DIVISION8.GR8 MISCELLANEOUS CONSTRUCTION
11.GR8 GUARDRAIL
BSP1102.GB8 Materials
BSP110201.GB8 Beam Guardrail
BSP11020101.GB8 Post and Blocks
BSP110201011.MB8 (Steel Shear Plates and
Backing Plates)
(BSP February 22, 2001)
Use in thrie beam retrofit projects with
beam guardrail Type Thrie Beam using
timber blockouts wedged between
openings in existing concrete baluster rails.
Include with 0221.MR6, 02318.MR6,
BSP110201021.GB8, BSP 110201022.GB8,
BSP110301A1.GB8, and BSP110301C2.GB8.
BSP110201012.GB8 (Grout)
(BSP July 12, 2000)
Use in thrie beam retrofit projects with
beam guardrail Type Thrie Beam using
a steel post connection to the existing
concrete curb or railbase. Include with
0221.MR6, 02318.MR6, BSP110201021.GB8,
and BSP110301A2.GB8.
BSP110201013.MB8 (Steel Angles for Timber Blockout
Connection to Truss)
(BSP October 13, 2003)
Use in thrie beam retrofit projects with
beam guardrail Type Thrie Beam requiring
timber blockout connection to existing steel
truss members. Include with
BSP110201022.GB8 and other appropriate
BSP's supplementing Sections 8-11.2 and
8-11.3(1).
BSP110201014.MB8 (Beam Guardrail Type WP Thrie Beam)
(BSP November 5, 2006)
Use in thrie beam retrofit projects with
weak post thrie beam guardrail retrofit
(beam guardrail Type WP Thrie Beam).
Include with 07012.FR1, BSP110201022.GB8,
BSP110301A3.MB8, BSP110301C4.GB8, BSP1103021.GB8,
BSP1103041.GB8, and BSP1105A1.MB8.
BSP11020102.GB8 Hardware
BSP110201021.GB8 (Resin Bonded Anchors)
(BSP July 12, 2000)
Use in thrie beam retrofit projects requiring
resin bonded anchors for connection to
concrete baluster railing end posts, and
concrete curbs and railbases. Include with
0221.MR6, 02318.MR6, and either BSP110201011.MB8,
BSP110201022.GB8, BSP110301A1.GB8, and BSP110301C2.GB8,
or BSP110201012.MB8 and BSP110301A2.GB8.
BSP110201022.GB8 (Lag Screws)
(BSP July 12, 2000)
Use in thrie beam retrofit projects requiring
connections with lag screws to timber
members and blockouts.
BSP1103.GB8 Construction Requirements
BSP110301.GB8 Beam Guardrail
BSP110301A.GB8 Erection of Posts
BSP110301A1.GB8 (Timber Blockouts for Beam Guardrail
Type Thrie Beam)
(BSP October 2, 2000)
Use in thrie beam retrofit projects with
beam guardrail Type Thrie Beam using
timber blockouts wedged between openings
in existing concrete baluster rails. Include
with 0221.MR6, 02318.MR6, BSP110201011.MB8,
BSP110201021.GB8, BSP110201022.GB8, and
BSP110301C2.GB8.
BSP110301A2.GB8 (Steel Posts for Beam Guardrail Type
Thrie Beam)
(BSP July 12, 2000)
Use in thrie beam retrofit projects with
beam guardrail Type Thrie Beam using a
steel post connection to the existing
concrete curb or railbase.
Include with 0221.MR6, 02318.MR6,
BSP110201012.GB8, BSP110201021.GB8,
and BSP110301A2.GB8.
BSP110301A3.MB8 (Beam Guardrail Type WP Thrie Beam)
(BSP November 5, 2006)
Include in thrie beam retrofit projects with
weak post thrie beam guardrail retrofit (beam
guardrail Type WP Thrie Beam).
Include with 07012.FR1, BSP110201014.MB8,
BSP110201022.GB8, BSP110301C4.GB8,
BSP1103021.GB8, BSP1103041.GB8 and
BSP1105A1.MB8.
BSP110301C.GB8 Erection of Rail
BSP110301C1.GB8 (Field Measuring to Existing
Type 3 Anchors)
(BSP July 12, 2000)
Include in thrie beam retrofit projects when
existing Type 3 anchors are being salvaged
for reuse as part of the retrofitted guardrail
system.
BSP110301C2.GB8 (Attaching Beam Guardrail Type Thrie
Beam to Timber Blockouts)
(BSP January 12, 2004)
Use in thrie beam retrofit projects with
beam guardrail Type Thrie Beam using
timber blockouts wedged between openings
in existing concrete baluster rails.
Include with 0221.MR6, 02318.MR6,
BSP110201011.MB8, BSP110201021.GB8,
BSP110201022.GB8, and BSP110301A1.GB8.
BSP110301C3.GB8 (Thrie Beam Expansion Joint Element)
(BSP July 12, 2000)
Use in thrie beam retrofit projects where
the beam guardrail elements are continuous
across interior bridge expansion joints.
BSP110301C4.GB8 (Beam Guardrail Type WP Thrie Beam)
(BSP January 12, 2004)
Include in thrie beam retrofit projects with
weak post thrie beam guardrail retrofit
(beam guardrail Type WP Thrie Beam).
Include with 07012.FR1, BSP110201014.MB8,
BSP110201022.GB8, BSP110301A3.MB8,
BSP1103021.GB8, BSP1103041.GB8 and BSP1105A1.MB8.
BSP110302.GB8 Guardrail Construction Exposed to Traffic
BSP1103021.GB8 (Beam Guardrail Type WP Thrie Beam)
(BSP July 12, 2000)
Include in thrie beam retrofit projects with weak
post thrie beam guardrail retrofit (beam
guardrail Type WP Thrie Beam). Include with
07012.FR1, BSP110201014.MB8, BSP110201022.GB8,
BSP110301A3.MB8, BSP110301C4.GB8, BSP1103041.GB8,
and BSP1105A1.MB8.
BSP110304.GB8 Removing Guardrail
BSP1103041.GB8 (Beam Guardrail Type WP Thrie Beam)
(BSP July 12, 2000)
Include in thrie beam retrofit projects with weak
post thrie beam guardrail retrofit (beam
guardrail Type WP Thrie Beam). Include with
07012.FR1, BSP110201014.MB8, BSP110201022.GB8,
BSP110301A3.MB8, BSP110301C4.GB8, BSP1103021.GB8,
and BSP1105A1.MB8.
1105.GB8 Payment
BSP1105A.GB8 Use preceding the following:
BSP1105A1.MB8 (Removal Costs Included in Beam
Guardrail Type WP Thrie Beam)
(BSP July 12, 2000)
Include in thrie beam retrofit projects with weak
post thrie beam guardrail retrofit (beam
guardrail Type WP Thrie Beam). Include with
07012.FR1, BSP110201014.MB8, BSP110201022.GB8,
BSP110301A3.MB8, BSP110301C4.GB8, BSP1103021.GB8,
BSP1105A1.MB8, and BSP1103041.GB8.
12.GR8 CHAIN LINK FENCE AND WIRE FENCE
1202.GR8 Materials
BSP12022.MB8 (Cable Fence)
(BSP September 8, 2003)
Use in projects with cable fence. Include with
BSP1203012.MB8, BSP120401.MB8, and BSP12052.MB8.
Include with BSP1203011.GB8 when anchoring the
cable fence posts to existing concrete structures.
Include with BSP1203013.GB8 when painting of the
galvanized fence posts is required.
BSP1203.GB8 Construction Requirements
BSP120301.GB8 (Cable Fence)
Use once preceding the following:
BSP1203011.GB8 (Field Measuring For Cable Fence)
(BSP September 8, 2003)
Use in projects with cable fence when anchoring
the cable fence posts to existing concrete
structures. Include with BSP12022.MB8,
BSP1203012.MB8, BSP120401.MB8, and BSP12052.MB8.
Include with BSP1203013.GB8 when painting of the
galvanized fence posts is required.
BSP1203012.MB8 (Cable Fence)
(BSP September 8, 2003)
Use in projects with cable fence. Include with
BSP12022.MB8, BSP120401.MB8, and BSP12052.MB8.
Include with BSP1203011.GB8 when anchoring the
cable fence posts to existing concrete structures.
Include with BSP1203013.GB8 when painting of the
galvanized fence posts is required.
BSP1203013.GB8 (Cable Fence)
(BSP September 8, 2003)
Use in projects with cable fence. Include with
BSP12022.MB8, BSP120401.MB8, and BSP12052.MB8.
Include with BSP1203011.GB8 when anchoring the
cable fence posts to existing concrete structures.
BSP1204.GB8 Measurement
BSP120401.MB8 (Cable Fence)
(BSP September 8, 2003)
Use in projects with cable fence. Include with
BSP12022.MB8, BSP1203012.MB8, and BSP12052.MB8.
Include with BSP1203011.GB8 when anchoring the cable
fence posts to existing concrete structures. Include
with BSP1203013.GB8 when painting of the galvanized
fence posts is required.
1205.GR8 Payment
BSP12052.MB8 (Cable Fence)
(BSP September 8, 2003)
Use in projects with cable fence. Include with
BSP12022.MB8, BSP1203012.MB8, and BSP120401.MB8.
Include with BSP1203011.GB8 when anchoring the cable
fence posts to existing concrete structures. Include
with BSP1203013.GB8 when painting of the galvanized
fence posts is required.
20.GR8 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS,
AND ELECTRICAL
2002.GR8 Materials
BSP20021.MB8 (Traffic Signal Shaft Foundation Shaft
Casing and Slurry)
(BSP September 8, 2003)
Use in traffic signal projects with shaft foundations
in seak soils, with the concurrence of the Materials
Laboratory Geotechnical Branch. Include with
BSP2203041.SB8 and BSP20051.GB8.
2003.GR8 Construction Requirements
BSP200304.GB8 Foundations
BSP2003041.SB8 (Shafts for Signal Standard Foundations)
(BSP August 4, 2008)
Use in traffic signal projects with shaft foundations in
weak soils, with the concurrence of the Materials
Laboratory Geotechnical Branch. The fill-in specifies
the location(s) of the shaft(s) requiring construction
under these construction requirements. Include with
BSP20021.MB8 and BSP20051.GB8.
(One fill-in)
BSP2005.GB8 Payment
BSP20051.GB8 (Removing Traffic Signal Shaft Obstructions)
(BSP September 8, 2003)
Use in traffic signal projects with shaft foundations
in Weak soils, with the concurrence of the Materials
Laboratory Geotechnical Branch. Include with
BSP20021.MB8 and BSP2003041.SB8.
BSP21.GB8 PERMANENT SIGNING
BSP2102.GB8 Materials
BSP210201.GB8 Sign Suport Structures
BSP210201A.GB8 Use preceding the following BSP only
BSP210201A1.MB8 (Shafts for Sign Structure Foundations)
(BSP August 4, 2008)
Use in sign structure projects with shaft foundations
where the shaft diameter is 48 inches or greater, or
where the shaft depth is 15 feet or greater, or where
the Materials Laboratory Geotechnical Branch identifies the
foundation soils as sufficiently weak to require use of
this specification.
Include with BSP210309F2.SB8 and BSP210501.GB8.
BSP21020101.GB8 Steel Structures and Posts
BSP210201011.MB8 (Monotube Sign Structures)
(BSP October 2, 2006)
Use in projects with monotube sign bridges
and/or monotube cantilever sign structures.
Include with either BSP210309A1.MB8 or
BSP210309A2.SB8, BSP210309F1.GB8,
and BSP2104.FB8. Include with BSP210201012.GB8
when sign structures are constructed with round
tube or pipe.
BSP210201012.GB8 (Monotube Sign Structures
of round tube or pipe)
(BSP August 5, 2002)
Use in projects with monotube sign bridges and/or
monotube cantilever sign structures, constructed
with round tube or pipe. Include with BSP210201011.GB8,
either BSP210309A1.MB8 or BSP210309A2.SB8, BSP210309F1.GB8,
and BSP2104.FB8.
BSP2103.GB8 Construction Requirements
BSP210309.GB8 Sign Structures
BSP210309A.GB8 Fabrication of Sign Structures
BSP210309A1.MB8 (Monotube Sign Structures)
(BSP February 20, 2002)
Use in projects with monotube sign bridges
and/or monotube cantilever sign structures
painted with the conventional gray color
(Federal Standard 595B No. 35237).
Include with BSP210201011.MB8, BSP210309F1.GB8,
and BSP2104.FB8. Include with
BSP210201012.GB8 when sign structures are
constructed with round tube or pipe.
BSP210309A2.SB8 (Monotube Sign Structures)
(BSP August 16, 2004)
Use in projects with monotube sign bridges
and/or monotube cantilever sign structures
painted a color other than the conventionally
specified gray color. Include with
BSP210201011.MB8, BSP210309F1.GB8, and
BSP2104.FB8. Include with BSP210201012.GB8
when sign structures are constructed with
round tube or pipe. The fill-in specifies
the Federal Standard 595B color number, or
the color name if no number.
(1 fill-in)
BSP210309E.GB8 Bridge Mounted Sign Brackets
BSP210309E1.FB8 (Bridge Mounted Sign Brackets)
(BSP December 14, 2000)
Use in projects with bridge mounted sign
brackets. The first and third fill-ins specify
the sign bracket number(s). The second fill-in
itemizes the structural carbon steel quantity
for each sign bracket. The fourth fill-in
specifies the quantity of the hole drilling
required for the resin bonded anchors for each
sign bracket.
(4 fill-ins)
BSP210309F.GB8 Foundations
BSP210309F1.GB8 (Deleting Grout Pad for Monotube Sign
Structures)
(BSP July 12, 2000)
Use in projects with monotube sign bridges
and/or monotube cantilever sign structures.
Include with BSP210201011.MB8, either BSP210309A1.MB8
or BSP210309A2.SB8, and BSP210309F1.GB8. Include
with BSP210201012.GB8 when sign structures
are constructed with round tube or pipe.
BSP210309F2.SB8 (Shafts for Sign Structure Foundations)
(BSP August 4, 2008)
Use in sign structure projects with shaft foundations
where the shaft diameter is 48 inches or greater, or
where the shaft depth is 15 feet or greater, or where
the Materials Laboratory Geotechnical Branch identifies
the foundation soils as sufficiently weak to require use
of this specification. The fill-in specifies the location(s)
of the shaft(s) requiring construction under these construction
requirements. Include with BSP210201A1.MB8 and BSP210501.GB8.
(1 fill-in)
BSP2104.GB8 Measurement
BSP210401.FB8 (Monotube Sign Structures)
(BSP July 12, 2000)
Use in projects with monotube sign bridges and/or
monotube cantilever sign structures. The first
fill in specifies the type of sign structure work
included (sign bridge or cantilever sign structure
or both). The second fill-in itemizes the quantities
and work involved with each sign structure. Include
with BSP210201011.MB8, either BSP210309A1.MB8 or
BSP210309A2.SB6, and BSP210309F1.GB8. Include with
BSP210201012.GB8, when sign structures
are constructed with round tube or pipe.
(2 fill-ins)
BSP2105.GB8 Payment
BSP210501.GB8 (Shafts for Sign Structure Foundation)
(BSP New Date)
Use in sign structure projects with shaft foundations where
the shaft diameter is 48 inches or greater, or where the shaft
depth is 15 feet or greater, or where the Materials Laboratory
Geotechnical Branch identifies the foundation soils as sufficiently
weak to require use of this specification.
Include with BSP210201A1.MB8 and BSP210309F2.SB8.