DIVISION8.GR8 MISCELLANEOUS CONSTRUCTION

01.GR8 EROSION CONTROL AND WATER POLLUTION CONTROL 0103.GR8 Construction Requirements 0103A.GR8 (Treatment of pH for Concrete Work) (April 3, 2006) Include in all projects when pH monitoring is a condition of a NPDES construction permits, a 401 Water Quality Certification, or other permit. Requires approval of Regional Environmental Manager and Regional Construction Manager. Must also use 01031A.GR8, 0105.GR8, 01031A1.GR5, 0105.GR5, 05031B.GR5, 0505.GR5, 023003.GB6, and 025A4.GB6. 01031.GR8 General

01031A.GR8 Submittals
(April 3, 2006)
Must include with 0103A.GR8, 0105.GR8, 01031A1.GR5,
                                  0105.GR5, 05031B.GR5, 0505.GR5, 023003.GB6,
                                  and 025A4.GB6.

010310.GR8 (Erodible Soil Central Basin) (April 3, 2006) Use for projects east of the Cascade range in areas receiving 12 inches or less annual precipitation. Do not use if any portion of the project lies in areas that receive more than 12 inches of annual precipitation. See Washington Mean Annual Precipitation.pdf
                                  for precipitation map. 010310A.GR8 Must use with 010311.GR8 or 010312.FR8. 010311.FR8 (Offsite Stormwater) April 1, 2002) Use when there are known locations where stormwater enters the project site and it is desired to prevent this stormwater from flowing uncontrolled through the project site. (1 fill-in) 010312.FR8 (Side Slope Treatment) (April 1, 2002) Use on projects where erodible soils are anticipated and it is desired to have the newly exposed slopes walked before final erosion control can be accomplished, in accordance with recommendation from environmental office. 010302.GR8 Erosion Control Seeding, Fertilizing, and Mulching 010302B.GR8 Seeding and Fertilizing 010302B1A.FR8 (Composition, proportion, quality and application rate of grass seed) (December 4, 2006) Use in projects with roadside seeding. (2 fill-ins) (Fill-ins with dollar signs only are to be used as required.) 010302B1B.FR8 (Composition, proportion, quality and application rate of grass seed) (December 4, 2006) Use this GSP when Source identified or non-source identified seed is not required. (3 fill-ins) (Fill-ins with dollar signs only are to be used as required.) 010302B2.GR8 (Seeding by hand) (January 3, 2006) Must also use 010302B5.GR8. Use in projects with seeding and fertilizing of less than 1 acre, the use of mechanical equipment would not be cost effective, or on remote projects with many small areas. 010302B3.FR8 (One application of fertilizer) (January 3, 2006) Use in projects requiring only one application of fertilizer. (4 fill-ins) (The fill-ins for the fertilizer itself should be by consulting the State Horticulturist, the Region Landscape Architect, or Headquarters Roadside and Site Development. Fill-in $$4$$ should be 2/3 the amount of nitrogen in fill-in $$1$$.) 010302B4.FR8 (More than one application of fertilizer) (January 3, 2006) Must also use 010302B1.FR8. Use in projects when the Region Landscape Arch. or Horticult. recommends more than one fertilizer application. (7 fill-ins) (The fill-ins for the fertilizer itself should be by consulting the State Horticulturist, the Region Landscape Architect, or Headquarters Roadside and Site Development. Fill-in $$7$$ should be 2/3 the amount of nitrogen in fill-in $$4$$.) 010302B5.GR8 (Fertilizing by hand) (January 3, 2006) Must include with 010302B2.GR8. Use in projects with seeding and fertilizing of less than 1 acre, the use of mechanical equipment would not be cost effective, or on remote projects with many small areas. 010302B6.FR8 (Fertilizing by hand) (January 3, 2006) Must include with 010302B2.GR8. Use this GSP for projects in eastern Washington where soils tests show excess potassium and phosphorous and high pH. 010302C.GR8 Liming 010302C1.FR8 (Rate of application of lime) (January 3, 2006) Use in projects requiring the application of lime. (1 fill-in) 010302D.GR8 Mulching 010302D1.FR8 (Type and rate of application of mulch) (January 3, 2006) Use in projects requiring the application of mulch. (2 fill-ins) 0105.GR8 Payment (April 3, 2006) Must include with 0103A.GR8, 01031A.GR8, 01031A1.GR5, 0105.GR5, 05031B.GR5, 0505.GR5, 023003.GB6, and 025A4.GB6. 02.GR8 ROADSIDE RESTORATION 0201.GR8 Description 02012.GR8 (Removal of Buried Man-Made debis) (December 6, 2004) Use on projects that include soil amendment, and/or irrigation systems, and where man-made construction debris is known or suspected to exist. Requires the approval of the Region Construction Manager. Must include 0203052.GR8 and 02052.GR8. 0203.GR8 Construction Requirements 020305.GR8 Planting Area Preparation 0203051.FR8 (Application of compost) (August 2, 2004) Include when no incorporation of compost is required. (1 fill-in) 0203051A.FR8 (Application of compost) (August 2, 2004) Include when compost is to be incorporated into the soil. (2 fill-ins) 0203052.GR8 (Removal of Buried Man-Made Debris) (December 6, 2004) Must include with 02012.GR8 and 02051.GR8.
0205.GR8 Payment 02051A.GR8 (Compost) (August 7, 2006) Must include with 0203051A.FR8 02052.GR8 (Removal of Buried Man-Made Debris) (December 6, 2004) Must include with 02012.GR8 and 0203052.GR8. 10.GR8 GUIDE POSTS 1001.GR8 Description 10011.GR8 (Barrier Delineators) (April 1, 2002) Must also use 10021.GR8, 10031.GR8 or 10032.GR8, 10041.GR8, and 10051.GR8. 1002.GR8 Materials 10021.GR8 (Barrier Delineators) (April 1, 2002) Must also use 10011.GR8, 10031.GR8 or 10032.GR8, 10041.GR8, and 10051.GR8. 1003.GR8 Construction Requirements 10031.GR8 (Barrier Delineators) (April 1, 2002) Delineators placed 6" down from top. Must also use 10011.GR8, 10021.GR8, 10041.GR8, and 10051.GR8. 10032.GR8 (Barrier Delineators) (April 1, 2002) Delineators placed on top of barrier. Must also use 10011.GR8, 10021.GR8 10041.GR8, and 10051.GR8. 1004.GR8 Measurement 10041.GR8 (Barrier Delineators) (April 1, 2002) Must also use 10011.GR8, 10021.GR8 10031.GR8 or 10032.GR8, and 10051.GR8. 1005.GR8 Payment 10051.GR8 (Barrier Delineators) (April 1, 2002) Must also use 10011.GR8, 10021.GR8, 10031.GR8 or 10032.GR8, and 10051.GR8. 11.GR8 GUARDRAIL 1101.GR8 Description 1101A.GR8 (Cable Barrier) (August 5, 2002) Must also use 1103B.GR8, 1103B.GR8, 11042.GR8, and 11052.GR8. 1101B.GR8 (High-Tension Cable Barrier) (April 3, 2006) Must also use 1102B.GR8, 1103C.FR8, 11043.GR8, and 11053.GR8, and 11054.GR8.. 1102.GR8 Materials 1102A.GR8 (Cable Barrier) (April 4, 2005) Must also use 1101A.GR8, 1103B.GR8, 11042.GR8 and 11052.GR8. 1102B.GR8 (High-Tension Cable Barrier) (August 6, 2007) Must also use 1101B.GR8, 1103C.FR8, 11043.GR8, and 11053.GR8, and 11054.GR8. 1103.GR8 Construction Requirements 1103A.GR8 (Box Culvert Guardrail Steel Posts) (January 5, 1998) Must also use 11041.GR8 and 11051.GR8. Use in projects requiring the construction of steel guardrail posts on top of existing concrete box culverts. 1103B.GR8 (Cable Barrier) (April 4, 2005) Must also use 1101A.GR8, 1102A.GR8, 11042.GR8, and 11052.GR8. 1103C.FR8 (High-Tension Cable Barrier) (April 24, 2006) Must also use 1101B.GR8, 1102B.GR8, 11043.GR8, and 11053.GR8. Fill-in is the location(s) of Contracting Agency sites to deliver complete sets of Additional High-Tension Cable Barrier Components. (1 fill-in) 1103D.GR8 (Beam Guardrail Type 31 NB) (August 6, 2007) Use in projects that contain Type 31 NB Guardrail. 11031.GR8 Beam Guardrail 11031C.GR8 Erection of Rail (August 6, 2007) Use in projects requiring snow load washers. Consult Region Operations for determination of need. 1104.GR8 Measurement 11041.GR8 (Box Culvert Guardrail Steel Posts) (March 13, 1995) Must include with 11031.GR8. Use in projects requiring the construction of steel guardrail posts on top of concrete box culverts. 11042.GR8 (Cable Barrier) (April 4, 2005) Must also use 1101A.GR8, 102A.GR8, 1103B.GR8, and 11052.GR8. 11043.GR8 (High-Tension Cable Cable Barrier) (April 3, 2006) Must also use 1101B.GR8, 1102B.GR8, 1103C.FR8, 11053.GR8, and 11054.GR8. 1105.GR8 Payment 11051.GR8 (Box culvert guardrail steel posts) (September 30, 1996) Must include with 11031.GR8. Use in projects requiring the construction of steel guardrail posts on top of concrete box culverts. 11052.GR8 (Cable Barrier) (April 4, 2005) Must also use 1101A.GR8, 1102A.GR8, 1103B.GR8, and 11042.GR8. 11053.GR8 (High-Tension Cable Barrier) (April 2, 2007) Must also use 1101B.GR8, 1102B.GR8, 1103C.FR8, 11043.GR8, and 11054.GR8. 11054.GR8 (Additional High-Tension Cable Barrier Components) (April 2, 2007) Must also use 1101B.GR8, 1102B.GR8, 1103C.FR8, 11043.GR8 and 11053.GR8. No Federal funding participation. Must be in state funds group. 12.GR8 CHAIN LINK FENCE AND WIRE FENCE 1202.GR8 Materials 12021.FR8 (Coated chain link fence) (November 27, 1995) Use in projects requiring the construction of coated chain link fence. Must include 12051.GR8. (1 fill-in) 1205.GR8 Payment 12051.GR8 (Coated chain link fence) (April 1, 2002) Use in projects requiring the construction of coated chain link fence. 13.GR8 MONUMENT CASES 1301.GR8 Description 13011.GR8 (Monument pipes included in work) (March 13, 1995) Must also use 13021.GR8, 13031.GR8, 13041.GR8 and 13051.GR8. Use in projects requiring that the monument pipes be installed by the Contractor. 1302.GR8 Materials 13021.GR8 (Monument pipes included in work) (March 13, 1995) Must include with 13011.GR8. Use in projects requiring that the monument pipes be installed by the Contractor. 1303.GR8 Construction Requirements 13031.GR8 (Monument pipes included in work) (March 13, 1995) Must include with 13011.GR8. Use in projects requiring that the monument pipes be installed by the Contractor. 1304.GR8 Measurement 13041.GR8 (Monument pipes included in work) (March 13, 1995) Must include with 13011.GR8. Use in projects requiring that the monument pipes be installed by the Contractor. 1305.GR8 Payment 13051.GR8 (Monument pipes included in work) (April 28, 1997) Must include with 13011.GR8. Use in projects requiring that the monument pipes be installed by the Contractor. 15.GR8 RIPRAP 1504.GR8 Measurement 1504A.GR8 Must use once preceding the following: 15041.GR8, 15042.GR8, 15043.GR8, and 15045.GR8. 15041.GR8 (Streambed sediment and streambed cobbles by the ton) (August 6, 2007) Must include with 15051.GR8. Use in projects requiring the use of streambed sediment and streambed cobbles
measured and paid by the ton. 15042.GR8 (Streambed sediment and streambed cobbles
by the cubic yard) (August 6, 2007) Must include with 15052.GR8. Use in projects requiring the use of streambed sediment and streambed cobbles
measured and paid by the cubic yard. 15043.GR8 (Special excavation) (March 13, 1995) Must also use 15053.GR8. Use in projects requiring excavation outside the limits of structure excavation for riprap at bridge piers located within streams. 15044.GR8 (Excavation for riprap is included in cost of riprap) (February 5, 2001) Must also use 15054.GR8. Use in projects with small quantities of riprap or upon recommendation of the Construction and Materials Division. 15045.GR8 (Streambed Boulders and Habitat Bouders) (August 6, 2007) Must also use 15055.GR8. Use in projects requiring the use of
streambed boulders and habitat boulders. 1505.GR8 Payment 1505A.GR8 Must use once preceding the following: 15051.GR8, 15052.GR8, 15053.GR8, and 15055.GR8. 15051.GR8 (Streambed sediment and streambed cobbles
by the ton) (August 6, 2007) Mustinclude with 15041.GR8. Use in projects requiring the use of streambed sediment and streambed cobbles
measured and paid by the ton. 15052.GR8 (Streambed sediment and streambed cobbles
by the cubic yard) (August 6, 2007) Must include with 15042.GR8. Use in projects requiring the use of streambed gravel measured and paid by the cubic yard. 15053.GR8 (Special excavation) (September 30, 1996) Must include with 15043.GR8. Use in projects requiring excavation outside the limits of structure excavation for riprap at bridge piers located within streams. 15054.GR8 (Excavation for riprap is included in cost of riprap) (March 13, 1995) Must include with 15044.GR8. Use in projects with small quantities of riprap or upon recommendation of the Construction and Materials Division. 15055.GR8 (Streambed Boulders and Habitat Bouders) (August 6, 2007) Must also use 15045.GR8. Use in projects requiring the use of
streambed boulders and habitat boulders. 16.GR8 CONCRETE SLOPE PROTECTION 1603.GR8 Construction Requirements 160302.GR8 Placing Semi-Open Concrete Masonry Units 1603021.GR8 (Requirements for semi-open precast masonry units) (December 19, 2005) Must include with 16051.GR8. Use in projects requiring semi-open concrete masonry slope protection. 1605.GR8 Payment 16051.GR8 (Semi-open Conc. Masonry Slope Protection) (September 30, 1996) Must include with 1603021.GR8. Use in projects requiring semi-open concrete masonry slope protection. 20.GR8 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, AND ELECTRICAL 2002.GR8 Materials 20022.GR8 Light And Signal Standards 200221.GR8 Light Standards With Type 1 Luminaire Arms (August 4, 2008) Use in projects requiring Type 1 luminaire arms and the Engineer is not required to verify the H1 distances shown in the Plans. 200222.GR8 Light Standards With Type 1 Luminaire Arms (August 4, 2008) Use in projects requiring Type 1 luminaire arms and H1 distances are not shown in the Plans or the Engineer is required to verify the H1 distances shown in the Plans. 200223.GR8 Light Standards With Type 2 Luminaire Arms (August 4, 2008) Use in projects requiring Type 2 luminaire arms and the Engineer is not required to verify the H1 distances shown in the Plans. 200224.GR8 Light Standards With Type 2 Luminaire Arms (August 4, 2008) Use in projects requiring Type 2 luminaire arms and H1 distances are not shown in the Plans or the Engineer is required to verify the H1 distances shown in the Plans. 200225.GR8 Traffic Signal Standards (August 4, 2008) Use in projects requiring traffic signal standards, or combination traffic signal/light standards with Type 1 luminaire arms, or both. 200226.GR8 Traffic Signal Standards (August 4, 2008) Use in projects requiring traffic signal standards, or combination traffic signal/light standards with Type 2 luminaire arms, or both. 200201.GR8 Equipment List And Drawings 2002011.GR8 (Light standards when H1 dimension is shown on the Plans) (March 13, 1995) Use in projects with illumination systems and the lighting standard H1 dimension is shown in the Plans and verification by the Engineer is not required prior to fabrication. 2002012.GR8 (Light standards when H1 dimension is not shown on the Plans or must be verified prior to fabrication.) (March 13, 1995) Use in projects with illumination systems and the lighting standard H1 dimension is not shown in the Plans or the dimension shown in the Plans must be verified by the Engineer prior to fabrication. 2002013.GR8 (Traffic signal standards, strain pole standards or combination traffic signal/lighting standards) (March 13, 1995) Use in projects with traffic signal systems when standards are to be installed. 2003.GR8 Construction Requirements 200308.GR8 Wiring 20CHART.GR8 Field Wiring Chart (March 13, 1995) Use in projects with traffic signal systems. 200314.GR8 Signal Systems 200314A.GR8 Signal Controllers 200314A1.GR8 Testing (March 13, 1995) Use in projects with Contractor furnished signal controllers. 24.GR8 ROCK AND GRAVITY BLOCK WALL, AND GABION CRIBBING 2402.GR8 Materials 24021.GR8 (Gravity Block Wall) (January 7, 2002) Use in projects constructing gravity block walls. Include with 2403021.GR8. 2403.GR8 Construction Requirements 240302.GR8 Gravity Block Wall 2403021.GR8 (Gravity Block Wall) (January 7, 2002) Use in projects constructing gravity block walls. Include with 24021.GR8. 25.GR8 GLARE SCREEN (April 1, 2002) Use in projects when the work zone analysis determines the need for temporary barrier screening. 50.GR8 WILDLIFE REFLECTORS (August 4, 2003) Use in projects requiring the use of wildlife reflectors. 53.GR8 FIELD OFFICE BUILDING 5301.GR8 Description (March 13, 1995) Use in projects when a field office building is required. 5303.GR8 Construction Requirements 53031.GR8 (Field office building requirements) (March 13, 1995) Use in projects when a field office building is required. 5305.GR8 Payment (October 28, 1996) Use in projects when a field office building is required. 54.GR8 BOLLARDS (April 4, 2005) Use in projects requiring bollards.