Design: Project Development | GSPs and Amendments | GSP Division 5
DIVISION5.GR5 SURFACE TREATMENTS AND PAVEMENTS
04.GR5 ASPHALT CONCRETE PAVEMENT
0403.GR5 Construction Requirements
040314.GR5 Planing Bituminous Pavement
BSP0403147.FB5 (Removing Top Layer of Pavement
Surfacing Overlay From Bridge Deck)
(BSP October 13, 2003)
Use in projects where the top layer of existing
pavement surfacing overlay is being removed from
a bridge deck with an existing waterproofing
membrane that is to remain and be protected from
damage. The fill-in specifies the bridge(s)
requiring the work. Include with BSP04049.GB5
and BSP04059.GB5 when the work is covered by a
separate stand-alone bid item instead of being
incidental to the overall surfacing planing.
(1 fill-in)
BSP0403148.FB5 (Removing Top Layer of Pavement
Surfacing Overlay From Bridge Deck)
(BSP October 13, 2003)
Use in projects where the top layer of existing pavement
surfacing overlay is being removed from a bridge deck
without an existing waterproofing membrane. The fill-in
specifies the bridge(s) requiring the work. Include
with BSP04049.GB5 and BSP04059.GB5 when the work is
covered by a separate stand-alone bid item instead of
being incidental to the overall surfacing planing.
(1 fill-in)
BSP0403149.FB5 (Removing Pavement Surfacing
Overlay From Bridge Deck)
(BSP October 13, 2003)
Use in projects where the existing pavement surfacing
overlay is being completely removed from a bridge deck.
The fill-in specifies the bridge(s) requiring the work.
Include with 02250.GB6, 023106.GB6, and either 02516.GB6,
or 02415.GB6 and 02515.GB6. Include with BSP04049.GB5
and BSP04059.GB5 when the work is covered by a separate
stand-alone bid item instead of being incidental to the
overall surfacing planing.
(1 fill-in)
BSP04031410.FB5 (Planing of Pavement in the Vicinity of
Bridge Expansion Joint Headers)
(BSP April 7, 2008)
Use in projects where bridge expansion joints and
headers within the limits of pavement planing over
bridge decks are to remain in place undamaged by the
pavement planing operations.
(1 fill-in)
BSP04031410.SB5 (Planing of Pavement in the Vicinity of
Bridge Expansion Joint Headers)
(BSP April 7, 2008)
Use in projects where bridge expansion joints
and headers within the limits of pavement planing
over bridge decks are to remain in place undamaged
by the pavement planing operations.
(1 fill-in)
0404.GR5 Measurement
BSP04049.GB5 (Removing Existing Overlay
From Bridge Deck)
(BSP October 13, 2003)
Use in projects where the existing pavement surfacing
overlay is being removed from a bridge deck when the
work is covered by a separate stand-alone bid item
instead of being incidental to the overall surfacing
planing. Include with BSP04059.GB5, and either
BSP0403147.FB5, BSP0403148.FB5, or BSP0403149.FB5.
0405.GR5 Payment
BSP04059.GB5 (Removing Existing Overlay
From Bridge Deck)
(BSP October 13, 2003)
Use in projects where the existing pavement surfacing
overlay is being removed from a bridge deck when the
work is covered by a separate stand-alone bid item
instead of being incidental to the overall surfacing
planing. Include with BSP04049.GB5, and either
BSP0403147.FB5, BSP0403148.FB5, or BSP0403149.FB5.