Skip Top Navigation

WSDOT Bridges in "Poor" condition

WSDOT regularly inspects bridges and categorizes them by condition. Bridges classified in "Poor" condition are monitored, repaired or replaced. These bridges are prioritized for future work as part of WSDOT's Bridge Preservation Program.

A bridge in "Poor" condition does not mean the bridge is unsafe for travelers or in danger of collapse. Bridge inspectors have authority to close or restrict any bridge deemed unsafe at any point during an inspection.

The actual number of bridges in "Poor" condition varies as work is completed and bridges are inspected. Depending on inspection schedule timing, a bridge with completed work may remain on the list until the next inspection is completed. The list is updated twice a year, in January and July.

This is the list as of July 1, 2017


County Bridge # Name Problem Status Bridge Type Year Built SR Milepost Leg Dist
Adams 021/114    BAUER COULEE Conc Deck Deterioration Prioritized for Bridge Rehabilitation CTB 1946 21 37.09 9
Adams 024/305    POTHOLES EAST CANAL Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1976 24 76.92 9
Adams 026/114    SR 26 OVER RAILROAD Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1959 26 48.28 9
Adams 026/119    SR 26 OVER RAILROAD Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1959 26 57.69 9
Adams 026/135    SR 26 OVER ABANDONED RR Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1977 26 84.13 9
Adams 090/310N   I-90 OVER DAMON RD Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1972 90 202.14 9
Adams 090/312S   I-90 OVER SR 21 Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1972 90 206.86 9
Adams 090/314N   I-90 OVER N WAHL RD Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1972 90 210.03 9
Adams 090/314S   I-90 OVER N WAHL RD Conc Deck Deterioration Contract work complete PCG 1972 90 210.03 9
Adams 090/322S   I-90 OVER SR 261 Concrete Slab Deterioration Prioritized for Bridge Rehabilitation CVS 1958 90 221.95 9
Adams 261/320    DRY RUN Concrete Pier Deterioration Prioritized for Bridge Replacement CESB 1900 261 57.72 9
Adams 395/212N-W US 395 RAMP OVER I-90 Conc Deck Deterioration Prioritized for Bridge Rehabilitation CBOX 1958 395 95 9
Asotin 128/010    SNAKE RIVER - RED WOLF BR Conc Deck Deterioration Funded 2015-17 Bien SBOX 1979 128 0.22 9
Benton 082/213N   CHANDLER CANAL BRIDGE Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1977 82 81.86 16
Benton 082/215N   YAKIMA RIVER Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG CBox 1977 82 82.04 16
Benton 082/280S   COLUMBIA R BR @ UMATILLA Conc Deck Deterioration Contract work in progress STrus SG 1955 82 132.36 16
Chelan 002/233A   WENATCHEE RIVER Conc Deck Deterioration Prioritized for Bridge Rehabilitation CBox 1957 2 100 12
Chelan 097/310A   LARSON CANYON RD BRIDGE Scour Monitor thru Inspection PCBTG 1979 97 181.94 12
Chelan 207/004    WENATCHEE RIVER Conc Deck Deterioration Prioritized for Bridge Rehabilitation STrus CTB 1940 207 4.22 12
Clallam 101/334    ELWHA RIVER Scour Prioritized for Bridge Replacement CA 1926 101 239.42 24
Clallam 110/015    BOGACHIEL RIVER Conc Deck Deterioration Prioritized for Bridge Rehabilitation SG CS 1967 110 8.64 24
Clallam 113/005    BEAVER CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CTB 1966 113 1.87 24
Clark 005/036E   E FORK LEWIS RIVER Steel Stringer Cracking Prioritized for Bridge Replacement STrus CTB 1936 5 18.21 18
Clark 005/040W   LEWIS RIVER Steel Corrosion Prioritized for Bridge Replacement STrus CTB 1940 5 19.83 20
Columbia 012/713    US 12 OVER RAILROAD Conc Deterioration Prioritized for Bridge Rehabilitation CTB 1933 12 367.73 16
Columbia 012/720    WHETSTONE CREEK Scour Prioritized for Bridge Replacement CS 1919 12 372.57 16
Cowlitz 005/140W   TOUTLE RIVER Conc Deck Deterioration Prioritized for Bridge Rehabilitation STA 1969 5 51.71 20
Cowlitz 411/009    CASTLEROCK BRIDGE Conc Deck Deterioration Prioritized for Bridge Rehabilitation SG 1963 411 12.37 19
Cowlitz 432/010S   HARRY E. MORGAN BRIDGE Conc Deck Deterioration Contract work in progress STrus CBox 1961 432 9.58 19
Cowlitz 503/112    JIM CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CA CTB 1945 503 39.55 20
Cowlitz 504/015    N FK TOUTLE R KID VALLEY Steel Girder Damage Prioritized for Bridge Rehabilitation SG PCG 1965 504 17.29 20
Douglas 097/420    COLUMBIA RIVER  BEEBE Conc Deck Deterioration Prioritized for Bridge Rehabilitation STA STrus CBox 1962 97 234.77 12
Ferry 021/302FT  N. LANDING KELLER FERRY Steel Pontoon Corrosion Prioritized for Bridge Rehabilitation SFP SG 1982 21 106.66 7
Ferry 021/321    W FK SAN POIL Scour Prioritized for Bridge Rehabilitation CTB 1932 21 145.62 7
Franklin 012/512S   SNAKE RIVER VAUGHN HUBBARD Steel Floorbeam Cracking Monitor STrus PCG 1986 12 294.51 16
Franklin 260/016    DRY WASH Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1967 260 24.86 9
Garfield 127/010    ELMER C. HUNTLEY BRIDGE Conc Deck Deterioration Prioritized for Bridge Rehabilitation STA STrus SG 1969 127 9.65 9
Grays Harbor 012/012S   HERON STREET BRIDGE Movable Br Foundation Deterioration Prioritized for Bridge Replacement SSwS SG 1949 12 0.08 19
Grays Harbor 101/110    MILL CREEK Conc Column Deterioration Prioritized for Bridge Rehabilitation CS 1949 101 81.46 19
Grays Harbor 101/115    CHEHALIS RIVER BRIDGE Scour Funded 2017-19 Bien BAS SG Cbox CTB 1955 101 83.22 19
Grays Harbor 101/155    SKUNK CREEK Timber Deterioration Maintenance Repair TTC 1936 101 120.43 24
Grays Harbor 105/118    CHAPIN CREEK Timber Deterioration Prioritized for Bridge Rehabilitation TS 1940 105 43.99 19
Grays Harbor 109/006    GRASS CREEK Timber Deterioration Prioritized for Bridge Rehabilitation CSTP 1956 109 6.45 24
Jefferson 104/005.1  HOOD CANAL-W.A. BUGGE BR PCG deterioration Funded 2015-17 Bien PTCFP PSG STrus 1982 104 14.03 24
King 005/566E   GALER-LAKEVIEW V Conc Deck Deterioration Recode NBI PCG 1961 5 167.35 43
King 018/031N   SR 18 OVER HOBART RD/CRK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CBOX 1961 18 20.34 5
King 090/025N HOMER M. HADLEY Anchor cable deterioration Funded 2017-19 Bien PTCFP 1989 90 4.51 41
King 090/025S LACEY V. MURROW BRIDGE Anchor cable deterioration Funded 2017-19 Bien CFP SA CBox 1940 90 4.28 41
King 090/043S   MERCER SLOUGH Bearings Prioritized for Bridge Rehabilitation CBox CS 1970 90 9.24 41
King 090/077N   RAGING RIVER Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1975 90 23.4 5
King 090/079S   GAME CROSSING Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1976 90 26.98 5
King 090/080S   I-90 OVER WINERY RD Conc Deck Deterioration Prioritized for Bridge Rehabilitation PTCBox 1976 90 27.33 5
King 090/091S   S FK SNOQUALMIE R Conc Deck Deterioration Contract work in progress PCG 1974 90 37.58 5
King 090/096.5N I-90 OVER DENNY CREEK RD Conc Deck Deterioration Contract work in progress PCG 1971 90 47.96 5
King 090/097.8N FRANKLIN FALLS BRIDGE Conc Deck Deterioration Contract work in progress SG 1971 90 51.12 5
King 090/099    I-90 OVER W-W RAMP Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1969 90 52.24 5
King 099/540NB  ALASKAN WAY V NORTHBOUND Concrete Deterioration Contract work in progress CG SRB CS CTB 1952 99 29.84 37
King 099/540SB  ALASKAN WAY V SOUTHBOUND Concrete Deterioration Contract work in progress CG SRB CS CTB 1952 99 29.84 36
King 203/002    SLOUGH Timber Pile Deterioration Maintenance Repair TTC 1945 203 0.24 5
King 203/033    CHERRY CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CTB 1946 203 17.22 45
King 520/021N SR 520 OVER 116TH AVE NE Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1966 520 7.03 48
Kitsap 104/005.2 HOOD CANAL-WA BUGGE BR E Pontoon Hatch Deterioration Prioritized for Bridge Rehabilitation PTCFP STrus PCG 2009 104 14.73 23
Kittitas 010/142    TEANAWAY RIVER Conc Deck Deterioration Prioritized for Bridge Replacement STrus CTB 1930 10 89.33 13
Kittitas 082/010S   I-82 OVER SR 821 Conc Deck Deterioration Contract work complete PCG 1970 82 3.22 13
Kittitas 090/105S   COAL CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CTB 1928 90 55.15 13
Kittitas 090/118N   KACHESS RIVER Conc Deck Deterioration Prioritized for Bridge Rehabilitation CVS 1958 90 69.49 13
Kittitas 090/126N   BIG CR Conc Deck Deterioration Contract Work Complete CS 1962 90 75.36 13
Kittitas 090/134N   CLE ELUM RIVER Conc Deck Deterioration Prioritized for Bridge Rehabilitation STrus CTB 1949 90 80.79 13
Kittitas 090/136S   I-90 OVER CLE ELUM RD, RR Conc Deck Deterioration Prioritized for Bridge Rehabilitation CBox 1966 90 83.53 13
Kittitas 090/140N   YAKIMA RIVER Conc Deck Deterioration Funded 2017-19 Bien CBOX 1965 90 86.2 13
Kittitas 090/140S   YAKIMA RIVER Conc Deck Deterioration Funded 2017-19 Bien CBOX 1965 90 86.2 13
Kittitas 090/141S   I-90 OVER PEOH RD Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1965 90 86.63 13
Kittitas 090/150N   TANEUM CR Conc Deck Deterioration Contract Work Complete PCG 1965 90 97.27 13
Kittitas 090/152N   WEST SIDE CANAL Conc Deck Deterioration Contract Work Complete CS 1966 90 100.55 13
Kittitas 090/152S   WEST SIDE CANAL Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1966 90 100.55 13
Kittitas 090/154N   YAKIMA RIVER Conc Deck Deterioration Funded 2017-19 Bien CBox 1967 90 102.49 13
Kittitas 090/154S   YAKIMA RIVER Conc Deck Deterioration Funded 2017-19 Bien CBOX 1967 90 102.49 13
Kittitas 090/162N   WILSON CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1967 90 109.13 13
Kittitas 090/174S   RENSLOW BR Conc Deck Deterioration Contract work in Progress PCG 1968 90 120.92 13
Klickitat 014/250    ALDER CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1965 14 149.06 14
Klickitat 097/006    SWALE CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1960 97 8.08 14
Klickitat 097/020    SATUS CREEK Concrete Deterioration Funded 2017-19 Bien CVS 1959 97 30.8 14
Klickitat 097/022    KUSSHI CR Conc Deck Deterioration Prioritized for Bridge Rehabilitation CTB 1945 97 32.78 14
Lewis 005/203W   COWLITZ RIVER Steel Truss Damage Contract Awarded - 3rd Party Damage STrus CTB 1953 5 59.06 20
Lewis 005/212    KOONTZ RD OVER I-5 Prestress Girder Damage Contract work Complete PCG 1976 5 69.4 20
Lewis 005/227    CHAMBER WAY OVER I-5 Prestress Girder Damage Contract work in Progress PCG 1958 5 79.08 20
Lewis 012/262    SURREY CREEK Timber Pile Deterioration Maintenance Work Scheduled PRCB 1958 12 117.52 20
Lewis 012/282    CLEAR FORK CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1972 12 138.06 20
Lewis 506/106    LACAMAS CREEK Timber Deterioration Funded 2017-19 Bien TTC 1951 506 8.05 20
Lewis 506/108    SR 506 OVER I-5 Concrete Girder Deterioration Prioritized for Bridge Rehabilitation PCG 1958 506 11.5 20
Lewis 507/008    SKOOKUMCHUCK RIVER Steel Truss Deterioration Prioritized for Bridge Replacement STrus CS 1928 507 2.36 20
Lewis 508/012    S FORK NEWAUKUM RIVER Steel Deterioration Funded 2017-19 Bien STrus TTC 1930 508 13.65 20
Lincoln 021/224    SINKING CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1950 21 85.16 13
Lincoln 021/235FT  S. LANDING KELLER FERRY Steel Pontoon Corrosion Prioritized for Bridge Rehabilitation SFP SG 1982 21 106.65 7
Lincoln 023/114    CRAB CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CTB 1948 23 52.82 13
Mason 101/432E   KENNEDY CREEK Conc Column Deterioration Prioritized for Bridge Rehabilitation CVS 1960 101 356.17 35
Mason 101/432W   KENNEDY CREEK Conc Column Deterioration Prioritized for Bridge Rehabilitation CVS 1960 101 356.17 35
Okanogan 020/612    EARLY WINTERS CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CTB 1964 20 177.78 12
Okanogan 020/624    METHOW RIVER Conc Deck Deterioration Prioritized for Bridge Rehabilitation STrus CTB 1929 20 193.37 12
Okanogan 097/512    GRIGGS CANYON Conc Deck Deterioration Prioritized for Bridge Rehabilitation CTB 1965 97 254.95 12
Okanogan 097/534    OKANOGAN RIVER Conc Deck Deterioration Funded 2017-19 Bien CBOX 1964 97 291.9 7
Okanogan 153/010    METHOW RIVER Conc Deterioration Funded 2015-17 Bien CTB 1939 153 11.83 12
Okanogan 153/013    METHOW RIVER Conc Deterioration Funded 2015-17 Bien CTB 1939 153 13.45 12
Okanogan 153/014    METHOW RIVER Conc Deck Deterioration Prioritized for Bridge Replacement CTB 1939 153 14 12
Okanogan 153/015    METHOW RIVER Conc Deterioration Funded 2015-17 Bien CTB 1939 153 15.51 12
Okanogan 153/016    METHOW RIVER Conc Deterioration Prioritized for Bridge Rehabilitation CTB 1939 153 16.85 12
Okanogan 153/017    METHOW RIVER Conc Deterioration Prioritized for Bridge Rehabilitation CTB 1939 153 18.91 12
Okanogan 153/020    METHOW RIVER Conc Deterioration Funded 2015-17 Bien CG 1935 153 22.31 12
Pacific 401/011    NASELLE RIVER OVERFLOW Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1964 401 11.59 19
Pend Oreille 031/038    SULLIVAN CREEK Conc Girder Deterioration Prioritized for Bridge Replacement CTB 1927 31 14.79 7
Pierce 005/408    STLCM DUPONT RD OVER I-5 Conc Deck Deterioration Connecting Wa Project CS 1957 5 119.01 28
Pierce 005/415A   GRAVELLY LK DR OVER RR Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1959 5 124.64 28
Pierce 162/022    SPIKETON CREEK Conc Deck Deterioration Prioritized for Bridge Replacement CBox 1936 162 19.64 31
Pierce 165/013    GULCH NO 1 Concrete pedestal undermining Prioritized for Bridge Rehabilitation TTC 1957 165 12.03 31
Pierce 167/013    SR 167 OVER RAILROAD Conc Pier Deterioration Prioritized for Bridge Rehabilitation CTB 1934 167 0.64 27
Pierce 302/105    PURDY BRIDGE Concrete Pier Deterioration Prioritized for Bridge Rehabilitation CBOX 1936 302 15.69 26
Skagit 005/720W   SAMISH RIVER Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1963 5 234.04 40
Skagit 020/244    SCOTT PAPER RD OVER SR 20 Damaged Steel Girder Prioritized for Bridge Rehabilitation SG TTC 1967 20 76.94 39
Skamania 014/103    HALF BRIDGE Foundation Prioritized for Bridge Rehabilitation CTB 1930 14 24.92 14
Snohomish 203/104    DRAINAGE OVERFLOW Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1954 203 22.05 39
Snohomish 529/010E   SNOHOMISH RIVER BRIDGE Steel Truss Deterioration Prioritized for Bridge Rehabilitation SLS STrus CG 1927 529 3.82 38
Snohomish 529/015E   UNION SLOUGH Scour Funded 2017-19 Bien CTB 1954 529 5.12 38
Snohomish 529/015W   UNION SLOUGH Concrete Deterioration Prioritized for Bridge Rehabilitation CTB 1927 529 5.13 38
Spokane 090/535    ROSAMOND AVE OVER I-90 Conc Deck Deterioration Prioritized for Bridge Rehabilitation CBox 1962 90 279.13 6
Spokane 090/537    LINDEKE ST OVER I-90 Conc Deck Deterioration Prioritized for Bridge Rehabilitation CBOX 1962 90 279.27 6
Spokane 090/540N   HANGMAN CREEK Movement in Pier Monitor thru Inspection CBox 1963 90 279.49 6
Spokane 090/540S   HANGMAN CREEK Movement in Pier Monitor thru Inspection CBox 1963 90 279.49 6
Spokane 090/548    SHERMAN ST OVER I-90 Conc Deck Deterioration Prioritized for Bridge Rehabilitation CBOX 1970 90 281.7 3
Spokane 090/550    ARTHUR ST OVER I-90 Conc Deck Deterioration Prioritized for Bridge Rehabilitation CBox 1970 90 282.07 3
Spokane 090/562E-E E-E RAMP OVER I-90 Conc Deck Deterioration Prioritized for Bridge Rehabilitation CBox 1970 90 282.11 3
Spokane 090/579E   MULLAN RD OVER I-90 Conc Deck Deterioration Prioritized for Bridge Rehabilitation CTB 1975 90 287.85 4
Spokane 195/124W   US 195 OVER I-90 Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1963 195 95.96 6
Spokane 290/001W-W W-W RAMP OVER SR 290 WB Conc Deck Deterioration Funded 2017-19 Bien CBOX 1971 290 0.07 3
Spokane 290/002W-W W-W RAMP OVER 2ND AVE Conc Deck Deterioration Funded 2017-19 Bien CBOX 1974 290 0.07 3
Spokane 290/005    SPOKANE RIVER  EAST TRENT Concrete Arch Deterioration Funded 2015-17 Bien CA 1910 290 0.82 3
Spokane 902/001    SR 902 OVER I-90 Conc Deck Deterioration Recode NBI PCG 1966 902 0 6
Spokane 904/001    SR 904 OVER I-90 Conc Deck Deterioration Recode NBI PCG 1966 904 0 9
Stevens 025/130    COLUMBIA RIVER @ NORTHPORT Bearing Anchor Bolts Contract work complete ST CTB CG CS 1948 25 113.92 7
Thurston 005/327E-N PLUM-N RAMP OVER EASTSIDE Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1957 5 105.45 22
Thurston 121/015    93RD AVE SW OVER I-5 Prestress Girder Damage Contract Awarded - 3rd Party Damage PCG 1968 121 7.63 35
Wahkiakum 409/010    JULIA BUTLER HANSEN BR Timber Deck Deterioration Funded 2015-17 Bien STrus PCG SG CTB 1938 409 2.79 19
Whatcom 539/860E NOOKSACK RIVER Steel Truss Damage Funded 2017-19 Bien STrus CTB 1950 539 9.43 42
Whatcom 542/031    CORNELL CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CTB 1931 542 32.51 42
Whatcom 542/033    GLACIER CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation SG 1956 542 33.49 42
Whitman 023/006    PLEASANT VALLEY CR Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1958 23 8.29 9
Whitman 023/016    ROCK CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CTB 1946 23 23.28 9
Whitman 026/002SP  N FK PALOUSE R WEST WYE Conc Deterioration Funded 2017-19 Bien CTB 1938 26 133.47 9
Whitman 026/253    SR 26 OVER RAILROAD Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1967 26 102.76 9
Whitman 026/259    WILLOW CREEK Conc Deck Deterioration Prioritized for Bridge Rehabilitation CS 1967 26 106.11 9
Whitman 195/027    N FK PALOUSE R Conc Deterioration Funded 2015-17 Bien CTB 1931 195 38.5 9
Whitman 195/034    US 195 OVER ABANDONED RR Conc Deck Deterioration Prioritized for Bridge Rehabilitation CBox 1958 195 48.45 9
Whitman 195/046    US 195 OVER RAILROAD Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1975 195 62.87 9
Whitman 195/049    PINE CREEK #1 Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1975 195 63 9
Whitman 195/052    US 195 OVER JOHN WAYNE TR Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1975 195 63.3 9
Whitman 195/060    US 195 OVER ABANDONED RR Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1975 195 65.56 9
Yakima 012/309    WILDCAT CREEK Bridge Deterioration Funded - Connecting Washington SRB TTC 1936 12 165.95 14
Yakima 012/346N   US 12 OVER RR & GORDON RD Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1971 12 202.12 15
Yakima 012/346S   US 12 OVER RR & GORDON RD Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1971 12 202.12 15
Yakima 082/118W-S W-S RAMP OVER I-82 Conc Deck Deterioration Prioritized for Bridge Rehabilitation PCG 1970 82 31.36 15
Yakima 082/135N   I-82 OVER ROAD & CANAL Conc Deck Deterioration Contract work in progress PCG 1979 82 41.53 15
Yakima 097/103    SATUS CR 3RD CROSSING Conc Deck Deterioration Contract work in progress PCG 1975 97 37.54 15