Skip Top Navigation Skip to Content
These drawings were developed and are supported by the Headquarters Design Office; however, they are provided “as is”. The user assumes full responsibility for the plan’s adequacy to address a specific construction situation and for any alterations to the drawing by the user.Local Crosswalk Options (PM-2)Roundabout Traffic Arrows (PM-3)Contact for this page:Bill BerensDesign Standards questions:designstandards@wsdot.wa.gov