Design - General Special Provisions

text size: T T T

Index: Metric General Special Provision Division 3

Design: Project DevelopmentGSP & Amendments |  Metric: Division 3

DIVISION3.GR3 PRODUCTION FROM QUARRY AND PIT SITES AND STOCKPILING 01.GR3 PRODUCTION FROM QUARRY AND PIT SITES 0102.GR3 Material Sources, General Requirements 01021.GR3 Permits For Operations In King County (March 13, 1995) Use in projects requiring a source of materials, whether furnished by the Contracting Agency or the Contractor, within King County. 0103.GR3 State Furnished Material Sources 01031.FR3 (Source of stockpiled materials) (March 13, 1995) Use in projects with Contracting Agency provided sources for all stockpiled surfacing materials, aggregates, riprap, backfill and borrow. (6 fill-ins) 01032.FR3 (Source of materials) (June 26, 2000) Use in projects with Contracting Agency provided sources for the production of all surfacing materials, aggregates, riprap, backfill and borrow. (8 fill-ins) 0106.GR3 Payment 01061.FR3 (Use of, or work in, Contracting Agency furnished sources not mandatory) (June 3, 1996) Use in projects when use of the furnished sources are not mandatory and the work to be performed in the site is not mandatory. Use site designations in bid items. (1 fill-in) (Fill-in is a list of the site specific bid items that the Contractor would bid $0.00 if the site was not going to be used) 01062.FR3 (Use of Contracting Agency furnished source is not mandatory, but work in site is mandatory) (March 13, 1995) Use in projects when the work in the site is mandatory even if the Contractor does not use the source. Do not use site designations in bid items. (3 fill-ins) 01063.FR3 (Use of Contracting Agency source is mandatory) (March 13, 1995) (2 fill-ins) 02.GR3 STOCKPILING AGGREGATES 0202.GR3 General Requirements 020207.GR3 Removing Aggregates From Stockpiles 0202071.FR3 (Materials existing in stockpile) (March 13, 1995) Use in projects when the material in stockpile will not be immediately available. (1 fill-in) 0202072.FR3 (Royalty payment required for material existing in stockpile) (March 13, 1995) Must also use 02051.SR3. Use in projects requiring reimbursement from the Contractor for materials removed from stockpile. (3 fill-ins) 0205.GR3 Payment 02051.SR3 (Royalty payment required for material existing in stockpile) (March 13, 1995) Must include with 0202072.FR3. (1 fill-in) 03.GR3 SITE RECLAMATION 030201.GR3 Contracting Agency-Provided Sites (March 13, 1995) 0302011.GR3 (Contracting Agency to perform site reclamation) (March 13, 1995) Use only in County and City projects.