Design - General Special Provisions

text size: T T T

Index: Metric General Special Provisions Division 4



Design: ProjectGSP & Amendments |  Metric: Division 4

DIVISION4.GR4 BASES 04.GR4 BALLAST AND CRUSHED SURFACING 0403.GR4 Construction Requirements 0403051.GR4 Shaping And Compaction (March 13, 1995) Use in projects requiring a reference line for asphalt pavers and projects to be paved with cement concrete pavement using a slip form paver. May be omitted at the Region's discretion for projects less than 2 miles (3 kilometers) in length. 06.GR4 ASPHALT TREATED BASE 0602.GR4 Materials 06020.SR4 (Asphalt Treated Base) (October 25, 1999) Use in projects requiring the construction of asphalt treated base. (1 fill-in) 06021.SR4 Asphalt Treated Permeable Base (August 6, 2001) Must also use 060306.MR4, 060307.MR4, and 06051.MR4. Use in projects requiring the construction of asphalt treated permeable base. (1 fill-in) 0603.GR4 Construction Requirements 060306.MR4 Spreading and Finishing (March 13, 1995) Must include with 06021.SR4. Use in projects requiring the construction of asphalt treated permeable base. 060307.MR4 Density (March 13, 1995) Must include with 06021.SR4. Use in projects requiring the construction of asphalt treated permeable base. 0605.GR4 Payment 06051.MR4 (Asphalt Treated Permeable Base) (June 3, 1996) Must include with 06021.SR4. Use in projects requiring the construction of asphalt treated permeable base.