﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="wsdot:urlManipulator" xmlns:dateManipulator="wsdot:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - October</title>
    <link>http://www.wsdot.wa.gov/News/2007/10/</link>
    <copyright>
          Copyright WSDOT 2006. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor></managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Fri, 29 Aug 2008 03:06:02 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - October</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/News/2007/10/</link>
    </image>
    <item>
      <title>WSDOT Invites Contractors to an Open House in Ellensburg</title>
      <pubDate>Thu, 01 Nov 2007 07:01:36 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/103107ContractorOpenHouse.htm</link>
      <description>North and South Central Regions are holding an open house for contractors at CWU in Ellensburg on November 5th.</description>
    </item>
    <item>
      <title>The Iron Goat Interpretive Site Closes for Winter November 1st</title>
      <pubDate>Thu, 01 Nov 2007 06:55:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/103107US2IronGoatInterpretiveSiteCloses.htm</link>
      <description>The US 2 - Iron Goat Trail Interpretive Site near Stevens Pass is closing for the winter November 1st.</description>
    </item>
    <item>
      <title>WSDOT Crews Demolished I-90 Easton Bridge Overnight</title>
      <pubDate>Wed, 31 Oct 2007 23:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/EastonBridgeDamageOctober07.htm</link>
      <description>The turn of events on Interstate 90 eastbound at Easton has gone rather quickly today as WSDOT construction engineers wrestled with the tough decision to shut down I-90 and demolish part of the interchange bridge at Easton (milepost 71) after an oversized load caused significant damage early this morning.</description>
    </item>
    <item>
      <title>A New Traffic Camera for Stevens Pass</title>
      <pubDate>Wed, 31 Oct 2007 06:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/103007WStevensCamera.htm</link>
      <description>The state's newest traffic camera is at the Stevens Pass summit.</description>
    </item>
    <item>
      <title>WSDOT Joins Multi-agency Group to Take Winter by Storm</title>
      <pubDate>Wed, 31 Oct 2007 02:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/30_TakeWinterByStorm.htm</link>
      <description>“Preparing for winter and getting through tough storms is a team effort,” said Lorena Eng, WSDOT Regional Administrator. “Agencies must work together and the public must do their part.”</description>
    </item>
    <item>
      <title>Governor, WSDOT and Community Open New I-405 Lanes in Kirkland: On-Time and On-Budget</title>
      <pubDate>Wed, 31 Oct 2007 01:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/30_I-405KirklandLaneOpen.htm</link>
      <description>Today, Gov. Chris Gregoire, opened new lanes and an improved interchange on I-405 in Kirkland.</description>
    </item>
    <item>
      <title>New Memorial Marker Installed at WSDOT Rest Area</title>
      <pubDate>Tue, 30 Oct 2007 04:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/BlueStarMemorialMarkerOctober2007.htm</link>
      <description>Dozens attended the dedication of two Blue Star Memorial Highway markers on October 5, 2007 at WSDOT’s Indian John Rest Stop on Interstate 90.</description>
    </item>
    <item>
      <title>Aviation Planning Council Holds First Meeting on November 1</title>
      <pubDate>Tue, 30 Oct 2007 00:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/29_AviationPlanningCouncil1stMtg.htm</link>
      <description>On November 1, 2007 members of the Governor appointed Aviation Planning Council will meet for the first time to begin the final phase of the Long-Term Air Transportation Study (LATS).</description>
    </item>
    <item>
      <title>I-405 Renton Stage I Widening Project Construction Updates Oct. 27 – Nov. 3</title>
      <pubDate>Sat, 27 Oct 2007 03:39:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/26_405RentonWidening.htm</link>
      <description></description>
    </item>
    <item>
      <title>New SR 20 Signal at Thompson Road Turned On near Anacortes</title>
      <pubDate>Sat, 27 Oct 2007 01:10:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/23_ThompsonRoadSignal.htm</link>
      <description>A new signal was installed at the intersection of SR 20 and Thompson Road in Anacortes this summer, and turned on Oct. 23.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Oct. 26- Nov. 2</title>
      <pubDate>Fri, 26 Oct 2007 08:41:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_KirklandUpdatesOct26.htm</link>
      <description>Next week crews working for the Washington State Department of Transportation plan to stripe the roadway and ramps between NE 85th and NE 132nd Streets.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Oct. 26 – Nov. 2</title>
      <pubDate>Fri, 26 Oct 2007 08:36:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_BellevueUpdatesOct26.htm</link>
      <description>Next week, drivers will begin to see the columns begin to rise out of the ground for the new bridge over I-90. Crews will continue repairing pavement on northbound and southbound I-405 in South Bellevue; widening the Coal Creek Parkway bridge; and performing electrical work. Crews will also continue to build retaining walls between 112th Ave SE and Coal Creek Parkway.</description>
    </item>
    <item>
      <title>Water Line Repairs at the SR 401, Dismal Nitch Rest Area Complete</title>
      <pubDate>Fri, 26 Oct 2007 06:48:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_25_SR401DismalNitch.htm</link>
      <description>NASELLE – Crews have completed repairs to the water line at the SR 401, Dismal Nitch Rest Area. The rest area facilities have now reopened, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Restriping at Eastbound I-90/SR 18 Exit in Snoqualmie</title>
      <pubDate>Fri, 26 Oct 2007 06:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_I90LaneRestriping.htm</link>
      <description>SNOQUALMIE –  Crews working for WSDOT will restripe freeway and ramp lanes at the eastbound Interstate 90 exit to State Route 18 this weekend.  The restriping will address an emerging safety issue and will help keep traffic moving at the exit.  

At 5 a.m. on Saturday, Oct. 27, crews will close the two right lanes of eastbound I-90 at SR 18 to complete this work.  The lanes will reopen at 9 p.m. Saturday.  The eastbound I-90 exit to SR 18 will remain open.  Restriping requires dry weather.  If</description>
    </item>
    <item>
      <title>Saturday Shaping Up to be Busy Day for I-5 Everett HOV Construction Work, Drivers Should Expect Some Delays</title>
      <pubDate>Fri, 26 Oct 2007 06:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_I5EverettSatRampClosures.htm</link>
      <description>This Saturday, Oct. 27, construction crews plan to take advantage of the forecasted dry weather to pave most of the I-5 ramps between Everett’s 41st Street and Marine View Dr. This work will be rescheduled if it rains. Drivers should plan extra time for their trips, particularly those heading to US 2.</description>
    </item>
    <item>
      <title>WSDOT Seattle Area Traffic Computer Gets an Upgrade</title>
      <pubDate>Fri, 26 Oct 2007 01:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_SeattleAreaTrafficComputer.htm</link>
      <description></description>
    </item>
    <item>
      <title>Major Construction Starts at I-5 Peace Arch Border Crossing</title>
      <pubDate>Thu, 25 Oct 2007 23:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/25_i5majorborderconstruction.htm</link>
      <description>Major construction starts at the I-5, Peace Arch border crossing Nov. 5 and will last for three years. Drivers should expect delays.</description>
    </item>
    <item>
      <title>WSDOT Hosts Business Open House for Contractors Interested in Upcoming Construction Projects</title>
      <pubDate>Thu, 25 Oct 2007 06:20:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/OpenHouseforContractors.htm</link>
      <description>WSDOT Hosts Business Open House for Contractors Interested in Upcoming Construction Projects</description>
    </item>
    <item>
      <title>Routine Inspections Close SR 303’s Manette Bridge Next Week</title>
      <pubDate>Thu, 25 Oct 2007 06:01:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_24_RoutineInspectionManette.htm</link>
      <description>Routine Inspections Close SR 303’s Manette Bridge Next Week</description>
    </item>
    <item>
      <title>Northbound SR 167 Off-Ramp in Kent Closed this Weekend</title>
      <pubDate>Thu, 25 Oct 2007 05:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/24_SR167RampAndLaneClosure.htm</link>
      <description>Safety upgrade work will close a State Route 167 off-ramp this weekend in downtown Kent.</description>
    </item>
    <item>
      <title>Chains Onboard: WSDOT and WSP Working Together to Keep Mountain Pass Drivers Safe</title>
      <pubDate>Thu, 25 Oct 2007 01:29:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/24_chains_on_mountains.htm</link>
      <description>OLYMPIA – If the early dusting of mountain snow doesn’t serve as an important reminder to drivers of passenger cars and heavy trucks to carry chains, a $500 ticket may do the trick.</description>
    </item>
    <item>
      <title>WSF CEO RETIRES AFTER 34 YEARS OF SERVICE</title>
      <pubDate>Wed, 24 Oct 2007 15:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/wsf-ceo-retires.htm</link>
      <description></description>
    </item>
    <item>
      <title>Amtrak Cascades Service Resumes Normal Operations: All Trainsets Repaired and Back in Service</title>
      <pubDate>Wed, 24 Oct 2007 06:48:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_AmtrakCascadesTalgoTrains.htm</link>
      <description>Amtrak Cascades Service Resumes Normal Operations: All Trainsets Repaired and Back in Service</description>
    </item>
    <item>
      <title>Safety Concerns Close Murray Morgan Bridge</title>
      <pubDate>Wed, 24 Oct 2007 04:54:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/23_MurrayMorganBridge.htm</link>
      <description>TACOMA – After informing City of Tacoma officials, the Washington State Department of Transportation announced today that the 94-year old Murray Morgan Bridge in Tacoma is closed to all vehicular traffic effective immediately.</description>
    </item>
    <item>
      <title>Reminder:  I-5 Everett Widening Project to Close Northbound I-5 Tonight</title>
      <pubDate>Wed, 24 Oct 2007 03:45:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/23_NBI5EverettClosure.htm</link>
      <description>If the weather remains dry tonight, crews working on the I-5 Everett HOV freeway expansion project will close northbound I-5 at the SR 526 interchange.  All traffic will use a short detour by exiting at SR 527 and back to northbound I-5 at the on-ramp from SR 527.  Late night drivers should plan extra time into their trips.</description>
    </item>
    <item>
      <title>Tacoma Narrows Bridge Citizen Advisory Committee to Meet</title>
      <pubDate>Tue, 23 Oct 2007 23:59:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/23_16_TNB_advisory_committee.htm</link>
      <description>Tacoma Narrows Bridge Citizen Advisory Committee to Meet</description>
    </item>
    <item>
      <title>Eastbound SR 16 Lane Closures Scheduled Near Toll Plaza</title>
      <pubDate>Tue, 23 Oct 2007 23:47:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/23_16_Lane_Closures_TollPlaza.htm</link>
      <description>All traffic on eastbound State Route 16 will be diverted through the toll plaza during night hours this Tuesday and Wednesday for maintenance on the electronic toll equipment.</description>
    </item>
    <item>
      <title>WSDOT is One Step Closer to Completing Four-lane US 12 Corridor</title>
      <pubDate>Tue, 23 Oct 2007 01:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/US12RibbonCuttingOctober07.htm</link>
      <description>WSDOT is one step closer to completing four-lane corridor from Pasco to Walla Walla.</description>
    </item>
    <item>
      <title>Transportation Secretary Paula Hammond Announces Appointments</title>
      <pubDate>Mon, 22 Oct 2007 22:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/19-Appointments.htm</link>
      <description>Washington State Department of Transportation Secretary Paula Hammond announces organizational changes and appointements.</description>
    </item>
    <item>
      <title>Water Line Repairs at the SR 401, Dismal Nitch Rest Area Begin Next Week</title>
      <pubDate>Sat, 20 Oct 2007 04:33:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/19_SR401Repairs.htm</link>
      <description>NASELLE – Repairs to the water line at the State Route 401 Dismal Nitch Rest Area will begin early next week, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Closures on SR 512 Next Week</title>
      <pubDate>Sat, 20 Oct 2007 04:30:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_19_SR512Closures.htm</link>
      <description>Closures on SR 512 Next Week</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Oct. 19 – 26</title>
      <pubDate>Sat, 20 Oct 2007 04:15:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/19_BellevueUpdates.htm</link>
      <description>Next week, crews will continue repairing pavement on northbound and southbound I-405 in South Bellevue; widening the Coal Creek Parkway bridge; preparing to build piers for the new bridge over I-90; and performing electrical work.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Oct. 19-26</title>
      <pubDate>Sat, 20 Oct 2007 04:10:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/19_KirklandUpdates.htm</link>
      <description>Next week crews working for the Washington State Department of Transportation plan to stripe the roadway and ramps between NE 85th and NE 132nd Streets.</description>
    </item>
    <item>
      <title>I-405 Renton Stage I Widening Project Construction Updates Oct. 20 - Oct. 27</title>
      <pubDate>Sat, 20 Oct 2007 04:06:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/19_RentonUpdates.htm</link>
      <description>Next week, crews working for the Washington State Department of Transportation will grade and pave the highway shoulder on southbound SR 167. Alternatively, if rain does not allow paving, crews will conduct electrical work.</description>
    </item>
    <item>
      <title>No New Settlement Found in Weekend Inspection of Alaskan Way Viaduct</title>
      <pubDate>Fri, 19 Oct 2007 22:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/ViaductResults-10182007.htm</link>
      <description>Inspection results released today show no additional settlement of the Alaskan Way Viaduct between Columbia Street and Yesler Way, and no new structural damage. However, the viaduct continues to show signs of aging and deterioration.</description>
    </item>
    <item>
      <title>Narrows Bridge Worker Rescued</title>
      <pubDate>Fri, 19 Oct 2007 02:36:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/18_SR16Narrow_rescue.htm</link>
      <description>Narrows Bridge worker rescued from east tower of new bridge.</description>
    </item>
    <item>
      <title>Signal Project at I-5 Southbound 13th Street Off-Ramp in Chehalis Begins Monday, Oct. 22</title>
      <pubDate>Thu, 18 Oct 2007 22:48:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/18_I513thSTSignal.htm</link>
      <description>CHEHALIS – A project that will add a new signal at the I-5 southbound 13th Street off-ramp will begin Monday, Oct. 22, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>New Signal Green Lights Transit, Pedestrian Improvements on SR 522 in Lake Forest Park</title>
      <pubDate>Thu, 18 Oct 2007 07:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/17_SR522Signal.htm</link>
      <description>New Signal Green Lights Transit, Pedestrian Improvements on SR 522 in Lake Forest Park</description>
    </item>
    <item>
      <title>CANCELED: I-5 Everett Widening Project to Close Northbound I-5 Saturday Night</title>
      <pubDate>Thu, 18 Oct 2007 05:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/17_I5EverettClosureDetourRestripe.htm</link>
      <description>Late night drivers heading north on Interstate 5 through Everett this weekend should plan a little extra time in their trips. If the weather is dry, crews working on the I-5 Everett HOV freeway expansion project will close northbound I-5 at SR 526 Friday or Saturday night.</description>
    </item>
    <item>
      <title>WSDOT Readying Roads and Crews for Windy Commute</title>
      <pubDate>Thu, 18 Oct 2007 02:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/17_windprep.htm</link>
      <description>OLYMPIA – WSDOT has its crews out, chainsaws sharpened, generators gassed up and additional crews on standby for what forecasters call the first major winter storm coming to Western Washington.</description>
    </item>
    <item>
      <title>Expect Single Lane Closures on SR 503 near Yale for Bridge Inspection, Nov. 6</title>
      <pubDate>Thu, 18 Oct 2007 00:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/17_SR503YaleInspection.htm</link>
      <description>VANCOUVER – Motorists traveling SR 503 near Yale should expect up to 20-minute delays as bridge maintenance crews inspect the SR 503, Yale Bridge November 6, from 8 a.m. to 4 p.m.</description>
    </item>
    <item>
      <title>SR 401 Dismal Nitch Rest Area Remains Open with Portable Facilities</title>
      <pubDate>Wed, 17 Oct 2007 05:35:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/16_SR401RestArea.htm</link>
      <description>NASELLE – Restroom facilities at the State Route 401 Dismal Nitch Rest Area have closed after a break in the water line, announced the Washington State Department of Transportation (WSDOT).</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct Reopened After Semiannual Inspections</title>
      <pubDate>Mon, 15 Oct 2007 23:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/Viaductreopens10142007.htm</link>
      <description>Washington State Department of Transportation maintenance crews re-opened all lanes on the Alaskan Way Viaduct at 2:45 p.m., ahead of schedule. With a 5:15 p.m. Seahawks game, crews worked late on Saturday so they could re-open the lanes earlier on Sunday. The viaduct was closed for its semiannual inspections on October 13 and 14.</description>
    </item>
    <item>
      <title>Mother Nature Gives Her Thumbs Up:  Crews Will Close SR 9 Near Arlington This Weekend</title>
      <pubDate>Sat, 13 Oct 2007 04:29:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_SR9SchlomanClosureGreenLight.htm</link>
      <description>fter reviewing the forecast, WSDOT and contractor Scarsella Brothers have decided to move forward with their plan to close State Route 9 just north of Arlington between 252nd and 268th Streets NE from 5 a.m., Saturday, Oct. 13, through 5 a.m., Monday, Oct, 15. During the closure, crews will fill a dip in the roadway just south of 268th Street NE to improve driver sight distance.</description>
    </item>
    <item>
      <title>I-5 Everett Pavers Finish All Travel Lanes Between Broadway On-ramp and SR 526</title>
      <pubDate>Sat, 13 Oct 2007 03:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_I5EverettPavingDone.htm</link>
      <description>A break in wet weather allowed paving crews to complete all travel lanes on southbound I-5 in Everett between SR 526 and the Broadway ramps. Crews still need to finish paving the shoulders both south and northbound.</description>
    </item>
    <item>
      <title>Crews Continue Installing HOT Lane Buffer Striping on SR 167; WSDOT Urges Motorcyclists to Use Caution</title>
      <pubDate>Sat, 13 Oct 2007 01:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_SR167HotLanesStriping.htm</link>
      <description>Crews Continue Installing HOT Lane Buffer Striping on SR 167; WSDOT Urges Motorcyclists to Use Caution</description>
    </item>
    <item>
      <title>Public Service Career Fair in Seattle, Oct. 29</title>
      <pubDate>Sat, 13 Oct 2007 00:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_CareerFair.htm</link>
      <description>WSDOT is participating in the Public Service Career Fair on Monday, Oct. 29 at the Seattle Center Northwest Rooms.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Oct. 12-19</title>
      <pubDate>Sat, 13 Oct 2007 00:11:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_I405KirklandUpdates.htm</link>
      <description>Next week crews working for the Washington State Department of Transportation plan to stripe the roadway and ramps between NE 85th and NE 124th Streets; and modify the southbound I-405 off-ramp to westbound NE 85th Street.</description>
    </item>
    <item>
      <title>I-405 Renton Stage I Widening Project Construction Updates Oct. 13 - Oct. 20</title>
      <pubDate>Sat, 13 Oct 2007 00:08:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_I405RentonUpdates.htm</link>
      <description>Next week, crews working for the Washington State Department of Transportation will perform surveys, electrical work, and excavate and grade the highway shoulder on SR 167; and conduct surveys on I-405.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Oct. 12 – 19</title>
      <pubDate>Fri, 12 Oct 2007 23:36:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/12_I405BellevueUpdates.htm</link>
      <description>This weekend, crews working for the Washington State Department of Transportation will drive piles in the ground on the east side of I-405 at Coal Creek Parkway to begin building a wider bridge. Sunday through Thursday nights, crews will continue repairing pavement on northbound and southbound I-405 in South Bellevue; work to widen the Coal Creek Parkway bridge; prepare to build piers for the new bridge over I-90; and pave the 112th Ave NE on-ramp to northbound I-405.</description>
    </item>
    <item>
      <title>US 12 Paving Project Continues Friday and Saturday</title>
      <pubDate>Fri, 12 Oct 2007 03:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_11_US12Paving.htm</link>
      <description>US 12 Paving Project Continues Friday and Saturday</description>
    </item>
    <item>
      <title>Crews are Ready to Close SR 9 Near Arlington This Weekend But Mother Nature Will Have the Final Word</title>
      <pubDate>Fri, 12 Oct 2007 00:56:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/11_SR9WeekendClosure.htm</link>
      <description>If the weather cooperates, WSDOT and contractor Scarsella Brothers will close State Route 9 just north of Arlington between 252nd and 268th Streets NE from 5 a.m., Saturday, Oct. 13, through 5 a.m., Monday, Oct, 15. During the closure, crews will fill a dip in the roadway just south of 268th Street NE to improve driver sight distance.</description>
    </item>
    <item>
      <title>Friday Night Lane Closure on I-5 in Tacoma</title>
      <pubDate>Thu, 11 Oct 2007 23:48:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_11_I5LaneClosure.htm</link>
      <description>Friday Night Lane Closure on I-5 in Tacoma</description>
    </item>
    <item>
      <title>WSDOT Asks for Drivers’ Help to Avoid Lengthy Back-ups on Northbound I-405 in Bellevue this Weekend</title>
      <pubDate>Thu, 11 Oct 2007 07:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_405BellevueWeekendWork.htm</link>
      <description>Crews working for WSDOT will close two northbound I-405 lanes near Coal Creek Parkway this weekend for pile driving work. Without drivers’ help, engineers expect long back-ups on northbound I-405 between I-90 and Renton, with the worst congestion Saturday and Sunday between 8 a.m. and 2 p.m.</description>
    </item>
    <item>
      <title>WSDOT Begins Viaduct Repairs Following Quarterly Inspection</title>
      <pubDate>Thu, 11 Oct 2007 05:57:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/Viaductinspection-4thq2007.htm</link>
      <description>The Washington State Department of Transportation (WSDOT) will kick off construction on the first of several projects to improve safety for drivers on the Alaskan Way Viaduct. Construction will begin next week to strengthen several column foundations between Columbia Street and Yesler Way, where the viaduct has settled approximately five inches since the 2001 Nisqually earthquake.</description>
    </item>
    <item>
      <title>The Ribbon is Cut for the SR 17 Widening Project in Moses Lake</title>
      <pubDate>Wed, 10 Oct 2007 04:57:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/100807SR17WideningRibbonCut.htm</link>
      <description>A ribbon cutting ceremony marked completion of the SR 17 Widening project in Moses Lake</description>
    </item>
    <item>
      <title>SR 520 Evergreen Point Floating Bridge to Close for Monthly Maintenance Tests</title>
      <pubDate>Wed, 10 Oct 2007 02:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/9_SR520BridgeTest.htm</link>
      <description></description>
    </item>
    <item>
      <title>Governor Gregoire Announces Safety Plans for US 2</title>
      <pubDate>Wed, 10 Oct 2007 00:36:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/9_US2SafetyCorridor.htm</link>
      <description>On Monday, Oct. 8, Governor Chris Gregoire announced the designation of US 2 as a safety corridor, and provided details on efforts by the Washington State Patrol and WSDOT to enhance safety on US 2.</description>
    </item>
    <item>
      <title>Wreckage of Missing Plane Found</title>
      <pubDate>Tue, 09 Oct 2007 23:48:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/WreckageFoundWhitePass.htm</link>
      <description>Yesterday, at around 7:40 p.m., search and rescue teams located the wreckage of a Cessna 208 Caravan aircraft near White Pass. The aircraft, with 10 people on board, had been missing since Sunday night after leaving Boise, Idaho around 7:30 p.m. for Shelton, Washington.</description>
    </item>
    <item>
      <title>Searchers Comb White Pass Area for Missing Plane</title>
      <pubDate>Tue, 09 Oct 2007 06:55:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/WhitePassMissingPlane.htm</link>
      <description>The search continues in the White Pass area for a missing Cessna 208 Caravan aircraft with a reported 10 people on board. The plane left Boise, Idaho around 7 p.m. yesterday and was headed to Shelton, Washington. Late yesterday evening, a person in the White Pass area reported seeing a low flying aircraft and hearing a crash. Several hours later, the co-owner of the missing aircraft notified emergency personnel that the plane was overdue and that she was unable to reach the people on board.</description>
    </item>
    <item>
      <title>Intermittent Closures of SR 303 in Silverdale Thursday Night</title>
      <pubDate>Tue, 09 Oct 2007 06:28:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_08_SR303Closures.htm</link>
      <description>Intermittent Closures of SR 303 in Silverdale Thursday Night</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Kirkland Oct. 5-12</title>
      <pubDate>Tue, 09 Oct 2007 01:16:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/08_KirklandUpdates.htm</link>
      <description>Next week crews working for the Washington State Department of Transportation plan to stripe the roadway and ramps between NE 85th and NE 124th Streets.</description>
    </item>
    <item>
      <title>SR 16 Reopens after WSDOT Engineers Deem Viaduct Safe</title>
      <pubDate>Sun, 07 Oct 2007 20:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_07_SR+16Reopens.htm</link>
      <description>SR 16 Reopens after WSDOT Engineers Deem Viaduct Safe</description>
    </item>
    <item>
      <title>Fire Shuts Down SR 16 at Nalley Valley</title>
      <pubDate>Sun, 07 Oct 2007 10:01:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/10_06_NalleyValleyFire.htm</link>
      <description>Fire Shuts Down SR 16 at Nalley Valley</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct Closed for Semiannual Inspections October 13 and 14</title>
      <pubDate>Sat, 06 Oct 2007 05:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/AWVClosureOct2007.htm</link>
      <description>WSDOT maintenance crews will close the Alaskan Way Viaduct for its semiannual inspections on the weekend of October 13 and 14. Since the 2001 Nisqually earthquake, WSDOT has conducted a full inspection of the viaduct every six months to closely monitor any settlement or other signs of continuing deterioration.  WSDOT crews also conduct three-month visual inspections as an added safety measure.</description>
    </item>
    <item>
      <title>I-405 Renton Stage I Widening Project Construction Updates Oct. 6 - 13</title>
      <pubDate>Sat, 06 Oct 2007 02:39:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/5_RentonWeeklyUpdates.htm</link>
      <description>Next week, crews working for the Washington State Department of Transportation will perform surveys, electrical work, and excavate and grade the highway shoulder on SR 167; and conduct surveys on I-405.</description>
    </item>
    <item>
      <title>I-405 Construction Updates in Bellevue Oct. 5 – 12</title>
      <pubDate>Sat, 06 Oct 2007 01:44:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/5_BellevueWeeklyUpdate.htm</link>
      <description>Next week, crews working for the Washington State Department of Transportation will continue repairing pavement on northbound I-405 in South Bellevue and restoring the Kelsey Creek Park wetland. Crews will also begin constructing piers for the new bridge over I-90, perform survey and electrical work, and work to widen the Coal Creek Parkway bridge.</description>
    </item>
    <item>
      <title>Mother Nature Puts on the Brakes: SR 9 Closure Near Arlington Postponed This Weekend</title>
      <pubDate>Sat, 06 Oct 2007 00:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/5_SR9ClosurePostponed.htm</link>
      <description>After weeks of rain and more to come, crews decided to postpone this weekend’s closure on State Route 9 just north of Arlington between 252nd and 268th Streets NE.  WSDOT and contractor Scarsella Brothers plan to move the closure to the weekend of Oct. 13, if the rain relents.</description>
    </item>
    <item>
      <title>Expect Delays on Southbound I-5 in Everett Friday Night and Saturday Morning while Paving Work Continues</title>
      <pubDate>Fri, 05 Oct 2007 08:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/4_ExtendedI5EverettWork.htm</link>
      <description>A long string of wet nights in Everett has paving crews on southbound I-5 looking for a few extra hours to get the job done.  That means if the weather is dry this weekend, crews will close lanes earlier and open them later than normal this Friday night and Saturday morning.  Drivers should expect long delays if they’re heading southbound through Everett during the closures.</description>
    </item>
    <item>
      <title>24 Inches of New Snow Prompts Closure of SR 542 Lower Gate to Artist Point</title>
      <pubDate>Fri, 05 Oct 2007 05:11:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/04_542closeddeepsnow.htm</link>
      <description>Snow 24-inches deep prompted crews to close the last 2 1/2 miles of State Route 542 on Oct. 4, blocking access to Artist Point for the winter. The end of Mount Baker Highway closes every year with the first snowfall.</description>
    </item>
    <item>
      <title>WSDOT Traveler Information Systems Unavailable Early Sunday</title>
      <pubDate>Fri, 05 Oct 2007 03:20:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/04_511_website_down.htm</link>
      <description>OLYMPIA – Snow in Washington’s mountains are just the first signs of winter weather. To make sure its website and travel information hotline are ready for the months to come, WSDOT will do computer maintenance tasks for two hours early Sunday.</description>
    </item>
    <item>
      <title>All Lanes Open on I-405 Northbound through Bellevue for Afternoon Commute</title>
      <pubDate>Wed, 03 Oct 2007 05:46:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/2_BellevueI405Open.htm</link>
      <description>Crews have reopened all lanes on northbound I-405 through Bellevue.  Crews closed lanes starting at 10 a.m. this morning to repair a damaged cement panel with quick-setting material.  Once they laid the material, crews estimated that the lanes would reopen by 1 p.m., but the cement took longer to cure than expected.  Crews were able to reopen the lanes by 3 p.m.</description>
    </item>
    <item>
      <title>Problem with New Pavement Causes Delays on I-405</title>
      <pubDate>Wed, 03 Oct 2007 02:39:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/2_BellevuePavementDelays.htm</link>
      <description>Crews working for the Washington State Department of Transportation (WSDOT) opened two northbound lanes on I-405 later than expected this morning due to technical issues involving the concrete mix for panel replacements on the roadway.</description>
    </item>
    <item>
      <title>CANCELLED:  SR 9 Closes Near Arlington This Weekend; Truckers and Travelers Should Plan for a Detour</title>
      <pubDate>Wed, 03 Oct 2007 00:56:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/2_SR9SchlomanClosure.htm</link>
      <description>CANCELLED:  WSDOT and contractor Scarsella Brothers will close State Route 9 just north of Arlington between 252nd and 268th Streets NE from 5 a.m., Saturday, October 6 through 5 a.m. Monday, October 8. Crews will fill a dip in the roadway just south of 268th Street NE to improve driver sight distance.</description>
    </item>
    <item>
      <title>I-90 Flammable Cargo Restriction Announced</title>
      <pubDate>Mon, 01 Oct 2007 22:24:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2007/10/1_I-90FlammableRestriction.htm</link>
      <description>WSDOT activated a flammable cargo restriction on Interstate 90 between Interstate 5 in Seattle and Island Crest Way on Mercer Island beginning at 7:00 a.m.on Monday, October 1, 2007. This restriction is expected to conclude on Wednesday, October 10, by 4 p.m.</description>
    </item>
  </channel>
</rss>