These drawings provide the details necessary for installing ITS Camera Poles.
 |
|
|
|
 |
 |
| Foundation Alternate #1 |
Foundation Alternate #2
|
In any WSDOT contract requiring the installation of ITS Camera Poles, include these plan sheets as part of the Contract Plans: View
Memorandum (pdf 186 kb)
These details were developed in the Bridge and Structures Office, and the original drawings, signed by Structural Engineers, are on file at the HQ Design Office. Specific project information may be inserted in the sheet borders, but any modification to the details or notes will require approval by a licensed Structural Engineer. The following copies of the filed originals are provided for comparison: View
Signed Plan Sheets (pdf 105 kb)
e above memorandum, Region Intelligent Transportation System design groups are directed to request a soils analysis, in memorandum format, from the Region Geotechnical group. Please note the highlights, representing the particular information to be included for each project, in the following sample:
View sample of
Soils Analysis Request Memo (pdf 21 kb).
One of these two General Special Provisions (GSP's) shall be included in contracts requiring this work, as well as other applicable GSP's and Special Provisions:
200225.GR8 200226.GR8 For more information, please contact Headquarters Traffic Office:
Terry Thayer
ThayerT@wsdot.wa.gov 360-705-7290
View
Plan Sheet (pdf 411 kb)
Download
WinZip file (zip 345 kb)
(WinZip file contains the following file formats: .dgn, .dwg, and .doc files)
Download free
Adobe Acrobat Reader Download free evaluation version of
WinZip