Washington State Department of Transportation
WSDOT NewsSite IndexContact WSDOTWSDOT Home
Traffic & RoadsProjectsBusinessEnvironmentalMaps & Data
WSDOT Projects
Construction Office Links
 •

Home

 •

Office Staff

 •

Administration

 •

Roadway

 •

Bridge

 •

Specifications and Agreements

 •

Alternative Delivery

 •

Design Build

 • Escalation Clauses
 • Highway Construction Cost Trends
 • Performance Measures
 •

Ad & Award

 •

Downloads

 •

Materials Lab

 • Apprenticeship
 • Partnering
   
Teams
 •

AGC Administration Team

 •

AGC Roadway Team

 •

AGC Structures Team

 •

Design Build

 •

WAPA/WSDOT

 •  ADSC Team 
ACPA Team
   
Resources
 •

Reports

 •

Engineering Publications

 •

Industrial Insurance Rates

 •

Labor Rates - State and Federal (WSDOT Projects Only)

 •

Jobsite Posters

 •

Links

   
Travel Information
 •

Construction Projects

 •

Traffic and Weather

Winter Driving

Studded Tire information

The Pacific Northwest Seismograph Network

   
 
Office Fax
(360) 705-6809
 
     
  For local construction traffic issues please go to our construction traffic page.  

   
Specifications and Agreements


  Amendments and GSPs- English Version
  Standard Specifications 2010 (pdf 5.5 mb)
 

Standard Specifications 2008 (pdf 7.5 mb)

  Standard Specifications 2006 (pdf 5.3 mb)
 

Standard Specifications 2004 (pdf 7.4 mb)

 

Standard Specifications 2002 (pdf 2.2 mb)

 

Standard Specifications 2000 - English Version (pdf 2.2 mb)

 

Standard Specifications 1998 - English Version (pdf 2.2 mb)

 

Standard Specifications 2000 - Metric Version (pdf 2.6 mb)

 

Standard Specifications 1998 - Metric Version (pdf 2.6 mb)

 

Construction Manual (pdf 4026 kb)

 

Standard Plans Archives

 

National Highway Specifications This site consists of a searchable library of transportation specifications from across the country.


WSDOT/AGC Equipment Rental Rate Agreements

AGC/WSDOT Equipment Rental Agreement 2007 (pdf 181 kb)


Older agreements not in effect are also available below.

On October 1, 2008 a supplemental agreement is in effect. This supplemental agreement provides a 7% increase to the operating cost. The supplemental agreement can be found below. The supplemental agreement expired on January 15th, 2009.

AGC/WSDOT Equipment Rental Agreement Supplemental 2008 (pdf 275 kb)

March 1st 2006 a supplemental AGC/WSDOT Equipment Rental Agreement was signed. This allows the payment of fuel price escalation payments on rental equipment for Force Account work. The WSDOT fuel cost escalation memo (pdf 48 kb) and the Price adjustment memo from Equipment Watch (pdf 53 kb) are also available here. The supplemental agreement can be found below. The supplemental agreement expired on July 15th, 2006.

AGC/WSDOT Supplemental Equipment Rental Agreement 2006 (pdf 36 kb)

AGC/WSDOT Equipment Rental Agreement 2004 (pdf 81 kb)

AGC/WSDOT Equipment Rental Agreement 2000 (pdf 15 kb)

AGC/WSDOT Equipment Rental Agreement 1997 (pdf 16 kb)

AGC/WSDOT Equipment Rental Agreement 1987 (pdf 80 kb)

AGC/WSDOT Equipment Rental Agreement 1978 (pdf 2838 kb)


The 2010 Standard Specifications have been distributed.

The 2010 Standard Specifications have been distributed. The book has an effective date of January 4, 2010 for projects advertised on or after that date.

January 2010      

For more information on what has changed in the 2008 book since it was published please see below. A summary of the updates to the 2008 Standard Specifications and GSPs is available.

Changes between the 2008 and 2010 Standard Specifications (see documents below)

January, 2008 (doc 59 kb) April, 2008 (doc 66 kb) August 2008 (doc 58 kb)
December 2008 (doc 87 kb) April 2009 (doc 94 kb) August 2009 (doc 115 kb)
Notice regarding the 2010 Standard Specifications

Changes between the 2006 and 2008 Standard Specifications (pdf 132 kb)

Logs of Amendments and information on changes to the General Special Provisions since to the 2010 Standard Specs:

Questions about the 2008 Standard Specifications or the General Special Provisions can be directed to Mike Grigware at 360-705-7831.


Project Delivery Memos
Update Schedule for Standard Specification GSPs and Construction Manual (pdf 8 kb)
Procedures for Review of Proposed Modifications to Standard Specifications or GSPs (pdf 35 kb)

Updated on May 6, 2009.


Some documents require Adobe Acrobat(tm)
Reader, a FREE utility from Adobe.
Get the file and instructions.

  Copyright WSDOT © 2007

    Traffic & Roads | Search | Contact WSDOT | WSDOT Business | WSDOT Home