DIVISION8.GR8 MISCELLANEOUS CONSTRUCTION 01.GR8 EROSION CONTROL AND WATER POLLUTION CONTROL 0103.GR8 Construction Requirements 0103A.GR8 (Treatment of pH for Concrete Work) (April 3, 2006) Include in all projects when pH monitoring is a condition of a NPDES construction permits, a 401 Water Quality Certification, or other permit. Requires approval of Regional Environmental Manager and Regional Construction Manager. Must also use 01031A.GR8, 0105.GR8, 01031A1.GR5, 0105.GR5, 05031B.GR5, 0505.GR5, 023003.GB6, and 025A4.GB6. 01031.GR8 General 010310.GR8 (Erodible Soil Central Basin) (April 3, 2006) Use for projects east of the Cascade range in areas receiving 12 inches or less annual precipitation. Do not use if any portion of the project lies in areas that receive more than 12 inches of annual precipitation. See http://www.wsdot.wa.gov/eesc/design/ hydraulics/pdf/EastWAIso.pdf for precipitation map. 010310A.GR8 Must use with 010311.GR8 or 010312.FR8. 010311.FR8 (Offsite Stormwater) April 1, 2002) Use when there are known locations where stormwater enters the project site and it is desired to prevent this stormwater from flowing uncontrolled through the project site. (1 fill-in) 010312.FR8 (Side Slope Treatment) (April 1, 2002) Use on projects where erodible soils are anticipated and it is desired to have the newly exposed slopes walked before final erosion control can be accomplished, in accordance with recommendation from environmental office. 01031A.GR8 Submittals (April 3, 2006) Must include with 0103A.GR8, 0105.GR8, 01031A1.GR5, 0105.GR5, 05031B.GR5, 0505.GR5, 023003.GB6, and 025A4.GB6. 010302.GR8 Erosion Control Seeding, Fertilizing, and Mulching 010302B.GR8 Seeding and Fertilizing 010302B1A.SR8 (Composition, proportion, quality and application rate of grass seed) (January 3, 2006) Use in projects with roadside seeding. (2 fill-ins) (Fill-ins with dollar signs only are to be used as required.) 010302B1B.SR8 (Composition, proportion, quality and application rate of grass seed) (January 3, 2006) Use this GSP when Source identified or non-source identified seed is not required. (2 fill-ins) (Fill-ins with dollar signs only are to be used as required.) 010302B2.MR8 (Seeding by hand) (January 3, 2006) Must also use 010302B5.MR8. Use in projects with seeding and fertilizing of less than 1 acre, the use of mechanical equipment would not be cost effective, or on remote projects with many small areas. 010302B3.SR8 (One application of fertilizer) (January 3, 2006) Use in projects requiring only one application of fertilizer. (4 fill-ins) (The fill-ins for the fertilizer itself should be by consulting the State Horticulturist, the Region Landscape Architect, or Headquarters Roadside and Site Development. Fill-in $$4$$ should be 2/3 the amount of nitrogen in fill-in $$1$$.) 010302B4.SR8 (More than one application of fertilizer) (January 3, 2006) Must also use 010302B1.SR8. Use in projects when the Region Landscape Arch. or Horticult. recommends more than one fertilizer application. (7 fill-ins) (The fill-ins for the fertilizer itself should be by consulting the State Horticulturist, the Region Landscape Architect, or Headquarters Roadside and Site Development. Fill-in $$7$$ should be 2/3 the amount of nitrogen in fill-in $$4$$.) 010302B5.MR8 (Fertilizing by hand) (January 3, 2006) Must include with 010302B2.MR8. Use in projects with seeding and fertilizing of less than 1 acre, the use of mechanical equipment would not be cost effective, or on remote projects with many small areas. 010302B6.SR8 (Fertilizing by hand) (January 3, 2006) Must include with 010302B2.MR8. Use this GSP for projects in eastern Washington where soils tests show excess potassium and phosphorous and high pH. 010302C.GR8 Liming 010302C1.SR8 (Rate of application of lime) (January 3, 2006) Use in projects requiring the application of lime. (1 fill-in) 010302D.GR8 Mulching 010302D1.SR8 (Type and rate of application of mulch) (January 3, 2006) Use in projects requiring the application of mulch. (2 fill-ins) 0105.GR8 Payment (April 3, 2006) Must include with 0103A.GR8, 01031A.GR8, 01031A1.GR5, 0105.GR5, 05031B.GR5, 0505.GR5, 023003.GB6, and 025A4.GB6. 02.GR8 ROADSIDE RESTORATION 0201.GR8 Description 02011.GR8 (Compost) (January 7, 2002) Use in projects containing planting or seeding items as determined by a landscape architect or horticulturist. No changes to this GSP are allowed without the concurrence of the OSC Design Office. Must include 0203051.SR8 and 02051.MR8, 0203051A.SR8 and 02051A.MR8. 02012.GR8 (Removal of Buried Man-Made Debris) (December 6, 2004) Use on projects that include soil amendment, and/or irrigation systems, and where man-made construction debris is known or suspected to exist. Requires the approval of the Region Construction Manager. Must include 0203052.GR8 and 02052.GR8. 0203.GR8 Construction Requirements 020305.GR8 Planting Area Preparation 0203051.SR8 (Application of compost) (August 2, 2004) Include when no incorporation of compost is required. Must include with 02011.GR8 and 02051.MR8. (1 fill-in) 0203051A.SR8 (Application of compost) (August 2, 2004) Include when compost is to be incorporated into the soil. Must include with 02011.GR8, and 02051.MR8. (2 fill-ins) 0203052.GR8 (Removal of Buried Man-Made Debris) (December 6, 2004) Must include with 02012.GR8 and 02051.GR8. 0205.GR8 Payment 02051.MR8 (Compost) (August 7, 2006) Must include with 02011.GR8 and 0203051.SR8. 02051A.MR8 (August 7, 2006) Must include with 02011.GR8 and 0203051A.SR8. 02052.GR8 (Removal of Buried Man-Made Debris) (December 6, 2004) Must include with 02012.GR8 and 0203052.GR8. 10.GR8 GUIDE POSTS 1001.GR8 Description

10011.GR8 (Barrier Delineators) (April 1, 2002) Must also use 10021.MR8, 10031.MR8 or 10032.GR8, 10041.GR8, and 10051.GR8. 1002.GR8 Materials 10021.MR8 (Barrier Delineators) (April 1, 2002) Must also use 10011.GR8, 10031.MR8 or 10032.GR8, 10041.GR8, and 10051.GR8. 1003.GR8 Construction Requirements 10031.MR8 (Barrier Delineators) (April 1, 2002) Delineators placed 6" down from top. Must also use 10011.GR8, 10021.MR8, 10041.GR8, and 10051.GR8. 10032.GR8 (Barrier Delineators) (April 1, 2002) Delineators placed on top of barrier. Must also use 10011.GR8, 10021.MR8 10041.GR8, and 10051.GR8. 1004.GR8 Measurement 10041.GR8 (Barrier Delineators) (April 1, 2002) Must also use 10011.GR8, 10021.MR8 10031.MR8 or 10032.GR8, and 10051.GR8. 1005.GR8 Payment 10051.GR8 (Barrier Delineators) (April 1, 2002) Must also use 10011.GR8, 10021.MR8, 10031.MR8 or 10032.GR8, and 10051.GR8. 11.GR8 GUARDRAIL 1101.GR8 Description 1101A.GR8 (Cable Barrier) (August 5, 2002) Must also use 1103B.GR8, 1103B.GR8, 11042.GR8, and 11052.GR8. 1101B.GR8 (High-Tension Cable Barrier) (April 3, 2006) Must also use 1102B.GR8, 1103C.FR8, 11043.GR8, and 11053.GR8.. 1102.GR8 Materials 1102A.GR8 (Cable Barrier) (April 4, 2005) Must also use 1101A.GR8, 1103B.GR8, 11042.GR8 and 11052.GR8. 1102B.GR8 (High-Tension Cable Barrier) (April 24, 2006) Must also use 1101B.GR8, 1103C.FR8, 11043.GR8, and 11053.GR8.. 1103.GR8 Construction Requirements 1103A.MR8 Box Culvert Guardrail Steel Posts (January 5, 1998) Must also use 11041.GR8 and 11051.MR8. Use in projects requiring the construction of steel guardrail posts on top of existing concrete box culverts. 1103B.GR8 (Cable Barrier) (April 4, 2005) Must also use 1101A.GR8, 1102A.GR8, 11042.GR8, and 11052.GR8. 1103C.FR8 (High-Tension Cable Barrier) (April 24, 2006) Must also use 1101B.GR8, 1102B.GR8, 11043.GR8, and 11053.GR8. Fill-in is the location(s) of Contracting Agency sites to deliver complete sets of Additional High-Tension Cable Barrier Components. (1 fill-in) 11031.GR8 Beam Guardrail 11031C.GR8 Erection of Rail (August 2, 2004) Use in projects requiring snow load washers. Consult Region Operations for determination of need. 1104.GR8 Measurement 11041.GR8 (Box culvert guardrail steel posts) (March 13, 1995) Must include with 11031.MR8. Use in projects requiring the construction of steel guardrail posts on top of concrete box culverts. 11042.GR8 (Cable Barrier) (April 4, 2005) Must also use 1101A.GR8, 102A.GR8, 1103B.GR8, and 11052.GR8. 11043.GR8 (High-Tension Cable Cable Barrier) (April 3, 2006) Must also use 1101B.GR8, 1102B.GR8, 1103C.FR8, and 11053.GR8. 1105.GR8 Payment 11051.MR8 (Box culvert guardrail steel posts) (June 3, 1996) Must include with 11031.GR8 or 11031.MR8. Use in projects requiring the construction of steel guardrail posts on top of concrete box culverts. 11052.GR8 (Cable Barrier) (April 4, 2005) Must also use 1101A.GR8, 1102A.GR8, 1103B.GR8, and 11042.GR8. 11053.GR8 (High-Tension Cable Barrier) (April 3, 2006) Must also use 1101B.GR8, 1102B.GR8, 1103C.FR8, and 11043.GR8. No Federal funding participation. Must be in a state funds group. 12.GR8 CHAIN LINK FENCE AND WIRE FENCE 1202.GR8 Materials 12021.SR8 (Coated chain link fence) (November 27, 1995) Use in projects requiring the construction of coated chain link fence. Must include 12051.MR8. (1 fill-in) 1205.GR8 Payment 12051.MR8 (Coated chain link fence) (April 1, 2002) Use in projects requiring the construction of coated chain link fence. 13.GR8 MONUMENT CASES 1301.GR8 Description 13011.GR8 (Monument pipes included in work) (March 13, 1995) Must also use 13021.GR8, 13031.GR8, 13041.GR8 and 13051.GR8. Use in projects requiring that the monument pipes be installed by the Contractor. 1302.GR8 Materials 13021.GR8 (Monument pipes included in work) (March 13, 1995) Must include with 13011.GR8. Use in projects requiring that the monument pipes be installed by the Contractor. 1303.GR8 Construction Requirements 13031.GR8 (Monument pipes included in work) (March 13, 1995) Must include with 13011.GR8. Use in projects requiring that the monument pipes be installed by the Contractor. 1304.GR8 Measurement 13041.GR8 (Monument pipes included in work) (March 13, 1995) Must include with 13011.GR8. Use in projects requiring that the monument pipes be installed by the Contractor. 1305.GR8 Payment 13051.GR8 (Monument pipes included in work) (April 28, 1997) Must include with 13011.GR8. Use in projects requiring that the monument pipes be installed by the Contractor. 15.GR8 RIPRAP 1502.GR8 Materials 1502A.GR8 Must use with 15021.MR8 15021.MR8 (Requirements for streambed gravel) (August 6, 2001) Must also use 15041.MR8 and 15051.MR8, or 15042.MR8 and 15052.MR8. Use in projects requiring the use of streambed gravel. 1504.GR8 Measurement 1504A.GR8 Must use once preceding the following: 15041.MR8, 15042.MR8 and 15043.MR8. 15041.MR8 (Streambed gravel by the tonne) (March 13, 1995) Must include with 15021.MR8. Use in projects requiring the use of streambed gravel measured and paid by the tonne. 15042.MR8 (Streambed gravel by the cubic meter) (March 13, 1995) Must include with 15021.MR8. Use in projects requiring the use of streambed gravel measured and paid by the cubic meter. 15043.MR8 (Special excavation) (March 13, 1995) Must also use 15053.MR8. Use in projects requiring excavation outside the limits of structure excavation for riprap at bridge piers located within streams. 15044.GR8 (Excavation for riprap is included in cost of riprap) (February 5, 2001) Must also use 15054.MR8. Use in projects with small quantities of riprap or upon recommendation of the Construction and Materials Division. 1505.GR8 Payment 1505A.GR8 Must use once preceding the following: 15051.MR8, 15052.MR8, 15053.MR8. 15051.MR8 (Streambed gravel by the tonne) (June 3, 1996) Must include with 15021.MR8. Use in projects requiring the use of streambed gravel measured and paid by the tonne. 15052.MR8 (Streambed gravel by the cubic meter) (June 3, 1996) Must include with 15021.MR8. Use in projects requiring the use of streambed gravel measured and paid by the cubic meter. 15053.MR8 (Special excavation) (June 3, 1996) Must include with 15043.MR8. Use in projects requiring excavation outside the limits of structure excavation for riprap at bridge piers located within streams. 15054.MR8 (Excavation for riprap is included in cost of riprap) (March 13, 1995) Must include with 15044.GR8. Use in projects with small quantities of riprap or upon recommendation of the Construction and Materials Division. 16.GR8 CONCRETE SLOPE PROTECTION 1603.GR8 Construction Requirements 160302.GR8 Placing Semi-Open Concrete Masonry Units 1603021.GR8 (Requirements for semi-open precast masonry units) (March 13, 1995) Must include with 16051.MR8. Use in projects requiring semi-open concrete masonry slope protection. 1605.GR8 Payment 16051.MR8 (Semi-open Conc. Masonry Slope Protection) (June 3, 1996) Must include with 1603021.GR8. Use in projects requiring semi-open concrete masonry slope protection. 20.GR8 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, AND ELECTRICAL 2002.GR8 Materials 20022.GR8 Light And Signal Standards 200221.MR8 Light Standards With Type 1 Luminaire Arms (August 4, 2008) Use in projects requiring Type 1 luminaire arms and the Engineer is not required to verify the H1 distances shown in the Plans. 200222.MR8 Light Standards With Type 1 Luminaire Arms (August 4, 2008) Use in projects requiring Type 1 luminaire arms and H1 distances are not shown in the Plans or the Engineer is required to verify the H1 distances shown in the Plans. 200223.MR8 Light Standards With Type 2 Luminaire Arms (August 4, 2008) Use in projects requiring Type 2 luminaire arms and the Engineer is not required to verify the H1 distances shown in the Plans. 200224.MR8 Light Standards With Type 2 Luminaire Arms (August 4, 2008) Use in projects requiring Type 2 luminaire arms and H1 distances are not shown in the Plans or the Engineer is required to verify the H1 distances shown in the Plans. 200225.MR8 Traffic Signal Standards (August 4, 2008) Use in projects requiring traffic signal standards, or combination traffic signal/light standards with Type 1 luminaire arms, or both. 200226.MR8 Traffic Signal Standards (August 4, 2008) Use in projects requiring traffic signal standards, or combination traffic signal/light standards with Type 2 luminaire arms, or both. 200201.GR8 Equipment List And Drawings 2002011.GR8 (Light standards when H1 dimension is shown on the Plans) (March 13, 1995) Use in projects with illumination systems and the lighting standard H1 dimension is shown in the Plans and verification by the Engineer is not required prior to fabrication. 2002012.GR8 (Light standards when H1 dimension is not shown on the Plans or must be verified prior to fabrication.) (March 13, 1995) Use in projects with illumination systems and the lighting standard H1 dimension is not shown in the Plans or the dimension shown in the Plans must be verified by the Engineer prior to fabrication. 2002013.GR8 (Traffic signal standards, strain pole standards or combination traffic signal/lighting standards) (March 13, 1995) Use in projects with traffic signal systems when standards are to be installed. 2003.GR8 Construction Requirements 200308.GR8 Wiring 20CHART.GR8 Field Wiring Chart (March 13, 1995) Use in projects with traffic signal systems. 200314A.GR8 Signal Controllers 200314A1.GR8 Testing (March 13, 1995) Use in projects with Contractor furnished signal controllers. 24.GR8 ROCK AND GRAVITY BLOCK WALL, AND GABION CRIBBING 2402.GR8 Materials 24021.GR8 (Gravity Block Wall) (January 7, 2002) Use in projects constructing gravity block walls. Include with 02403021.GR8. 2403.GR8 Construction Requirements 240302.GR8 Gravity Block Wall (January 7, 2002) Use in projects constructing gravity block walls. Include with 02403021.GR8. 2403021.GR8 (Gravity Block Wall) (January 7, 2002) Use in projects constructing gravity block walls. Include with 024021.GR8. 25.MR8 GLARE SCREEN (April 1, 2002) Use in projects when the work zone analysis determines the need for temporary barrier screening. 50.MR8 WILDLIFE REFLECTORS (August 4, 2003) Use in projects requiring the use of wildlife reflectors. 53.GR8 FIELD OFFICE BUILDING 5301.GR8 Description (March 13, 1995) Use in projects when a field office building is required. 5303.GR8 Construction Requirements 53031.MR8 (Field office building requirements) (June 3, 1996) Use in projects when a field office building is required. 5305.MR8 Payment (June 3, 1996) Use in projects when a field office building is required. 54.MR8 BOLLARDS (June 3, 1996) Include in all Metric projects requiring steel bollards.