.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Three Ferries to Operate on Edmonds/Kingston Route February 25-March 20</title>
      <pubDate>Thu, 22 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/3-ferries-at-edmondskingston.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/3-ferries-at-edmondskingston.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Southworth Parking Fees to Go Up April 1</title>
      <pubDate>Thu, 22 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/southworth-parking-fees-increase.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/southworth-parking-fees-increase.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Ferry System Plans 11 Tariff Meetings this month</title>
      <pubDate>Thu, 22 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/11-tariff-meetings-this-month.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/11-tariff-meetings-this-month.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Tariff/FAC Meeting Planned for Anacortes</title>
      <pubDate>Thu, 22 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/anacortes-tarifffac-meeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/anacortes-tarifffac-meeting.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Puget Sound's Eastside Traffic Cameras Off-Line While Crews Repair Fiber Optic Cable</title>
      <pubDate>Thu, 22 Feb 2007 06:14:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/21_FiberOpticCableRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/21_FiberOpticCableRepair.htm</guid>
      <description>About 60 of our traffic cameras on I-405, SR 520 and I-90 are currently off-line due to a damaged fiber optic cable in the Totem Lake area.  We expect the cameras to be back in operation during the Thursday afternoon commute.</description>
    </item>
    <item>
      <title>I-5 Gee Creek Safety Rest Areas in Clark Co. Closing for Maintenance</title>
      <pubDate>Wed, 21 Feb 2007 23:57:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/21_I5GeeCreek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/21_I5GeeCreek.htm</guid>
      <description>RIDGEFIELD – The Gee Creek Safety Rest Areas on I-5 in Clark County will be closed alternately between Monday, February 26 and Tuesday, March 6, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Everett's 41st Street Bridge Now Open</title>
      <pubDate>Tue, 20 Feb 2007 03:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/19_Everett41stBridgeOverI5.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/19_Everett41stBridgeOverI5.htm</guid>
      <description>Everett’s new 41st Street Bridge and its ramp to northbound I-5 is now open to traffic.</description>
    </item>
    <item>
      <title>Link Light Rail Construction Across I-5 at Boeing Access Road Continues Over Northbound Lanes</title>
      <pubDate>Sat, 17 Feb 2007 08:15:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/16_i5LightRailClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/16_i5LightRailClosures.htm</guid>
      <description>Full closures of I-5 northbound are scheduled for Monday, Tuesday, and Wednesday nights (Feb. 19-21) for construction of Sound Transit's light rail bridge over I-5 at Boeing Access Road.</description>
    </item>
    <item>
      <title>Revised Plan Allows Openings on Agate Pass Bridge</title>
      <pubDate>Sat, 17 Feb 2007 08:11:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/16_305_AgatePassBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/16_305_AgatePassBridge.htm</guid>
      <description>WSDOT revised its workplan for the Agate Pass Bridge to lessen the impact to motorists.</description>
    </item>
    <item>
      <title>SR 502 Widening Project Open House Scheduled for February 22, 2007</title>
      <pubDate>Fri, 16 Feb 2007 23:33:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/16_SR502WideningScopingMtg.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/16_SR502WideningScopingMtg.htm</guid>
      <description>VANCOUVER - The Washington State Department of Transportation (WSDOT) will host a community scoping meeting and open house on Thursday, February 22, from 4-7 p.m. to solicit input on the SR 502 Corridor Widening Project.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Feb. 16 - 23</title>
      <pubDate>Fri, 16 Feb 2007 23:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/16_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/16_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland Feb. 16 - 23</description>
    </item>
    <item>
      <title>Atkinson Construction Front-runner to Build WSDOT’s I-405, 112th Avenue SE to SE 8th Street Widening Project</title>
      <pubDate>Thu, 15 Feb 2007 23:20:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/15_AtkinsonI405.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/15_AtkinsonI405.htm</guid>
      <description>Atkinson Construction Front-runner to Build WSDOT’s I-405, 112th Avenue SE to SE 8th Street Widening Project</description>
    </item>
    <item>
      <title>Tariff Meeting Planned for Bainbridge Island</title>
      <pubDate>Thu, 15 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/bainbridge-tariff-meeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/bainbridge-tariff-meeting.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Ferries on Regular Schedule</title>
      <pubDate>Thu, 15 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/holiday-schedule.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/holiday-schedule.htm</guid>
      <description></description>
    </item>
    <item>
      <title>High Winds Impact Ferry Service at Lopez Island</title>
      <pubDate>Thu, 15 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/high-winds-impact-lopez.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/high-winds-impact-lopez.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Ferries to Introduce New Fare Collection System at Edmonds/Kingston on February 20</title>
      <pubDate>Thu, 15 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/new-fare-system-at-edmondskingston.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/new-fare-system-at-edmondskingston.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Tariff Meeting Planned for Southworth</title>
      <pubDate>Thu, 15 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/southworth-tariff-meeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/southworth-tariff-meeting.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Tariff Meeting Planned for Bremerton</title>
      <pubDate>Thu, 15 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/bremerton-tariff-meeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/bremerton-tariff-meeting.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Understanding Vessel and Terminal Security</title>
      <pubDate>Thu, 15 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/understanding-vessel-and-terminal-security.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/understanding-vessel-and-terminal-security.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Crews to Close I-405 Lanes and NE 116th Street for Bridge Construction this Week</title>
      <pubDate>Wed, 14 Feb 2007 06:53:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/13_I405GirderSetting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/13_I405GirderSetting.htm</guid>
      <description>Monday through Thursday nights (Feb. 12-15) crews working for the Washington State Department of Transportation will install bridge girders for the segment of I-405 that travels over NE 116th Street in Kirkland.</description>
    </item>
    <item>
      <title>WSDOT Finds Surface/Tunnel Hybrid Proposal Unacceptable</title>
      <pubDate>Wed, 14 Feb 2007 06:27:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/13_ViaductHybrid.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/13_ViaductHybrid.htm</guid>
      <description>WSDOT cannot recommend the surface/tunnel hybrid proposal as an acceptable replacement option for the Alaskan Way Viaduct.</description>
    </item>
    <item>
      <title>New Online Tool for Reporting Metal Theft</title>
      <pubDate>Tue, 13 Feb 2007 03:46:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/2_MetalTheft.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/2_MetalTheft.htm</guid>
      <description>Copper Wire and other valuable metals are being stolen in plain view along the highway and from construction sites prompting WSDOT and the Washington State Patrol to launch a new web site encouraging drivers to help catch these brazen thieves.</description>
    </item>
    <item>
      <title>WSDOT Reduces Speed Limit on SR 109</title>
      <pubDate>Tue, 13 Feb 2007 02:59:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/12_WSDOT_Reduces_SR+109+Speed+Limit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/12_WSDOT_Reduces_SR+109+Speed+Limit.htm</guid>
      <description>WSDOT Reduces SR 109 Speed Limit</description>
    </item>
    <item>
      <title>Ribbon Cutting Rescheduled for Feb. 19</title>
      <pubDate>Tue, 13 Feb 2007 02:52:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/12_RibbonCuttingRescheduledforFeb19.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/12_RibbonCuttingRescheduledforFeb19.htm</guid>
      <description>Ribbon Cutting Rescheduled for Feb. 19</description>
    </item>
    <item>
      <title>Heavy Loads Move to the Left on Heron Street Bridge</title>
      <pubDate>Sat, 10 Feb 2007 07:18:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/10_HeavyLoadsMoveToTheLeftOnHeronStreetBridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/10_HeavyLoadsMoveToTheLeftOnHeronStreetBridge.htm</guid>
      <description>Heavy Loads Move to the Left on Heron Street Bridge</description>
    </item>
    <item>
      <title>I-5 HOV Ramps in Federal Way Quickly Gain Fans in First Year of Service</title>
      <pubDate>Sat, 10 Feb 2007 06:19:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/9_FederalWayRamps.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/9_FederalWayRamps.htm</guid>
      <description>Traffic volumes have doubled on the Interstate 5 Federal Way direct access ramps at S. 317th Street since the ramps opened one year ago.</description>
    </item>
    <item>
      <title>Fallen Trees Reduce Potential of Ice Chunks Reaching I-90 Snoqualmie Pass</title>
      <pubDate>Sat, 10 Feb 2007 05:38:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/fallingtreesI90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/fallingtreesI90.htm</guid>
      <description>High above I-90, just 6 miles east of Snoqualmie Pass, large amounts of ice were hanging in an avalanche chute and had the potential of breaking loose, sliding down the steep slope and landing in the roadway.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Feb. 9 - 16</title>
      <pubDate>Fri, 09 Feb 2007 23:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/9_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/9_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland Feb. 9 - 16</description>
    </item>
    <item>
      <title>Expect Rolling Slowdowns on I-5 in Salmon Creek Vicinity Sunday Morning, Feb. 11</title>
      <pubDate>Fri, 09 Feb 2007 03:50:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/08_I5SlowdownsVancouver.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/08_I5SlowdownsVancouver.htm</guid>
      <description>VANCOUVER – Motorists should expect rolling slowdowns on I-5, in both directions, between 4 a.m. and 10 a.m. Sunday morning, Feb. 11 in the Salmon Creek area.</description>
    </item>
    <item>
      <title>SR 21 Keller Ferry Repairs scheduled</title>
      <pubDate>Fri, 09 Feb 2007 02:24:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/08_sr21_ferryrepairsslated.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/08_sr21_ferryrepairsslated.htm</guid>
      <description>Service on the Keller Ferry will be interrupted for part of a day while the vessel undergoes repairs.</description>
    </item>
    <item>
      <title>Sign Replacement Requires Nighttime I-5 Ramp Closures, Night of Feb. 10-11</title>
      <pubDate>Thu, 08 Feb 2007 23:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/08_I-5NightimeRampClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/08_I-5NightimeRampClosures.htm</guid>
      <description>VANCOUVER – I-5 ramp closures between Fourth Plain and SR 500/ 39th Street will take place beginning at 10 p.m. Saturday, Feb. 10, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Tariff Meetings Planned for San Juan Islands</title>
      <pubDate>Thu, 08 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/san-juan-islands-tariff-meetings.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/san-juan-islands-tariff-meetings.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Tariff Meeting Planned for Vashon Island</title>
      <pubDate>Thu, 08 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/vashon-tariff-meeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/vashon-tariff-meeting.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Hosts Informational Open House for Contractors Interested in Upcoming Construction Projects</title>
      <pubDate>Thu, 08 Feb 2007 06:32:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/7_ConstructionOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/7_ConstructionOpenHouse.htm</guid>
      <description>WSDOT Hosts Informational Open House for Contractors Interested in Upcoming Construction Projects</description>
    </item>
    <item>
      <title>WSDOT Crews Narrow Bellevue Way Ramp to Eastbound I-90 in Bellevue</title>
      <pubDate>Wed, 07 Feb 2007 07:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/6_I90MercerSlough.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/6_I90MercerSlough.htm</guid>
      <description>WSDOT bridge crews will install measuring devices on several I-90 bridges at the Mercer Slough in Bellevue this week.  The measuring devices are GPS tools that will continually monitor the movement and performance of the bridges.</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Wed, 07 Feb 2007 06:07:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/6_SR520MonthlyMaintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/6_SR520MonthlyMaintenance.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Let the Demolition Begin in Tacoma</title>
      <pubDate>Tue, 06 Feb 2007 08:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/05_I5_bridedemo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/05_I5_bridedemo.htm</guid>
      <description>Bridge demolition begins in Tacoma, prompting lane and ramp closures.</description>
    </item>
    <item>
      <title>Lane Restiction on US 12 Heron Street Bridge Set for Saturday, Feb. 3</title>
      <pubDate>Sat, 03 Feb 2007 08:27:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/2_07_Heron+Bridge.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/2_07_Heron+Bridge.htm</guid>
      <description>Lane Restiction on US 12 Heron Street Bridge Set for Saturday, Feb. 3</description>
    </item>
    <item>
      <title>Expect Single Lane Closures Just South of Woodland as Crews Work to Close Median Crossover, Feb. 7-9</title>
      <pubDate>Sat, 03 Feb 2007 00:18:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/02_I5MedianClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/02_I5MedianClosure.htm</guid>
      <description>VANCOUVER – Beginning Wednesday, Feb. 7, crews will begin work to permanently close a median crossover on I-5, just south of the North Fork Lewis River Bridge.</description>
    </item>
    <item>
      <title>Community Advisory Group for the Bainbridge Island Ferry Terminal Project Will Meet Next Week</title>
      <pubDate>Fri, 02 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/bainbridge-cag-to-meet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/bainbridge-cag-to-meet.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Working to Correct Structural Problem on New I-405 HOV Ramps in Kirkland</title>
      <pubDate>Fri, 02 Feb 2007 09:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/1_405RampsKirkland.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/1_405RampsKirkland.htm</guid>
      <description>Engineers with the Washington State Department of Transportation have discovered a structural problem in the construction of new HOV direct access ramps at NE 128th Street in the Totem Lake area of Kirkland. The problem does not pose any safety risk to the traveling public and will be repaired before the new ramps open to traffic. These repairs will delay the opening of the new transit flyer stops until summer 2007, adding an estimated $2 million to $3 million to the cost of the project.</description>
    </item>
    <item>
      <title>I-90 widening open house slated for February 8</title>
      <pubDate>Fri, 02 Feb 2007 01:15:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/02_i90openhousefeb8.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/02_i90openhousefeb8.htm</guid>
      <description>An Open House to present details on future plans for the continuation of  the Interstate 90/Spokane to Idaho widening project is scheduled for February 8th.</description>
    </item>
    <item>
      <title>SR 502 Corridor Widening Project Community Scoping Meeting Scheduled for February 22, 2007</title>
      <pubDate>Thu, 01 Feb 2007 23:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/01_SR502Meeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/01_SR502Meeting.htm</guid>
      <description>VANCOUVER - The Washington State Department of Transportation (WSDOT) will host a community scoping meeting and open house on Thursday, February 22, from 4-7 p.m. to solicit input on the SR 502 Corridor Widening Project.</description>
    </item>
    <item>
      <title>Ferries</title>
      <pubDate>Thu, 01 Feb 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/02/ferries-star-in-greys-anatomy.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/02/ferries-star-in-greys-anatomy.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Everett's New 41st Street Bridge Over I-5 Opens February 19</title>
      <pubDate>Mon, 12 Feb 2007 22:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/12_EverettUpdates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/12_EverettUpdates.htm</guid>
      <description>Everett's New 41st Street Bridge Over I-5 Opens February 19</description>
    </item>
    <item>
      <title>WSDOT Crews Close Lanes on Ship Canal Bridge for Noisy Repairs This Weekend</title>
      <pubDate>Tue, 06 Feb 2007 23:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/6_ShipCanalNoise.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/6_ShipCanalNoise.htm</guid>
      <description>WSDOT Crews Close Lanes on Ship Canal Bridge for Noisy Repairs This Weekend</description>
    </item>
    <item>
      <title>Round Two of Hood Canal Bridge Pontoon Construction Moves Ahead</title>
      <pubDate>Sat, 03 Feb 2007 08:42:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/020207_SR104-pontoonfourpour.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/020207_SR104-pontoonfourpour.htm</guid>
      <description>Round Two of Hood Canal Bridge Pontoon Construction Moves Ahead</description>
    </item>
    <item>
      <title>Right Lane of US 12 Heron Street Bridge Closed to Traffic</title>
      <pubDate>Sat, 03 Feb 2007 04:05:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/02_Right_Lane_of_US+12+Heron+St+Bridge_Closedtotraffic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/02_Right_Lane_of_US+12+Heron+St+Bridge_Closedtotraffic.htm</guid>
      <description>Right Lane of US 12 Heron Street Bridge Closed to Traffic</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Feb. 2 - 9</title>
      <pubDate>Sat, 03 Feb 2007 00:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/2_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/2_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland Feb. 2 - 9</description>
    </item>
    <item>
      <title>Final TNB Deck Section Lifted to Bridge Deck</title>
      <pubDate>Wed, 31 Jan 2007 09:40:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/30_TNB_48deck.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/30_TNB_48deck.htm</guid>
      <description>Today marked a big milestone in the construction story of the new Tacoma Narrows Bridge project as crews working for design-builder Tacoma Narrows Constructors (TNC) lifted the last deck section into place.</description>
    </item>
    <item>
      <title>Open House Date Added for I-5 Columbia River Crossing Project</title>
      <pubDate>Wed, 31 Jan 2007 08:42:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/30_CRCOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/30_CRCOpenHouse.htm</guid>
      <description>VANCOUVER - An additional open house on the Columbia River Crossing project has been scheduled for Monday, February 5, 2007, in Vancouver.</description>
    </item>
    <item>
      <title>Eastbound Drivers Should Prepare for Delays Over Snoqualmie Pass Due to Snow and Ice Removal</title>
      <pubDate>Wed, 31 Jan 2007 08:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/iceandsnowremoval.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/iceandsnowremoval.htm</guid>
      <description>In order to protect motorists, WSDOT is periodically closing the left lane of the eastbound lanes on Interstate 90 to remove snow and ice from the east snow shed (five miles east of the summit).</description>
    </item>
    <item>
      <title>WSDOT Lowers I-5 Speed Limit through Burlington</title>
      <pubDate>Wed, 31 Jan 2007 03:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/30_i5lowerspeedlimit.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/30_i5lowerspeedlimit.htm</guid>
      <description>This week the Washington State Department of Transportation will lower the speed limit on two miles of Interstate 5 to 60 mph in Skagit County.</description>
    </item>
    <item>
      <title>Research and Development Leads to a Better Method of Melting Snow and Ice</title>
      <pubDate>Tue, 30 Jan 2007 03:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/newdeicermethod.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/newdeicermethod.htm</guid>
      <description>South Central Region Maintenance experts are developing innovative new techniques to battle icy winter roadways.</description>
    </item>
    <item>
      <title>WSDOT Presents SR 900 Widening Plans in Issaquah</title>
      <pubDate>Mon, 29 Jan 2007 23:57:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/29_SR900OpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/29_SR900OpenHouse.htm</guid>
      <description>WSDOT Presents SR 900 Widening Plans in Issaquah</description>
    </item>
    <item>
      <title>SR 524 Reduced to One Lane Daily Next Week Near Maltby</title>
      <pubDate>Sat, 27 Jan 2007 02:31:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/26_SR524Reduced.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/26_SR524Reduced.htm</guid>
      <description>SR 524 Reduced to One Lane Daily Next Week Near Maltby</description>
    </item>
    <item>
      <title>I-90 Flammable Cargo Restriction Announced</title>
      <pubDate>Sat, 27 Jan 2007 01:42:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/26_I-90FlammableRestrictions.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/26_I-90FlammableRestrictions.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Rain Forces One-day Delay of HOV Lane</title>
      <pubDate>Fri, 26 Jan 2007 09:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/25_SR16_HOV_delayed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/25_SR16_HOV_delayed.htm</guid>
      <description>Pierce County's first HOV lane delayed by rain.</description>
    </item>
    <item>
      <title>Bridge Construction Requires Nightly Closures of 112th Street SE Over I-5 in South Everett; Long-term Closure of Bicycle/Pedestrian Trail Section Begins Jan. 29</title>
      <pubDate>Fri, 26 Jan 2007 08:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/25_I5112thStreet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/25_I5112thStreet.htm</guid>
      <description>Starting Jan. 29, crews will close 112th Street SE in south Everett nightly to work on supports for new, wider bridges over I-5.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Jan. 26 – Feb. 2</title>
      <pubDate>Fri, 26 Jan 2007 07:53:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/25_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/25_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland Jan. 26 – Feb. 2</description>
    </item>
    <item>
      <title>WSDOT Updates Average Travel Times on the Web with New Puget Sound Numbers</title>
      <pubDate>Fri, 26 Jan 2007 07:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/25_TravelTimesUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/25_TravelTimesUpdate.htm</guid>
      <description>WSDOT Updates Average Travel Times on the Web with New Puget Sound Numbers</description>
    </item>
    <item>
      <title>New HOV Lane, Demolition Detour Alter Tacoma Trips</title>
      <pubDate>Thu, 25 Jan 2007 08:58:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/24_SR16_HOV_Opening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/24_SR16_HOV_Opening.htm</guid>
      <description>WSDOT is adding a new HOV lane on eastbound SR 16 and implementing two traffic revisions on northbound I-5.</description>
    </item>
    <item>
      <title>Last TNB Deck Section to be Lifted off SWAN Tomorrow (Jan. 25)</title>
      <pubDate>Thu, 25 Jan 2007 08:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/24_SR16_TNB_FinalDeck.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/24_SR16_TNB_FinalDeck.htm</guid>
      <description>Final deck section will be lifted from cargo ship.</description>
    </item>
    <item>
      <title>Two More Traffic Cameras Go Online in Wenatchee</title>
      <pubDate>Thu, 25 Jan 2007 02:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/012407WenatcheeCameras.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/012407WenatcheeCameras.htm</guid>
      <description>Two new traffic cameras for North Wenatchee are available on the internet</description>
    </item>
    <item>
      <title>Timeline Set for Tacoma's Major I-5 Shift</title>
      <pubDate>Wed, 24 Jan 2007 09:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/23_I5_Laneshift_timeline.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/23_I5_Laneshift_timeline.htm</guid>
      <description>Timeline set for major I-5 shift through downtown Tacoma.</description>
    </item>
    <item>
      <title>SR 16 WSDOT Traffic Web Cams Down Until Wednesday, Jan. 24</title>
      <pubDate>Wed, 24 Jan 2007 08:17:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/23_SR16_WSDOT_TrafficWebCamsDownUntilTomorrow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/23_SR16_WSDOT_TrafficWebCamsDownUntilTomorrow.htm</guid>
      <description>SR 16 WSDOT Traffic Web Cams Down Until Wednesday, Jan. 24</description>
    </item>
    <item>
      <title>WSDOT Hosts Open House for Federal Way Triangle Project</title>
      <pubDate>Wed, 24 Jan 2007 07:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/23_FederalWayOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/23_FederalWayOpenHouse.htm</guid>
      <description>WSDOT Hosts Open House for Federal Way Triangle Project</description>
    </item>
    <item>
      <title>Crews Close I-5 Lanes for Repairs in North Snohomish County</title>
      <pubDate>Wed, 24 Jan 2007 03:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/23_i5bridgerepairsnohomish.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/23_i5bridgerepairsnohomish.htm</guid>
      <description>Crews will make repairs on southbound lanes of I-5 near the Snohomish/Skagit County line.</description>
    </item>
    <item>
      <title>Crews to Close Ramp from Northbound I-5 to Eastbound US 2 in Everett for Entire Weekend</title>
      <pubDate>Tue, 23 Jan 2007 23:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/23_EverettClosureUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/23_EverettClosureUpdate.htm</guid>
      <description>Crews to Close Ramp from Northbound I-5 to Eastbound US 2 in Everett for Entire Weekend</description>
    </item>
    <item>
      <title>Wave2Go successfully launched on Mukilteo/Clinton ferry route</title>
      <pubDate>Tue, 23 Jan 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/wave2go-at-mukilteo-clinton.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/wave2go-at-mukilteo-clinton.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Link Light Rail Construction across Southbound I-5 at Boeing Access Road in Seattle Almost Complete</title>
      <pubDate>Tue, 23 Jan 2007 07:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/22_I5LightRailClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/22_I5LightRailClosures.htm</guid>
      <description>Sound Transit’s construction of a new light rail overpass across I-5 just south of the Boeing Access Road is nearing the halfway point. Full closures of I-5 southbound plus partial lane closures on northbound I-5 are scheduled through this Wednesday night-Thursday morning.</description>
    </item>
    <item>
      <title>Traffic Tie-ups Expected in Tacoma</title>
      <pubDate>Tue, 23 Jan 2007 06:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/18_I5_nbshfts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/18_I5_nbshfts.htm</guid>
      <description>Motorists are warned to expect heavier-than-normal congestion on I-5 through Tacoma beginning the week of Jan. 22.</description>
    </item>
    <item>
      <title>Drivers Should Expect Delays on Agate Pass Bridge Jan. 24</title>
      <pubDate>Tue, 23 Jan 2007 01:32:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/22_Drivers_should_expect_delays_on_AgatePassBridge_Jan24.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/22_Drivers_should_expect_delays_on_AgatePassBridge_Jan24.htm</guid>
      <description>Drivers Should Expect Delays on Agate Pass Bridge Jan. 24</description>
    </item>
    <item>
      <title>Columbia River Crossing Task Force will discuss public outreach and the economic importance of the I-5 corridor next week</title>
      <pubDate>Sat, 20 Jan 2007 07:43:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/19_CRCTaskForce.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/19_CRCTaskForce.htm</guid>
      <description>VANCOUVER – The Columbia River Crossing Task Force will meet Tuesday, January 23, in Vancouver to hear about public outreach activities and discuss the economic importance of the I-5 corridor.</description>
    </item>
    <item>
      <title>State Route 4 Fence Repair and Cleanup near Stella begins January 22</title>
      <pubDate>Sat, 20 Jan 2007 06:14:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/19_SR4Maintenance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/19_SR4Maintenance.htm</guid>
      <description>KELSO – Fence repairs and debris removal along State Route 4 near Stella will begin Jan. 22, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>SR 20 Loup Loup Summit Traffic Camera Goes On Line</title>
      <pubDate>Sat, 20 Jan 2007 02:16:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/011907LoupLoup.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/011907LoupLoup.htm</guid>
      <description>New traffic camera and weather station for the SR 20 Loup Loup Pass is available on the internet.</description>
    </item>
    <item>
      <title>WSDOT Names Jack Burkman Southwest Region Planning Manager</title>
      <pubDate>Fri, 19 Jan 2007 23:41:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/19_SWRPlanning.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/19_SWRPlanning.htm</guid>
      <description>VANCOUVER – The Washington State Department of Transportation (WSDOT) is pleased to announce Jack Burkman as the Southwest Region Planning Manager.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Jan. 19-26</title>
      <pubDate>Fri, 19 Jan 2007 08:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/18_KirklandUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/18_KirklandUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland Jan. 19-26</description>
    </item>
    <item>
      <title>Columbia River Crossing Open House in Battle Ground Cancelled Due to Weather</title>
      <pubDate>Thu, 18 Jan 2007 05:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/17_CRCMeetingCancelled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/17_CRCMeetingCancelled.htm</guid>
      <description>VANCOUVER -- A public open house on the Columbia River Crossing project scheduled for tonight in Battle Ground, Washington, has been cancelled due to inclement weather.</description>
    </item>
    <item>
      <title>Crews to Close Northbound Everett Ramps from I-5 to US 2 and 41st Street for Entire Weekend</title>
      <pubDate>Thu, 18 Jan 2007 05:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/17_EverettHOVClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/17_EverettHOVClosures.htm</guid>
      <description>Crews to Close Northbound Everett Ramps from I-5 to US 2 and 41st Street this Weekend</description>
    </item>
    <item>
      <title>Sun going down taking temperatures with it - Crews battle ice</title>
      <pubDate>Wed, 17 Jan 2007 07:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/16_EveningSnowUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/16_EveningSnowUpdate.htm</guid>
      <description>Evening and nighttime temperatures are expected to refreeze area highways and drivers are encouraged to prepare for snow and ice, especially on neighborhood routes and less traveled roadways. WSDOT crews cleared major highways throughout last night and this morning and will apply de-icer as temperatures drop overnight.</description>
    </item>
    <item>
      <title>SR 4, Ocean Beach Highway Paving Project Open House Scheduled for January 18</title>
      <pubDate>Wed, 17 Jan 2007 07:16:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/16_SR4OpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/16_SR4OpenHouse.htm</guid>
      <description>KELSO – An opportunity for the public to learn more about the SR 4, Ocean Beach Highway Paving Project will take place January 18, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Replace the I-5 Bridge Across the Columbia River? You tell us.</title>
      <pubDate>Wed, 17 Jan 2007 06:08:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/16_ColumbiaRiverCrossingPublicMeetings.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/16_ColumbiaRiverCrossingPublicMeetings.htm</guid>
      <description>The Columbia River Crossing project has recommended a set of bridge and transit options to improve safety and congestion on I-5 between Oregon and Washington. Public comment is encouraged on the proposal.</description>
    </item>
    <item>
      <title>Southwest Washington State Crews Clearing Roads, Chains Not Required in Metro Area at This Time</title>
      <pubDate>Wed, 17 Jan 2007 05:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/16_SWRSnow.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/16_SWRSnow.htm</guid>
      <description>VANCOUVER – Maintenance crews are hard at work plowing and deicing state roads in Southwest Washington.</description>
    </item>
    <item>
      <title>WSDOT Clearing Snow and Ice; Drivers Urged to Plan for Conditions</title>
      <pubDate>Tue, 16 Jan 2007 22:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/16_MorningSnowUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/16_MorningSnowUpdate.htm</guid>
      <description>WSDOT Clearing Snow and Ice; Drivers Urged to Plan for Conditions</description>
    </item>
    <item>
      <title>Public Comment Period Extended on Bainbridge Island Ferry Terminal Improvement Project</title>
      <pubDate>Tue, 16 Jan 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/bi-improvement-project.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/bi-improvement-project.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Preparing for Snowy and Icy Tuesday Commute</title>
      <pubDate>Tue, 16 Jan 2007 08:12:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/15_TuesdaySnowandIce.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/15_TuesdaySnowandIce.htm</guid>
      <description>WSDOT crews are getting ready for more snow and ice in Western Washington and are urging drivers to make their own preparations. Forecasts are calling for up to four inches of snow beginning early Tuesday morning. This storm also brings the potential for icy roads. 

WSDOT has more than 200 vehicles ready to fight snow and ice on Western Washington highways and freeways, including snow plows, deicers, sanders, and dump trucks. Crews will be out in force early Tuesday morning applying deicer th</description>
    </item>
    <item>
      <title>Two North Central Region Highway Construction Projects Rated at the Top in Statewide End-of-Season Report</title>
      <pubDate>Sat, 13 Jan 2007 08:50:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/011207PjtReportCard.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/011207PjtReportCard.htm</guid>
      <description>Two North Central Region Highway Construction Projects Rated at the Top in Statewide End-of-Season Report</description>
    </item>
    <item>
      <title>Total Southbound I-5 Closures in Seattle for Light Rail Construction</title>
      <pubDate>Sat, 13 Jan 2007 08:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/12_I5SoundTransitClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/12_I5SoundTransitClosures.htm</guid>
      <description>Southbound I-5 will be completely closed for several nights beginning this Monday

Sound Transit continues its construction of a new light rail overpass across Interstate 5 just south of the Boeing Access Road near Seattle’s southern border. Crews are employing a construction method and schedule that keeps the freeway open during the day, limiting lane closures and traffic impacts to nighttime hours. 

Beginning this Monday, Jan. 15, southbound I-5 freeway southbound will be closed completel</description>
    </item>
    <item>
      <title>Left Turn Lane at Seattle's Fourth Avenue S. Off-Ramp Closing for Demolition Work</title>
      <pubDate>Sat, 13 Jan 2007 08:44:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/12_FourthAveRamp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/12_FourthAveRamp.htm</guid>
      <description>Drivers who exit Interstate 5 and I-90 at Fourth Avenue S. in Seattle may face delays during the morning commute until May.</description>
    </item>
    <item>
      <title>Weekend Everett Ramp Work Cancelled; Too Cold to Pave at 41st Street On-Ramp to Northbound I-5</title>
      <pubDate>Sat, 13 Jan 2007 07:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/12_EverettWorkCancelled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/12_EverettWorkCancelled.htm</guid>
      <description>The weather forecast shift to below freezing temperatures for tonight and this weekend has forced crews working to widen I-5 through Everett to cancel the long-awaited closure of the 41st Street on-ramp to northbound I-5 that was set for this weekend.</description>
    </item>
    <item>
      <title>Total Closure of Northbound I-405 in Bothell Rescheduled for Saturday Night</title>
      <pubDate>Sat, 13 Jan 2007 03:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/12_CanyonParkSaturday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/12_CanyonParkSaturday.htm</guid>
      <description>Total Closure of Northbound I-405 in Bothell Rescheduled for Saturday Night</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Jan. 12 - 19</title>
      <pubDate>Fri, 12 Jan 2007 08:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/11_KirklandConstructionUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/11_KirklandConstructionUpdate.htm</guid>
      <description>I-405 Construction Updates in Kirkland Jan. 12 - 19</description>
    </item>
    <item>
      <title>WSDOT Presents Draft Skagit River Debris Management Study - Meeting Re-Scheduled for January 29</title>
      <pubDate>Fri, 12 Jan 2007 07:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/11_SkagitRiverDebrisManagementStudyMeeting.htm.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/11_SkagitRiverDebrisManagementStudyMeeting.htm.htm</guid>
      <description>On January 29, the Washington State Department of Transportation (WSDOT) and Skagit County will host an informational public meeting in Mount Vernon. WSDOT and the county will present the draft Skagit River Debris Management Study.</description>
    </item>
    <item>
      <title>Total Closure of Northbound I-405 in Bothell Rescheduled for Thursday Night</title>
      <pubDate>Fri, 12 Jan 2007 06:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/11_CanyonParkClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/11_CanyonParkClosure.htm</guid>
      <description>Total Closure of Northbound I-405 in Bothell Rescheduled for Thursday Night</description>
    </item>
    <item>
      <title>SR 4, Paving Project Open House Postponed due to Winter Weather Conditions, Rescheduled for January 18</title>
      <pubDate>Thu, 11 Jan 2007 23:02:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/11_SR4OpenHouseRescheduled.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/11_SR4OpenHouseRescheduled.htm</guid>
      <description>KELSO – The Washington State Department of Transportation (WSDOT) has postponed the January 11 public open house for the upcoming State Route 4 Paving Project.</description>
    </item>
    <item>
      <title>Snow Continues Overnight, WSDOT Crews Prepare Roads for Morning Commute</title>
      <pubDate>Thu, 11 Jan 2007 21:11:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/11_snowandicemorningupdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/11_snowandicemorningupdate.htm</guid>
      <description>Crews have been working non-stop for almost three days clearing ice and snow in the western half of our state from Bellingham to Vancouver. They are still going strong.</description>
    </item>
    <item>
      <title>Snow and cold temperatures taking hold in western Washington - Prepare for ice Thursday morning</title>
      <pubDate>Thu, 11 Jan 2007 15:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/10_snowandiceupdate11pm.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/10_snowandiceupdate11pm.htm</guid>
      <description>Snow and colder temperatures moved into Central Puget Sound during the afternoon and evening hours snarling traffic and challenging road crews.</description>
    </item>
    <item>
      <title>Slide Repair Work Closes I-5 Lane in Pierce County</title>
      <pubDate>Thu, 11 Jan 2007 12:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/10_I-5_SlideRepairMounts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/10_I-5_SlideRepairMounts.htm</guid>
      <description>Slide repair work will close the right lane of southbound I-5 Thursday near Mounts Road.</description>
    </item>
    <item>
      <title>Slide Repair Work Closes  I-5 On-ramp in Pierce County</title>
      <pubDate>Thu, 11 Jan 2007 12:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/10_I-5_SlideNisq.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/10_I-5_SlideNisq.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT NEWS: Snow in North Puget Sound; Moves Into Seattle During Evening Commute</title>
      <pubDate>Thu, 11 Jan 2007 07:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/10_4pmsnowupdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/10_4pmsnowupdate.htm</guid>
      <description>OLYMPIA – Drivers are encouraged to adjust their travel plans as the snow begins to fall in Puget Sound. Forecasts indicate the most severe winter weather will hit the Central Puget Sound area within two hours.</description>
    </item>
    <item>
      <title>WSDOT Crews Prepare for an Icy Evening, Southwest Emergency Operation Center Deactivates</title>
      <pubDate>Thu, 11 Jan 2007 07:14:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/10_SwrEOCDeactivate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/10_SwrEOCDeactivate.htm</guid>
      <description>VANCOUVER – WSDOT (Washington State Department of Transportation) crews continue to monitor temperatures and road conditions in Southwest Washington.</description>
    </item>
    <item>
      <title>Ramp to Northbound I-5 From 41st Street in Everett to Close for Weekend</title>
      <pubDate>Thu, 11 Jan 2007 06:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/10_EverettSchedule.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/10_EverettSchedule.htm</guid>
      <description>Ramp to Northbound I-5 From 41st Street in Everett to Close for Weekend</description>
    </item>
    <item>
      <title>Total Closure of Northbound I-405 in Bothell Rescheduled for Wednesday Night</title>
      <pubDate>Thu, 11 Jan 2007 06:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/10_I405CanyonParkGirders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/10_I405CanyonParkGirders.htm</guid>
      <description>CLOSURE POSTPONED DUE TO SNOWSTORM
On Wednesday night, Jan. 10, crews will close all lanes of northbound I-405 at SR 527 and the northbound I-405 exit to SR 527 to set girders for the second half of a new pedestrian bridge over the freeway in Bothell.</description>
    </item>
    <item>
      <title>WSDOT NEWS: Arctic Blast Will Bring Afternoon Black Ice to Puget Sound</title>
      <pubDate>Thu, 11 Jan 2007 04:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/11_blackicewarning.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/11_blackicewarning.htm</guid>
      <description>OLYMPIA – WSDOT crews continue to monitor temperature and road conditions in Western Washington and warn of black ice just in time for the afternoon commute. Drivers should consider adjusting their travel plans as black ice will begin forming in the Puget Sound area by 2 p.m.</description>
    </item>
    <item>
      <title>Arctic Blast to Hit Puget Sound</title>
      <pubDate>Thu, 11 Jan 2007 04:14:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/10_ArcticBlast.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/10_ArcticBlast.htm</guid>
      <description>Arctic Blast to Hit Puget Sound this Afternoon</description>
    </item>
    <item>
      <title>WSDOT Crews Out in Force, Drivers Should Be Prepared for an Icy Afternoon Commute</title>
      <pubDate>Thu, 11 Jan 2007 02:28:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/10_IceforWeek.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/10_IceforWeek.htm</guid>
      <description>Ice expected overnight in Skagit and Whatcom Counties</description>
    </item>
    <item>
      <title>WSDOT Crews Responding to Snow Accumulations in Western Washington</title>
      <pubDate>Wed, 10 Jan 2007 21:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/10_morningsnowonroads.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/10_morningsnowonroads.htm</guid>
      <description>Snow is falling around most of Western Washington, just in time for the morning commute.</description>
    </item>
    <item>
      <title>Ferry Tacoma awaits dry dock</title>
      <pubDate>Wed, 10 Jan 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/ferry-tacoma-awaits-dry-dock.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/ferry-tacoma-awaits-dry-dock.htm</guid>
      <description></description>
    </item>
    <item>
      <title>WSDOT Maintenance Crews Prepare for Impending Snow Storms</title>
      <pubDate>Wed, 10 Jan 2007 06:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/09_SWRStormPrep.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/09_SWRStormPrep.htm</guid>
      <description>VANCOUVER – With snow and ice in the weather forecast once again, Washington State Department of Transportation (WSDOT) maintenance crews across the Southwest Region are preparing for another storm.</description>
    </item>
    <item>
      <title>Three 1980s Hood Canal Bridge pontoons arrive at Seattle’s Terminal 91</title>
      <pubDate>Wed, 10 Jan 2007 06:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/09_SR104RSTArrive.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/09_SR104RSTArrive.htm</guid>
      <description>Three 1980s Hood Canal Bridge pontoons arrive at Seattle’s Terminal 91</description>
    </item>
    <item>
      <title>Puget Sound Drivers should be prepared for rapid weather change today</title>
      <pubDate>Wed, 10 Jan 2007 04:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/09_noonweatherupdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/09_noonweatherupdate.htm</guid>
      <description>A mix of rain, hail and wind could hit Western Washington drivers beginning at 4 p.m. today and WSDOT encourages families take action now.</description>
    </item>
    <item>
      <title>New Year Brings New Leadership to Olympic Region</title>
      <pubDate>Wed, 10 Jan 2007 03:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/09_OR_newadmin.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/09_OR_newadmin.htm</guid>
      <description>The new year brings new leadership to the WSDOT's Olympic Region with the appointment of Kevin Dayton as regional administrator.</description>
    </item>
    <item>
      <title>Break-In and Theft in WSDOT’s Vancouver Maintenance Yard Means Taxpayer Dollars Stolen</title>
      <pubDate>Wed, 10 Jan 2007 01:02:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/09_VancouverMaintenaceYardThefts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/09_VancouverMaintenaceYardThefts.htm</guid>
      <description>VANCOUVER – On two separate occasions in the past four days, maintenance workers noted a break-in at the maintenance yard on Main Street in Vancouver, reported the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Tacoma Narrows Bridge Citizens Advisory Group Meets to Discuss Toll Rates</title>
      <pubDate>Wed, 10 Jan 2007 00:03:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/08_TNBCitizensAdvisoryGroupMeetstoDiscussTollRates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/08_TNBCitizensAdvisoryGroupMeetstoDiscussTollRates.htm</guid>
      <description>Tacoma Narrows Bridge Citizen Advisory Committee Meets to Discuss Toll Rates</description>
    </item>
    <item>
      <title>Ferry Tacoma Suffers Rudder Failure; Three Routes Impacted</title>
      <pubDate>Tue, 09 Jan 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/ferry-tacoma-suffers-rudder-failure-three-routes-impacted.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/ferry-tacoma-suffers-rudder-failure-three-routes-impacted.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Crews Prepare for Western Washington Snow; Drivers Encouraged to Plan Ahead</title>
      <pubDate>Tue, 09 Jan 2007 08:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/08_snowprep.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/08_snowprep.htm</guid>
      <description>With heavy snow expected to hit western Washington this week, WSDOT crews are gearing up to keep drivers safe, and encouraging drivers to make their own preparations.  Current forecasts are calling for two to four inches of snow beginning Tuesday afternoon and continuing into Wednesday afternoon. The storm will followed by freezing temperatures Wednesday night through the weekend.</description>
    </item>
    <item>
      <title>Slide Repair Work Closes I-5 On-ramp in Pierce County</title>
      <pubDate>Tue, 09 Jan 2007 08:23:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/08_I-5_sliderepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/08_I-5_sliderepair.htm</guid>
      <description>DUPONT – Crews tomorrow will close the Mounts Road on-ramp to southbound Interstate 5 and a short stretch of the right southbound lane in the same area for landslide repair work.</description>
    </item>
    <item>
      <title>Overnight Closures as Crews Set More Girders Over I-405 in Bothell</title>
      <pubDate>Tue, 09 Jan 2007 02:33:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/08_I405CanyonParkGirders.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/08_I405CanyonParkGirders.htm</guid>
      <description>TUESDAY NIGHT CLOSURE CANCELLED DUE TO FORECAST SNOW AND ICE  This week crews plan to set the framework for the second half of a new pedestrian bridge over Interstate 405 in Bothell. This will require a single total nighttime closure of northbound I-405 and a nighttime northbound I-405 ramp closure.</description>
    </item>
    <item>
      <title>2006 Construction Highlights Report</title>
      <pubDate>Tue, 09 Jan 2007 01:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/8_2006ConstructionHighlights.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/8_2006ConstructionHighlights.htm</guid>
      <description>The Washington State Department of Transportation's annual end-of-year highway construction report card is now available.  The 2006 Construction Highlights report is a self-assessment of WSDOT's delivery and performance of project construction.</description>
    </item>
    <item>
      <title>One-of-a-Kind Road Protection on Deception Pass</title>
      <pubDate>Tue, 09 Jan 2007 01:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/08_DeceptPassRailing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/08_DeceptPassRailing.htm</guid>
      <description></description>
    </item>
    <item>
      <title>I-90 Snoqualmie Pass Avalanche Control Delayed due to heavy, wet snow</title>
      <pubDate>Mon, 08 Jan 2007 05:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/07_1pmpassupdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/07_1pmpassupdate.htm</guid>
      <description>HYAK - After two days of snow that turned to rain early today, avalanche control crews brought down heavy, wet snow off Snoqualmie Summit at noon today. Crews expect to have the roadway reopen by 2:30 p.m.. and drivers can expect traffic backups.</description>
    </item>
    <item>
      <title>Mountain Pass Update; Drivers can Expect Snow and Rain today in Mountains</title>
      <pubDate>Mon, 08 Jan 2007 01:02:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/7_PassUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/7_PassUpdate.htm</guid>
      <description>Drivers can expect wet roadways in Washington's mountain pass highways today, with heavy rain forecasted most of the day Sunday.</description>
    </item>
    <item>
      <title>Mountain Pass Update; Snow Overnight and Rain Sunday for Mountain Travel</title>
      <pubDate>Sun, 07 Jan 2007 13:28:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/6_SnoqualmieOvernight.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/6_SnoqualmieOvernight.htm</guid>
      <description>WSDOT crews are clearing roads and will be out overnight to have the roads ready for Sunday travelers.</description>
    </item>
    <item>
      <title>WSDOT Cautions Drivers, Not All I-90 Snoqualmie Pass Communication Tools Are Avaliable Due to Power Outage</title>
      <pubDate>Sun, 07 Jan 2007 03:04:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/6_i90poweroutage.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/6_i90poweroutage.htm</guid>
      <description>High winds and many inches of wet, heavy snow pounded I-90 Snoqualmie Pass last night creating a power outage</description>
    </item>
    <item>
      <title>Overnight Closures for Light Rail Construction across I-5 in South Seattle</title>
      <pubDate>Sat, 06 Jan 2007 08:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/5_I5SoundTransitConstructionClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/5_I5SoundTransitConstructionClosures.htm</guid>
      <description>TUESDAY NIGHT CLOSURE CANCELLED DUE TO FORECAST SNOW AND ICE.  Sound Transit continues its construction of a new light rail overpass across I-5 just south of the Boeing Access Road near Seattle’s southern border. Crews are employing a construction method and schedule that keeps the freeway open during the day, limiting lane closures and traffic impacts to nighttime hours. 

This past week, the first four cantilever-balanced sections of the new overpass were placed on the west side of southboun</description>
    </item>
    <item>
      <title>WSDOT Revises Speed Limit on SR 4 &amp; SR 401 through Naselle</title>
      <pubDate>Sat, 06 Jan 2007 06:33:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/05_SR4_SR401SpeedLimitRevision.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/05_SR4_SR401SpeedLimitRevision.htm</guid>
      <description>NASELLE – Starting January 2, 2007, the Washington State Department of Transportation (WSDOT) revised the posted speed limit on SR 4 and SR 401 in the Naselle area.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Jan. 5 - 12</title>
      <pubDate>Sat, 06 Jan 2007 03:03:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/4_I405Construction.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/4_I405Construction.htm</guid>
      <description>Crews working for the Washington State Department of Transportation will continue building noise walls and performing highway construction work in Kirkland next week.</description>
    </item>
    <item>
      <title>WSDOT Prepares for Wintry Weekend on Snoqualmie Pass</title>
      <pubDate>Sat, 06 Jan 2007 01:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/05_winterstorm.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/05_winterstorm.htm</guid>
      <description>Drivers planning to make the trip over Snoqualmie Pass this weekend should prepare for extreme winter conditions.</description>
    </item>
    <item>
      <title>Crews Reduce US 2 to One Lane East of Index for Emergency Slide Repairs</title>
      <pubDate>Sat, 06 Jan 2007 01:14:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/05_US2SlideRepair.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/05_US2SlideRepair.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Community Advisory Group for the Seattle Ferry Terminal Project to meet on January 11</title>
      <pubDate>Fri, 05 Jan 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/seattle-cag-to-meet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/seattle-cag-to-meet.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Two-Month Closure of Kirkland Intersection Next to I-405 Begins Jan. 8</title>
      <pubDate>Fri, 05 Jan 2007 07:56:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/04_I405TotemLakeIntersection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/04_I405TotemLakeIntersection.htm</guid>
      <description>On Monday, Jan. 8, crews will close the intersection of 116th Avenue NE and NE 128th Street. The intersection will remain closed for eight weeks for reconstruction.</description>
    </item>
    <item>
      <title>WSDOT Presents Draft Skagit River Debris Management Study</title>
      <pubDate>Fri, 05 Jan 2007 06:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/04SkagitRiverDebrisManagementStudyMeeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/04SkagitRiverDebrisManagementStudyMeeting.htm</guid>
      <description>On January 10, the Washington State Department of Transportation (WSDOT) and Skagit County will host an informational public meeting in Mount Vernon.  WSDOT and the county will present the draft Skagit River Debris Management Study.</description>
    </item>
    <item>
      <title>Weekend Closure of 41st Street Ramp to Northbound I-5 in Everett Postponed Due to Weather</title>
      <pubDate>Thu, 04 Jan 2007 08:01:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/3_EverettPostponed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/3_EverettPostponed.htm</guid>
      <description>Weekend Closure of 41st Street Ramp to Northbound I-5 in Everett Postponed Due to Weather
Second Ramp Closure from I-5 to US 2 Also Postpone</description>
    </item>
    <item>
      <title>Open House Scheduled for SR 4, Ocean Beach Highway Paving Project on January 11</title>
      <pubDate>Wed, 03 Jan 2007 23:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/03_SR4OpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/03_SR4OpenHouse.htm</guid>
      <description>KELSO – The Washington State Department of Transportation (WSDOT) will host a public open house on January 11 to provide information on the upcoming State Route 4 Paving Project.</description>
    </item>
    <item>
      <title>Winter Ferry Schedule starts January 7</title>
      <pubDate>Wed, 03 Jan 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/winter-schedule-starts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/winter-schedule-starts.htm</guid>
      <description></description>
    </item>
    <item>
      <title>Ferries introduce new fare collection system on Mukilteo/Clinton route January 23, 2007</title>
      <pubDate>Wed, 03 Jan 2007 16:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/01/mukilteoclinton-new-fare-collection-system.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2007/01/mukilteoclinton-new-fare-collection-system.htm</guid>
      <description></description>
    </item>
  </channel>
</rss>