Design: Project Development | GSP & Amendments | Metric: Division 7
DIVISION7.GR7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY
SEWERS, WATER MAINS, AND CONDUITS
02.MR7 CULVERTS
(April 1, 2002)
Include in all projects. Must also use
INTRO.AM1, INTRO.MR1, 0202.MR1, 0901.MR1,
03038.MR6, 02.MR7, 0202.MR7, 0402.MR7,
04031E.MR7, 00.MR9, 004.MR9, 06.MR9, and
0605.MR9.
0202.MR7 Materials
(April 1, 2002)
Include in all Metric projects. Must also
use INTRO.AM1, INTRO.MR1, 0202.MR1, 0901.MR1,
03038.MR6, 02.MR7, 04.MR7, 0402.MR7,
04031E.MR7, 00.MR9, 004.MR9, 06.MR9, and
0605.MR9.
04.MR7 STORM SEWERS
(April 1, 2002)
Include in all projects. Must also use
INTRO.AM1, INTRO.MR1, 0202.MR1, 0901.MR1,
03038.MR6, 02.MR7, 0202.MR7, 0402.MR7,
04031E.MR7, 00.MR9, 004.MR9, 06.MR9, and
0605.MR9.
0402.MR7 Materials
(April 1, 2002)
Include in all Metric projects. Must also
use INTRO.AM1, INTRO.MR1, 0202.MR1, 0901.MR1,
03038.MR6, 02.MR7, 0202.MR7, 04.MR7,
04031E.MR7, 00.MR9, 004.MR9, 06.MR9, and
0605.MR9.
0403.MR7 Construction Requirements
04031E.MR7 Low Pressure Air Test for Storm Sewers
Constructed of Air-Permeable Materials
(April 1, 2002)
Include in all Metric projects. Must also
use INTRO.AM1, INTRO.MR1, 0202.MR1, 0901.MR1,
03038.MR6, 02.MR7, 0202.MR7, 04.MR7, 0402.MR7,
00.MR9, 004.MR9, 06.MR9, and 0605.MR9.
0502.GR7 Materials
05.GR7 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS
0502.GR7 Materials
050216.GR7 Grate Inlets And Drop Inlets
0502161.GR7 (Grate B required on grate inlets)
(March 13, 1995)
Use in projects, at the Region's
discretion, requiring grate inlets.