Funding | Agency | Leg District | Title of Project | Project Description | Total Project Cost | Amount Requested | Cumulative Total |
Federal |
Tukwila |
11 |
Thorndyke Elementary Safe Routes to School Application |
The project includes sidewalk, curb, gutter, drainage, widen road to 10 ft., walking school bus, educational materials, maps and events. |
$1,082,000 |
$457,000 |
$457,000 |
Federal |
Seattle |
11, 36 |
Greenwood Neighborhood Greenways Go to School |
The project includes curb extensions, rectangular rapid flashing beacons, educational materials and events, speed enforcement, speed feedback signs, and a speed control campaign. |
$173,000 |
$153,000 |
$610,000 |
State |
Mount Vernon |
40 |
Bike Walk Mount Vernon 2013 |
The project includes bike lanes, a bike signal, a trail crossing improvement, a roundabout, and enforcement. |
$419,500 |
$389,500 |
$999,500 |
State |
Washington State Department of Health (Statewide) |
N/A |
State Student Travel Survey |
The project conducts a statewide student travel survey to support state, regional and local project development and performance measurement. |
$223,052 |
$173,052 |
$1,172,552 |
State |
Woodland |
18 |
South Woodland Safe Walking Route |
The project includes sidewalk, curb, gutter, crossing improvements, crossing guards, and walking school bus program. |
$340,525 |
$306,473 |
$1,479,025 |
Federal |
Bellingham |
40 |
Carl Cozier Safe Routes to School Program |
The project includes sidewalk, curb, gutter, drainage, curb ramps, crosswalk markings and signage, curb extensions, flashing beacons, bicycle racks, educational materials and events, increased school zone crosswalk and speed emphasis patrols. |
$263,700 |
$237,300 |
$1,716,325 |
State |
Battle Ground |
18 |
School Zone Safety Improvements, City Wide Battle Ground |
The project includes crosswalk pavement markings, rear flashing beacon strobe lights, flashing beacon, guided walk groups and crossing guards, student/parent education, and speed emphasis patrols. |
$70,706 |
$66,206 |
$1,782,531 |
Federal |
Everett |
38 |
Hawthorne Elementary Safe Routes to School |
The project includes sidewalk, curb, gutter, crosswalk markings, curb ramps, flashing beacon, educational materials and events, and speed emphasis patrols. |
$256,000 |
$256,000 |
$2,038,531 |
State |
Puyallup |
25 |
Meeker Elementary, Aylen Junior High and Stewart Elementary School Crosswalk Improvements |
The project includes flashing beacons, street lights, curb ramps, educational materials and events, and speed emphasis patrols. |
$210,000 |
$210,000 |
$2,248,531 |
State |
Clark County |
49 |
Sacajawea Elementary Pedestrian Safety |
The project includes sidewalk, curb, gutter, crosswalk pavement markings, crossing guard safety equipment, walking school bus program, educational materials and events, speed feedback signs and emphasis patrols. |
$302,000 |
$302,000 |
$2,550,531 |
State |
Washington State Office of Superintendent of Public Instruction (Statewide) |
N/A |
Safe Routes to School Bicycle and Pedestrian Safety Education Program |
The project conducts Bicycle and Pedestrian Safety Training for students across the state (to be conducted at schools determined by OSPI to have need). |
$500,000 |
$500,000 |
$3,050,531 |
State |
Swinomish Indian Tribal Community |
10 |
Swinomish to La Conner Safe Routes Project |
The project includes sidewalk, curb, gutter, bicycle lanes, signage, sharrow markings, crosswalk markings including stop bars, flashing beacons, bicycle and pedestrian safety education training, crossing guard training, speed feedback signs and emphasis patrols. |
$779,610 |
$744,610 |
$3,795,141 |
Federal |
Olympia |
22 |
22nd Avenue Sidewalk Project |
The project includes sidewalk, planter strip, education materials and events, walking school bus. |
$1,899,300 |
$1,076,000 |
$4,871,141 |
Federal |
University Place |
28 |
44th Street Safe Routes to Schools Project |
The project includes sidewalk, curb, gutter, bike lane, street lights, curb ramps, signage, educational materials and events, speed feedback signs and emphasis patrols. |
$910,000 |
$820,000 |
$5,691,141 |
Federal |
Federal Way |
30 |
Federal Way Pedestrian Connection |
The project includes sidewalk, curb, gutter, curb ramps, planter strips, sharrow markings, street lights, roundabout, and flashing beacons. |
$775,000 |
$775,000 |
$6,466,141 |
Federal |
Bellevue |
48 |
West Lake Sammamish Parkway Sidewalk Connection |
The project includes sidewalk, curb, gutter, planter strip, educational materials and events, walking school bus, and emphasis patrols. |
$347,375 |
$260,000 |
$6,726,141 |
State |
Quincy |
12, 13 |
Quincy Valley K-7 Pathway |
The project includes shared use path, bollards, enclose irrigation ditch, fencing, landscaping, bicycle racks, educational materials and events, walking school bus, adult crossing guard equipment, and emphasis patrols. |
$342,000 |
$292,000 |
$7,018,141 |
Federal |
Seattle |
37 |
Beach Square Safe Routes to School |
The project includes school speed zone signage, flashing beacons, crosswalk markings and stop bar, pedestrian refuge island, curb extensions, street lighting, pedestrian countdown signals, educational materials and events, and speed control campaign. |
$258,000 |
$248,000 |
$7,266,141 |
Federal |
University Place |
28 |
Cirque Drive Safe Routes to Schools Project |
The project includes sidewalk, curb, gutter, bike lane, planter strip, street lights, crosswalk markings, signalized crosswalks, curb ramps, educational materials and events, speed feedback signs and emphasis patrols. |
$1,325,000 |
$1,040,000 |
$8,306,141 |
State |
Sedro Woolley |
39 |
SR9 Pedestrian/Bicycle Safety Improvements |
The project includes sidewalk, curb, gutter, bike lane, stormwater improvements, educational materials and events, emphasis patrols. |
$351,000 |
$300,000 |
$8,606,141 |
State |
Port Townsend |
24 |
Sheridan Street Sidewalk and Crossing Improvements |
The project includes sidewalk, curb, gutter, curb extensions, planter strips, crosswalk markings, signage, educational materials and events, and emphasis patrols. |
$561,681 |
$497,913 |
$9,104,054 |
State |
Vancouver |
49 |
Endeavour Elementary Pathway and Safety Improvement Program |
The project includes a shared use path, educational materials and events, speed feedback sign, and emphasis patrols. |
$227,654 |
$209,654 |
$9,313,708 |
State |
Lake Forest Park |
32 |
NE 178th Street Sidewalk Improvements |
The project includes sidewalk, curb, gutter, curb ramps, removal of guardrail, curb extensions, crosswalk markings, flashing beacons, signage, bike lanes, bicycle racks, educational materials and events, and crossing guard equipment. |
$1,018,000 |
$569,000 |
$9,882,708 |
Federal |
University Place |
28 |
56th Street Safe Routes to Schools Project |
The project includes sidewalk, curb, gutter, street lights, curb ramps, crosswalk markings, signage, pedestrian refuge island, educational materials and events, speed feedback signs, and emphasis patrols. |
$540,000 |
$464,000 |
$10,346,708 |
Federal |
Seattle |
46 |
Wedgwood Elementary Children and Neighbors |
The project includes sidewalk, curb, gutter, planter strip, drainage, educational materials and events, speed feedback signs, and emphasis patrols. |
$454,000 |
$439,000 |
$10,785,708 |
State |
Shelton |
35 |
Evergreen Elementary Safe Routes to School Program |
The project includes sidewalk, curb, gutter, curb ramps, curb extensions, signage, educational materials and events, walking school bus, speed feedback signs, crossing guard equipment and emphasis patrols. |
$509,596 |
$497,700 |
$11,283,408 |
State |
Anacortes |
40 |
Anacortes Safe Routes to Schools - Covered Bike Parking and Mid-Block Crossing |
The project includes mid-block crossing, pavement markings, flashing beacons, curb extensions, curb ramps, covered bike parking, drainage, street lighting, educational materials and events, and emphasis patrols. |
$221,000 |
$221,000 |
$11,504,408 |
State |
Shoreline |
32 |
Einstein Safe Routes |
The project includes sidewalks, curb, gutter, curb ramps, educational materials and events, and emphasis patrols. |
$435,000 |
$435,000 |
$11,939,408 |
State |
Edmonds |
21 |
15th St. SW from Edmonds Way (SR-104) to 8th Ave. S |
The project includes sidewalk, curb, gutter, drainage, curb ramps, sharrow markings, flashing beacon, bicycle rack, educational materials and events, and emphasis patrols. |
$374,000 |
$374,000 |
$12,313,408 |
Federal |
Spokane |
6 |
Westview Elementary School |
The project includes, curb, gutter, planter strip, curb ramps, educational materials and events, and increased traffic patrols. |
$610,435 |
$555,935 |
$12,869,343 |
Federal |
Spokane |
6 |
Hamblen Elementary School |
The project includes sidewalk, curb, gutter, planter strips, curb ramps, educational materials and events, and emphasis patrols. |
$646,732 |
$592,232 |
$13,461,575 |
State |
Edmonds |
21 |
238th St. SW from 100th Ave. W to 104th Ave. W |
The project includes sidewalk, curb, gutter, drainage, curb ramps, sharrow markings, flashing beacon, bicycle rack, educational materials and events, and emphasis patrols. |
$591,000 |
$591,000 |
$14,052,575 |