Chapter 720 of the WSDOT Design Manual provides guidance for the impact attenuators that are used by WSDOT. |
|
|||||||||||||||||||||||||||||||||||||
|
For new (permanent) installations, the following systems are approved for use by WSDOT: For both new (permanent) installations and Work Zone (temporary) installations, the following systems are approved for use by WSDOT:
For Work Zone (Temporary) installations, the following systems are approved for use by WSDOT:
Older systems that that have been installed in the past that are no longer approved by WSDOT for new installations:
|
|||||||||||||||||||||||||||||||||||||||
| Copyright WSDOT © 2002 |
Traffic & Roads | Site Index | Contact WSDOT | WSDOT Business | WSDOT Home |