News

text size: T T T

July 2007 News Archive


News Archives by Month for 2007 News
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec

News Archives by Year
2008 | 2007 | 2006 | 2005

08/02/07
Prep Work Begins on Simpson Avenue Bridge

08/01/07
Crews Begin Stabilizing Slope on Monday

08/01/07
Month-long Paving Project on US 12 Starts Sunday

07/31/07
Nighttime Lane Closures Start Earlier on Guide Meridian in Bellingham

07/31/07
WSDOT Reduces SR 109 Speed Limit in Hoquiam

07/31/07
Paving Continues This Weekend on 1950 Tacoma Narrows Bridge

07/31/07
Full Service to Continue of Port Townsend-Keystone Route

07/30/07
Expect 50-Minute Delays on I-405 and I-90 in Bellevue Monday through Wednesday Nights

07/30/07
Crews Close I-90 Bridge for Annual Seafair Blue Angels Shows

07/30/07
WSDOT Crews Perform Emergency Repair Work on I-90 East of Preston Tonight

07/30/07
South Everett Bridge Work Requires Nightly I-5 Lane Closures, Day and Night Lane Closures on 112th Street SE

07/30/07
Crews Begin Surveying I-5 in Marysville for Concrete Median Barrier

07/30/07
Mukilteo Dock/Cathlamet Investigation Report Finalized

07/29/07
US 12 Opens One Lane of Alternating Traffic

07/27/07
SR 508 at Bear Canyon Reopens Today, Emergency Repairs Complete

07/27/07
I-90 Drivers and Eastside Residents are Talking; WSDOT is Listening

07/27/07
New Roundabout Open to Traffic East of Mount Vernon

07/27/07
Expect Heavy Traffic Across All State Passes During US 12 Rock Work

07/27/07
Artist Point Opens Saturday

07/27/07
Ramp Widening Project at Port of Tacoma Road Begins

07/27/07
Improvements transform SR 7

07/27/07
Eyesore Becomes Sight for Sore Eyes in Marysville: WSDOT and Tulalip tribe work together to clean graffiti over I-5

07/27/07
Southbound Swerve Straightened, Northbound Next

07/26/07
I-405 Construction Updates in Kirkland July 27 - August 3

07/26/07
Southbound SR 167 On-Ramp in Renton to Close for the Weekend

07/26/07
Paving Resumes Monday West of Burlington; Expect Long Delays

07/26/07
Expect Delays in South Oak Harbor Sunday Evening

07/26/07
WSDOT will wrap up two major Spokane area I-90 projects ahead of schedule

07/26/07
New Northbound I-5 Lane is Open in Everett

07/26/07
Concurrent Rolling Slowdowns on I-405 and I-90 in Bellevue on Sunday through Wednesday Nights

07/26/07
Four Months of Paving Improvements Start on I-5 in Pierce County

07/26/07
Westbound Lane Closures on TNB for Paving Begin Tonight

07/26/07
Crews to Close Southbound I-5 in South Everett Saturday Night

07/25/07
Northbound I-405 Paving Work in Kirkland Re-Scheduled for this Weekend

07/24/07
SR 28 at Rock Island Dam to be Closed for Up to Four Days

07/24/07
Critical I-5 Repairs Delayed Indefinitely in Bellingham; Contractors Bid Too High

07/23/07
The Ribbon is Cut for the new US 2 Dryden Signal

07/23/07
S-Curve Removal, Take Two

07/23/07
New I-5 Lane in Everett Will Help Reduce One of the State’s Worst Daily Backups

07/23/07
Inspection Work Means Two Weekends of Lane Closures for Agate Pass Bridge

07/22/07
Crews Close Lanes on Southbound I-5 for Expansion Joint Repairs in Downtown Seattle

07/21/07
Postponed: I-5 Shift Work in Tacoma

07/20/07
SR 548 Closed 43 Days Starting Wednesday in Birch Bay

07/20/07
WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound July 20 - 30

07/20/07
Motorists Should Plan Ahead for Delays on US 12 Next Week

07/20/07
SR 20 Paving Resumes Week of July 30 West of Burlington

07/20/07
I-405 Construction Updates in Bellevue July 20 - 27

07/20/07
Gov. Chris Gregoire announces Paula Hammond as interim Secretary of Transportation

07/20/07
I-405 Construction Updates in Kirkland July 20 - 27

07/19/07
WSDOT Removes Hills along SR 20 South of Oak Harbor

07/19/07
WSDOT Bridge Crews Perform Annual Maintenance Work on I-5 Ship Canal Bridge Deck This Weekend

07/19/07
Inspections Close SR 167 Puyallup River Bridge this Weekend

07/19/07
I-5 Weekend Lane Closure in Nisqually

07/19/07
Further Speed Limit Revisions in SR 502 Interchange Construction Zone Begin July 23

07/18/07
Washout Prompts Emergency Repair on SR 20 East of Rockport; WSDOT Seeks Long-Term Solution to Erosion on SR 20, SR 530

07/18/07
Tacoma Loses its Curves

07/18/07
WSDOT Postpones Biggs Bridge Closure until Early ‘08

07/18/07
First Day of Tolling Goes Smoothly on Tacoma Narrows Bridge

07/18/07
WSDOT and WSP Keep Drivers Safe with Expanded Tow-Away Zone in Puget Sound Region

07/17/07
Crews Begin SR 20 Construction East of Deception Pass Next Week

07/17/07
4.5 Miles of New Black Top on SR 202 from Fall City to North Bend

07/17/07
SR 3 Ramp Closure in Silverdale

07/17/07
Engineers Expect Lengthy Back-Ups on Northbound I-405 in Kirkland this Weekend if Drivers Don't Help

07/17/07
SR 20 Open East of Tonasket

07/17/07
Tunk Grade Fire Closes SR 20 in Okanogan County

07/17/07
New Hood Canal Bridge Pontoons Begin Their Journey

07/16/07
Burwell Street on SR 304 Closes in Bremerton

07/16/07
Drivers Put Roundabout to the Test

07/16/07
I-405 Construction Updates in Kirkland July 13 –20

07/16/07
Win Some, Lose Some with WSDOT Project in Federal Way : I-5 drivers gain carpool lane, lose annoying bumpy ride

07/16/07
New Narrows Bridge Open, Tolling Begins

07/13/07
SR 20 Paving Work Near Burlington Postponed for One Week After Construction Zone Fatality

07/13/07
Expect Lane Closures on I-405 Tonight as Crews Repair Pavement

07/12/07
Crews Complete Paving of Over Four Miles on Two Major Roads in South Snohomish County

07/12/07
Worker Killed in WSDOT Work Zone West of Burlington

07/12/07
Toll Transponders Top 100,000 Mark

07/12/07
Road Closures this Weekend in Poulsbo

07/12/07
All Hands on Bridge Deck; SR 520 Evergreen Point Floating Bridge Closes For Annual Maintenance This Weekend

07/12/07
HIYU to Return to Islands for Six Days

07/11/07
Temporary Hang-over in Tacoma

07/11/07
What SR 16 Motorists Will See Before, During and After TNB Opening

07/11/07
Section of I-90 Bike Path in Bellevue Closes for Ten Days Beginning July 16

07/11/07
WSDOT Alerts Motorists to Nighttime Closure of NE 179th ST Southbound I-5 On-Ramp, July 13

07/11/07
Coal Creek Parkway Closed under I-405 Thursday Night; Additional Closures Planned

07/11/07
WSF and USCG Address Essential Maintenance for 80-year-old Vessels; San Juan Inter-Island Run Gets Temporary Ferry

07/10/07
Link Light Rail Construction across SR-518 near International Boulevard Continues

07/10/07
Expect Slow Rolling on Northbound I-405 in Bellevue Tuesday Through Thursday Night

07/10/07
The Clock is Ticking on WSDOT’s I-5 Downtown Seattle Construction; Extensive I-5 Closures Are Only One Month Away

07/10/07
July 14 - 16 Closure of SR 520 Evergreen Point Floating Bridge Hinges on Weather

07/09/07
Media Advisory for new Narrows Bridge Opening Celebration

07/09/07
Public Trial Period Ending for Tacoma Narrows Electronic Toll System

07/09/07
Crews Start Paving North Whatcom County Highways Today

07/06/07
SR 16 Road Work in Full Gear as Bridge Opening Approaches

07/06/07
Ramp-meter Testing Next Week on SR 16

07/06/07
SR 20 Paving Starts Next Week Near Anacortes

07/06/07
WSDOT Alerts Drivers to a Busy Construction Week in Puget Sound July 6 – July 16

07/06/07
Tacoma’s Next Big Thing: Bridge Construction Near the T- Dome

07/06/07
I-405 Construction Updates in Kirkland July 6 - 13

07/06/07
Crews Begin Construction on the I-405 South Bellevue Widening Project

07/05/07
Overnight Lane, Ramp Closures on I-5 in Olympia

07/02/07
Heads Up: Lauck Road will be Closed for Four Weeks Starting in July

07/02/07
WSDOT, TIB and Yakima County Team Up to Open New Lanes

07/02/07
Join WSDOT and Scarsella Brothers, Inc. to Celebrate the Start of the I-5 Widening in Lewis County, July 3

07/02/07
WSDOT and WSP Release Report on Effectiveness of Cable Median Barrier in Washington State