Design - General Special Provisions

text size: T T T

Metric: Bridge GSPs Division 2

Design: Project DevelopmentGSPs and Amendments |  Bridge GSP Division 2


DIVISION2.GR2 EARTHWORK 09.GR2 STRUCTURE EXCAVATION 0903.GR2 Construction Requirements BSP090303.GB2 Construction Requirements, Structure Excavation, Class A BSP090303B.GB2 Excavation Using Open Pits - Extra Excavation BSP090303B1.FB2 (Extra Excavation and Open Pit Excavation Not Allowed) (October 13, 2003) Use in projects where extra excavation and open pit excavation is not allowed at specific locations. The fill-in specifies the location(s) where extra excavation and open pit excavation is not allowed. (1 fill-in)