Design: Project Development | GSP & Amendments | Metric: Division 3
DIVISION3.GR3 PRODUCTION FROM QUARRY AND PIT SITES
AND STOCKPILING
01.GR3 PRODUCTION FROM QUARRY AND PIT SITES
0102.GR3 Material Sources, General Requirements
01021.GR3 Permits For Operations In King County
(March 13, 1995)
Use in projects requiring a source of
materials, whether furnished by the
Contracting Agency or the Contractor,
within King County.
0103.GR3 State Furnished Material Sources
01031.FR3 (Source of stockpiled materials)
(March 13, 1995)
Use in projects with Contracting Agency
provided sources for all stockpiled
surfacing materials, aggregates, riprap,
backfill and borrow.
(6 fill-ins)
01032.FR3 (Source of materials)
(June 26, 2000)
Use in projects with Contracting Agency
provided sources for the production of
all surfacing materials, aggregates,
riprap, backfill and borrow.
(8 fill-ins)
0106.GR3 Payment
01061.FR3 (Use of, or work in, Contracting Agency
furnished sources not mandatory)
(June 3, 1996)
Use in projects when use of the
furnished sources are not mandatory
and the work to be performed in the
site is not mandatory.
Use site designations in bid items.
(1 fill-in) (Fill-in is a list of
the site specific bid items that the
Contractor would bid $0.00 if the
site was not going to be used)
01062.FR3 (Use of Contracting Agency furnished
source is not mandatory, but work
in site is mandatory)
(March 13, 1995)
Use in projects when the work in the
site is mandatory even if the
Contractor does not use the source.
Do not use site designations in bid
items.
(3 fill-ins)
01063.FR3 (Use of Contracting Agency source is
mandatory)
(March 13, 1995)
(2 fill-ins)
02.GR3 STOCKPILING AGGREGATES
0202.GR3 General Requirements
020207.GR3 Removing Aggregates From Stockpiles
0202071.FR3 (Materials existing in stockpile)
(March 13, 1995)
Use in projects when the material
in stockpile will not be immediately
available.
(1 fill-in)
0202072.FR3 (Royalty payment required for material
existing in stockpile)
(March 13, 1995)
Must also use 02051.SR3.
Use in projects requiring reimbursement
from the Contractor for materials
removed from stockpile.
(3 fill-ins)
0205.GR3 Payment
02051.SR3 (Royalty payment required for material
existing in stockpile)
(March 13, 1995)
Must include with 0202072.FR3.
(1 fill-in)
03.GR3 SITE RECLAMATION
030201.GR3 Contracting Agency-Provided Sites
(March 13, 1995)
0302011.GR3 (Contracting Agency to perform site
reclamation)
(March 13, 1995)
Use only in County and City projects.