Agency | County | Leg District | Project Title | Project Description | Amount Awarded | Contact for More Info |
Adams County |
Adams |
9 |
2013 Guardrail Safety Project |
Remove low tension cable guardrail on Schrag Road, Gun Club Road, and Gray Road and replace with guardrail that meets current standards. |
$1,000,000
|
Brandi Colyar, 509-659-3279, e-mail |
City of Kennewick |
Benton |
8 |
Columbia Center Blvd. Safety Project-Phase 1 |
Install a traffic signal at the intersection of Columbia Center Blvd./Rio Grande and make channelization and storage lane modifications between Canal Drive and Quinault Avenue. Install rectangular rapid flashing beacons. |
$730,000 |
Steve Plummer, 509-585-4287, e-mail |
Chelan County |
Chelan |
12 |
Entiat River Road Guardrail Infill |
Install guardrail.
|
$479,794 |
Paula Cox, 509-667-6415, e-mail |
Clark County |
Clark |
18 |
Guardrail Safety Improvements (Pacific Hwy, Hayes & Cedar Creek Roads) |
Replace existing guardrail and install new guardrail. |
$988,000 |
Bill Wright, 360-397-6118 x4523, e-mail |
City of Vancouver map |
Clark |
49 |
Fourth Plain Blvd. - Crosswalk Upgrade to Pedestrian Hybrid Beacon |
Upgrade marked crosswalks to pedestrian hybrid beacons.
|
$360,000 |
Ali Eghtedari, 360-487-7705, e-mail |
City of Vancouver |
Clark |
49 |
SE 136th Ave. and SE 7th St. Traffic Signal |
Install a traffic signal. |
$250,000 |
Ali Eghtedari, 360-487-7705, e-mail |
Cowlitz County |
Cowlitz |
19 |
Willow Grove Road Guardrail |
Install guardrail and guardrail terminals. Install flexible guide posts on the guardrail. |
$480,000 |
Christopher Andrews, 360-577-3030 x6527, e-mail |
City of Kelso |
Cowlitz |
19 |
West Main Street Realignment
|
Realign West Main Street and implement access control. Construct sidewalks and bicycle lanes. Add through lanes and turn lanes, widen lanes, and close a road. Construct new traffic signals and revise traffic signal timing.
|
$1,140,000 |
Mike Kardas, 360-577-3376, e-mail |
Franklin County |
Franklin |
9 and 16 |
Road Safety Program Phases 1 and 3
|
Flatten a slope and install guardrail. Upgrade signing and delineation through a curve. Install over-sized Stop signs with flashing beacons, advanced warning signs, and transverse rumble strips.
|
$360,800 |
Steve Aldrich, 509-545-3514, e-mail |
City of Pasco map |
Franklin |
16 |
Court St. ADA Ramp Upgrade and Pedestrian Countdown Signal Heads
|
Install pedestrian countdown signals and upgrade curb ramps to meet ADA requirements.
|
$628,000 |
Ahmad Qayoumi, 509-544-3446, e-mail |
City of Pasco |
Franklin |
16 |
Pasco Safe Routes to School 1
|
Install rectangular rapid flashing beacons at crosswalks. Upgrade school zone sign and beacon equipment. |
$124,000 |
Ahmad Qayoumi, 509-544-3446, e-mail |
City of Pasco |
Franklin |
16 |
Road 68 Corridor Safety Improvements
|
Improve traffic signal phasing and timing and implement access management. |
$500,000 |
Ahmad Qayoumi, 509-544-3446, e-mail |
Grant County |
Grant |
12 and 13 |
Grant County Road Safety Project |
Upgrade existing and add new horizontal alignment signing and guideposts, install an overhead flashing beacon, and install durable rumble lines with new Stop Ahead signs. |
$343,467 |
Todd Mittge, 509-754-6082, e-mail |
City of Moses Lake/WSDOT |
Grant |
13 |
SR 171 Pedestrian Crossing Improvements |
Upgrade crosswalks with rectangular rapid flashing beacons and improved lighting and signing. Upgrade ramps and sidewalks to meet ADA requirements. |
$638,244 |
David Kieninger, WSDOT, 509-667-3081, e-mail |
Grays Harbor County map |
Grays Harbor |
19 and 24 |
2013 County Road Guardrail Project |
Install guardrail. |
$440,000 |
Russ Esses, 360-249-4222, e-mail |
City of Auburn |
King |
30, 31, and 47 |
Citywide Guardrail Improvements |
Install guardrail along Green River Road SE, R Street SE/Kersey Way SE, and Mountain View Drive SW. |
$502,275 |
James Webb, 253-931-5040, e-mail |
City of Bellevue |
King |
48 |
NE 8th Street/Crossroads Park Mid-Block Crossing |
Improve a crosswalk with a pedestrian refuge island, signs, and rectangular rapid flashing beacons. |
$311,213 |
Jen Benn, 425-452-4270, e-mail |
City of Black Diamond |
King |
5 and 47 |
Black Diamond Street Signs Replacement |
Upgrade traffic signs.
|
$20,923 |
Scott Hanis, 360-886-5700 x 5713, e-mail |
City of Federal Way map |
King |
30 |
Citywide Flashing Yellow Arrow Conversions |
Improve traffic signal phasing and improve the visibility of traffic signal heads. |
$241,200 |
Rick Perez, 253-835-2740, e-mail |
City of Federal Way |
King |
30 |
Citywide Retroreflective Backplates |
Improve the visibility of traffic signal heads. |
$122,000 |
Rick Perez, 253-835-2740, e-mail |
City of Kent |
King |
11, 33, and 47 |
Panther Lake Signal System Integration |
Upgrade traffic signal controllers, improve communication to the controllers, and improve traffic signal phasing. |
$341,958 |
Steve Mullen, 253-856-5585, e-mail |
City of Kenmore/City of Lake Forest Park/City of Seattle/WSDOT |
King |
46 |
SR 522 NE 145th St. to 83rd Place NE Adaptive Signal Control - MP 4.22-8.15 |
Improve traffic signal timing. |
$330,000 |
Barbara Briggs, WSDOT, 206-440-4486, e-mail |
City of Seattle |
King |
11, 32, 34, 36, 37, 43, and 46 |
Citywide Stop and Yield Controlled Intersection Enhancement |
Upgrade traffic signs. |
$1,000,000 |
Dorinda Costa, 206-615-0765, e-mail |
City of Shoreline map |
King |
32 |
Aurora Ave. N. - N. 145th Street to N. 192nd Street Safety Improvements |
Improve the visibility of traffic signal heads, upgrade pedestrian signal poles, curb ramps, and sidewalks to meet ADA standards, and upgrade signs. |
$352,491 |
Kirk McKinley, 206-801-2481, e-mail |
Kitsap County |
Kitsap |
23 |
SR 303 SB Ramps and Ridgetop Blvd. NW Signal Project |
Add a right turn lane, install a traffic signal with pedestrian signals, and provide signal coordination. |
$1,140,000 |
Jonathan Brand, 360-337-4893, e-mail |
City of Poulsbo |
Kitsap |
23 |
SR 305 Intersection Safety Lighting |
Install intersection lighting. |
$400,000 |
Andrzej Kasiniak, 360-779-4078, e-mail |
City of Ellensburg |
Kittitas |
13 |
City of Ellensburg Traffic Signal Enhancement Project |
Improve the visibility of traffic signal heads, upgrade pedestrian signals and curb ramps, upgrade traffic signal controllers and timing, and upgrade signs. |
$527,000 |
Derek Mayo, 509-925-8631, e-mail |
Klickitat County |
Klickitat |
14 |
BZ Glenwood Safety Improvements |
Remove or relocate fixed objects from the clear zone, flatten slopes, and install guardrail and recessed pavement markers. |
$475,640 |
Jeff Hunter, 509-773-2372, e-mail |
Lincoln County map |
Lincoln |
7 |
Lincoln County Widespread Guardrail Installation Project |
Install guardrail on various roadways. |
$799,924 |
Rich Becker, 509-725-7041, e-mail |
City of Lakewood |
Pierce |
28 and 29 |
Citywide Safety Upgrade Project |
Improve the visibility of traffic signal heads and change signal phasing. |
$661,000 |
Desiree Winkler, 253-983-7818, e-mail |
City of Lakewood |
Pierce |
28 and 29 |
Custer Rd. & John Dower Rd. Intersection Safety Improvement |
Improve the visibility of traffic signal heads, change signal phasing, upgrade signs, increase pavement friction, and improve conditions for pedestrians in crosswalks. |
$415,000 |
Desiree Winkler, 253-983-7818, e-mail |
Pierce County |
Pierce |
2 |
Orville Road East (MP 11.97 to MP 12.08) |
Install guardrail. |
$74,000 |
Cindy Bui, 253-798-3560, e-mail |
City of Tacoma |
Pierce |
27, 28, and 29 |
Citywide Safety Improvements |
Upgrade signs and pavement markings at traffic signals. |
$794,750 |
Darius Thompson, 253-573-2410, e-mail |
City of Tacoma map |
Pierce |
28 |
Mildred Street Improvements |
Rehabilitate the roadway and implement a road diet, install a marked crosswalk with pedestrian-activated flashing beacons and median pedestrian refuge islands. |
$942,792 |
Dan Sebrands, 253-591-5150, e-mail |
City of Tacoma |
Pierce |
27 |
S. 25th Street Corridor Signal Improvements |
Install a traffic signal and add pedestrian curb bulbs at the intersection of S. 25th St./J St. Upgrade and interconnect adjacent traffic signals. Reconstruct intersection corners/pedestrian ramps along S. 25th St. |
$251,097 |
Said Seddiki, 253-591-5204, e-mail |
City of Anacortes |
Skagit |
10 and 14 |
22nd Street and R Avenue Roundabout |
Construct a roundabout. |
$500,000 |
Eric Shjarback, 360-299-1980, e-mail |
Skagit County |
Skagit |
10, 39, and 40 |
Pioneer Highway/Fir Island Intersection |
Construct a roundabout. |
$2,000,000 |
Forrest Jones, 360-336-9400 x3172, e-mail |
City of Bothell |
Snohomish/King |
1 |
228th Street SW at 15th Avenue SE |
Improve the visibility of traffic signal heads, improve traffic signal phasing, install an audible pedestrian signal, and upgrade intersection signing and pavement markings. |
$100,000 |
Seyed Safavian, 425-486-2768, e-mail |
City of Bothell |
Snohomish/King |
1 |
Main Street from 101st Avenue NE to 104th Avenue NE |
Improve crosswalks with elevated pavement and upgraded signs, beacons, and curb ramps. |
$250,000 |
Seyed Safavian, 425-486-2768, e-mail |
City of Bothell map |
Snohomish/King |
1 |
SR 527 MP 2.90 to 3.68 |
Improve the visibility of traffic signal heads, upgrade signs and pavement markings, and improve crosswalks with upgraded pedestrian signals and curb ramps. |
$500,000 |
Seyed Safavian, 425-486-2768, e-mail |
City of Everett |
Snohomish |
38 |
Everett Citywide Guardrail Improvement Program |
Upgrade existing guardrail, guardrail anchors, and bridge transition sections, install a raised island, and upgrade pavement markings and signs.
|
$470,000 |
Corey Hert, 425-257-8887, e-mail |
City of Everett |
Snohomish |
38 |
Evergreen Way and Pecks Drive-Intersection Safety |
Improve traffic signal phasing, visibility of traffic signal heads, intersection lighting, and pedestrian accessibility, including ADA. |
$411,000 |
Corey Hert, 425-257-8887, e-mail |
City of Mountlake Terrace |
Snohomish |
1 and 21 |
Citywide Safety Improvements
|
Improve the visibility of traffic signal heads and install rectangular rapid flashing beacons at crosswalks.
|
$191,730 |
Janet Hall, 425-774-6275, e-mail |
City of Spokane |
Spokane |
6 |
Ash and Maple Streets Couplet, Pedestrian Countdown Timer Modifications |
Install pedestrian countdown signals.
|
$178,000 |
Brandon Blankenagel, 509-625-6419, e-mail |
City of Spokane map |
Spokane |
6 |
Flint Rd. and Sunset Highway (US Hwy 2) Traffic Signal |
Install a traffic signal and widen the roadway to add deceleration lanes, left turn lanes, and sidewalks at the curb radii. Includes ADA compliant curb ramps, pedestrian signals, pedestrian refuge islands, and illumination. |
$1,271,000 |
Brandon Blankenagel, 509-625-6419, e-mail |
Spokane County map |
Spokane |
4 |
Hangman Valley Road #1717, Mile Post 2.76 to 3.31 Segment Safety Improvement |
Upgrade existing or install new signs. Install guardrail. Install delineators on and in advance of guardrail. |
$260,973 |
Barry Greene, 509-477-3600, e-mail |
Spokane County |
Spokane |
6 |
Madison Road Segment Safety Improvements Project from Mile Post 4.08 to 4.59 |
Upgrade existing or install new signs. Install guardrail. Install delineators on and in advance of guardrail. |
$173,174 |
Barry Greene, 509-477-3600, e-mail |
Spokane County |
Spokane |
4 |
Magnesium Road from Mile Post 0.30 to 0.66 (Regal Street) Segment Safety Improvements |
Upgrade existing or install new signs. Install guardrail. Install delineators on and in advance of guardrail. |
$138,215 |
Barry Greene, 509-477-3600, e-mail |
Spokane County |
Spokane |
9 |
Wellesley Avenue Safety Project-Murray Road to Starr Road |
Widen the roadway to install a two-way left turn lane and left turn lanes. Upgrade or install new signing and pavement markings. |
$313,851 |
Barry Greene, 509-477-3600, e-mail |
City of Spokane Valley |
Spokane |
4 |
Citywide Traffic Sign Upgrade Project |
Upgrade signs.
|
$200,000 |
Steve Worley, 509-720-5014, e-mail or Inga Note, 509-720-5011, e-mail |
Thurston County map |
Thurston |
2 |
Martin Way-Meridian-Duterrow Intersection |
Improve the visibility of traffic signal heads and improve traffic signal phasing. |
$65,000 |
Scott Davis, 360-867-2345, e-mail |
Thurston County |
Thurston |
2, 20, 22, and 35 |
Run-Off-Road and Intersection Safety-Guardrail |
Install new guardrail and delineators on barriers on selected roads throughout the county. |
$675,000 |
Scott Davis, 360-867-2345, e-mail |
Thurston County |
Thurston |
2, 20, 22, and 35 |
Run-Off-Road and Intersection Safety |
Install new signs, pavement markings, rumble strips, and street lighting on selected roads throughout the county. Also, narrow the lanes at the intersection of South Bay Rd. NE/26th Ave. NE. |
$1,400,000 |
Scott Davis, 360-867-2345, e-mail |
City of Walla Walla |
Walla Walla |
16 |
13th Avenue and Rose Street Signalization |
Install a traffic signal and a two-way left turn lane. |
$200,828 |
Neal Chavre, 509-527-4537, e-mail |