Washington State Department of Transportation
WSDOT NewsSite IndexContact WSDOTWSDOT Home
Traffic & RoadsProjectsBusinessEnvironmentalMaps & Data
WSDOT Projects
Construction Office Links
 •

Home

 •

Office Staff

 •

Administration

 •

Bridge

 •

Specifications and Agreements

 •

Alternative Delivery

 •

Design Build

 • Escalation Clauses
 • Highway Construction Cost Trends
 • Performance Measures
 •

Ad & Award

 •

Downloads

 •

Materials Lab

 • Apprenticeship
 • Partnering
   
Teams
 •

AGC Administration Team

 •

AGC Roadway Team

 •

AGC Structures Team

 •

Design Build

 •

WAPA/WSDOT

 •  ADSC Team 
ACPA Team
   
Resources
 •

Reports

 •

Engineering Publications

 •

Industrial Insurance Rates

 •

Labor Rates - State and Federal (WSDOT Projects Only)

 •

Jobsite Posters

 •

Links

   
Travel Information
 •

Construction Projects

 •

Traffic and Weather

Winter Driving

Studded Tire information

The Pacific Northwest Seismograph Network

   
 
Office Fax
(360) 705-6809
 
     
  For local construction traffic issues please go to our construction traffic page.  

   
Construction Industry Teams
 
AGC/WSDOT ADMINISTRATION TEAM M I N U T E S
All documents are PDF. File size varies
2011 2010 2009 2008 2007 2006 2005 2004 2003 2002
Jan 21 Jan 22 Jan 16 Jan 18 Jan 19 Jan 13 Jan 14 Jan 16 Jan 10 Oct 18
Feb 18 Feb 19 Feb 20 Feb 15 Feb 16 Feb 10 Mar 18 Feb 13 Feb 7 Nov 15
Mar 18 Mar 19 Mar 20 Mar 14 Mar 16 Mar 10 April 15 Mar 12 Apr 11  
Apr 15 Apr 16 Apr 17 Apr 18 April 20 April 14 May 20 Apr 16 May 16  
May 20 May 21 May 15 May 16 Sep 21 May 19 June 10 May 14 Jun 6  
Sep 16 Jun 25 Sep 18 Sep 19 Oct 19 June 16 Sep 9 Jun 11 Sep 12  
Oct 19 Jul 23 Oct 16 Nov 14 Nov 16 Sep 15 Oct 14 Sep 17 Oct 17  
  Sep 24 Nov 20     Oct 13 Nov 18 Oct 15 Nov 14  
  Oct 29       Dec 01 Dec 09 Nov 12      
  Dec 3                  

 
AGC/WSDOT BRIDGE AND STRUCTURES TEAM M I N U T E S
All documents are PDF. File size varies
2011        
Jan 21 – Excavation Submittal, Shear Stud Field Install Waivers, Accelerated Bridge Construction, Shaft Slurry and Spoils Disposal, Specification for Barrel (Drift) Pins, Specification for (Steel Erection) Swinging the Span, Concrete Forms on Steel Spans, Overhang Brackets for Steel Superstructures
         
Feb 18 –  Shear stud field install waivers, shaft slurry and soils disposal update, deck repair payment change, electronic plans
         
Apr 15 - Membership changes, shaft spoils and slurry disposal, synthetic slurry testing
program, excavation submittal, shear stud field installation waivers, concrete forms onsteel spans, bridge deck overhang brackets, update on pre-bent girder stirrups, bridgedeck repair payment change, screed rail supports for alternative finishing machines, end diaphragm back fill wait, incorporating drilled shaft specification into Standard Specs.
         
May 11 - Earthcam presentation, welded shear connector paint requirements, pre-bent girder stirrups, incorporating drilled shaft special provisions in the standard
specifications, bridge deck repair payment, bracing requirements for girders, bridge deck performance concrete specifications.
         
Sep 16 - Constructability of SR520 Eastside Crossbeams & Bearings, Shear Stud Field Install Waivers, Drilled Shaft Standard Specifications, Performance Concrete Specifications for Bridge Decks,  Update on Synthetic Slurry Testing, Fraudulent Contractor Registration Letters, Bracing Requirements for PC Girders, Application of Pigmented Sealer, and Alternate Bridge Deck Curing Practices.
         
Nov 4 - Constructability Review – 9th St. Bridge; Presentation – ABC on Grand Mound and Bone River; Shear Stud Field Install Waivers; Update on Synthetic Slurry Testing/DOE Coordination; Requirements for Application of Pigmented Sealer; Column/Silo connection; Candidates for Technology Team; Pre-Bid/Pre-Solicitation Meetings; Update on WSDOT Construction Outlook; Details of Shaft/Column Spiral Reinforcement; Resin-Bonded Anchors and Reinforcing Bar
         
2010        
Jan 22 - AGC/WSDOT annual meeting recap, alternate “U” bar detail in decks, girder bracing,need for intermediate diaphragms, steel girder erection method review requirements, Hood Canalbridge stay-in-place concrete deck panels lessons learned.
         
Feb 19 - Integration of AGC Contractors During Permit Acquisition, Timber Pile Removal, Use of Alternate Girder “U” Stirrups in decks, and Latest Research on Accelerated Bridge Construction.
         
Mar 19 - Mukilteo Ferry Terminal constructability, I-90 Snoqualmie Pass bridge constructability, girder bracing, need for intermediate diaphragms, integration of AGC during permit acquisition, subgrade requirements for barrier construction, precast retaining wall joints, use of MMFX/galvanized rebar.
         
Apr 16 - I-90 snowshed constructability, I-90 slide curve bridge constructability, membership changes, use of alternate girder “U” bar stirrups, traffic barrier forms, need for shear key in precast wall panels, how to estimate bridge surveying costs, work bridge standard details update.
         
Sep 24 - Constructability review for Nalley Valley precast substructure, LRFD design requirements for shoring, excavation using open hole, HPC deck construction in Spokane, shaft thermal integrity testing, OSHA crane safety, OSHA shear studs.
         

Oct 29 – Constructability of Edge of Bridge Decks, Section 6-10.3(2) Traffic Barrier Forms, Section 2-09.3(3)B Excavation Submittal, Section 6-03.3(29) Shear Stud Field Installation, Paint Specification Payment and Film Thickness, Need for Filter Fabric between Backfill for Drain and Wall, Mass Concrete, Underwater Vibration – I-5 Willamette River Bridge Project (Oregon)

         
Dec 10 - Constructability of Puyallup River Work Bridge, Joint Annual Meeting on January 6th, WSDOT projected workload, shaft slurry spoils disposal, Section 2-09.3(3)B excavation submittals, Section 6-03.3(29) shear stud field install waivers, mass concrete cooling.
         
2009        
Jan 30 - AGC Annual Meeting, Stimulus Package, Shaft Slurry Disposal, Preservation of Rebar During Deck Overhang Removal, Concrete Barrier Detail Revision, Epoxy Coated Rebar Repair, Electronic Bidding, Certification Requirement for Mechanical Couplers, Placing Concrete in Foundation Seals, Accelerated Bridge Construction (ABC), Use of Self Consolidating Concrete (SCC)
         
Mar 6 - WSDOT Budget Cuts, Steel Cost Escalation, Mechanical Coupler Approval, Concrete Barrier detail Revision, Consolidating Concrete Barrier Bid Items, Concrete Surface Roughening, Underwater Pile Driving Noise
         
Apr 3 - American Recovery and Reinvestment Act, Surface Roughening, BMPs for Field Stirrup Bending, Falsework Removal, Placing Concrete, Girder Erection, Approach Slab Skewed Ends, Need for Intermediate Diaphragms.
         
May 1 - Constructability Review of Manette Bridge, Lead Team Report, Concrete Placement Time, Tension Control Bolt Specification, Shaft Rebar Cage Stability During Transport and Lifting, New Painting Specification
         
Jun 5 - Constructability review of SR305 boring, Review of falsework std spec 6-02.3(17)N, Steel reinforcement Assembly and Installation for shafts and long columns, Best practices to bend girder stirrups, Bridge deck bottom mat ties, bridge deck top mat support methods, Steel escalation index, Load restrictions on bridges under construction Std Spec 6-01.6.
         
Sep 25 - Constructability review of Ebey Slough Bridge, AGC Lead Team report, concrete placement (Section 6-02.3(6)), shaft rebar cage stability draft submittal requirements.
         
Oct 30 - Pile driving in a marine environment, LRFD calculations for temporary structures, shaft polymer slurry disposal, luminaire locations to accommodate heavy and long load hauling.
         
Dec 11 - SR522 Snohomish River Bridge constructability, alternate “U” bar detail in decks, steel cost adjustment, girder bracing requirements, contractor-provided skidmore, cure boxes.
         
2008        
Jan 25 - Tieton River Bridge Constructibility, Prestressed Girders Temporary Strand Creep, Steel BP Rail, Powder Coating Sign Bridges, Retaining Wall Barriers, SEW Moment Slab Strip Feature, Owner Designed Moment Slabs, Pile Driving Spec Modification, Fast-set Epoxy Resin, Constructibility Review Guide, Oscillator Temporary Pile Support, Shaft/Column Splice Zone Concrete, Work Bridge Pile Driving with Vibro-hammers
         
Feb 22 - I-90 Expansion Joint Constructibility, SEW Strip Feature, Owner Designed Moment Slabs, Pile Driving Specifications, Noise Wall Standards.
         
Mar 21 - SEW Barrier Strip Feature, Owner Designed Moment Slabs, Pile Driving Specification, Early Formwork Release <24hrs, Concrete Performance Specifications, Roadway and Bridge Approach Slab Specification
         
Apr 18 - Constructability review of Hylebos Bridge rehab, pile driving specification, diaphragm details, revision of roadway and approach slab specifications, owner designed moment slabs
         
May 23 - Constructibility review of SR 522 BNSF Overcrossing and Puyallup River Bridge SR 162, curved steel girders, structural steel bolt installation, pile driving leads, material cost escalation, WSDOT construction through 2011, bridge deck and approach slabs, construction access, cast-in-place barrier payment, deck curing, spiral breaks in columns, new intermediate diaphragms, and shoring design review.
         
Jun 27 - Constructibility Review of the George Sellar Bridge and SR522 Snohomish River Bridge, Use of Tension Controlled Bolts (TCBs), Pile Driving Specification, Steel Escalation Clause
 
Sep 19 - Constructability Review of I-90/I-5 to 12th Ave S., New Members, Steel Escalation Clause, CEVP, Accelerated Bridge Construction, Girder Transport, Tension Controlled Bolts, Use of Shoulders for Construction Site Access, Concrete Traffic Barrier Payment, Concrete Performance Specification, Collection & Disposal of Shaft Slurries, New Long-Span Girders, Oscillator Support Pile Removal
         
Oct 17 - Shaft Slurry Disposal; Accelerated Bridge Construction Conference; Constructibility Review of East Camas Slough SR-14 Bridge; Deck Slab Overhang Removal; Alternative Rebar Configuration for Retaining Wall Traffic Barriers; Repair of Damage to Epoxy Coated Steel Reinforcing Bar; Sampling and Testing of Concrete; Sequencing of Plan Sheets; Abutment Design for Safety; Status of Alaskan Way Viaduct Replacement; WSDOT Bridge Construction Lessons Learned from the Field
         
2007        

Jan 26 - Topics - Biggs Rapids Deck Replacement Constructibility, Fly Ash Production, Further Deck Prep, I-5 Seattle Viaduct Overlay Constructibility, Footing Max Slope, Working with BNR, Temporary Excavations

 
Mar 2 - Topics - Fly Ash Production, I-90 Widening Constructibility, Staged Construction Finishing Machine Support, Standard Wall Joint Spacing, Electronic Contracts, Construction Zone Lighting
 
Apr 6 - Topics - Fly Ash Production, Staged Construction Finishing Machine Support, Standard Wall Joint Spacing, Electronic Plans PDF, New Approach Slab Specification, Deck Overhang Tapered Soffits, Rapid Formwork Release, Constructibility Review Procedures, Electrical/Mechanical Contract Support
 
Sep 21 - Topics - Sound Transit Tunnel Constructibility, Underwater Pile Driving Noise, George Sellar Bridge Constructibility, Project Management & Delivery System
 
Oct 19 - Topics - WSDOT Executive Reorganization, Nighttime Bridge Deck Placement, New Standard Plan Walls, New Constructibility Review Form, Nooksack River Pile Welding Constructibility, Prestressed Girder Temporary Strand Release Camber, Approach Slab Finishing, Pile Driving with Semi-Fixed Leads, Strike Board Finishing for 200ft Bridges, Steel BP Rails, Moment Slab Strip Feature, Intermediate and End Diaphragm Drawings
 
Nov 30 - Topics - Mountlake Terrace Constructibility, Pile Driving Analyzer (PDA)
         
2006 2005 2004 2003 2002
Jan 27 Jan 28 Jan 16 Feb 7 Jan 25
Feb 24 Feb 25 Feb 12 Mar 7 Mar 29
Mar 24 Mar 25 Mar 12 May 9 May 17
Apr 28 Apr 22 Apr 9 Jun 13 Sep 20
Jun 30 May 20 May 7 Jul 18  
Oct 20 Jun 17 Jun 18 Aug 15 2001
Dec 1 Jul 15 Jul 16 Sep 12 Sep 14
  Aug 12 Aug 13 Oct 10 Oct 26
  Sep 10 Oct 22 Nov 14 Dec 7
  Nov 18 Nov 19    
         

AGC/WSDOT ROADWAY TEAM M I N U T E S
All documents are PDF. File size varies
2011 2010 2009 2008 2007 2006 2005 2004 2003 2002
Jan 20 Jan 17 Feb 19 Jan 17 Feb 1 Jan 18 Jan 13 Jan 15 Jan 16 Mar 28
Feb 17 Mar 18 Mar 19 Mar 06 Mar 29 Feb 16 Feb 17 Feb 26 May 9 Apr 25
Mar 17 Apr 15 Apr 16 Apr 17 Apr 26 Apr 20 May 19 Mar 18 Jun 19 Oct 31
Sep 22 May 20 May 21 May 22 May 24 May 18 June 16 Apr 15 Sep 18 Dec 12
  Sep 30 Jun 18 Sep 18 Jun 20 Jun 15 Sep 15 Jun 17 Oct 16  
  Oct 28 Sep 17 Oct 23   Sep 21 Oct 20 Sep 16 Dec 4  
  Dec 09 Oct 22 Dec 11   Oct 19 Dec 8 Oct 28    
    Dec 03     Dec 7   Dec 9    

 
ADSC/WSDOT TEAM M I N U T E S
All documents are PDF. File size varies
2011          

December 1 - Soldier pile/cement mixing specifications; Pumpable lean mis def. in Specification; Update on synthetic slurry disposal; Update on annual shaft reporting; Payment for shaft reinforcing cages as materials on hand; Summary of last AGC Structures Team meeting; Review of drilled shaft centralizers; Discussion of Force Account Obstruction Clause.

 
Jan 13 - Constructability reviews of SR 522 Snohomish River Bridge, and I-5 Puyallup River Bridge. Synthetic slurry disposal, Groundwater disposal in City of Seattle, Sign structure foundation barrier transition, Free fall placement of shaft concrete, Soil-cement mixing for cantilever solider pile walls.
 
Feb 24 - Constructability reviews of SR99 Spokane Street Overcrossing, CRC Shafts, Synthetic slurry disposal update, ADSC/WSDOT Joint Training Shaft Constructability Workshop, Barrier transition cap details at sign bridge shafts, Spec change allowing concrete Free fall, Securing top and bottom of CSL tubes, Conflict between 3.03E and 3.03A concerning stoppage, Change to 3.03E, Slurry level maintenance, Soldier pile soil cememtn mixing specification, request for equipment costs, Use of PVC tubes for thermally tested shafts, Minimum rebar cage cover inside permanent casing, wet setting soil nail provision, pumpable lean mix definition in specs, provisions for telescoping secant/cylinder pile shafts.
 
Apr 7 - Introduction of new team members, review interim specification for disposal of polymer slurry and spoils in contact with polymer slurry, update on polymer slurry testing, constructability review of Nalley Valley shaft/column, specification change allowing concrete free fall, we setting soil nail provisions, moving drilled shaft specials to the Standard Specs.
 

Jun 2 – Update on polymer slurry testing, Shaft thermal integrity testing report, End of year shaft report through 2008, Specification change allowing concrete free fall, Changes to 3.03E, Soldier pile soil/cement mixing specifications, Request for equipment costs, Allowing for slip casing, new spec proposal, Minimum rebar cage cover inside perm casing, Pumpable lean mix def. in Specifications, Moving the drilled shaft special to the Standard Specs, Constructability Review – CRC Shafts

           
Sep 8 - Puyallup River Bridge constructability review, Holgate to King Stage 3 constructability review, Drilled shaft specifications clean-up, Update on polymer slurry testing, CRC test shaft project
           
Oct 26 - Constructability Reviews: SR9 Pilchuck Creek and SR101 McDonald Creek; Update on upcoming WSDOT Projects and workload; Force Account discussion; Update on polymer slurry testing; Update on CRC Test Shaft project; Soldier pile soil/cement mixing specifications; Wet setting soil nail provisions; Pumpable lean mix def. in Specification; Identifying potential project for “O” cell testing; Vent Seal Elevations; Discussion of Force Account Obstruction Clause
           
2010          
Jan 7 - Constructability Reviews for M Street to Portland Ave, Shaw Ferry Terminal and Manette Bridge, Annual Joint Training Planning, Provisions for Pea Gravel in Temp Soldier Pile Walls, Specification for Disallowing Wet Setting of PGAs, Soldier Pile Lifting and Handling Details, Equipment Operator Qualifications, White Paper Outline/Research, Shaft Preconstruction Submittal Issues, Slurry Head, Shaft Provision Section 3.03A Changes, Vibrating Concrete Top 5 Feet of Shaft, Micropile Grout Testing, Sign and Signal Structure Shafts
           

Mar 18 – Constructability Review for SR 520 East Approach,  meeting notes review, annual joint training update, revisions to the preconstruction submittal, updates to shaft provision, section 5-01 ground water disposal, yield plot field adjustments, CSL feedback from testers, payment for trimming soldier piles, column construction prior to shaft acceptance, ADSC membership, payment for force account.

           

May 13 – March Meeting Notes Review, Soldier Pile Standard ,  Revisions to the Preconstruction Submittal, Updates to Shaft Provision Sections: 3.03A(1) – Clarifying Stoppage, Groundwater Disposal Payment, 3-07B Concrete Vibration Top 5 Feet of Shaft, CSL, Payment for Trimming Soldier Piles, Column Construction Post Shaft Approval, Yield Plot Adjustment, Barrier Transition Cap Details at Sign Bridge Shafts, 3.07C Free Fall Concrete Placement, Soil/Cement Soldier Pile Construction Method, Large Diameter Rebar Hoop Fabrication, Slurry Research,  Force Account Slow Payment, Force Account Equipment Rates,  ADSC/WSDOT Joint Training, Section 2.01D Slip Casing, Section 3.05C Rebar Cover, CSL Caps, Telescoping Casing for Secant and Cylinder Pile Shafts, Section 3.03E in Conflict with 3.03A Regarding Allowance for Stoppage, Section 3.03F Provision for Grab Hammers, Maintenance of Slurry Head During Stoppage, 3.05B Centralizers vs. Spacers, Pause vs. Stop.

           

Sep 10 – Constructability reviews of I-90 snowshed, SR 530 Skaglund landside, Snohomish River Bridge shaft cage, and Simpson Ave. Bridge.  Soldier pile soil/cement mixing specifications, Chinese CSL tubes, shaft thermal testing.

           
Nov 18 - Constructability reviews of SR 522 Snohomish River Bridge, and I-5 Puyallup River Bridge. Synthetic slurry disposal, Groundwater disposal in City of Seattle, Sign structure foundation barrier transition, Free fall placement of shaft concrete, Soil-cement mixing for cantilever solider pile walls.
           
2009          
April 16 - Topics – Rebar Cage Review Criteria, Synthetic Slurry Disposal, Soldier Pile Provisions for Handling, Soil Nail Proof Testing, Provision Changes Allowing Tying CSL Tubes to Verts, Provision Changes Pertaining to Sand Content and Density Limits Higher PGA Allowance for Telescoping, St. Johns Bridge Sonic Coring Results, Centralizer Detail Concerns, Hoop Butt Welding, Shaft Thermal Integrity Tests, Temporary Shoring Removal, Constructability Review of Columbia River Crossing Project Walls
           
June 25 - Rebar Cage Review Criteria, Soldier Pile Provisions for Handling, Soil Nail Proof Testing, Provision Changes Allowing Tying CSL Tubes to Vertical Bars, Use of Flash Welded Hoops, New Centralizers, Allowing for Use of Pea Gravel in Temporary Soldier Piles, Wet Setting PGA Tendons, Sonic Coring, Alaskan Way Viaduct Holgate to King Shaft Constructability, Columbia River Crossing Shaft Constructability
           
Sep 10 - Feedback from ADSC West Coast Chapter; Constructability Reviews for Local Agencies; Constructability Review of U-tube tunnel Shafts on the Holgate To King Project; Constructability Review T-Street Ground Improvement; Criteria for Rebar Cage Lifting; Soldier Pile Handling Provisions; New Centralizer Schemes; Use of Pea Gravel for Temporary Soldier Piles; Wet Setting Permanent Ground Anchors; Synthetic Slurry Disposal; Sand Content Limits; Contractor Qualification with New Equipment; Thermal Testing for Shaft Integrity
           
November 5 - Constructability Reviews for SR 542 Gallup Creek, Thomas Street Pedestrian Overpass, I-5 196th Street Interchange Braided Ramps, SR 529 Ebey Slough Bridge Replacement, I-90 Snoqualmie Pass Snow Shed Phase 1C.
           
2008 2007 2006 2005 2004  
Jan 24 Jan 25 Jan 17 Apr 6 Feb 6
Apr 24 Jun 6 Mar 20 May 26 Apr 27    
Jun 26 Sep 13 May 4 Aug 18 Jun 10  
Sep 25 Nov 15 Jun 22 Oct 20 Jun 17    
    Aug 10 Dec 8 Aug 5    
    Oct 26   Sep 16    
        Oct 28    
        Dec 9    

 
WAPA/WSDOT TEAM M I N U T E S
All documents are PDF. File size varies
October 10, 2002
February 27, 2003
May 15, 2003
May 27, 2004
August 5, 2004
November 16, 2004
May 20, 2005
October 14, 2005
April 28, 2006
November 13, 2006
May 18, 2007
November 2, 2007
May 16, 2008
2008 Annual
May 14, 2010
October 22, 2010
April 29, 2011
November 4, 2011
 
 
 
ACPA/WSDOT TEAM M I N U T E S
All documents are PDF. File size varies

April 23, 2007
September 10, 2007
April 1, 2008
October 7, 2008
April 13, 2009
October 5, 2009
April 12, 2010
October 4, 2010
April 11, 2011
October 3, 2011

 



Some documents require Adobe Acrobat(tm)



Reader, a FREE utility from Adobe. Get the file and instructions.



  Copyright WSDOT © 2007

    Traffic & Roads | Search | Contact WSDOT | WSDOT Business | WSDOT Home