INTRO.MR1 SPECIAL PROVISIONS (January 7, 2008) Include in all projects. Must also use INTRO.AM1, 0202.MR1, 0901.MR1, 03038.MR6, 02.MR7, 0202.MR7, 04.MR7, 0402.MR7, 04031E.MR7, 00.MR9, 004.MR9, 06.MR9, and 0605.MR9.

DIVISION1.GR1 GENERAL REQUIREMENTS

DESWORK.GR1 DESCRIPTION OF WORK

DESWORK1.FR1 (Description of Work) (March 13, 1995) Use in all projects except those involving only painting of metal bridges. (1 fill-in)

DESWORK2.SB1 (Description of Work - Bridge Painting) (January 7, 2002) Use in projects involving only the painting of metal bridges. (3 fill-ins)

02.GR1 BID PROCEDURES AND CONDITIONS

0202.MR1 Plans and Specifications of Work (April 1, 2002) Use in all projects. Must also use INTRO.AM1, INTRO.MR1, 0901.MR1, 03038.MR6, 02.MR7, 0202.MR7, 04.MR7, 0402.MR7, 04031E.MR7, 00.MR9, 004.MR9, 06.MR9, and 0605.MR9.

0204.FR1 Examination of Plans, Specifications And Site of Work (March 13, 1995) Use in projects for which soils investigations have been made. (1 fill-in)

0206.GR1 Preparation Of Proposal

02062.GR1 (Supplemental Instructions) (January 11, 1999) Must use with 02063.FR1, 02063A.FR1, and 020631.FR1.

02063.FR1 Alternative Bids (March 13, 1995) Use in projects when the proposal is to contain alternate items for bidding. Fill-ins consist of a brief description of the portion of the project or the of work that would be subject to alternative bidding. Repeat the "Alternative" paragraphs if the project consists of more than two alternatives. (4 or more fill-ins)

020631.FR1 (Cumulative Alternate Bidding) (August 7, 2006) Use in contracts when the award process is modified to include cumulative Alternates. The region shall determine and notify the Ad and Award office of the Funds Available. The bid items shall be segregated into a Base Bid and Alternates as appropriate. Fill-ins consist of a brief description of the portion of the project or of the work that is included in the noted Alternates. The specification language may be adjusted to suit the number of Alternates.

Use of this GSP requires the approval of the HQ Ad and Award Manager and HQ Assistant State Design Engineer. When requesting approval, provide documentation of funds available, and that Approvals consistent with Design Manual Chapter 330 exist for the Base project and each potential combination of Base plus Alternates. (1 or more fill-ins)

02063A.FR1 (Progress Schedule) (August 7, 2006) Use in all projects unless a Type A Schedule (simple bar chart) is requested. This request should come to the Design Project Engineer from the Construction Project Engineer and be the result of discussion between the Design Project Engineer and by the Construction Project Engineer concerning the level of schedule complexity required to administer the contract. Must also use 08032C1.GR1 when a Type C Progress Schedule is specified.

Fill-in #1 is the minimum bid amount. Any amount over $50,000 requires HQ Construction Office approval. For the following engineers estimates, use the corresponding minimum bid amount:

Engineers Estimate Minimum Bid $1 to $5 mil $5,000 $5 mil to $15 mil $10,000 $15 mil to $20 mil $15,000 $20 mil to $30 mil $25,000 $30 mil to $50 mil $35,000 Over $50 million $50,000

Fill-in #2 is the schedule Type, either “B” or “C.” Use of a Type C schedule requires prior approval from HQ Construction Administration and the Region Construction Manager.

02064.GR1 (Subcontractor list not required with bid) (September 5, 1995) Use in all projects with estimated cost of $1,000,000 or less.

02121.GR1 Public Opening Of Proposal (May 19, 2008) Use in all projects.

02161.GR1 (Protest Procedures) (April 5, 2004) Include in all contracts with Federal Transit Administration (FTA) funding. Typically only applies to Ferry System and Sound Transit projects.

0303.GR1 Execution Of Contract


0303A.GR1 Must use with 03031.GR1.


03031.GR1 Execution Of Contract
(March 13, 1995)
Use in projects selected by the Region when it is
desired to have Escrow Bid Documentation established
for the project. The project must be of significant
size and duration to extend over multiple construction
seasons.

Requires Region to set up banking facility for document
storage prior to advertisements.


03032.GR1 Rapid Execution Of Contract
(April 7, 2008)
Use in Emergency Response projects where the nature of the
emergency requires a rapid award and execution of the contract.
Requires approval of HQ Contract Ad and Award Manager.
Must also use 030201.GR1.


04.GR1 SCOPE OF THE WORK

04051.GR1 Procedure And Protest By The Contractor (April 4, 2005) Use in all projects with an Engineer’s Estimate that exceeds $10 Million. At Region request and with Headquarters Construction approval, may be included in smaller projects.

04051A.GR1 (Appendix for Disputes Review Board) (January 5, 2004) Must be included in the contract as an Appendix when using 04051.GR1.

05.GR1 CONTROL OF WORK

05031.GR1 Plans And Working Drawings (August 2, 2004) Use in projects that are adjacent to or over railroad tracks and involve the Burlington Northern Railroad or the Union Pacific Railroad Co. Do not use in projects involving only bridge painting, planing bridge decks, or bridge deck overlays. If the 60-day turnaround is critical to the schedule, increase the working days accordingly.

05041.GR1 Conformity With And Deviations From Plans And Stakes

050411.MR1 (Contractor Surveying - Structure) (December 6, 2004) Use in projects requiring the Contractor to do all surveying needed for bridges and retaining walls. May be wwwed to retain portions of surveying for WSDOT crews but wwwing to assign additional work to the Contractor requires HQ
                             Construction Office approval.

050412.GR1         (Contractor Surveying - Roadway)
                             (December 4, 2006)
                             Use in projects requiring the Contractor to do
                             all surveying needed for roadway items. May
                             be wwwed to retain portions of surveying for
                             WSDOT crews but wwwing to assign additional work
                             to the Contractor requires HQ Construction
                             Office approval. Must also use 03042.GR2 if
                             roadway excavation or embankment is included
                             in the project.
050413.GR1 (Licensed Surveyors) (August 2, 2004) Include in projects requiring the Contractor to supply professional land surveyors to extablish right-of-way lines and other monuments.

05141.FR1 Cooperation With Other Contractors (March 13, 1995) Use when it is anticipated that other projects are, or will be, under construction during the life of this project within the limits of this project or when access to, or through adjacent projects may be necessary. (1 fill-in)

05142.FR1 (Provide Access) (March 13, 1995) Use on structure contracts which are separate contracts when other contractors are required to haul past the structure being constructed. (1 fill-in)

06.GR1 CONTROL OF MATERIAL

06011.SR1 Approval of Materials Prior To Use (October 25, 1999) Use in projects having fabricated structural steel bridges. (1 fill-in)

0605.GR1 Foreign Made Materials

06051.GR1 (American Made Steel) (March 13, 1995) Use in all Federal Aid projects that do not require the use of 06053.FR1

06052.FR1 (American Made Steel) (March 13, 1995) Use in Federal Aid projects involving the use of steel or iron in both permanent and temporary installations. Must also use 06051.GR1. (1 fill-in)

06053.FR1 (American Made Steel) (March 13, 1995) Use in all Federal Aid projects that require the use of structural steel when the use of foreign structural steel would result in a cost benefit approaching 25 percent of the cost of the total project. If the structural steel items constitute at least 60 percent of the estimated total project cost, alternate bids for domestic and foreign structural steel will be required. Format for alternate bid items is Item Name - Domestic Steel and Item Name - Foreign Steel. (6 fill-ins) ($$1$$ and $$6$$ will be the same and $$2$$ and $$5$$ will be the same).

07.GR1 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC

0701.GR1 Laws To Be Observed

07012.FR1 Lead Health Protection Program (January 5, 2004) Use in projects when lead based paint on existing structures and non-structural items will be disturbed. (1 Fill-in)

07013.FR1 Confined Space (April 3, 2006) Must use when Contractor workers are required to enter a confined space and all other projects where confined spaces are known to exist. Use requires approval of the Region Safety Manager.

A confined space is a space that is ALL of the following:

• Large enough and arranged so an employee could fully enter the space and work. • Has limited or restricted entry or exit. Examples of spaces with limited or restricted entry are tanks, vessels, silos, storage bins, hoppers, vaults, excavations, and pits. • Not primarily designed for human occupancy.

Examples of confined spaces include but are not limited to concrete or steel box girder structures, pontoons on floating bridges, existing stormwater/sewer conveyances and vaults, electrical or signal hubs.

Fill-in #1: Include each known confined space that the Contractor may enter to perform the work. Describe identified hazards and experience with each known confined space, if any. Must contact Region Safety office for fill-in information.

0702.GR1 State Taxes

07021.GR1 (Sales Tax) (March 13, 1995) Use when the Contractor is to pay all sales tax. Section 1-07.2(1) applies to the entire project.

07022.GR1 (Sales Tax) (March 13, 1995) Use when the Contractor is to collect all sales tax from the State. Section 1-07.2(2) applies to the entire project.

07023.FR1 (Sales Tax) (March 13, 1995) Use when the Contractor is to pay sales tax on portions of the project and also collects sales tax from the State on portions of the project. Both Section 1-07.2(1) and Section 1-07.2(2) apply to the project as determined by Control Section subsections. (1 Fill-in)

0703.GR1 Forest Protection And Merchantable Timber Requirements

07031.GR1 (August 2, 2004) Use in projects that require work in or adjacent to National Forest Reservations. Must also use 07031A.FR1 as an appendix.

07031A.GR1 (Forest Service Provisions Appendix) (August 2, 2004) Use with 07031.GR1 when additional stipulations are required. Must be included in the contract as an Appendix when using 07031.GR1. Do not include in the run-list. On the Final Check sheet (Form 221-019EF) under Contract Make-Up check the box Forest Service Provisions.

07032.GR1 (Timber Export Restrictions) (April 28, 1997) Use in projects that have one log truck load (approximately 5,000 board feet) or more of merchantable timber that is to be cut.

0704.GR1 Sanitation

070402A.GR1 Health Hazards (August 2, 2004) The state may elect to share in the risk and hopefully reduce the cost by paying lump sum for initial hazard maintenance and force account for ongoing maintenance. This provision should be used when ongoing maintenance is expected because the site is difficult to secure or the work on site is not scheduled to be continuous.

070402B.GR1 Health Hazards (August 2, 2004) The state may elect to require the contractor to estimate the total cost of hazard maintenance, including initial and periodic maintenance as a lump sum. Use this provision if hazard maintenance activities are expected to be minimal and ongoing maintenance is not expected because the site may be secured.

0705.GR1 Fish And Wildlife, And Ecology Regulations

07051.FR1 (March 13, 1995) Use in projects for which WSDOT has obtained a Department of Fish and Wildlife Hydraulic Permit. (Region to determine permit requirements). (2 fill-ins)

0706.GR1 Permits And Licenses

07061.GR1 (March 13, 1995) Use in projects that do not require a Department of Fish and Wildlife Hydraulics Permit.

07062.FB1 Corps Of Engineers Permits For Construction (March 13, 1995) Use in projects with impacts to the waters of the U.S. when the Contracting Agency has obtained a Corps of Engineers permit. (1 fill-in)

07063.GB1 United States Coast Guard (March 13, 1995) Use with either 070631.FB1 or 070632.GB1

070631.FB1 (March 13, 1995) Use in projects over navigable waters when the CoastGuard is involved. (2 fill-ins)

070632.GB1 (March 13, 1995) Use in all projects involving bridge work, including painting, in or near the navigable portion of a waterway when 070631.FB1 is not used.

0707.GR1 Load Limits

07071.GR1 (March 13, 1995) Use in projects where all existing roadways are subject to major reconstruction or are to be abandoned or replaced under this project.

07072.FR1 (March 13, 1995) Use in projects where some, but not all, of the existing roadways are subject to major reconstruction, or are to be abandoned or replaced under this project. (1 fill-in)

07073.FR1 (March 13, 1995) Use when WSDOT provides a materials source and roads other than State highways are designated as the haul route. (4 fill-ins)

07074.FR1 (March 13, 1995) Use with 07073.FR1 when the agreement stipulates additional requirements. (1 fill-in)

07075.GR1 (March 13, 1995) Use in all projects where WSDOT provides a source of materials for part or all required materials.

07076.GR1 (March 13, 1995) Use in projects when no source of materials is provided.

0709.GR1 Wages

070901.GR1 General

0709011.GR1 (February 11, 2008) Use in all Federal Aid projects consisting of highway construction and/or landscaping.

0709012.FR1 (February 11, 2008) Use in Federal Aid projects consisting of both highway and building construction. (1 fill-in)

0709013.FR1 (May 28, 1996) Use in Federal Aid projects consisting of only building construction. (1 fill-in)

0709014.GR1 Application of Wage Rates For The Occupation Of Landscape Construction (April 2, 2007) Use in Federal Aid projects that include wage rates for the occupation Landscape Construction. This would be projects with seeding and fertilizing, or landscape work.

0711.GR1 Requirements For Nondiscrimination

07112.GR1 Requirement for Affirmative Action to Ensure Equal Employment Opportunity (March 6, 2000) Use in Federal Aid projects exceeding $10,000 in contract cost.

07112B.GR1 Disadvantaged Business Enterprise (DBE) Participation REQUIREMENTS PERTAINING TO A "ZERO GOAL" (September 17, 2007) Use on all Federal Aid projects unless 07112C.FR1 is used. The no DBE goal is to be furnished or verified by the External Civil Rights Branch.

07112C.FR1 Disadvantaged Business Enterprise (DBE) Participation CONDITION-OF-AWARD GOAL REQUIREMENT (December 3, 2007) Use in selected Federal Aid projects with COA DBE goals. The final COA DBE goal is to be furnished or verified by the External Civil Rights Branch. Use of DBE Utilization Certification (DOT Form 272 056A) is required in the proposal. (1 fill-in) The fill-in shall be one of the following formats:

___ percent (___%) of the contract total for DBE goals; or ___ dollars for DBE goals.

07113.FR1 Special Training Provisions (September 17, 2007) Use in all projects with more than 50 working days that contain Training (Obtain Training Decision & Fill-in from OEO office) (1 fill-in) Note: Fill-in is Total Hours.

MWBE1.FR1 Minority And Women's Business Enterprise (MWBE) Participation (August 4, 2008) Use in State funded projects that contain M/WBE Goals.
Do not use if the M/WBE Goal is zero. The final M/WBE goal is to be either furnished or verified by the External Civil Rights Unit. (1 fill-in)

The fill-in shall be in one of the following formats:

Option 1: ___ percent (___%) of the contract total for MBE goal and ___ percent (___%) of the contract total for WBE goal.

Option 2: ___ dollars for MBE goal and ___ dollars for WBE goal.

Option 3: ___ percent (___%) of the contract total for combined MWBE goals.

Option 4: ___ dollars for combined MWBE goals.

0712.GR1 Federal Agency Inspection (March 13, 1995) Use in all Federal Aid projects.

07121.FR1 Indian Preference And Tribal Ordinances (December 2, 2002) Use in projects with any portion of the project on an Indian reservation. (2 fill-ins) ($$1$$ is the Tribe or Reservation; $$2$$ is the Tribal representative, telephone and address.)

0713.GR1 Contractor's Responsibility For Work

071304.GR1 Repair of Damage (August 6, 2001) At the Region's discretion, include in projects when the use of "Reimbursement for Third Party Damage" is NOT desired and the Region wants to set up another method of reimbursement for third party damages.

0716.GR1 Protection And Restoration Of Property

071604.GR1 Archaeological And Historical Objects (December 6, 2004) Use in projects when reconnaissance studies indicate that there is the probability of finding cultural remains within the project limits which will require monitoring the project area during clearing, grubbing or excavation operations. Requires a pay item.

     07171.FR1          Utilities and Similar Facilities
                            (April 2, 2007)
                             Use in projects where there are utilities within the R/W
                             that will not be adjusted, replaced or constructed by the
                            utility owner or its contractor during the prosecution of the work.
                            (1 fill-in)
                            (May use with 07172.FR1 if utilities other than those described
                            in this provision will be adjusted, replaced or constructed by the
                            utility owner during the prosecution of the work.)

    
         07172.FR1           Utilities and Similar Facilities
                             (April 2, 2007)
                            Use in projects where there are utilities within the R/W
                             and those utilities will be adjusted, relocated or replaced
                             by the utility owner or its contractor during the performance
                             of the contract, or when the utility owner or its contractor
                             will construct new utilities within the R/W during the performance
                             of the contract.
                             (3 fill-ins) ($$1$$ is a description and location of the work
                             the each utility owner or its contractor will complete, and the
                             duration of that work or anticipated date of completion by each
                             utility or its contractor. $$2$$ is the name of the utility company
                             or companies, contact person, address, telephone number and e-mail
                             address or other contact information as required to enable the
                             Contractor to identify and contact each utility performing work
                             during the life of the contract. $$3$$ is a description of any
                             additional requirements that the contractor must perform in order
                             to coordinate with the utility owner or its contractor, such as
                             advance notifications to be provided to the utility for staged work.
                             (Use with 07171.FR1 if other utilities exist within the R/W that
                             will not be adjusted, relocated or replaced by the utility owner.)
0718.GR1 Public Liability And Property Damage Insurance

0718A.GR1 Must use once, preceeding 07182.FR1, 07183.GR1, or 07184.GR1.

07182.FR1 Relations With Railroad (August 7, 2006) Use in projects when a railroad is involved in the contract. (8 fill-ins) ($$1$$ is list of railroad companies involved in contract; $$2$$ is amount of advance notice contractor is required to provide the Railroad prior to working adjacent to tracks; $$3$$ is name, address and telephone of the railroad contact person; $$4$$ is a list of work to be performed by the Railroad, other than flagging, as specified in the Railroad agreement; $$5$$ is the name and address of each Railroad Company involved (owner only); $$6$$ is the minimum policy amount for required Railroad Protective Liability coverage (typically $2,000,000); $$7$$ is the maximum policy Railroad Protective Liability aggregate (typically $6,000,000); $$8$$ is any additional required forms or conditions per railroad agreement). The design office shall contact the Environmental & Engineering Program Design Office, Railroad Liaison Engineer (360) 705-7271 for the fill in information.

07183.GR1 Auto And Workers Compensation Insurance-BNSF (August 7, 2006) Use with 07182.FR1 when BNSF is involved in the contract. Must include Contractor’s Right of Entry and BNSF’s Contractor Requirements as appendices. Contact the Environmental & Engineering Program Design Office, Railroad Liaison Engineer (360) 705-7271 for appendices.

07184.GR1 Auto And Workers Compensation Insurance-UPRR (August 7, 2006) Use with 07182.FR1 when UPRR is involved in the contract. Must include Contractor’s Right of Entry and BNSF’s Contractor Requirements as appendices. Contact the Environmental & Engineering Program Design Office, Railroad Liaison Engineer (360) 705-7271 for appendices.

07185.FR1 Owners and Contractors Protective Insurance (December 6, 2004) Use in projects when the Engineer's estimate is in excess of $10 million or in projects under $10 million when in the Engineer's judgment the project involves higher than normal risk(s). The project office should contact the Finance and Administration Service Center, Risk Manager (360) 704-6363 to discuss the project's risks. The Risk Manager will advise the region as to the need to require the additional insurance, and if so, will provide the fill in amount. (1 fill-in)

07186.GR1 Builders Risk Insurance (November 27, 1995) Use in projects when in the Engineer's judgment the project facilities themselves may be exposed to significant damage. The project office should contact the Finance and Administration Service Center, Risk Manager (360) 753-2101 to discuss any high risk components of the project regarding damage to departmental owned/rented facilities or assets. The Risk Manager will advise the region as to the need to require the additional insurance. CAUTION: Using this provision will result in significantly higher project costs.

07187.GR1 Reduced Insurance Requirement (January 5, 1004) Use in all projects when the Engineer's estimate is $500,000 or less.

0723.GR1 Public Convenience And Safety

072301.GR1 Construction Under Traffic

0723011.FB1 (Traffic Restrictions) (March 13, 1995) Use in bridge painting projects. (1 fill-in)

0723012.GR1        (Work Zone clear zone)
                                  (April 2, 2007)
                                  Use in all projects requiring traffic control
                                  unless the conditions described in the Design Manual
                                  Chapter 810.12 warrent a more restrictive special
                                  provision.




            0723013.GR1 (Temporary Access Breaks) (December 6, 2004) Use on limited access non-interstate facilities to prohibit temporary access to the traveled way except from established legal movements. Consider use with 0723014.GR1.to allow regulated access at other locations.

Requires Region and Headquarters Project Development Office Approval. Consult with the Region Traffic Office, or contact the Headquarters Design Office, Access and Hearings Engineer for guidance.

0723014.GR1 (Temporary Access Breaks) (December 6, 2004) Use to allow temporary access to the traveled way at locations other than those defined in Standard Specifications 1-07.23(1). Consider for use on all limited access interstate facilities, and on non-interstate limited access facilities that contain 0723013.GR1.

Requires Region Approval for all projects. Requires FHWA Approval for use on limited access interstate facilities (allow 30 days minimum for approval). Requires Headquarters State Design Engineer approval for use on non-interstate limited access facilities. Region Project Development shall insure that site conditions meet the criteria contained in the provision. Region Construction and Traffic Offices should concur with projects selected for use. Contact Headquarters Design, Access and Hearings Engineer for guidance.

0723015.FR1 (Lane Closure Restrictions) (August 7, 2006) Use in projects that prohibit lane closures prior to a holiday, and where traffic volumes require that lane closures are restricted. Must use with 0805A.GR1. (1 Fill-in) Fill-in describes the specific facility or location and the hours that closures are allowed.

0724.FR1 Rights Of Way (March 13, 1995) Use in projects when it is possible that the right of way will not be fully acquired at the time of award. (2 fill-ins)

0728.GR1 Apprentice Utilization
(July 1, 2008)
Use only on projects advertised by the Washington State
Department of Transportation. Use in projects with
an engineers estimate of $3 million and greater.

08.GR1 PROSECUTION AND PROGRESS

0801.GR1 Subcontracting

08011.GR1 (Subcontracting) (October 12, 1998) Use in all Federal Aid projects.

08012.FR1 Specialty Items (March 13, 1995) Use in projects when unusual work will likely have to be subcontracted. Obtain concurrence from Pre-contract Administration. (1 fill-in)

08013.GR1 Qualifications Of Building Contractor (March 13, 1995) Use in road construction projects that also include building construction.

0803.GR1 Progress Schedule

080311.GR1 General Requirements (August 7, 2006) Include in complex or high impact projects when the Engineers Estimate exceeds $15 million, or Time for Completion exceeds 180 working days, or at the discretion of the Region Construction Manager. Use requires the approval of the HQ Construction Office. Must include with 080321.GR1, 08032C1.GR1, 080331.GR1, 080341.GR1, and 080351.GR1.

080321.GR1 Progress Schedule Types (August 7, 2006) Include in complex or high impact projects when the Engineers Estimate exceeds $15 million, or Time for Completion exceeds 180 working days, or at the discretion of the Region Construction Manager. Use requires the approval of the HQ Construction Office. Must include with 080311.GR1, 08032C1.GR1, 080331.GR1, 080341.GR1, and 080351.GR1.

08032C1.GR1 (Type C Progress Schedule) (August 7, 2006) Include in complex or high impact projects when the Engineers Estimate exceeds $15 million, or Time for Completion exceeds 180 working days, or at the discretion of the Region Construction Manager. Use requires the approval of the HQ Construction Office. Must include with 080311.GR1, 080321.GR1, 080331.GR1, 080341.GR1, and 080351.GR1.

080331.GR1 Schedule Updates (August 7, 2006) Include in complex or high impact projects when the Engineers Estimate exceeds $15 million, or Time for Completion exceeds 180 working days, or at the discretion of the Region Construction Manager. Use requires the approval of the HQ Construction Office. Must include with 080311.GR1, 080321.GR1, 08032C1.GR1, 080341.GR1, and 080351.GR1.

080341.GR1 Measurement (August 7, 2006) Include in complex or high impact projects when the Engineers Estimate exceeds $15 million, or Time for Completion exceeds 180 working days, or at the discretion of the Region Construction Manager. Use requires the approval of the HQ Construction Office. Must include with 080311.GR1, 080321.GR1, 08032C1.GR1, 080331.GR1, and 080351.GR1.

080351.GR1 Payment (August 7, 2006) Include in complex or high impact projects when the Engineers Estimate exceeds $15 million, or Time for Completion exceeds 180 working days, or at the discretion of the Region Construction Manager. Use requires the approval of the HQ Construction Office. Must include with 080311.GR1, 080321.GR1, 08032C1.GR1, 080331.GR1, and 080341.GR1.

0804.GR1 Prosecution Of Work

08041.FR1 (Establish starting date for roadway operations) (January 5, 2004) Must also use 08056.FR1. At the discretion of the Region Administrator, use in short term projects when a delayed start is desirable to allow the Contractor some latitude in scheduling the work. Recommendation by the Region Construction Office is advised. (1 fill-in)

08042.GR1 (Variable start: State controls start) (August 7, 2006) Use in contracts where the contractor shall start work immediately after a happening or event to avoid high impacts to the public. At the time of issuance of the contract the date of that event or happening is not known. Region Construction Engineer, or equivalent, approval is required to use this provision. Must include 08058.FR1 and 08051.FR1.

08043.FR1 (Fixed start: State controls start) (August 7, 2006) Use in contracts where the contractor shall start work immediately after a happening or event to avoid high impacts to the public. At the time of issuance of the contract the date of that event or happening is known. Region Construction Engineer, or equivalent, approval is required to use this provision. Must include 080581.FR1 and 08051.FR1.

0805.GR1 Time For Completion

0805A.GR1 (Restrictions to Critical Work) (August 7, 2006) Use in projects that contain 0723015.FR1, and when the contract specifically prohibits critical work from being performed.

08051.FR1 (Time for physical completion) (March 13, 1995) Use in all projects not requiring one of the following "TIME FOR COMPLETION" GSP's. (1 fill-in)

08053.FR1 (Time for physical completion) (March 13, 1995) Must also use 08091.FR1. Use in projects requiring an interim or temporary controller for early use of a signal system and where an intermediate physical completion time is required. (2 fill-ins)

08056.FR1 (Time for physical completion) (February 5, 2001) Must also use 08041.FR1. (2 fill-ins) Fill-in #2 is the same as fill-in #1 for 08041.FR1.

08057.FR1 (Time for physical completion) (March 13, 1995) Use in projects with signal work and the Contracting Agency furnishes the signal control equipment. (1 fill-in)

08058.FR1 (Variable start: State controls start) (August 7, 2006) Use in contracts where the contractor shall start work immediately after a happening or event to avoid high impacts to the public. At the time of issuance of the contract the date of that event or happening is not known. Region Construction Engineer, or equivalent, approval is required to use this provision. Must include 08042.FR1 and 08051.FR1. (2 fill-ins) Fill-ins are contract start times.

080581.FR1 (Fixed start: State controls start) (August 7, 2006) Use in contracts where the contractor shall start work immediately after a happening or event to avoid high impacts to the public. At the time of issuance of the contract the date of that event or happening is known. Region Construction Engineer, or equivalent, approval is required to use this provision. Must include 08043.FR1 and 08051.FR1. (1 fill-in) Fill-in is contract start time.

08059.FR1 Incentive For Early Completion (August 4, 2003) Use in projects requiring an incentive for early completion. Prior approval from the State Construction Office is required for the use of this GSP. (4 fill-ins) $$1$$, $$2$$ and $$4$$ are substantial or physical, $$3$$ is dollar value established by the Region, must be justified by road user costs.

0806.GR1 Suspension of Work

08061.FR1 (Procurement Suspension) (August 7, 2006) Use in projects requiring materials that have long lead times for procurement or fabrication, or proprietary/specialized materials, and procurement of the materials is a controlling factor in the time for completion. May also be used to suspend work for verification of HMA mix designs where paving is critical and insufficient time is available for mix design verification.

Not recommended for use on projects with adequate time for mix design verification prior to HMA placement, adequate time for materials to be acquired, or when other mechanisms (such as a flexible start date) allow verification of mix design or acquisition of materials to occur without causing a delay to critical activities.

Fill-in #1 identifies materials that are critical for timely completion and require fabrication or long lead times for procurement. Examples of critical materials may include: Hot Mix Asphalt, landscaping (cultivated) items, permanent signing, steel guardrail posts, ITS equipment, modular expansion joints, bridge railing, hydraulic/electrical rehabilitation components, bridge girders, steel jackets for seismic retrofits, castings, single-source drain pipe, signal controllers, light standards, or signal standards.

Fill-in #2 limits the duration of the suspension for acquisition of critical materials. The duration of the suspension should be appropriate for the work being performed, and will vary according to the type of materials required.

0809.GR1 Liquidated Damages

08091.FR1 (Failure to complete temporary signal system) (March 13, 1995) Must also use 08053.FR1. Use in projects requiring an interim or temporary controller for early use of a signal system and where an intermediate physical completion time is required. The Region must determine the appropriate liquidated damages based on road user costs. (1 fill-in)

08092.FR1 (Interim Completion Liquidated Damages) (August 7, 2006) Use in projects where an interim completion time is desired (such as the completion of a stage of work, lane closure, or ITS disruption), and the Region determines that user costs for failure to complete the specified portion of work, as calculated by the Transportation Data Office, are significant enough to warrant liquidated damages. Determination of the liquidated damage amount must adhere to Chapter 750.11 of the Plans Prep Manual. (6 fill-ins) $$1$$ describes the work to be completed; $$2$$ is the user cost; $$3$$ and $$4$$ is the unit of time (minutes, hours or days); $$5$$ is the smallest increment of time that will be measured; and $$6$$ is the contract provision that specifies the completion time.

09.GR1 MEASUREMENT AND PAYMENT

0901.MR1 Measurement of Quantities (April 1, 2002) Include in all projects. Must also use INTRO.AM1, INTRO.MR1, 0202.MR1, 03038.MR6, 02.MR7, 0202.MR7, 04.MR7, 0402.MR7, 04031E.MR7, 00.MR9, 004.MR9, 06.MR9, and 0605.MR9.

0902.GR1 Weighing Equipment

09021.GR1 General Requirements for Weighing Equipment (August 6, 2001) If the Region chooses (and if the Construction Engineer can satisfy Local 17), the General Special for Contractor Weighing can be inserted. This provision, as its name implies, requires the Contractor to supply an operator. But it goes much further. If this specification is used, the entire weighing operation becomes an end product specification. The Contractor weighs the trucks and issues the tickets without oversight of the scale, the operator or the operation while its going on. The oversight occurs after the truck leaves the scale, when the inspector will randomly select loads and send them to an independent scale. Variations between the ticket and the check weights will result in pay adjustments. Must include 09021A.FR1 or 09021B.GR1. Must also use 09022.GR1, 09023.GR1, 09024.GR1, 09025.GR1 and 09026.GR1.

09021A.SR1 (Designated Scale) (August 6, 2001) The location and quality of the check scale become important. It will be up to the Region to find an independent scale and arrange for its use (including an agreement to pay fees). This selection will have to be made jointly with the Construction PE, taking into account convenience and haul time to get to the scale. The decision is communicated to bidders through a second GSP designating a scale location. Fill-in is scale location. Must use with 09021.GR1. (1 fill-in).

09021B.GR1 (Installed Scale) (August 6, 2001) If the Region desires to use Contractor weighing and cannot find a convenient scale, then an alternate to the designated scale has been prepared. The GSP for installed scale directs the Contractor to provide and install the check scale at a designated location. This provision contains a lump sum pay item for the work. Must use with 09021.GR1 if 09021A.FR1 is not used.

09022.GR1 Specific Requirements for Batching and Hopper Scales (August 6, 2001) Must use with 09021.GR1

09023.GR1 Specific Requirements for Platform Scales (August 6, 2001) Must use with 09021.GR1

09024.GR1 Specific Requirements for Belt Conveyor Scales (August 6, 2001) Must use with 09021.GR1

09025.GR1 Measurement (August 6, 2001) Must use with 09021.GR1

09025B.GR1 (Installed Scale) (August 6, 2001) Must use with 09021B.GR1 and 09026B.GR1.

09026.GR1 Payment (August 6, 2001) Must use with 09021.GR1

09026B.GR1 (Installed Scale) (August 6, 2001) Must use with 09021B.GR1 and 09025B.GR1.

09032.GR1          Steel Cost Adjustments
                        (August 4, 2008)
                        Use in all projects longer than 200 working days
                        that contain non proprietary walls, and
                        pedestrian or vehicular bridges. Contact the
                        HQ Strategic Analysis and Estimating Unit for
                        assistance preparing the Engineers Estimate for the
                        bid item "Steel Cost Adjustment".
09081.GR1 Payment For Material On Hand (April 28, 1997) Use in projects that are over $2 million and have more than 120 working days.

09091.FB1 Payments (March 13, 1995) Use when items are designated for payment by plan quantity. Must be used for bridge substructure items for steel reinforcing bars, epoxy-coated steel reinforcing bars, and concrete, except for shafts and seals. (1 fill-in)

10.GR1 TEMPORARY TRAFFIC CONTROL

1001.GR1 General

100102.GR1 (Traffic Control)

1001021.FR1 (Agency-Provided Traffic Control Resources) (August 2, 2004) Use on projects where the Region will be providing some labor, equipment or material resource to the Contractor. Typically will include signs, posts, pilot car drivers, WSP officers, etc. The decision to provide resources and the use of this provision requires the approval of the Region Construction Manager.

Fill-in is a detailed list of the resources to be provided. Include a description of the item, the quantity (if appropriate), its location and any special instructions to the Contractor for acquiring the item. Include a reference to the description of work provision where the resource is to be applied.

If the fill-in list includes providing any law enforcement organization for traffic control duties, must also use 1001022.FR1. (1 fill-in)

1001022.FR1 (Agency-Provided Law Enforcement) (August 2, 2004) Use in projects where the Region has decided to provide law enforcement personnel to participate in the Contractor’s traffic control activities.

Fill-in is a list of the specific duties of the law enforcement personnel. Must use with 1001021.FR1. (1 fill-in)

1002.GR1 Traffic Control Management

100201.GR1 General

1002012.GR1 (Acceptable TCS Training) (August 2, 2004) Include in all projects that include the bid item Traffic Control Supervisor, or include the bid item Project Temporary Traffic Control.

1004.GR1 Measurement One of the following three GSPs must be included in every project with traffic control.

100401.GR1 (Total Project Lump Sum Payment) (August 2, 2004) Use on projects where there will be only one item for all temporary traffic control in the bid proposal. Not for use in projects containing
multi-year plant establishment. Requires the
establishment of a lump sum item and the deletion of all other standard temporary traffic control items. Use of this provision requires the approval of the Region Construction Manager or designee.

This type of payment should only be used on the simpler jobs, typically single-season, for which the entire project duration and sequence of activities can be readily visualized. The bidder must have a reasonable opportunity to predict the necessary temporary traffic control measures and prepare a responsible estimate. The designer should be able to do the same. Do not use with 100402.GR1 or 100403.FR1.

100402.GR1 (Standard Items) (August 2, 2004) Use on projects that will be utilizing the standard items referenced in the provisions. While there are lump sums within that list, this is not a total-project lump sum bid. Do not use with 100401.GR1 or 100403.FR1.

100403.FR1 (Project Lump Sum) (August 2, 2004) Use on projects that will be total project lump sum except that some standard items will be reinstated and utilized on the project. Use of this provision requires the approval of the Region Construction Manager or designee.

This method of payment might be applied to a job that would be total project lump sum except that some part of the work is not readily predictable. The need for Flaggers might be unclear or there could be an indeterminate future need for public information utilizing Portable Changeable Message Signs.

The fill-in for this provision is a list of the standard items that are reinstated according to Sections 1-10.4(3) and 1-10.5(3). Do not use with 100401.GR1 or 100402.GR1. (1 fill-in)