Design - General Special Provisions

text size: T T T

Index: Metric General Special Provisions Division2

Design: Project DevelopmentGSP & Amendments |  Metric: Division 2

DIVISION2.GR2 EARTHWORK 01.GR2 CLEARING, GRUBBING, AND ROADSIDE CLEANUP 0101.GR2 Description 01011.FR2 (Clearing and Grubbing) (March 13, 1995) Use when the payment for clearing and grubbing is either lump sum or included in other work. (1 fill-in) (Fill-in describes the longitudinal and lateral limits of clearing and grubbing) 0103.GR2 Construction Requirements 01031.GR2 Roadside Cleanup 010311.FR2 (Roadside Cleanup) (January 5, 1998) Use if additional work is required under the item "Roadside Cleanup". 0105.GR2 Payment 01051.FR2 (Clearing and Grubbing) (January 5, 1998) Must be used with 01011.FR2 when the payment for clearing and grubbing is included in other work. (1 fill-in) 02.GR2 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 0201.GR2 Description 02011.GR2 (Removal of Misc. Traffic Items) (March 13, 1995) Must also use 02032.FR2 and 02052.MR2 Use in projects requiring the removal of minor quantities of miscellaneous traffic items such as traffic islands, traffic curb, lane markers, plastic traffic buttons, guide posts, etc. when there is no pay item for Removal of Structures and Obstructions and the cost of removing each type of item is under $5,000. 02013.FR2 (Asbestos Handling and Removal) (March 13, 1995) Must also use 020342.GR2 and 020511.MR2. Use in projects when asbestos removal is required. (1 fill-in) 02014.GR2 (Removing Portions of Existing Box Culvert) (March 13, 1995) Use in projects requiring removal of portions of existing box culverts prior to extending or widening the structure. Include with 02030207.GB2, 02035.GR2, 02203.GB6, 0234C1.GB6, 02324C2.GR6, 025C1.GB6, and either 020512.GR2 or 020515.GR2. 02015.GR2 (Asbestos Handling and Removal) (September 30, 1996) Must also use 020341.GR2 and 020514.GR2. Use in projects when there is a reason to suspect asbestos may be encountered. 0203.GR2 Construction Requirements 02031.FR2 Removal of Obstructions (February 17, 1998) Use except when the combined cost of all obstruction removal is $5,000 or less and payment is to be included in other payment items. Removal of obstructions that are readily measurable and for which the cost of removal is $5,000 or less per obstruction may be included in this pay item. Removal of obstructions that are not readily measurable, such as foundations, may be included in this item regardless of the removal cost. List all items and approximate quantities to be removed under "Removal of Structures and Obstructions". (1 fill-in) 02032.FR2 Removing Miscellaneous Traffic Items (March 13, 1995) Must include with 02011.GR2. 020341.GR2 Asbestos Handling and Disposal (September 30, 1996) Must include with 02015.GR2. 020342.GR2 Asbestos Handling and Disposal (September 30, 1996) Must include with 02013.FR2. 020350.FB2 (Salvage of Removed Structure Items) (June 26, 2000) Use when removal items are to remain the property of the Contracting Agency. The first fill-in specifies the salvaged items. The second fill-in specifies the name and address (street addres or highway milepost) of the material storage site. Include with 02030205.GB2, either 02030201.FB2, 02030202.FB2, or 02030203.FB2, either 020302091.GB2 or 020302092.FB2, and either 02053.GB2 or 02054.GB2. (2 fill-ins) 020302.GB2 Removal of Bridges, Box Culverts, and other Drainage Structures 02030201.FB2 (Removing Existing Bridge) (June 26, 2000) Use in projects requiring the removal of existing bridge(s) in one stage. The first fill-in specifies the bridge(s). The second fill-in specifies where traffic is directed (onto the detour route or bridge, onto the new bridge, etc.) Include with 02030205.GB2, either 020302091.GB2 or 020302092.FB2, and 02053.GB2. Include with steel members with lead paint. (2 fill-ins) 02030202.FB2 (Removing Existing Bridge) (June 26, 2000) Use in projects requiring the removal of existing bridge(s) in two or more stages. The fill-in specifies the bridge(s). Include with 02030205.GB2, 02030207.MB2, 020302091.GB2, and 02053.GB2. Include with 07012.FR1 if the bridge being removed has steel members with lead paint. (1 fill-in) 02030203.FB2 (Removing Portion of Existing Bridge) (June 26, 2000) Use in projects requiring the removal of portions of existing bridge(s). The first fill-in specifies the bridge(s). The second fill-in specifies the portions being removed. Include with 02030205.GB2, 02030207.MB2, 020302091.GB2, and 02054.GB2. Include with 07012.FR1 if the bridge being partially removed has steel members with lead paint. (2 fill-ins) 02030204.GB2 (Plans of Existing Bridge) (June 26, 2000) Use in projects requiring the removal of existing bridge(s) or of portions of bridge(s) when plans of the existing bridge(s) are available. Include with 02030205.GB2, either 02030201.FB2, 02030202.FB2, or 02030203.FB2, either 020302091.GB2 or 020302092.FB2, and either 02053.GB2 or 02054.GB2.

02030205.GB2 (Bridge Demolition Plan) (June 26, 2000) Use in projects requiring the removal of bridge(s) or of portions of bridge(s). Include with either 02030201.FB2, 02030202.FB2, or 02030203.FB2, either 020302091.GB2 or 020302092.FB2, and either 02053.GB2 or 02054.GB2. Include with 020302051.GB2 if removal of a truss bridge is involved. Include with 07012.FR1 if the bridge involved has steel members with lead paint. 020302051.GB2 (Truss Removal Plan) (April 3, 2006) Use in projects requiring removal of existing steel truss bridges. Include with 02030205.GB2. Include with 07012.FR1 if the bridge involved has steel members with lead paint. 02030206.FB2 (Removal in Water) (June 26, 2000) Use in projects requiring the removal of existing bridge(s) when removal involves piers within the wetted perimeter of a stream, lake or bay. The first fill-in specifies the bridge(s). The second and fourth fill-ins specify the body of water. The third fill-in specifies the elevation of the removal level. Include with 02030205.GB2, either 02030201.FB2, 02030202.FB2, or 02030203.FB2, either 020302091.GB2 or 020302092.FB2, and either 02053.GB2 or 02054.GB2. (4 fill-ins) 02030207.MB2 (Removing Portions of Existing Concrete) (June 26, 2000) Use in projects requiring the removal of portions of existing concrete. For bridges, include with 02030205.GB2, either 02030202.FB2, or 02030203.FB2, 020302091.GB2, and either 02053.GB2 or 02054.GB2. Include with 07012.FR1 if the bridge involved has steel members with lead paint. For box culverts, include with 02014.GR2, 02035.GR2, 02203.GB6, 02324C1.GB6, 02324C2.MR6, 025C1.MB6, and either 020512.GR2 or 020515.GR2 02030208.MB2 (Removing Portions of Existing Concrete Without Replacement) (June 26, 2000) Use in projects requiring the removal of portions of existing concrete where the face of removal is permanently exposed. Include with 02030203.FB2, 02030205.GB2, 02030207.MB2, 020302091.GB2, and 02054.GB2. 02030209.GB2 (Use of Explosives) (June 26, 2000) Must use once in all bridge removal projects, preceding one of the following: 020302091.GB2 (Explosives Prohibited) (June 26, 2000) Use in all projects requiring removal of existing bridges except when use of explosives is permitted. Include with 02030205.GB2, either 02030201.FB2, 02030202.FB2, or 02030203.FB2, and either 02053.GB2 or 02054.GB2. Include with 07012.FR1 if the bridge involved has steel members with lead paint. 020302092.FB2 (Structure Removal By Explosives) (June 26, 2000) Use in projects requiring removal of existing bridges only if explosives may be used. The fill-in specifies the bridge where the use of explosives is permitted for removal operations. Include with 02030201.FB2, 02030205.GB2, and 02053.GB2. Include with 07012.FR1 if the bridge involved has steel members with lead paint. (1 fill-in) 02030210.GB2 (Requirements for Closing Bridge Prior to removal) (January 7, 2002) Use in projects requiring removal of existing bridges when it is necessary to close the bridge to traffic in order to complete removal as soon as possible. Include with 02030201.FB2, 02030205.GB2, 02053.GB2, and either 020302091.GB2 or 020302092.FB2. Include with 07012.FR1 if the bridge involved has steel members with lead paint. 02035.GR2 (Removing Portions of Existing Box Culvert) (June 26, 2000) Use in projects requiring removal of portions of existing box culverts prior to extending or widening the structure. Include with 02014.GR2, 02030207.MB2, 02203.GB6, 02324C1.GB6, 02324C2.MR6, and 025C1.MB6, and either 020512.GR2 or 020515.GR2. 02036.SR2 Removal of Pavement, Sidewalks, Curbs, and Gutters (September 8, 1997) Include in projects when removal of pavement is outside the limits of roadway excavation, and the removal is to be paid by the square meter. Must also use 02043.MR2 and 020513.SR2 (2 fill-ins) 0204.GR2 Measurement 02043.MR2 (Pavement Removal) (September 8, 1997) Must include with 02036.SR2. 02044.MR2 (Sidewalk Removal) (September 8, 1997) Include in projects when removal of sidewalk is outside the limits of roadway excavation, and the removal is to be paid by the square meter. Must include with 020516.SR2. 02045.MR2 (Curb Removal) (September 8, 1997) Include in projects when removal of curb is outside the limits of roadway excavation, and the removal is to be paid by the meter. Must include with 020517.SR2. 0205.GR2 Payment 02051.SR2 (Removal of structures and obstructions included in other work) (June 3, 1996) (1 fill-in) 0205A.GR2 Must use once, preceeding one of the following: 02052.MR2 (Removing Miscellaneous Traffic Items) (June 3, 1996) Must include with 02011.GR2. 02053.GB2 (Removing Existing Bridge) (June 26, 2000) Use in projects requiring the removal of existing bridge(s). Include with 02030205.GB2, either 020302091.GB2 or 020302092.FB2 and either 02030201.FB2 or 02030202.FB2. Include with 07012.FR1 if the bridge involved has steel members with lead paint. 02054.GB2 (Removing Portion of Existing Bridge) (June 26, 2000) Use in projects requiring the removal of portions of existing bridge(s). Include with 02030203.FB2, 02030205.GB2, 02030207.GB2, and 020302091.GB2. Include with 07012.FR1 if the bridge involved has steel members with lead paint. 020511.MR2 (Removal and Disposal of Asbestos Material) (June 3, 1996) Must include with 02013.FR2. 020512.GR2 (Removing Portion of Conc. Box Culvert) (June 26, 2000) Use in projects requiring removal of portions of existing box culverts prior to extending or widening the structure. Include with 02014.GR2, 02030207.MB2, 02035.GR2, 02203.GB6, 02324C1.GB6, 02324C2.MR6, and 025C1.MB6. 020513.SR2 (Pavement Removal) (September 30, 1996) Must include with 02036.SR2. (1 fill-in) 020514.GR2 (Asbestos removal as changed condition) (September 30, 1996) Must include with 02015.GR2. 020515.GR2 (Removal of portions of box culvert) (June 26, 2000) Use in projects requiring removal of portions of existing box culverts prior to extending or widening the structure. Include with 02014.GR2, 02030207.MB2, 02035.GR2, 02203.GB6, 023121.MB6, 02324C1.GB6, 02324C2.MR6, 025a1.SB6, and 025C1.MB6. 020516.SR2 (Sidewalk Removal) (September 8, 1997) Must include with 02044.MR2. (1 fill-in) 020517.SR2 (Removal of portions of curb) (September 8, 1997) Must include with 02045.MR2. (1 fill-in) 03.GR2 ROADWAY EXCAVATION AND EMBANKMENT 0303.GR2 Construction Requirements 030307.GR2 Disposal of Surplus Material 030307A.GR2 (Supplemental Information) Must use preceeding 0303071.FR2, 0303072.FR2, 0303073.GR2, and 0303074.GR2. 0303071.SR2 (Contracting Agency furnished waste site) (March 13, 1995) Use in projects with Contracting Agency provided waste sites. (1 fill-in) 0303072.SR2 (Waste material by embankment widening) (March 13, 1995) Use in projects where the Contracting Agency specifies embankments to be widened. (2 fill-ins) 0303073.GR2 (Contracting Agency provided sites are not mandatory) (March 13, 1995) Use, when applicable, with 0303071.SR2 or 0303072.SR2. 0303074.GR2 (Contracting Agency provided sites are not of sufficient size) (March 13, 1995) Use, when applicable, with 0303071.SR2 or 0303072.SR2. 030314.GR2 Embankment Construction 030314C1.GR2 Compacting Earth Embankments (March 13, 1995) Use in projects when no payment for embankment compaction (Method A) is included. 030314I1.FB2 Embankments At Bridge And Trestle Ends (March 13, 1995) Use in projects when the bridge approach embankments must be constructed before the end piers. (2 fill-ins) 0304.GR2 Measurement 03041.MR2 ("Embankment In Place") (September 8, 1997) Must also include 03051.MR2. Use in projects that require embankment widening for beam guardrail and no other grading pay items are included in the contract to construct the widening. 03042.GR2 (Measurement of roadway excavation and embankment) (March 13, 1995) Must include with 050412.MR1, Contractor surveying - roadway. May be used without Contractor surveying. 03043.GR2 (Measurement of roadway excavation and embankment) (March 13, 1995) Use in minor grading projects when the original cross-sections are satisfactory for construction payment. 0305.GR2 Payment 03051.MR2 ("Embankment In Place") (June 3, 1996) Must include with 03041.MR2. 03052.FR2 (Preparation of waste sites) (March 13, 1995) Use in projects when the preparation of waste sites is included in other work. (1 fill-in) 06.GR2 SUBGRADE PREPARATION 0603.GR2 Construction Requirements 060301.GR2 Subgrade For Surfacing 0603011.GR2 (Subgrade trimmer required) (March 13, 1995) Use in projects where a treated base or pavement will be placed directly on the subgrade. The project should include a bid item for "Gravel Borrow Including Haul" or "Borrow Excavation Including Haul" to ensure that sufficient fine material is available for trimming. 0603012.GR2 (Subgrade trimmer not required) (March 13, 1995) Use in grading-only projects where a treated base is planned for construction on a future project. The project should include a bid item for "Gravel Borrow Including Haul" or "Borrow Excavation Including Haul" to ensure that sufficient fine material is available for trimming. The position of the future treated base is to shown on the plans. 09.GR2 STRUCTURE EXCAVATION 0903.GR2 Construction Requirements 090301C.GR2 Removal Of Unstable Base Material 090301C1.SB2 (Soils that tend to liquify) (March 13, 1995) Use in bridge projects in where soil in the bottom of footing excavation will tend to liquify. (1 fill-in) 090301C2.MB2 (Removal of unsatisfactory foundation material) (January 3, 2006) Must also use 09051.GB2. Use in bridge projects where the removal of unsatisfactory material under spread footings may be required even though the soils report does not require removal. 090303D.GR2 Shoring And Cofferdams 090303D1.GB2 (Protecting existing pavement) (March 13, 1995) Use in projects when bridges are over or adjacent to existing highways. 090303D2.GB2 (Protecting RR tracks) (March 13, 1995) Use in projects when bridges are over or adjacent to existing railroad tracks. 090303D3.FB2 Use with 090303D2.GB2 when construction is required near railroad tracks, or structures which require extensive shoring. (March 13, 1995) (3 fill-ins) 0904.GR2 Measurement 09041.MB2 (Additional structure excavation under girders at end piers) (March 13, 1995) Use in projects where excavation is required outside of normal structure excavation limits for end pier footings. 0905.GR2 Payment 09051.GB2 (Lean concrete for backfilling) (March 13, 1995) Use with 090301B2.MB2. 12.GR2 CONSTRUCTION GEOTEXTILE 1201.GR2 Description 12012.GR2 Wall Backfill (November 17, 1997) Use in projects requiring geosynthetic reinforced slopes. Slope design should be performed by the Olympia Service Center Materials Laboratory or a geotechnical consultant. Use details from DETAILS.CEL Library; MD225, MD229, MD230, and MD230A or MD230B. 1202.GR2 Materials 12022.GR2 Borrow

120222.SR2 Borrow for Geosynthetic Reinforced Slopes (November 17, 1997) Use in projects requiring geosynthetic reinforced slopes. (1 fill-in) 12023.MR2 Cold Drawn Wire (November 17, 1997) Use in projects where welded wire faced geosynthetic reinforced slopes are specified. 12024.GR2 Seed (November 17, 1997) Use in projects where turf reinforcement mat or welded wire faced geosynthetic reinforced slopes are specified. 12026.GR2 Geosynthetic Properties 120264.SR2 Geosynthetic Properties for Reinforced Slopes (April 5, 2004) Use in projects requiring geosynthetic reinforced slopes. The slope class must be identified in fill-in 6 based on the following: Class 1 is typically reinforced slopes which support bridge abutments, buildings, critical utilities, or other facilities which the consequences of poor performance or failure would be severe. In general, slopoes greater than 9.2 meters in height. Class 2 is all reinforced slopes not categorized as Class 1. (6 fill-ins) 120265.MR2 Geosynthetic Properties for Turf Reinforcement Mat (April 5, 2004) Use in projects where geosynthetic reinforced slopes with a truf reinforcement mat facing are specified. 12027.GR2 Source Approval 120273.GR2 Geosynthetic Reinforced Slope Primary Reinforcement (April 5, 2004) Use in projects requiring geosynthetic reinforced slopes. 120274.GR2 Geosynthetic Reinforced slope Secondary Reinforcement (April 5, 2004) Use in projects where geosynthetic reinforced slopes with secondary reinforcement are specified. 120275.GR2 Geosynthetic Reinforced Slope Turf Reinforcement Mat (November 17, 1997) Use in projects where geosynthetic reinforced slopes with turf reinforcement mat facing are specified. 12028.GR2 Acceptance Samples 120283.GR2 Geosynthetic Reinforced Slope Primary Reinforcement (November 17, 1997) Use in projects requiring geosynthetic reinforced slopes. 120284.GR2 Geosynthetic Reinforced Slope Secondary Reinforcement (April 5, 2004) Use in projects where geosynthetic reinforced slopes with secondry reinforcement are specified. 120285.GR2 Geosynthetic Reinforced Slope Turf Reinforcement Mat (November 17, 1997) Use in projects where geosynthetic reinforced slopes with turf reinforcement mat facing are specified. 12029.GR2 Acceptance by Certificate of Compliance 120292.GR2 Retaining Wall (November 17, 1997) Use in projects requiring geosynthetic reinforced slopes. 1203.GR2 Construction Requirements 12034.MR2 Geosynthetic Reinforced Slope Construction Requirements (November 17, 1997) Use in projects requiring geosynthetic reinforced slopes. Slope facing options which include vegetative cover should only be used at sites where the average annual precipitation is 500 mm or more. 12035.MR2 Turf Reinforced Mat Facing Construction (November 17, 1997) Use in projects requiring geosynthetic reinforced slopes with turf reinforcement mat facing. In general, use for slopes no steeper than 1V:1.2H. 12036.MR2 Geosynthetic Wrapped Slope Facing Construction (November 17, 1997) Use in projects requiring geosynthetic reinforced slopeswith geosynthetic wrapped facing. Because of planting requirements, do not use this option for sites where the elevation is over 460 m. In general, use for slopes no steeper than 1V:1H. 12037.MR2 Welded Wire Facing Construction (November 17, 1997) Use in projects requiring geosynthetic reinforced slopes with welded wire facing. In general, use for slopes no steeper than 2V:1H. 12038.GR2 Installing Guardrail Posts in Geosynthetic Reinforced Slopes (November 17, 1997) Use in projects requiring guardrail on geosynthetic reinforced slopes. 1204.GR2 Measurement 12042.SR2 (Geosynthetic Reinforced Slope) (January 5, 1998) Use in projects requiring geosynthetic reinforced slopes. (1 fill-in) 1205.GR2 Payment 12052.SR2 (Geosynthetic Reinforced Slope) (November 17, 1997) Use in projects requiring geosynthetic reinforced slopes. (1 fill-in)