Skip Top Navigation Skip to Content
These drawings were developed and are supported by the Headquarters Design Office; however, they are provided “as is”. The user assumes full responsibility for the plan’s adequacy to address a specific construction situation and for any alterations to the drawing by the user.Median Barrier Catch Basin (DS-4)Manhole Ring and Cover for Bridges (DS-6)Contact for this page:Bill BerensDesign Standards questions:designstandards@wsdot.wa.gov